This is a comprehensive set of technical drawings and specifications detailing planned renovations to Building 002 at the USDA Agricultural Research Service Columbia Plateau Conservation Research Center in Adams, Oregon. The drawings include architectural, civil, mechanical, and electrical plans for renovating the southern end of the building to create two conditioned spaces for sample washing and storage.
The project is structured with a base bid and four alternates: The base bid includes installing a generator with concrete pad, constructing a dividing wall to create Sample Cleaning Room 101, and associated electrical work. Alternate 01 covers concrete slabs for a biomass drying chamber and storage room, plus completion of Sample Cleaning Room 101. Alternate 02 includes installing AHU-002-01 and associated HVAC components. Alternate 03 covers furnishing and installing a packaged biomass drying chamber. Alternate 04 involves electrical power and controls for three motorized garage doors. The drawings provide detailed mechanical specifications for ventilation, cooling and heating systems, electrical power distribution, lighting plans, and control systems for the renovated spaces.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024.04.02 Pendleton Project C Spec Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
SHEET NUMBER SHEET NAME
GENERAL
G-001 COVER SHEET
CIVIL
C-101 CIVIL - SITE PLAN
ARCHITECTURE
A-001 SYMBOLS & ABBREVIATIONS
A-101 FIRST FLOOR PLAN
A-201 BUILDING ELEVATIONS AND SECTIONS
A-301 WALL SECTIONS
MECHANICAL
M-001 LEGENDS AND ABBREVIATIONS
M-201 MECHANICAL FLOOR PLAN
M-301 MECHANICAL SECTIONS
M-302 MECHANICAL SECTIONS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-701 MECHANICAL CONTROL DIAGRAMS
ELECTRICAL
E-001 ELECTRICAL SHEET INDEX, LEGENDS, NOTES, SYMBOLS, AND ABBREVIATIONS
ED-100 ELECTRICAL SITE PLAN - DEMO
E-101 ELECTRICAL SITE PLAN
E-102 BUILDING 002 - LIGHTING PLANS NEW AND DEMO
E-103 BUILDING 002 - POWER AND SYSTEMS PLANS
E-501 ELECTRICAL DETAILS
E-601 BUILDING 002 NEW AND EXISTING ONE-LINE DIAGRAMS
E-701 ELECTRICAL PANEL AND EQUIPMENT SCHEDULES
PROJECT SUMMARY
THE USDA RESEARCH CENTER IN PENDLETON CONSISTS OF MULTIPLE BUILDINGS. PROJECT C MODIFIES BUILDING 002 WHICH WAS CONSTRUCTED IN 1976.
THE EXISTING METAL BUILDING IS USED FOR STORAGE AND HAS NO MECHANICAL OR PLUMBING INSTALLED.
THIS PROJECT WILL RENOVATE THE SOUTHERN END OF THE BUILDING, CREATING TWO CONDITIONED SPACES FOR SAMPLE WASHING, STORAGE, ETC. NEW
MECHANICAL EQUIPMENT WILL BE INSTALLED TO PROPERLY VENTILATE AND CONDITION BOTH SPACES.
THE ITEMS TO BE INCLUDED IN THE BASE BID VS ALTERNATES ARE IDENTIFIED THROUGHOUT THE BID DOCUMENTS AND LISTED HERE:
BASE BID:
INSTALL GENERATOR AND ALL RELATED EQUIPMENT, TO INCLUDE CONCRETE PAD. CONSTRUCT DIVIDING WALL INSIDE BUILDING 002, CREATING SAMPLE
CLEANING ROOM 101. SEE ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR DETAILED DESCRIPTIONS OF WORK THAT IS INCLUDED IN THE BASE BID.
ALTERNATE 01:
INSTALL CONCRETE SLABS FOR BIOMASS DRYING CHAMBER 103 AND NEW STORAGE ROOM 102. CONSTRUCT STORAGE ROOM 102, AND FINISH CONSTRUCTION
OF SAMPLE CLEANING ROOM 101 INCLUDING INSULATION AND COMPLETION OF ELECTRICAL. SEE ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR DETAILED
DESCRIPTIONS OF WORK THAT IS INCLUDED IN ALTERNATE 01.
ALTERNATE 02:
INSTALL AHU-002-01 AND ALL ASSOCIATED HVAC ITEMS FOR THIS UNIT, TO INCLUDE CONCRETE PAD. SEE CIVIL, ARCHITECTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS FOR DETAILED DESCRIPTIONS OF WORK THAT IS INCLUDED IN ALTERNATE 02.
ALTERNATE 03:
FURNISH AND INSTALL BIOMASS DRYING CHAMBER 103. THIS DRYING ROOM IS A PACKAGED PRODUCT PROVIDED BY A SINGLE MANUFACTURER TO MEET THE
FACILITY CRITERIA OUTLINED IN THE DRAWINGS AND SPECIFICATIONS. THE NEW EQUIPMENT WILL MEET ALL CURRENT APPLICABLE CODE AND USER
REQUIREMENTS.
SEE ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR DETAILED DESCRIPTIONS OF WORK THAT IS INCLUDED IN ALTERNATE 02.
ALTERNATE 04:
INSTALL ELECTRICAL POWER AND CONTROLS TO THREE MOTORIZED GARAGE DOORS LOCATED IN THE EXISTING GARAGE BAYS ADJACENT TO NEW SAMPLE
CLEANING ROOM 101. SEE ELECTRICAL DRAWINGS FOR A DETAILED DESCRIPTION OF WORK THAT IS INCLUDED IN ALTERNATE 04.
www.coffman.com
221 N. Wall Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:0
:0
P M
04/02/2024
TAH
RKC
231290
G-001
COVER SHEET
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
USDA AGRICULTURAL RESEARCH SERVICE
RENOVATIONS TO GARAGE BUILDING PROJECT C
COLUMBIA PLATEAU CONSERVATION
RESEARCH CENTER
OREGON STATE SITE MAP
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
UMATILLA COUNTY
COLUMBIA PLATEAU
CONSERVATION RESEARCH
CENTER
BUILDING 002
PROJECT AREA
REV DATE DESCRIPTION
campbell Snapshot
Peter.Lane Callout 4/24/24 USDA: Alternates 1, 2, 3, 4 not in contract
Peter.Lane Polygon
EXISTING BUILDING 001
EX
IS
TI
N
G B
U
IL
D
IN
G
EX
IS
TI
N
G B
U
IL
D
IN
G
EX
IS
TI
N
G B
U
IL
D
IN
G
T
NEW PANEL A
CONCRETE PAD FOR
GENERATOR & ATS-2,
SEE DETAIL THIS SHEET.
FOR EQUIPMENT & CONDUIT
INFORMATION, SEE
ELECTRICAL PLANS
NEW ATS-2
NEW DIESEL
GENERATOR
EXISTING 150KVA
TRANSFORMER10'
EXISTING
PROPANE TANK
3/4" LP UNDERGROUND TO
AHU-002-01.
APPROX TOTAL LENGTH = 200LF
SEE NOTE 3.
FOR CONTINUATION,
SEE SHEET M-201
CONNECT 3/4" LP LINE
TO PROPANE TANK BY
TANK SUPPLIER.
G G
G G G
14'
DISTANCE PER
TANK SUPPLIER.
FUTURE LOCATION OF
EXISTING 1,000 GALLON
PROPANE TANK TO BE
RELOCATED BY ARS.
S. 24, T.3N., R.33E., W.M., UMATILLA COUNTY, OREGON
SCALE: 1"=20'
NOTES
1. EXISTING BUILDINGS AND PAVEMENT ARE SHOWN
SCHEMATICALLY.
2. EXISTING UTILITY LOCATIONS PROVIDED BY
OWNER. CONTRACTOR TO VERIFY LOCATIONS
PRIOR TO CONSTRUCTION.
3. LP PIPING SHALL HAVE MINIMUM 36 INCHES OF
COVER. SEE SPECIFICATIONS FOR ADDITIONAL LP
PIPING INFORMATION.
4. SEE E-101 FOR ADDITIONAL ELECTRICAL
INFORMATION.
5. CONCRETE PAD FOR NEW DIESEL GENERATOR IS
INCLUDED IN BASE BID.
6. 3/4" LP PIPING FROM PROPANE TANK TO AHU-002-01
SHALL BE BID PER ALTERNATE 02.
LEGEND
PROPERTY LINE
EXISTING BUILDING
EXISTING ASPHALT
EXISTING SIDEWALK
PROPOSED LP GAS
www.coffman.com
221 N Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
04/02/2024
CJB
KCM
8050.03
C-101
CIVIL - SITE PLAN
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
REV DATE DESCRIPTION
USDA
RENOVATION
TO GARAGE
BUILDING
C-101
DETAIL - CONCRETE PAD FOR GENERATOR & ATS-21
SCALE: NTS
23.5'
9.
5'
12" CONCRETE SLAB ON GRADE W/ #5
@12" OC, EA WAY, TOP AND BOT
T.O. SLAB EL 6" ABOVE GRADE
G
NOTES:
1. PROVIDE EXPANSION ANCHORS WITH 3-INCH EMBEDMENT INTO
CONCRETE PAD AT ANCHOR POINTS PROVIDED BY MANUFACTURER.
2. 12" PORTLAND CEMENT CONCRETE SLAB SHALL HAVE MINIMUM 4000
PSI 28-DAY STRENGTH CONCRETE.
3. TOP OF SLAB SHALL BE 6 INCHES ABOVE GRADE.
4. COMPACT EXISTING SOILS TO MIN 95% COMPACTION.
12/31/2025
DRAWING ABBREVIATIONS DRAWING REFERENCE
01 / A-210
DISCIPLINE:
G- GENERAL
LS LIFE SAFETY
C- CIVIL
A- ARCHITECTURAL
I- INTERIOR
S- STRUCTURAL
M- MECHANICAL
P- PLUMBING
E- ELECTRICAL
SERIES NUMBER
REFERENCE SYMBOLS
SHEET NUMBER WHERE
ELEVATION IS DRAWN
NUMBER OF PLAN,
DETAIL, ETC. ON
SHEET
SHEET NUMBER
WITHIN SERIES
AB ANCHOR BOLT
ABV ABOVE
AC ACOUSTICAL / AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADDL ADDITIONAL
ADJ ADJUSTABLE
ADJT ADJACENT
A/E ARCHITECT/ENGINEER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGG AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APPROX APPROXIMATE
ARCH ARCHITECT
AUX AUXILIARY
A/V AUDIO / VISUAL
AVG AVERAGE
B/ BOTTOM OF
B/B BACK TO BACK
B/F BOTTOM OF FOOTING
BD BOARD
BDRY BOUNDARY
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BASE PLATE
BRG BEARING
BRK BRICK
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
BW BOTH WAYS
CAB CABINET
CB CATCH BASIN
CCTV CLOSED CIRCUIT TV
CD CONSTRUCTION DOCUMENTS
CDR CARD READER
CEM CEMENT
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED
/CONTRACTOR INSTALLED
CFMF COLD-FORMED METAL FRAMING
CG CORNER GUARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLO CLOSET
CLR COLOR, CLEARANCE
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
COMB COMBINATION
COMM COMMUNICATION
CONC CONCRETE
CONF CONFERENCE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR, CORRUGATED
CPT CARPET
CSWK CASEWORK
CT CERAMIC TILE
CTR CENTER
CU FT CUBIC FEET
D DEPTH
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL. DIAGRAM
DIM DIMENSION
DIR DIRECTION
DIST DISTANCE
DL DEAD LOAD
DN DOWN
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION
AND FINISH SYSTEM
EB EXPANSION BOLT
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR, EXTINGUISHER
F/ FACE OF
F/C FACE OF CONCRTETE
F/F FACE TO FACE, FLOOR TO FLOOR
F/M FACE OF MASONRY
F/S FACE OF STUDS
FA FIRE ALARM
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF&E FIXTURE, FURNISHING & EQUIPMENT
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FIN FINISH
FLR FLOOR
FM FACTORY MUTUAL
FP FIRE PROOFING
FR FRAME
FTG FOOTING
FUR FURRING
FUT FUTURE
FVC FIRE VALVE CABINET
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL, GENERATOR
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED
INSTALLED BY GOVERNMENT
GL GLASS
GR GRADE
GR BM GRADE BEAM
GRD GROUND
GUT GUTTER
GYP BD GYPSUM BOARD
H HIGH
HB HOSE BIBB
HC HANDICAPPED
HD HEAVY DUTY
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HT HEIGHT
HTR HEATER
HVAC HEATING, VENTILATING, & AIR
CONDITIONING
HWD HARDWOOD
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
ILO IN LIEU OF
IN INCH
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
J JOIST
JAN JANITOR
JB JUNCTION BOX
JT JOINT
KD KNOCK DOWN
KIP KILO-POUND
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LB POUND
LF LINEAR FEET (FOOT)
LH LEFT HAND
LIN LINEAR
LKR LOCKER
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LP LOW POINT
LT LIGHT
LTWT LIGHT WEIGHT
LVR LOUVER
M METER
MAINT MAINTENANCE
MAS MASOMRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MM MILLIMETER
MO MASONRY OPENING
MOD MODULAR, MODIFY
MOV MOVABLE
MTD MOUNTED
MTL METAL
MULL MULLION
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OFD OVERFLOW DRAIN
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
OZ OUNCE
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER, PLASTIC
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PR PAIR
PRCST PRECAST
PRKG PARKING
PROP PROPERTY, PROPOSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, POINT, PRESSURE TREATED
PTN PARTITION
PWR POWER
QT QUARRY TILE
QTY QUANTITY
R RADIUS, RISER
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REV REVISED, REVISION
RFG ROOFING
RH RIGHT HAND
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
RVL REVEAL
SAN SANITARY
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SGL SINGLE
SH SHOWER
SHT SHEET
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SK SINK
SLV SLEEVE
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STR STRUCTURAL
SUB FL SUBFLOOR
SUPP SUPPLEMENTAL
SW SIDEWALK, SHORT WAY
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
T&B TOP & BOTTOM
T&G TONGUE & GROOVE
T/ TOP OF
T/BM TOP OF BEAM
T/C TOP OF CONCRETE, TOP OF CURB
T/COL TOP OF COLUMN
T/FTG TOP OF FOOTING
T/J TOP OF JOIST
T/S TOP OF STEEL
TB TEST BORING
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
THK THICK
TKBD TACKBOARD
TOPO TOPOGRAPHY
TV TELEVISION
TYP TYPICAL
UC UNDERCUT
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
UNF UNFINISHED
UNO UNLESS NOTED OTHERWISE
USGS UNITED STATES GEOLOGICAL
SURVEY
VAR VARIES
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W WIDE, WIDTH
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WF WIDE FLANGE
WH WALL HYDRANT, WATER HEATER
WL WIND LOAD
WP WATERPROOFING, WORK POINT
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
YD YARD DRAIN
EXTERIOR ELEVATION
SECTION
INTERIOR ELEVATION
SHEET NUMBER WHERE
SECTION IS DRAWN
DRAWING SYMBOLS
SHEET NUMBER WHERE
ELEVATION IS DRAWN
ELEVATION NUMBER ON
SHEET
ELEVATION NUMBER ON
SHEET
SECTION NUMBER ON SHEET
SHEET NUMBER WHERE
DETAIL IS DRAWN
DETAIL NUMBER ON
SHEET
DETAIL
X
SPOT ELEVATION
FLOOR LEVEL & NAME
ROOM NAME / NUMBER
DOOR NUMBER
WINDOW TYPE
INTERIOR PARTITIONS
EQUIPMENT NUMBER
REVISION CLOUD
REVISION NUMBER
NORTH ARROW
DRAWING NOTENNN
NN COLUMN CENTERLINE
FACE OF BUILDINGNN
CEILING HEIGHT AFFX'-XX"
ROOM NAME
A3F
NAME
ELEVATION
DEMOLITION DRAWING NOTENNN
TOILET ACCESSORYTA-XX
N www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/1
/2
:0
:2
A M
04/02/2024
KING
LITMER
8050.03
A-001
SYMBOLS &
ABBREVIATIONS
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
REV DATE DESCRIPTION
A-201
A-201
A -2
STORAGE
SAMPLE
CLEANING
62'-0" ±
A01
A01
A02
A03 A03 A03
A04
A05 .
2'-8"20'-8"
A-301
02 A06
A07
A01
A08
A09 A10
A11
A12
A-301
2'-2" ±
A13
A-301
A-301
A-301
A14A14
A-301
A06
A15
CHAMBER
A. ROOM NUMBERS ARE FOR CONSTRUCTION
PURPOSES ONLY.
B. ALL DIMENSIONS ARE FROM FACE TO FACE OF FINISH
CONSTRUCTION UNLESS INDICATED OTHERWISE.
C. USE ONLY WRITTEN DIMENSIONS - DO NOT SCALE
DRAWINGS.
D. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND
DIMENSIONS ON THE SITE PRIOR TO COMMENCING
WORK. ALL INQUIRIES AND DISCREPANCIES SHALL BE
DIRECTED TO THE GOVERNMENT.
E. ALL WORK SHOWN ON THESE DRAWINGS IS TO BE BY
THE CONTRACTOR UNLESS OTHERWISE
INDICATED.
F. PROVIDE BLOCKING FOR ITEMS AS INDICATED.
BLOCKING SHOWN OR DETAILED IN THESE
DOCUMENTS IS TO ILLUSTRATE CONCEPT AND IS NOT
INTENDED TO LIMIT THE CONTRACTOR'S
REQUIREMENT TO PROVIDE A COMPLETE AND SOUND
INSTALLATION.
G. ALL NEW STANDARD DOORS IN STUD PARTITIONS TO
BE LOCATED 4" FROM FACE OF PERPENDICULAR
WALL ON THE HINGE SIDE UNLESS INDICATED
OTHERWISE.
H. DO NOT PENETRATE THE EXISTING WALL OR ROOF
PANELS WITH ANY FASTENERS.
F HG
S E
E S
C H
E D
U L E
SCHED
SEE
SCHED
SEE
5" 5"
2" 2"
D O
O R
S
IZ
E
S E
E S
C H
E D
U L E
SCHED
SEE
S E
E S
C H
E D
U L E
DOOR TYPES FRAME TYPES
5/8" GYPSUM BD
CONT. SEALANT -
BOTH SIDES
STANDARD JAMB
ANCHOR -
SECURE TO STUD
HOLLOW METAL
FRAME
JAMB J01
CONT.
SEALANT -
BOTH SIDES
HOLLOW METAL
FRAME
HEAD H01
7 3/4"
5/8" GYPSUM
BD
7 3/4"
/4
HSS 5x5x5/16 JAMB -
EXTEND FROM FLOOR
TO STRUCTURE
ABOVE
HOLLOW METAL FRAME
2"
R-19 FACED
INSULATION
STANDARD JAMB
ANCHOR -
SECURE TO STUD
EXISTING METAL
BUILDING STRUCTURE
AND SIDING
JAMB J02 HEAD H02
HOLLOW METAL FRAME
EXISTING METAL
BUILDING STRUCTURE
AND SIDING
8 1/4"
R-19 FACED
INSULATION
FACING TAPE
FACING
TAPE HSS 5x5x5/16 HEADER
ABBREVIATIONS
AN ANODIZED
HM HOLLOW METAL
PF PRE-FINISHED
PT PAINT
STL STEEL
WD WOOD
DOOR SCHEDULE REMARKS
R1 OWNER PROVIDED LOCKSET
R2 INSULATED DOOR
R3 THERMALLY BROKEN FRAME
GLASS TYPES
01 1/4" CLEAR TEMPERED GLASS
02 1" CLEAR TEMPERED
INSULATING GLASS
Set H01 – Entry Function Qty Item Manufacturer BOD Model # / Series Finish 3 Hinges Ives 5BB1HW-NRP 26D 1 Entrance Function Cylindrical Lockset Best Access 9K37AB15DS3 626 1 Closer (parallel arm) LCN 4021-MC-H 689 1 Kickplate Ives 8400 (8”x2” LDW) 626 1 Set Seals National Guard Products 5020 Charcoal 1 Auto Door Bottom National Guard Products 320S Mill
Set H02 – Storage Function Qty Item Manufacturer BOD Model # / Series Finish 3 Hinges Ives 5BB1HW 26D 1 Storeroom Function Cylindrical Lockset Best Access 9K37D15DS3 626 1 Closer LCN 4011-MC-H 689 2 Kickplate Ives 8400 (8”x2” LDW) 626 3 Silencers Ives SR64 Gray
HARDWARE SCHEDULE
DOOR AND FRAME SCHEDULE
MARK
DOOR FRAME DETAILS
RATING HDW SET REMARKS MARK
# OF
LEAFS WIDTH HEIGHT THK TYPE MATL FINISH GLASS TYPE MATL FINISH HEAD JAMB
101 1 3' - 6" 7' - 0" 0' - 1 3/4" HG HM PT 02 01 HM PT H01 J01 -- R1, R2, R3 101
102 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM PT -- 01 HM PT H02 J02 -- R1 102
www.coffman.com
10 N Post Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/1
/2
:0
:2
A M
04/02/2024
KING
LITMER
8050.03
A-101
FIRST FLOOR PLAN
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
GENERAL NOTES
DRAWING NOTES
1/8" = 1'-0"A-101
01 BUILDING 002 FLOOR PLAN
N
A01 ALTERNATE 01: MBI R-19 WMP-VR FACED METAL
BUILDING INSULATION ATTACHED TO INSIDE OF
EXISTING WALL WITH ADHESIVELY ATTACHED
SPINDLE-TYPE ANCHORS AND LOCKING WASHERS.
REMOVE EXISTING LINER PANELS PRIOR TO
INSULATION INSTALLATION. LINER PANELS TO BE
REATTACHED UTILIZING Z FURRING AND THERMAL
SPACERS. DO NOT PENETRATE EXTERIOR OF
BUILDING
A02 NEW 2X6 WOOD STUD WALL WITH R-19 BATT
INSULATION AND 5/8" GYPSUM BOARD BOTH SIDES.
PAINT BOTH SIDES
A03 EXISTING OVERHEAD DOOR TO REMAIN
A04 ALTERNATE 03: NEW WALK-IN ENVIRONMENTAL
CHAMBER WITH ENTRY RAMP
A05 ALTERNATE 03: CUT OPENING IN EXISTING METAL
BUILDING WALL FOR ACCESS TO NEW WALK-IN
ENVIRONMENTAL CHAMBER AND CONTROLS.
COORDINATE OPENING SIZE WITH CHAMBER
MANUFACTURER
A06 ALTERNATE 01: NEW 6" REINFORCED 4,000 PSI
CONCRETE SLAB. COORDINATE FINAL SIZE AND
HEIGHT OF CHAMBER SLAB WITH CHAMBER
MANUFACTURER
A07 ALTERNATE 02: 6" 4,000 PSI CONCRETE PAD
BENEATH AHU SHALL EXTEND BEYOND THE UNIT
FOOTPRINT IN ALL DIRECTIONS 6” (MIN). COORDINATE
SIZE WITH APPROVED UNIT AND MECHANICAL
DRAWINGS. REINFORCE WITH #5 AT 12" SPACING
EACH WAY CENTERED IN PAD
A08 LINE OF EXISTING ROOF OVERHANG ABOVE
A09 RELOCATED REFRIGERATORS
A10 EXISTING COLUMNS TO REMAIN
A11 EXISTING EXTERIOR WALL TO REMAIN
A12 RELOCATE EXISTING FIRE EXTINGUISHER FROM
EXTERIOR WALL TO NEW INTERIOR WALL
A13 NO WORK THIS AREA
A14 AT NEW DOOR OPENINGS IN METAL BUILDING
PROVIDE HSS 5X5X5/16 JAMB MEMBERS FROM FLOOR
TO ROOF STRUCTURE WITH HSS 5X5X5/16 HEADER
ABOVE OPENING. WELD HEADER TO JAMB WITH 3/16"
FILLET WELD ALL AROUND. CONNECT JAMB TO ROOF
PLATE WITH L2X2X3/16 AND (3) #10 SCREWS AT EACH
SIDE OF HSS JAMB. CONTRACTOR TO SUBMIT TO
GOVERNMENT FOR REVIEW
A15 ALTERNATE 01: ALL WORK PERTAINING TO STORAGE
LEVEL 1
100' - 0"
A-201
E01
E02
E03E04 E05
A-301
LEVEL 1
100' - 0"
A-301
A-301
EXISTING METAL BUILDING
ALTERNATE 01: MBI R-19 WMP-VR
FACED METAL BUILDING
INSULATION ATTACHED TO
INSIDE OF EXISTING WALL/ROOF
WITH ADHESIVELY ATTACHED
SPINDLE-TYPE ANCHORS AND
LOCKING WASHERS
EXISTING TRANSLUCENT
PANELS - DO NOT COVER
WITH INSULATION
A-301 www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/1
/2
:0
:2
A M
04/02/2024
KING
LITMER
8050.03
A-201
BUILDING
ELEVATIONS AND
SECTIONS
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
DRAWING NOTES
1/8" = 1'-0"A-201
01 EAST ELEVATION
1/4" = 1'-0"A-201
02 BUILDING SECTION
E01 EXISTING COLUMNS TO REMAIN
E02 EXISTING METAL SHED ROOF TO REMAIN
E03 ALTERNATE 03: NEW WALK-IN
ENVIRONMENTAL CHAMBER
E04 ALTERNATE 01: NEW METAL SIDING TO
MATCH EXISTING
E05 REFER TO MECHANICAL DRAWINGS FOR
NEW EQUIPMENT
LEVEL 1
EXISTING METAL ROOF
PANEL
NEW METAL SIDING TO
MATCH EXISTING
NEW 2x6 WOOD STUDS
AT 16" O.C. MAX
R-19 BATT
INSULATION IN
STUD CAVITIES
5/8" GYP BOARD -
PAINTED
LOCKING WASHER
SPINDLE TYPE
INSULATION ANCHOR
R-19 FACED
INSULATION
4" RUBBER BASE
NEW REINFORCED
CONCRETE SLAB AND
FOOTING
2" RIGID INSULATION -
EXTEND 2'-0" MIN
HORIZONTALLY
UNDER SLAB
L 2x2x1/8 AT 48" O.C.
W/ (3) #10 SCREWS TO
WOOD STUD. WELD
TO CLIP WITH 2" OF
1/8" FILLET WELD
EXISTING BEAM
CLIP ANGLE
A-301
METAL SILL FLASHING SET
IN SEALANT
M
IN
LINE OF GRADE
BENT BAR TO MATCH
SLAB REINFORCING
#5 CONTINUOUS
TOP AND BOTTOM
#5 AT 12" O.C.
EACH WAY
CENTERED IN
SLAB
SIMPSON TITEN
HD 1/2" DIAMETER
W/ 3" EMBED AT
48" O.C.
6"
LEVEL 1
100' - 0"
LOCKING WASHER
SPINDLE TYPE
INSULATION ANCHOR
R-19 FACED
INSULATION
EXISTING METAL
BUILDING ROOF
NEW 2X6 WOOD STUDS AT
16" O.C. WITH R-19 BATT
INSULATION AND 5/8"
GYPSUM BOARD BOTH
SIDES. PAINT BOTH SIDES
EXISTING METAL BUILDING
STRUCTURE
EXISTING FLOOR SLAB
2x6 AT 48" O.C. SCREWED
TO VERTICAL STUD WITH
(3) #10 SCREWS
PRESERVATIVE TREATED
SILL PLATE
/2
G
A P
SEALANT
SIMPSON TITEN HD 1/2"
DIAMETER W/ 3" EMBED
AT 48" O.C.
DOUBLE TOP
PLATE
SIMPSON A34
SCREWED TO
EXISTING
STRUCTURE
MEMBER
METAL TRIM TO
MATCH PANELS
5/8" GYPSUM
BD
WEATHER
BARRIER
1/2" PLYWOOD
SHEATHING
CONT. SEALANT -
BOTH SIDES
EXISTING METAL
BUILDING STRUCTURE
AND SIDING
R-19 INSULATION
2x6 WOOD STUDS AT
16" O.C. MAX
EXISTING METAL
BUILDING STRUCTURE
AND SIDING
CONTINUOUS
WATERTIGHT
EXPANSION JOINT
SEAL VERTICAL AND
HORIZONTAL
ENVIRONMENTAL
CHAMBER WALL PANEL
5/8" GYPSUM
BD
CONT.
SEALANT -
BOTH SIDES
EXISTING METAL
BUILDING STRUCTURE
AND SIDING
R-19 INSULATION
2x6 WOOD STUDS AT
16" O.C. MAX
J-BEAD
EXISTING METAL ROOF
PANEL
METAL TRIM CLOSURE
TO MATCH PANELS
WEATHER BARRIER
NEW METAL SIDING TO
MATCH EXISTING
CONTINUOUS SEALANT
EXISTING EXTERIOR
METAL BUILDING SIDING
THERMAL SPACER
BLOCK
3" Z FURRING
EXISTING LINER PANEL
EXISTING METAL
ROOF PANEL
METAL TRIM
CLOSURE TO
MATCH PANELS
WEATHER
BARRIER
NEW METAL SIDING
TO MATCH
EXISTING
CONTINUOUS
SEALANT
EXISTING BEAM
BEYOND
HSS6x2x3/16
WELDED TO
EXISTING BEAMS.
SCREW TOP PLATE
TO NEW HSS
LEVEL 1
100' - 0"
LINE OF GRADE
BENT BAR TO
MATCH SLAB
REINFORCING
#5 CONTINUOUS
TOP AND BOTTOM
6"
M
IN
#5 AT 12" O.C.
EACH WAY
CENTERED IN
SLAB
COORDINATE
ANCHORAGE OF
CHAMBER TO SLAB
W/ MANUFACTURER
www.coffman.com
10 N Post Street, Suite 500
Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/1
/2
:0
:2
A M
04/02/2024
KING
LITMER
8050.03
A-301
WALL SECTIONS
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
1 1/2" = 1'-0"A-301
02 PLAN DETAIL
3/4" = 1'-0"A-301
01 WALL SECTION
3/4" = 1'-0"A-301
03 WALL SECTION
1 1/2" = 1'-0"A-301
04 PLAN DETAIL
1 1/2" = 1'-0"A-301
05 PLAN DETAIL
1 1/2" = 1'-0"A-301
06 SECTION DETAIL
1 1/2" = 1'-0"A-301
07 PLAN DETAIL AT LINER PANEL
1 1/2" = 1'-0"A-301
08 SECTION DETAIL
3/4" = 1'-0"A-301
09 SECTION DETAIL
CODES AND AUTHORITIES HAVING
JURISDICTION (AHJ)
THIS LIST IS FOR REFERENCE ONLY AND MAY NOT CONTAIN ALL CODES REQUIRED FOR
THIS PROJECT OR LIST ALL AUTHORITIES HAVING JURISDICTION. CONTACT STATE, COUNTY
AND CITY BUILDING DEPARTMENT FOR A FULL AND ACCURATE
• 2018 INTERNATIONAL BUILDING CODE
• 2018 INTERNATIONAL PLUMBING CODE
• 2020 NATIONAL ELECTRIC CODE
• 2018 INTERNATIONAL FUEL GAS CODE
• 2018 INTERNATIONAL MECHANICAL CODE
• CODE AMENDMENTS SPECIFIC TO THE LOCAL AND REGIONAL JURISDICTIONS
• STATE, COUNTY, CITY CODE AGENCIES AND OFFICIALS
DESIGN CONDITIONS
OUTDOORS
VENTILATION
INDOOR
ELEVATION
5B (UMATILLA COUNTY)
-2.0°F DB
COOLING
HEATING
PER ASHRAE 62.1-2019
1486 FT ABOVE SEA LEVEL
LOCATION PENDLETON, OR
CLIMATE ZONE
97.1°F DB / 64.7°F WBCOOLING
HEATING
70°F
72°F
GENERAL ABBREVIATIONS
ø ROUND or DIAMETER
AAV AUTOMATIC AIR VENT
ABV ABOVE
AD ACCESS DOOR
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
AL ACOUSTIC LINED
AP ACCESS PANEL
APD AIR PRESSURE DROP
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AWT AVERAGE WATER TEMPERATURE
BB BASEBOARD
BBD BACKDRAFT DAMPER
BFF BELOW FINISH FLOOR
BHP BRAKE HORSEPOWER
BG BELOW GROUND/GRADE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
C CENTIGRADE
CC COOLING COIL
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CI CAST IRON
CLG CEILING
CO CLEANOUT
CMU CONCRETE MASONRY UNIT
CM CONDENSATE METER
CONC CONCRETE
CONN CONNECT or CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION
(D) DEMOLISH
DB DECIBEL or DRY BULB
DDC DIRECT DIGITAL CONTROL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DOAS DEDICATED OUTDOOR AIR SYSTEM
DPR DAMPER
DPS DIFFERENTIAL PRESSURE SWITCH
DWG DRAWING
(E) EXISTING
EA EACH
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
ELEC ELECTRIC or ELECTRICAL
ELEV ELEVATION
EMCS ENERGY MANAGEMENT CONTROL
SYSTEM
ERV ENERGY RECOVERY VENTILATOR
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXST EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FD FIRE DAMPER
FFD FUNNEL FLOOR DRAIN
FF FINAL FILTER
FLR FLOOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOOR SINK
FSD COMBINATION FIRE/SMOKE DAMPER
FT FOOT/FEET
FTR FINNED TUBE RADIATION
FV FACE VELOCITY
GA GAGE or GAUGE
GAL GALLON
GALV GALVANIZED
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRD GRILLE, REGISTER, OR DIFFUSER
H HEIGHT
HB HOSE BIBB
HD HEAD
HP HORSEPOWER
HRV HEAT RECOVERY VENTILATOR
HTG HEATING
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
HWG HIGH WALL GRILLE
HWR HIGH WALL REGISTER
HZ HERTZ
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH or INCHES
INSUL INSULATION
INV INVERT
KH KICKSPACE HEATER
KW KILOWATT
KWH KILOWATT HOUR
L LENGTH
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LF LINEAR FOOT/FEET
LVG LEAVING
LWG LOW WALL GRILLE
LWR LOW WALL REGISTER
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MAV MANUAL AIR VENT
MBH 1000 BRITISH THERMAL UNITS
PER HOUR
MCA MINIMUM CIRCUIT AMPACITY
MCC MOTOR CONTROL CENTER
MFR MANUFACTURER
MOP MAXIMUM OVERCURRENT
PROTECTION
MUA MAKEUP AIR UNIT
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTG MOUNTING
(N) NEW
(NL) NEW LOCATION
N/A NOT APPLICABLE
N/C NORMALLY CLOSED
N/O NORMALLY OPEN
NC NOISE CRITERIA
N.I.C. NOT IN CONTRACT
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
O/C ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
PVC PRESSURE CONTROL VALVE
PD PRESSURE DROP
PH PHASE
PLCS PLACES
POC POINT OF CONNECTION
POUA POINT OF USE ALARM
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH (GAGE)
(REL) RELOCATE/RELOACTED
RA RETURN AIR
RAG RETURN AIR GRILLE
REQD REQUIRED
R.O. ROUGH OPENING
RPBP REDUCED PRESSURE BACKFLOW
PREVENTER
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SD SMOKE DETECTOR
SF SUPPLY FAN
SHT SHEET
SIM SIMILAR
SL SOUNDLINING
SP STATIC PRESSURE
SQ SQUARE
SQ FT SQUARE FOOT/FEET
SS STAINLESS STEEL
STD STANDARD
TAB TESTING, ADJUSTING & BALANCING
THK THICK
TP TRAP PRIMER or TEST PLUG
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
TU TERMINAL UNIT
UBC UNIFORM BUILDING CODE
UFC UNIFORM FIRE CODE
UMC UNIFORM MECHANICAL CODE
UPC UNIFORM PLUMBING CODE
UG UNDERGROUND
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
VA VALVE
VAC VACUUM
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
VTR VENT THRU ROOF
W WIDE
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WCO WALL CLEANOUT
WG WATER GAGE
WGE WASTE GAS EVACUATION
WH WALL HYDRANT
WPD WATER PRESSURE DROP
WT WEIGHT
GENERAL HVAC NOTES
1. SHEET METAL DUCTWORK AND COMPONENTS INCLUDING HANGING, SEALING, PLENUMS, & ACCESSORIES SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE LATEST EDITION OF SMACNA STANDARDS FOR HVAC DUCT CONSTRUCTION, NFPA 90A, & 90B STANDARDS.
2. ALL DUCTWORK OPENINGS SHALL BE COVERED DURING CONSTRUCTION.
3. ALL DAMPERS SHALL BE SET FULLY OPEN PRIOR TO BALANCING.
4. CONTRACTOR TO PROVIDE TRANSITIONS TO CONNECT TO ALL MECHANICAL EQUIPMENT. PROVIDE FLEXIBLE CONNECTIONS ON INTAKE AND
DISCHARGE OF ALL MECHANICAL EQUIPMENT.
5. DUCT DIMENSIONS SHOWN ARE INSIDE SHEET METAL DIMENSIONS OR CLEAR OPENING INSIDE LINED DUCT.
6. PROVIDE 1" THICK DUCT LINER IN ALL TRANSFER AIR DUCTWORK UNLESS NOTED OTHERWISE.
7. ALL ELBOWS SHALL BE LONG RADIUS ELBOWS WHEREVER POSSIBLE, OR SHALL HAVE TURNING VANES WHERE INDICATED ON PLANS. NO SQUARE
THROAT OR ZERO RADIUS ELBOWS ALLOWED.
8. ALL DUCT BRANCH CONNECTIONS TO DIFFUSER OR GRILLES, TO OR FROM MAIN DUCTS, SHALL INCLUDE MANUAL VOLUME DAMPERS. ALL SPIN-IN FITTINGS SHALL BE CONICAL, RECTANGULAR BRANCH DUCT TAKEOFFS SHALL HAVE 45° TAKEOFFS.
9. PROVIDE CONCEALED DAMPER REGULATORS OR ACCESS DOORS FOR ALL MANUAL VOLUME DAMPERS LOCATED THAT ARE INACCESSIBLE. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES. ALL FINAL ACCESS DOOR LOCATIONS SHALL BE APPROVED BY ARCHITECT PRIOR TO
INSTALLATION.
10. 24"x24" ACCESS DOORS SHALL BE PROVIDED FOR ALL MECHANICAL EQUIPMENT LOCATED ABOVE GYPSUM BOARD CEILINGS. ALL FINAL ACCESS
DOOR LOCATIONS SHALL BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION.
11. PROVIDE DIFFUSER AND GRILLE FRAMES COMPATIBLE WITH ARCHITECTURAL CEILING TYPES AND COORDINATE LOCATIONS WITH THE
ARCHITECTURAL REFLECTED CEILING PLAN AND ELECTRICAL LIGHTING LAYOUT.
12. ALL DUCTWORK VISIBLE THROUGH RETURN OR SUPPLY GRILLES TO BE PAINTED FLAT BLACK.
13. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTS SHALL HAVE THE TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS
SEALED AIRTIGHT WITH DUCT SEALANT (SMACNA SEAL CLASS "A").
14. COORDINATE EXACT LOCATIONS OF ALL ROOM THERMOSTATS AND/OR ROOM TEMPERATURE SENSORS WITH ARCHITECT/OWNER PRIOR TO
INSTALLATION.
15. BALANCE AIR SYSTEM TO QUANTITIES SHOWN, AND SUBMIT A COPY OF THE BALANCE REPORT TO THE ENGINEER FOR REVIEW.
GENERAL LEGEND
THERMOSTAT. ADJACENT NUMBER
INDICATES TERMINAL UNIT CONTROLLED
HUMIDISTAT
SENSOR
CO2 SENSORCO2
T
H
S
PLUMBING FIXTURE TAG, SEE PLUMBING SCHEDULES
NOTES:
XX-X
SPECIFIC TO LOCATION(S) INDICATED.
A. NOTE APPLIES TO ENTIRE SHEET.
EXISTING
NEW
(E)
(N)
EXISTING (THIN)
NEW (MEDIUM)
POINT OF CONNECTION (POC)
EXISTING TO BE DEMOLISHED
MECHANICAL EQUIPMENT, SEE MECHANICAL SCHEDULES.XX-X
x
SD DUCT SMOKE DETECTOR
SP DUCT STATIC PRESSURE
LINETYPES:
B
A
A
B
DETAIL SYMBOL:
A = IDENTIFYING NUMBER
B = SHEET WHERE DETAIL IS SHOWN
SECTION SYMBOL:
A = IDENTIFYING NUMBER
B = SHEET WHERE DETAIL IS SHOWN
NEW LOCATION(NL)
RELOCATED(REL)
GENERAL NOTES
1. CONTRACTOR SHALL SECURE, MAINTAIN, AND PAY FOR ALL REQUIRED PERMITS, LICENSES, AND INSPECTIONS FOR DURATION OF WORK UNLESS
DIRECTED OTHERWISE.
2. ALL WORK SHALL COMPLY WITH THE OWNER'S REQUIREMENTS, AND WITH ALL APPLICABLE STATE AND LOCAL CODES, OR AUTHORITY HAVING
JURISDICTION.
3. SUBSTITUTIONS OF EQUIPMENT OTHER THAN AS SPECIFIED SHALL BE THE COMPLETE RESPONSIBILITY OF THE CONTRACTOR, ANY ADDITIONAL ELECTRICAL, STRUCTURAL, MECHANICAL, OR ARCHITECTURAL REQUIREMENTS SHALL BE PROVIDED AT NO ADDITIONAL EXPENSE TO THE OWNER.
4. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT ATTEMPT TO SHOW ALL REQUIRED OFFSETS. COORDINATE WITH OTHER TRADES AND PROVIDE ALL NECESSARY OFFSETS. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR CONSTRUCTION DETAILS.
5. REFER TO PROJECT MANUAL (SPECIFICATIONS) FOR ADDITIONAL REQUIREMENTS. PLANS AND SPECIFICATIONS SHALL BE TAKEN TOGETHER.
PROVIDE ALL WORK CALLED FOR IN EITHER. IN CASE OF CONFLICT BETWEEN SPECIFICATIONS AND PLANS THE MORE STRINGENT SHALL APPLY.
6. ALL EQUIPMENT AND MATERIAL ON THE JOB SITE PRIOR TO INSTALLATION SHALL BE COVERED AND PROTECTED FROM RAIN, DIRT, DUST, AND
DAMAGE.
7. VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN BE MET. COORDINATE FINAL EQUIPMENT LOCATIONS W/ GENERAL CONTRACTOR AND OTHER TRADES TO ALLOW FOR REQUIRED MECHANICAL EQUIPMENT CLEARANCES.
8. PROVIDE AN UNOBSTRUCTED PASSAGEWAY MEASURING NO LESS THAN 36" WIDE BY 80" HIGH FROM DOOR INTO THE SPACE TO SERVICEABLE MECHANICAL EQUIPMENT. A LEVEL WORKING SPACE MEASURING NO LESS THAN 30" WIDE BY 36" DEEP MUST BE PROVIDED IN FRONT OF CONTROL
SIDE OF EQUIPMENT FOR SERVICING.
9. PROVIDE NEC CODE MINIMUM HORIZONTAL AND VERTICAL WORKING CLEARANCES FOR ALL ELECTRICAL PANELS AND EQUIPMENT. OFFSET
MECHANICAL WORK AS REQUIRED.
10. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF INSTALLATION STANDARDS AND CONSTRUCTION CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO SHOP FABRICATION AND/OR FIELD INSTALLATION. DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE CONSTRUCTION DRAWINGS SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER.
11. ALL MECHANICAL EQUIPMENT, MATERIALS, AND INSTALLATION SHALL BE PROVIDED BY THE CONTRACTOR. ALL EQUIPMENT SHALL BE COMPLETE, INSTALLED, AND FULLY FUNCTIONAL PRIOR TO FINAL ACCEPTANCE OF THE WORK.
12. INSTALL ALL EQUIPMENT PER MANUFACTURERS RECOMMENDATIONS AND REQUIREMENTS. ANY CONFLICTS BETWEEN THE MANUFACTURERS DOCUMENTATION AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER.
13. DO NOT ALLOW ANY WORK TO BE COVERED UP OR ENCLOSED UNTIL INSPECTED, TESTED AND APPROVED BY OWNER'S REPRESENTATIVE OR
AUTHORITY HAVING JURISDICTION.
14. MECHANICAL EQUIPMENT SHALL NOT BE USED FOR TEMPORARY HEATING OR COOLING DURING CONSTRUCTION.
15. PIPES AND WIRING IN PLENUM SHALL BE RATED FOR PLENUM USE. PVC, ABS, AND PLASTIC PIPING IS NOT ACCEPTABLE IN PLENUM APPLICATIONS.
16. ALL DETAILS ARE TYPICAL UNLESS NOTED OTHERWISE.
HVAC DUCTWORK LEGEND
DUCTWORK
24x12 S/A
RECTANGULAR DUCT
SIZE (INCHES) FIRST
DIMENSION IS SIDE OF
DUCT SHOWN
DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS OF DUCT. DUCT SIZE
SHOWN DOES NOT INCLUDE INSULATION OR LINING UNLESS NOTED OTHERWISE. SEE
BELOW FOR DUCT SIZE TAG LEGEND.
DUCT SIZE
DUCT SYSTEM ABBREVIATION
(NOT ALWAYS BE SHOWN)
INSULATED DUCT
SOUND LINED DUCT
24x12ø
FLAT OVAL DUCT
SIZE (INCHES) FIRST
DIMENSION IS SIDE OF
DUCT SHOWN
24ø ROUND DUCT
18ø24x12
CHANGE IN DUCT SIZE
AND/OR SHAPE
SUPPLY AIR (SA)
OUTSIDE AIR (OSA)
RECTANGULAR DUCT
TURNED UP/SECTION
ROUND/FLAT OVAL DUCT
TURNED UP/SECTION
RECTANGULAR DUCT
TURNED DOWN/AWAY
ROUND/FLAT OVAL DUCT
TURNED DOWN/AWAY
RETURN AIR (RA)
RECTANGULAR DUCT
TURNED UP/SECTION
ROUND/FLAT OVAL DUCT
TURNED UP/SECTION
RECTANGULAR DUCT
TURNED DOWN/AWAY
ROUND/FLAT OVAL DUCT
TURNED DOWN/AWAY
EXHAUST AIR (EA)
RECTANGULAR DUCT
TURNED UP/SECTION
ROUND/FLAT OVAL DUCT
TURNED UP/SECTION
RECTANGULAR DUCT
TURNED DOWN/AWAY
ROUND/FLAT OVAL DUCT
TURNED DOWN/AWAY
DAMPERS
VOLUME/BALANCING
DAMPER
FIRE DAMPER (FD)
SMOKE DAMPER (SD)
FIRE/SMOKE DAMPER
(FSD)
BACKDRAFT DAMPER
MOTORIZED DAMPER
DUCT SYSTEM ABBREVIATIONS
M
SUPPLY AIRSA
OUTSIDE AIROSA
COMBUSTION AIRCA
RETURN AIRRA
TRANSFER AIRTA
EXHAUST AIREA
FLEXIBLE DUCT
DUCT SYMBOLS
DUCT END CAP
DUCT ACCESS DOOR
AD
SUPPLY AIR (SA)
TERMINAL
RETURN AIR (RA) OR
TRANSFER AIR (TA) TERMINAL
AIR TERMINAL
IDENTIFICATION
EXHAUST AIR (EA) TERMINAL
GRILLE, REGISTER, OR OPEN
DUCT
X
CFM
AIRFLOW DIRECTION
SOUND ATTENUATOR
OR X-CFM
PIPING LEGEND
CS
CR
CWS
CWR
CONDENSER
WATER SUPPLY
CONDENSER
WATER RETURN
CHILLED WATER
SUPPLY
CHILLED WATER
RETURN
HWS
HWR
HEATING HOT
WATER SUPPLY
HEATING HOT
WATER RETURN
HGS
HGR
HEATING GLYCOL
SUPPLY
HEATING GLYCOL
RETURN
FOS
FOR
FUEL OIL SUPPLY
FUEL OIL RETURN
SMS
SMR
SNOWMELT
GLYCOL SUPPLY
SNOWMELT
GLYCOL RETURN
RL
REFRIGERANT
LIQUID LINE
RS
REFRIGERANT
SUCTION LINE
HRS
HIGH PRESSURE
REFRIGERANT
SUCTION LINE
GWS
GWR
GEOTHERMAL
WATER SUPPLY
GEOTHERMAL
WATER RETURN
G NATURAL GAS
PG PROPANE GAS
LPG
LIQUID PETROLEUM
GAS
CA COMPRESSED AIR
LPS
LOW PRESSURE
STEAM SUPPLY
LPR
LOW PRESSURE
STEAM RETURN
LPC
LOW PRESSURE
CONDENSATE
MPS
MEDIUM PRESSURE
STEAM SUPPLY
MPR
MEDIUM PRESSURE
STEAM RETURN
MPC
MEDIUM PRESSURE
CONDENSATE
HPS
HIGH PRESSURE
STEAM SUPPLY
HPR
HIGH PRESSURE
STEAM RETURN
HPC
HIGH PRESSURE
CONDENSATE
D
CONDENSATE
DRAIN (D)
VAC VACUUM (VAC)
www.coffman.com
221 N. Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:3
A M
04/02/2024
TAH
RKC
231290
M-001
LEGENDS AND
ABBREVIATIONS
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
REV DATE DESCRIPTION
campbell Snapshot
T
SAMPLE CLEANING
STORAGE
BIOMAS DRYING
NEW WALL
M-301
REFRIGERATION
UNITS, TYP.
M-302
M-301
AHU-002-01
O A
I N
T A
K E
2R
1S
1S
1S
1S
2S ø
14ø
22x22 x2 x2
LP FROM TANK
1R 87514ø
PROVIDE FLEX DUCT
AT EQUIPMENT
CONNECTION (TYP)
3'
18x16
1R
1R
1R
GENERAL NOTES
A. ALL MECHANICAL HVAC WORK PART OF ALTERNATE 02 SCOPE.
B. MINIMUM 6 AIR CHANGES PER HOUR IN THIS BUILDING. OUTSIDE
AIR PROVIDED PER INTERNATIONAL MECHANICAL CODE.
C. BIOMASS DRYING ROOM TO BE PROVIDED AS ALTERNATE 03. THE
BIOMASS DRYING ROOM SHALL MEET THE CRITERIA OUTLINED IN
ARCHITECTURAL SHEETS AND SPECIFICATIONS, AND WILL BE
PROVIDED WITH ITS OWN HEATING AND COOL-DOWN SYSTEM.
D. INSULATE EXTERIOR DUCT AND JACKET.
E. ROUTE CONDENSATE DRAIN TO DRY WELL DECK PIT ADJACENT
TO AHU.
F. PROVIDE DUCT SUPPORTS AT NO LESS THAN 10' INTERVALS.
G. PROVIDE DUCT SUPPORTS FOR VERTICAL AND HORIZONTAL
(WIND) LOADS. USE SUPPORT METHODS AND MATERIALS FROM
SMACNA DUCT CONSTRUCTION STANDARDS, AND SUBMIT FOR
GOVERNMENT REVIEW.
H. CONTRACTOR SHALL PERFORM A UTILITY LOCATE PRIOR TO ANY
EARTHWORK.
I. PIPE TRENCHING (BEDDING, DEPTH, ETC.) AND UNDERGROUND
PIPE SPECIFICATION AND PROTECTION SHALL BE DETERMINED BY
THE PROPANE SUPPLIER. PROPANE SUPPLIER SHALL ALSO
SPECIFY THE METHOD OF TYING-IN TO THE EXISTING PROPANE
TANK AND TANK REGULATOR. MAINTAIN CLEARANCE FROM
OTHER BURIED UTILITIES. SEE C-101 FOR UNDERGROUND PIPE
ROUTING FROM EXISTING PROPANE TANK.
J. RETURN GRILLES SHALL HAVE FILTER FRAME. CONTRACTOR TO
PROVIDE AND INSTALL 1" MERV 8 FILTERS IN GRILLES PRIOR TO
CONSTRUCTION COMPLETTION.
www.coffman.com
221 N. Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:3
A M
04/02/2024
TAH
RKC
231290
M-201
MECHANCIAL
FLOOR PLAN
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
1/8" = 1'-0"M-201
1 MECHANICAL FLOOR PLAN (ALTERNATE 02)
REV DATE DESCRIPTION
Level 1
SAMPLE CLEANING
STORAGE
REFRIGERATION
UNITS, TYP.
M-302
1R
2R
22x22
1S
22ø 14ø
CL
CL
CL
Level 1 100' - 0"
M-302
AHU-002-01
22ø
14ø
22x22
APPROXIMATE STRUCTURAL SYSTEM -
FIELD VERIFY PRIOR TO INSTALLATION
22x22
22x22
ROUTE DUCT HIGH TO LEAVE
ROOM FOR STORAGE BELOW
AHU CURB AND CONCRETE
PAD PER DETAILS ON M-501
AND M-502
GENERAL NOTES
A. ALL MECHANICAL HVAC WORK PART OF ALTERNATE 02 SCOPE.
www.coffman.com
221 N. Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:3
A M
04/02/2024
TAH
RKC
231290
M-301
MECHANICAL
SECTIONS
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
1/4" = 1'-0"M-301
1 SECTION
1/4" = 1'-0"M-301
2 SECTION
REV DATE DESCRIPTION
Level 1
M-301
M-301
22x22
14ø
16x18
22"ø
GENERAL NOTES
A. ALL MECHANICAL HVAC WORK PART OF ALTERNATE 02 SCOPE.
www.coffman.com
221 N. Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:3
A M
04/02/2024
TAH
RKC
231290
M-302
MECHANICAL
SECTIONS
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
1/4" = 1'-0"
1/M-302
REV DATE DESCRIPTION
CHANGE OF DUCT SIZE
TRANSITION
BRANCH DUCT TAKEOFFS
END TAP
A ≤ 30°
RECTANGULAR
DUCT
DUCT ELBOWS
NOTE: OFFSETS (TO AVOID OBSTRUCTIONS) ARE REQUIRED BUT ARE
NOT NECESSARILY SHOWN ON THE PLANS.
OFFSETS
TURNING
VANES
R=1/2W
45° OR 90°
RADIUS ELBOWS
.0
ROUND OR
RECTANGULAR
CONICAL
SPIN-IN
ROUND DUCT RUNOUT
TO SINGLE DIFFUSER
OR GRILLE ONLY
.0
D
W
D=1/2W, BUT NOT MORE
THAN 12"
A
CONICAL SPIN-IN OR TRANSITION
TO AT LEAST 70% GREATER THAN
AREA OF SMALLER DUCT. SEE MAX
TRANSITION ANGLE.
THE DUCT FITTINGS ABOVE ARE CONSIDERED ACCEPTABLE. THE CONTRACTOR SHALL OBTAIN ENGINEER'S APPROVAL FOR ALTERNATIVE FITTINGS PRIOR TO FABRICATION. ONLY FITTINGS WITH EQUAL OR LOWER PRESSURE DROP WILL BE CONSIDERED.
A
W
12"x12" ACCESS PANEL ON
BOTTOM OF DUCT
UPSTREAM OF TURNING
VANES, REQUIRED FOR
RETURN AND EXHAUST
DUCTS
A ≤ 30°
R
A
W
R
R=1/2W
420ONE 1 x 18 GA STRAP36
ONE 1 x 16 GA STRAP
50 700
ONE 1 x 22 GA STRAP
QUANTITY/SIZE IN.MAX. DUCT
Ø IN.
HANGER STRAPS OR RODS
MAX. LOAD LBS.
MAX. SPACING
IN.
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING AND
INSULATION, BUT NO EXTERNAL LOAD.
BAND OF SAME
SIZE AS HANGER
STRAP
LOAD RATED
FASTENERS
50" Ø & UNDER
TWO 3/8 Ø RODS
TWO 1/2 Ø RODS
M
A X
UNISTRUT P1000
LATERAL BRACE
UNISTRUT P1843
HINGE CONNECTOR
TYPICAL EA. END
RIGID BRACE (SHOWN) OR MULTIPLE CABLE BRACES.
SEE STRUCTURAL FOR ANCHORAGE.
1 2
NOTES
LP TANK (EXISTING)
3/4” LP
FIRST AND SECOND STAGE
REGULATORS PROVIDED
WITH TANK
GRADE
AHU-002-01
200 MBH
LINE PRESSURE
REGULATOR, TYP.
SECTION A-A
RECTANGULAR DUCT
ROUND DUCT
A
A
SIZE DUCTWORK SO GRILLE
DOES NOT EXTEND BEYOND
OUTER SURFACE, VERIFY SIZE
WITH DIFFUSER SUPPLIER
SPIRAL SUPPLY DUCT
SUPPLY GRILLE
SUPPLY
AIR PLENUM
SPIRAL
DUCT
APPLY SEALANT
ALL AROUND
SHEET METAL SCREW
OPPOSED BLADE DAMPER,
SEPARATE OR INTEGRAL PER
GRD SCHEDULE
FILTER FRAME PROVIDED WITH
GRILLE
SHEET METAL SCREW
OPPOSED BLADE DAMPER
GRILLE
DUCT
18 GAUGE SHEET METAL COLLAR
FLANGE TIGHT AGAINST WALL
SURFACE. ATTACH TO DUCT WITH
SHEET METAL SCREWS OR POP RIVETS
PARTITION WALL
WALLBOARD
STUD FRAME OPENING
NOT BY MECHANICAL
SHEET METAL DUCT
2"MIN.
HVAC UNIT DRAIN PAN
NOTE:
CONDENSATE PIPING SHALL
BE TYPE 'L' OR 'M' COPPER
OPEN VENT
3/4"
UNION
ROUTE MIN. 1/4" PER
FOOT, SLOPE AWAY
FROM UNIT
BLOW-THROUGH
(FAN UPSTREAM OF COILS)
HVAC UNIT
DRAIN PAN
OPEN VENT
2"
2"
MIN.
SIZE SAME AS OUTLET OR 3/4",
WHICHEVER IS LARGER
UNION
ROUTE 1/4" PER FOOT,
SLOPE AWAY FROM UNIT
DRAW-THROUGH
(FAN DOWNSTREAM OF COILS)
#5 AT 12" ON CENTER EACH
WAY, CENTERED IN SLAB
GRADE
1" CHAMFER
NOTE:
CONCRETE AHU PAD SHALL EXTEND BEYOND EQUIPMENT BY 6" (MIN) IN
ALL DIMENSIONS. FINAL SIZE SHALL BE BASED ON APPROVED AHU
SUBMITTAL.
2" 4"
GENERAL NOTES
A. ALL MECHANICAL HVAC WORK PART OF ALTERNATE 02 SCOPE.
www.coffman.com
221 N. Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:3
A M
04/02/2024
TAH
RKC
231290
M-501
MECHANICAL
DETAILS
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
NTSM-501
1 LOW PRESSURE DUCT FITTING REQUIREMENTS
NTSM-501
2 ROUND DUCT HANGER - SEISMIC
NTSM-501
4 PROPANE GAS PIPING DIAGRAM
NTSM-501
3 SUPPLY GRILLE - EXPOSED DUCTWORK
NTSM-501
5 STUD WALL PENETRATION
NTSM-501
6 CONDENSATE TRAP AND DRAIN
NTSM-501
7 AIR HANDLING UNIT CURB AND HOUSEKEEPING PAD
REV DATE DESCRIPTION
NEOPRENE GASKET
ALL AROUND
AHU BASE RAIL
SEISMIC RESTRAINT CLOP,
FASTEN TO CURB AND
BASERAIL WITH SELF
TAPPING SCREWS
AHU CURB
ANCHOR BOLT
NEOPRENE GASKET ALL
AROUND
CONCRETE HOUSEKEEPING
PAD 7/M-501
CAULK ALL AROUND
3/8"ø x 4" LG. HEX HEAD BOLT, NUT, FLAT & LOCK WASHERS, SPACING 8" O.C. MAXIMUM
R-12 RIGID
INSULATION
ALUMINUM JACKET
PENETRATION FLASHING
BY OTHERS
CAULK ALL AROUND
INSULATION & FLASHING
R-12 EXPOSED
INSULATION
S/R DUCT AS
INDICATED ON PLANS
1" INTERMITTENT
WELD 6" O.C.
2"x3"x1/4" ANGLE FLANGE
NEOPRENE GASKET
ALL AROUND
C-CHANNEL FRAME
A S
I N
D
IC
A T
E D
O N
P
LA
N
END VIEW
NOTES
M A
X
UNISTRUT P1000
LATERAL BRACE
UNISTRUT P1843
HINGE CONNECTOR
TYPICAL EA. END
HANGER RODS WITH STIFFENERS OR ANGLE
IRON SUPPORTS.
ANGLE IRON CROSS MEMBER.
RIGID BRACE (SHOWN) OR MULTIPLE CABLE
BRACES.
UNISTRUT P1000
UNISTRUT P1000
6" DRIP LEG WITH CAP
1/2" LP CONNECTION
TO EQUIPMENT
CERTIFIED LP FLEX LINE
LP SUPPLY LINE
G
LP SUPPLY LINE
1/2" LP
CONNECTION TO
EQUIPMENT
CERTIFIED LP FLEX LINE
6" DRIP LEG WITH CAP
LISTED LP VALVE
UNION
PIPE REDUCER,
IF REQUIRED
UNION
GLISTED LP
VALVE
PIPING FROM
ABOVE
SUPPLY FROM ABOVE
HORIZONTAL SUPPLY
VERTICAL OFFSET
FOR DRIP LEG
GENERAL NOTES
A. ALL MECHANICAL HVAC WORK PART OF ALTERNATE 02 SCOPE.
www.coffman.com
221 N. Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:3
A M
04/02/2024
TAH
RKC
231290
M-502
MECHANICAL
DETAILS
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
REV DATE DESCRIPTION
NTSM-502
1 AIR HANDLING UNIT MOUNTING
NTSM-502
2 TYPICAL EXTERIOR DUCT CONNECTION
NTSM-502
4 SUSPENDED DUCTWORK
NTSM-502
3 PROPANE EQUIP. CONNECTION
AIR HANDLING UNIT SCHEDULE
TAG
MANUFACTURER/
MODEL
SUPPLY FAN EXHAUST FAN PROPANE HEATING COIL COOLING COIL
UNIT POWER REQMTS UNIT
WT.
(LBS)
REMARKSCOOLING
CFM
HEATING
CFM
MIN OA
CFM
ESP
(IN WC)
TSP
(IN WC)
MOTOR DATA TOTAL
CFM
ESP
(IN WC)
TSP
(IN WC)
MOTOR DATA INLET
MBh
INLET PRESS
(IN WC)
EAT
(F)
LAT
(F)
APD
(IN WC)
TOTAL
MBh
SENS.
MBh
ROWS/
FPI
EAT (F) LAT (F) APD
(IN WC)HP RPM FLA HP RPM FLA DB WB DB WB VOLTS Ø MOCP SCCR
AHU-002-01
DAIKIN/
REBEL DPS007A
4,200 4,200 420 0.50 1.9 4 2,398 8.8 4,200 0.50 0.64 4.3 1,768 9.6 200 11-14 58 90 0.04 90.0 84.7
3/
74.5 57.8 55.0 50.0 0.19 208 3 50 65 kAIC 2,207 1,2,3,4,5,6,7,8
1. PROVIDE UNIT WITH FULL ECONOMIZER CAPABILITIES, INCLUDING INTERNAL EXHAUST FAN OR POWER EXHAUST ACCESSORY.
2. PACKAGED UNIT WITH HEAT PUMP AND PROPANE AUXILIARY HEATING. HEAT PUMP SHALL BE SIZED ONLY ACCORDING TO UNIT COOLING LOAD AND PROPANE HEAT SIZED FOR FULL HEATING LOAD. MINIMUM 5:1 TURNDOWN ON PROPANE HEATING COIL.
3. UNIT SHALL HAVE STAINLESS STEEL DRAIN PAN, CONDENSATE SHALL BE TRAPPED ACCORDING TO MANUFACTURER'S INSTRUCTIONS AND THE CONTRACT DOCUMENTS.
4. UNIT SHALL BE PROVIDED WITH LP PRESSURE REGULATOR AT UNIT AND ANY NECESSARY LP CONVERSION KIT INSTALLED ACCORDING TO MANUFACTURER'S INSTRUCTIONS.
5. PROVIDE UNIT WITH FACTORY CONTROLS, UNIT SHALL BE MONITORED BY THE FACILITY ALERTON SYSTEM. BASIS-OF-DESIGN IS DAIKIN MICROTECH III CONTROLLER. PROVIDE FACTORY-INSTALLED RETURN SMOKE DETECTION AND INTERNAL FILTER DIFFERENTIAL PRESSURE MONITORING.
6. FILTRATION SHALL INCLUDE 2" MERV 8 PREFILTER AND 4" MERV 13 FILTER.
7. UNIT SHALL INCLUDE 115V GFI OUTLET AND FUSED DISCONNECT AT SCCR RATING SHOWN ON SCHEDULE.
8. PROVIDE INSULATED CURB FOR UNIT INSTALLATION ON CONCRETE PAD OUTDOORS. CURB HEIGHT SHALL BE MINIMUM 14" FOR SNOW ACCUMULATION AND CONDESATE TRAP, INCREASED AS NECESSARY FOR SIDE DUCT CONNECTIONS THROUGH CURB (IF AHU PROVIDED DOES NOT HAVE SIDE CONNECTIONS)
DUCT INSULATION SCHEDULE
SYSTEM LOCATION
COMBINED INSTALLED R-VALUE
REMARKS
SUPPLY/RETURN AIR
OUTSIDE
BUILDING
12 1,3
SUPPLY/RETURN AIR
UNCONDITIONED
SPACE
6 2,3
SUPPLY/RETURN AIR
BUILDING
ENVELOPE
ASSEMBLY
16 3
SUPPLY AIR
CONDITIONED
SPACE
3.3 3,4
1. OUTSIDE THE BUILDING MEANS OUTDOORS AND EXPOSED TO WEATHER,
TO INCLUDE DUCT UNDERNEATH LEAN-TO.
2. UNCONDITIONED SPACE MEANS ENCLOSED BUT NOT IN THE BUILDING
CONDITIONED ENVELOPE.
3. CONFORM TO ALL APPLICABLE LOCAL, CITY, STATE, AND NATIONAL
CODES AND REGULATIONS.
4. DUCTWORK WITIHIN THE CONDITIONED SPACE SHALL BE INSULATED IF
THE AIR INSIDE THE DUCTWORK EXCEEDS 105°F OR IS LESS THAN 55°F.
GRILLES, REGISTERS, DIFFUSERS SCHEDULE
TAG TYPE MANUFACTURER/ MODEL GRILLE SIZE MATERIAL FRAME STYLE FINISH NOTES
1S SUPPLY
PRICE/
SDG
16X12 STEEL DUCT MOUNT GRAY 1, 2
2S SUPPLY
PRICE/
12X10 STEEL SURF. MOUNT WHITE 1
1R RETURN
PRICE/
80FF
24X20 STEEL DUCT MOUNT GRAY 1,3
2R RETURN
PRICE/
530FF
18X16 STEEL SURF. MOUNT WHITE 1,3
1. SEE FLOOR PLANS FOR CONNECTION SIZE.
2. PROVIDE WITH BALANCING DAMPER OPTION INTEGRAL TO GRILLE.
3. FILTERED RETURN GRILLE, CONTRACTOR TO PROVIDE AND INSTALL 1" MERV 8 FILTERS.
SEISMIC AND VIBRATION CONTROL SEISMIC RESTRAINT PROVISIONS
TAG EQUIPMENT LEVEL RESTRAINTS BASE
FLEXIBLE
CONNECTORS
VIBRATION
ISOLATORS
DEFLECTION
(IN)
SEISMIC SUPPORTS ARE REQUIRED FOR THIS PROJECT FOR ALL MECHANICAL AND ELECTRICAL
EQUIPMENT AND DISTRIBUTION SYSTEMS. SEISMIC RESTRAINT CALCULATIONS MUST BE PROVIDED BY THE PRODUCT MANUFACTURER FOR ALL CONNECTIONS OF EQUIPMENT TO THE STRUCTURE. ALL RESTRAINING DEVICES SHALL HAVE TESTING DATA TO VALIDATE MAXIMUM RESTRAINT RATINGS.
PREAPPROVALS BASED ON INDEPENDENT TESTING ARE PREFERRED TO PREAPPROVALS BASED ON
CALCULATIONS. CALCULATIONS (INCLUDING THE COMBINING OF TENSILE AND SHEAR LOADING) TO
SUPPORT SEISMIC RESTRAINT DESIGNS MUST BE STAMPED BY A REGISTERED PROFESSIONAL
ENGINEER LICENSED IN OREGON. THE ENGINEERING ANALYSIS MUST INDICATE CALCULATED DEAD LOADS, STATIC SEISMIC LOADS, AND CAPACITY OF MATERIALS UTILIZED FOR CONNECTIONS TO
EQUIPMENT STRUCTURE. ANALYSIS MUST DETAIL ANCHORING METHODS, BOLT DIAMETER,
EMBEDMENT, AND/OR WELDED LENGTH.
AHU-002-01 OUTDOOR AIR HANDLING UNIT GRADE A D Y NR NA
DUCTWORK OVER 6 SF (CROSS-SECTION) ALL A NR NR NR NR
ALL SEISMIC RESTRAINT DEVICES SHALL BE DESIGNED TO ACCEPT, WITHOUT FAILURE, THE FORCES
PRESCRIBED PER THE ASCE 7 ACTING THROUGH THE EQUIPMENT CENTER OF GRAVITY.
OVERTURNING MOMENTS MAY EXCEED FORCES AT GROUND LEVEL AND MAY BE RESISTED BY
SEISMIC RESTRAINTS, SUPPORT, OR ANCHORAGE. ANCHORAGE TO CONCRETE MUST HAVE AN ICC
TESTING REPORT THAT ADHERES TO THE REQUIREMENTS OF THE IBC AND MUST BE RATED FOR
SEISMIC RESTRAINT IN CRACKED CONCRETE USING THE APPROPRIATE REDUCTION FACTORS PER ACI 318 APPENDIX D. ACCEPTABLE ANCHORS INCLUDE THE HILTI KWIK BOLT TZ AND SIMPSON STRONG BOLT WEDGE ANCHORS OR HILTI HIT-RE 500-SD AND SIMPSON SET XP EPOXY ANCHORS.
EPOXIES ARE NOT ACCEPTABLE FOR USE IN OVERHEAD APPLICATIONS.
ASCE 7-16 SEISMIC DESIGN CRITERIA
SEISMIC DESIGN CATEGORY "D"
RISK CATEGORY II
SITE CLASS "D"
SEISMIC IMPORTANCE FACTOR FOR BUILDING, I = 1.0
COMPONENT RESPONSE MODIFICATION AND AMPLIFICATION FACTORS
SHALL BE DETERMINED IN ACCORDANCE WITH ASCE 7, TABLE 13.6-1.
DESIGN SPECTRAL RESPONSE ACCELERATION AT SHORT PERIODS (0.2 SECOND):
SDS = 0.376 G.
DESIGN SPECTRAL RESPONSE ACCELERATION AT 1-SECOND PERIOD:
RESTRAINTS BASE TYPE
SD1 = 0.212 G.
NOTESA = ANCHOR A = ISOLATOR ATTACHED TO EQUIPMENT DIRECTLY
AM = ANCHOR SPECIFIED BY EQUIPMENT MANUFACTURER B = STRUCTURAL STEEL RAILS OR BASE 1 CONCRETE PAD MASS TO EQUAL AT LEAST 75% OF EQUIPMENT
B = RESTRAINING BASE WITH SNUBBER C = CONCRETE INERTIA BASE 2 NR=NOT REQUIRED, NA=NOT APPLICABLE
Y = REQUIRED PER SPECIFICATION 23 05 40 D = CURB-MOUNTED BASE 3 PIPING TO BE BRACED LATERALLY A MINIMUM OF EVERY 40' AND LONGITUDINALLY EVERY 80'
REGARDLESS OF SEISMIC REQUIREMENTS.
ISOLATOR TYPE 4 SEE SPECIFICATION SECTION 23 05 40 FOR DESCRIPTION AND REQUIREMENTS OF BASES, ISOLATORS, AND RESTRAINTS.1. PAD: RUBBER, GLASS FIBER 4. RESTRAINED SPRING ISOLATOR
2. RUBBER ISOLATOR, FLOOR OR HANGER 5. THRUST RESTRAINT 5 ALL PIPING GREATER THAN 1" MUST BE RESTRAINED
3. SPRING ISOLATOR, FLOOR OR HANGER 6. AIR SPRING 6 EQUIPMENT VENDOR TO DETERMINE DEFLECTION
GENERAL NOTES
A. ALL MECHANICAL HVAC WORK PART OF ALTERNATE 02 SCOPE.
www.coffman.com
221 N. Wall Street, Suite 500 Spokane, WA 99201 ph 509.328.2994
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
/2
/2
:1
:3
A M
04/02/2024
TAH
RKC
231290
M-601
MECHANICAL
SCHEDULES
USDA
RENOVATION TO
GARAGE
BUILDING
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
FINAL
TURNOVER
REV DATE DESCRIPTION
EXHAUST
AIR
OUTSIDE
AIR
RETURN
AIR
SUPPLY
AIR
SD
T
DI
M
M
M DPS
TT
AI
AO
DI
AI
R
RETURN SMOKE
DETECTORRETURN
TEMPERATURE
MIXED
TEMPERATUREFILTER
ALARM
NO
NC
NC
R
SAFETY
RELAY
XFMR
120V24VAC
EXHAUST AIR
DAMPER
VFD
DO
AO
START/STOP
SPEED
AI CURRENT
AI
SUPPLY
AIR
FLOW
RETURN AIR
DAMPER
AO
AO
OUTSIDE AIR
DAMPER
DPDOSTART / STOP
AOSETPOINT
SUPPLY
TEMPERATURE
PH
H
P
START / STOP
AO SETPOINT
DO
LP
FURNACE
DESCRIPTION OF OPERATION
EXISTING BUILDING AUTOMATION SYSTEM:
BUILDING 002 DOES NOT HAVE AN EXISTING BUILDING AUTOMATION SYSTEM. THE AIR HANDLING UNIT IN
THIS PROJECT’S SCOPE WILL BE STAND-ALONE, WITH PACKAGED FACTORY CONTROLS.
AHU-002-01:
PROVIDES SINGLE-ZONE HEATING, COOLING, AND VENTILATION FOR THE SAMPLE STORAGE AREA OF
BUILDING 002. THE OCCUPANCY MODE SHALL BE DETERMINED THROUGH A USER-ADJUSTABLE,
GRAPHICAL, SEVEN-DAY SCHEDULE WITH HOLIDAY SCHEDULE.
OCCUPIED MODE:
1. THE SUPPLY FAN SHALL BE ENERGIZED AND RUN AT CONSTANT SPEED WITH MINIMUM OUTSIDE AIR.
2. THE SUPPLY AIR TEMPERATURE SETPOINT SHALL BE RESET FROM T-MIN (55°F ADJ) WHEN THE OUTSIDE AIR TEMPERATURE IS 70°F AND ABOVE TO T-MAX (75-90°F) WHEN THE OUTSIDE AIR TEMPERATURE IS 65°F
AND BELOW.
3. UPON CALL FOR HEATING, INITIATE HEAT PUMP HEATING MODE AND MAINTAIN HEATING AIR SUPPLY TEMPERATURE SETPOINT OF 85°F (ADJ). IF SPACE SETPOINT IS STILL NOT MET, INCREASE SUPPLY FAN SPEED TO HIGH. IF DISCHARGE AIR SETPOINT CANNOT BE MET, OR THE HEAT PUMP ENTERS DEFROST, ENGAGE PROPANE HEAT TO MAINTAIN SUPPLY TEMPERATURE SETPOINT.
4. UPON CALL FOR COOLING, INITIATE FIRST STAGE COOLING AND MAINTAIN COOLING AIR SUPPLY TEMPERATURE SETPOINT. IF UNABLE TO MAINTAIN SETPOINT, ACTIVATE SECOND STAGE COOLING AND INCREASE SUPPLY FAN SPEED. SEPARATE THE TWO STAGES BY AN ADJUSTABLE TEMPERATURE DEAD
BAND TO ACHIEVE NO MORE THAN 4 COMPRESSOR STARTS PER HOUR.
5. ECONOMIZER COOLING IS ENABLED WHEN OUTSIDE AIR TEMPERATURE IS BELOW SUPPLY AIR TEMPERATURE SETPOINT AND DISABLED WHEN OUTSIDE AIR TEMPERATURE FALLS BELOW 35°F (ADJ) WITH A MIXED AIR TEMPERATURE LOW LIMIT OF 52°F (ADJ). WHEN ECONOMIZER COOLING IS ENABLED, DAMPERS OPEN TO MAXIMUM OUTSIDE AIR AND FANS RUN AT HIGH SPEED. IF COOLING SETPOINT IS NOT REACHED, ACTIVATE FIRST STAGE MECHANICAL COOLING.
6. SMOKE DETECTION CONTACTS SHALL BE WIRED TO DISABLE THE SUPPLY FAN THROUGH A HARD- WIRED INTERLOCK.