2024.12.04-Addendum 3 RU Campus Tunnel Repair 2.pdf
PDF 51 KB Posted
- Attached to
- 217-B3217-014 Campus Tunnel Repair Project
- Solicitation number
- 80632
- Issued by
- Richmond City, Virginia
About this file
This is Addendum No. 3 for Radford University's Campus Tunnel Repair 2 Project (Number 217-B3217-014), dated December 4, 2024, issued by Dewberry Engineers Inc. The addendum addresses several contractor questions regarding technical specifications for the tunnel repair project, including clarifications on base plate leveling approaches, tunnel element demolition requirements, soil undercutting testing criteria, and structural shoring requirements. The document specifies that engineered concrete formwork shop drawings must be submitted for tunnel top replacement in areas 1 and 3, but not for the small patch in area 2.
Key technical clarifications include allowing alternate base plate leveling methods within 1/8" per foot tolerance, requiring protection of all existing tunnel elements during demolition work, and establishing temporary structural shoring requirements for areas 1, 3, and 4 per specific design details. The addendum also notes that if contractors choose to submit alternate shoring schemes, they must provide engineered plans for review. The document emphasizes contractor responsibility for protecting all tunnel items including piping, insulation, electrical devices, and data cabling, with contractors having been given opportunities for site visits to identify these elements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .