2024.02.01 Clare Gladwin Area Schools Gym AHU 100% Combined BID SET (1) (1).pdf

PDF 2 MB Posted

Attached to
Area School Gym HVAC
Solicitation number
RFP - CGRE - 240000001308
Issued by
Clare County, Michigan

About this file

This document is a bid package for a mechanical HVAC renovation project for the Clare-Gladwin Day School in Clare, Michigan. The project involves the replacement of an existing air handling unit (AHU) with a new AHU-1 unit and installation of a new air-cooled condensing unit (ACCU-1). The mechanical scope also includes modifying and connecting existing ductwork, piping, and controls to the new equipment. The electrical scope includes demolition of the existing AHU power and controls, and installation of new power and controls for the AHU-1 and ACCU-1. The project is scheduled for completion by February 1, 2024.

The bid package provides detailed specifications and drawings for the mechanical and electrical work. It specifies the use of particular manufacturers and models for the AHU and condensing unit. Pricing is not provided, but the bid package directs bidders to provide add/deduct pricing for any substitutions to the specified equipment. The project will be awarded based on the base bid price. No specific funding sources or set-asides are mentioned. The project will be subject to prevailing wage requirements and the contractor must obtain all necessary permits and inspections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2/ 3/

1:

A

M

JO

SE

PH

B R

EE

N

(J

BR

EE

N

M

AC

M

IL

LA

N

AS

SO

C

IA

TE

S.

C

O M

F:

\0 1-

M

IS

C \2

3-

C

LA

R

E G

LA

D

W

IN

A R

EA

S

C H

O O

L G

YM

N

AS

IU

M A

H U

R

EP

LA

C

EM

EN

T W

IT

H

A C

\2

3-

- C O

VE

R

S H

EE

T

AL

L

RI

GH

TS

R

ES

ER

VE

D.

C

OP

YR

IG

HT

M ac M

IL

LA

N

AS

SO

CI

AT

ES

, I

NC

. 2

SITE PLAN

NORTH

CLARE-GLADWIN RESD

2024 AHU RENOVATION

4041 MANNSIDING RD, CLARE, MICHIGAN

BID PACKAGE

Since 1963

(989) 894-4300

714 East Midland Street Bay City, Michigan 48706 www.macmillanassociates.com

CONSULTING ENGINEERS

MacMILLAN ASSOCIATES

CLARE, MICHIGAN

CLARE-GLADWIN

PUBLIC SCHOOL DISTRICT

LOCATION MAP

NONE

NORTH

DRAWING INDEX

M1.01 MECHANICAL HVAC DEMOLITION PLAN

M2.01 MECHANICAL HVAC RENOVATION PLAN

M3.01 MECHANICAL SCHEDULE AND DETAILS

M3.02 MECHANICAL SPECIFICATIONS

E1.01 ELECTRICAL DEMOLITION PLAN

E2.01 ELECTRICAL REVISED PLAN

E3.01 ELECTRICAL INFORMATION

CODE SUMMARY

BUILDING CODES

2015 MICHIGAN BUILDING CODE (MBC)

2015 INTERNATIONAL FIRE CODE (IFC)

2015 MICHIGAN MECHANICAL CODE (IMC)

2018 MICHIGAN PLUMBING CODE (IPC)

NEC 2017 (STATE OF MICHIGAN ELECTRICAL CODE)

2017 NATIONAL ELECTRICAL CODE WITH PART 8 AMENDMENTS

2015 MICHIGAN UNIFORM ENERGY CODE - CHAPTER 5 & MICHIGAN

UNIFORM ENERGY CODE,

PART 10A RULES (ANSI/ASHRAE 90.1-2013)

BUILDING STANDARDS

2009 ICC ANSI A117.1 ACCESSIBILITY STANDARD

2013 NFPA 10 - STANDARD FOR PORTABLE FIRE EXTINGUISHERS

2013 NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE

2012 NFPA 101 - LIFE SAFETY CODE

FIRE SUPPRESSION

NO

USE AND OCCUPANCY CLASSIFICATIONS (CHAPTER 3)

PROPOSED OCCUPANCIES

E, EDUCATION

SPECIAL DETAILED REQUIREMENTS (CHAPTER 4)

NONE

PROJECT

LOCATION

STORAGE

STORAGE

STORAGE

ACTIVITY

MUSIC

CLASSROOM

CLASSROOM

TOILET

TOILET

RAMP

PASSAGE

BOYS

TOILET

CORRIDOR

PRE-VOCATIONAL

TRAINING

COAT RM

GIRLS

TOILET

HALL

136a

STAFF

STORAGE

MECH

CLASSROOM

PASS

ITINERANT

WORK

RECEPTION

TLT

OFFICE

OFFICE

CONFERENCE

OFFICE

ASSESS'T

THERAPY

HEAR'G

STOR

TLT

TLT

CLASSROOM

CORRIDOR

VEST

TOILET

STORAGE

STORAGE

MECH

JC

113 JC

KITCHEN

CAFETERIA

OFFICE

OFFICE

CONFERENCE

RECEPTION

OFFICE

BATH

FIRST AID

SHWR

TLT

SHWR

TLT

HALL

LIBRARY

CLASSROOM

CORRIDOR

CORRIDOR

CLASSROOM

STOR

TLT

TLT

TLT

122 TLT

STOR

STOR

CLASSROOM

VEST

AREA OF WORK

NONE

February 1, 2024

MAI #2023-01119

February 1, 2024

MAI #2023-01119

http://www.macmillanassociates.com

AHU REPLACEMENT - MECHANICAL DEMOLITION PLAN

1/4"=1'-0"

DISCONNECT AND REMOVE EXISTING HEATED

HOT WATER SUPPLY AND RETURN PIPING

SERVING THE EXISTING AHU. REMOVE

ASSOCIATED CONTROL VALVE, SHUT OFF

VALVES, ETC.

DISCONNECT EXISTING SUPPLY DISCHARGE AIR

DUCT FROM AIR HANDLING UNIT. DISCONNECTED

DUCTWORK IS TO REMAIN AND BE REUSED FOR

THE NEW AIR HANDLING UNIT.

EXISTING OUTSIDE AIR INTAKE LOUVER TO

REMAIN. CONTRACTOR SHALL CLEAN LOUVER

AND BIRDSCREEN.

REMOVE EXISTING AHU AND ASSOCIATED

CONTROLS, PIPING, DUCTWORK ETC. AS

NECESSARY TO ALLOW INSTALLATION OF NEW

AHU-1, PIPING, DUCTWORK, ETC.

DISCONNECT AND REMOVE EXISTING

THERMOSTAT. (CONTRACTOR WILL FURNISH

NEW THERMOSTAT.)

REMOVE EXISTING OUTSIDE AIR DUCTWORK AND

FLEX CONNECTION AS REQUIRED TO INSTALL

NEW AHU-1 AND NEW FLEX CONNECTION.

EXISTING DUCT SMOKE DETECTOR TO BE

REUSED. EXISTING WIRING TO BE REVISED AND

EXTENDED AS REQUIRED FOR NEW UNIT.

KEYED NOTES

T

Since 1963

(989) 894-4300

714 East Midland Street Bay City, Michigan 48706 www.macmillanassociates.com

CONSULTING ENGINEERS

MacMILLAN ASSOCIATES

REV. DESCRIPTION BY DATE

0.5"0.0" 1.0" 2.0"1.5"2/ 3/

1:

A

M

JO

SE

PH

B R

EE

N

(J

BR

EE

N

M

AC

M

IL

LA

N

AS

SO

C

IA

TE

S.

C

O M

F:

\0 1-

M

IS

C \2

3-

C

LA

R

E G

LA

D

W

IN

A R

EA

S

C H

O O

L G

YM

N

AS

IU

M A

H U

R

EP

LA

C

EM

EN

T W

IT

H

A C

\2

3-

9-

M -M

1.

-M

EC

H

AN

IC

AL

H

VA

C D

EM

O

LI

TI

O N

P

LA

N

PROJECT DESCRIPTION

SHEET DESCRIPTION

AL

L

RI

GH

TS

R

ES

ER

VE

D.

C

OP

YR

IG

HT

M ac M

IL

LA

N

AS

SO

CI

AT

ES

, I

NC

SHEET No.

JOB No.DRAWN BY

DESIGNED BY

APPROVED BY

95% OWNER REVIEW MAI 01.24.2024

100% BID SET MAI 02.01.2024

CLARE-GLADWIN DAY SCHOOL

AHU REPLACEMENT

MECHANICAL HVAC

DEMOLITION PLAN VIEW

M1.01

2023-01119JWB

JWB

RAM

EX AHU

H W

W S

H W

W S

HWWS

H H

W R

H W

W S

H H

W R

EX 2" HWWS

EX 1 1/4" HHWR

EX 1 1/4" HWWS

EX 2" HHWR

H W

W S

HHWR

HWWSHWWS

HHWR

HWWS

HHWR HHWR

EX 1 1/4" HWWS

EX 1 1/4" HHWR

D S D

February 1, 2024

AHU REPLACEMENT - MECHANICAL RENOVATION PLAN

1/4"=1'-0"

INSTALL AND FURNISH NEW AIR HANDLING UNIT

PER MANUFACTURERS INSTRUCTIONS. UTILIZE

/REVISE THE EXISTING STRUCTURAL STEEL TO

SUPPORT SYSTEM.

CONNECT EXISTING SUPPLY AIR DISCHARGE

DUCT TO NEW AIR HANDLING UNIT.

CONNECT NEW OUTSIDE AIR DUCTWORK TO

EXISTING LOUVER AND WALL SLEEVE. FIELD

VERIFY EXACT DUCT SIZES. CONNECT NEW DUCT

TO OUTSIDE AIR CONNECTION ON FILTER MIXING

BOX WITH FLEXIBLE CONNECTION.

THE OWNERS TEMPERATURE CONTROL

CONTRACTOR SHALL FURNISH AND INSTALL NEW

SPACE SENSOR WALL THERMOSTAT.

MECHANICAL TRADES SHALL INCLUDE ALL

TEMPERATURE CONTROL COSTS.

FURNISH AND INSTALL NEW AIR COOLED

CONDENSING UNIT PER MANUFACTURERS

INSTRUCTIONS. FURNISH WITH 6" THICK

REINFORCED CONCRETE PAD.

ROUTE NEW REFRIGERANT PIPING UP WALL TO

ABOVE BOTTOM CHORD OF JOISTS. ROUTE PIPE

THROUGH JOISTS TO NEW AHU-1. FURNISH WALL

PIPE SUPPORT AS NECESSARY. ROUTE PIPING

TO THE BOTTOM OF STEEL WITHIN THE GYM FOR

ELEVATION. REFRIGERANT LINES ARE TO HAVE

3/4" ARMAFLEX INSULATION. INSULATION

OUTDOORS SHALL BE COVERED BY VENTURE

CLAD.

CONNECT NEW HEATING HOT WATER SUPPLY

AND RETURN PIPE TO EXISTING PIPING. (SEE

HEATED HOT WATER PIPE DETAIL FOR VALVES,

FITTINGS, ETC.)

DISCHARGE CONDENSATE DRAIN PIPE AT 24"

ABOVE GRADE. EXTEND DRAIN PIPE OUT WITH

GOOSENECK DOWN 2" FROM BUILDING.

REFRIGERANT LINES (RF) THROUGH WALL SHALL

BE INSULATED WITH ARMAFLEX AND EXTERIOR

INSULATION SHALL BE COVERED WITH VENTURE

CLAD.

EXISTING DUCT SMOKE DETECTOR TO BE

REMOUNTED AND HAVE WIRING REVISED AND

EXTENDED AS REQUIRED.

KEYED NOTES

Since 1963

(989) 894-4300

714 East Midland Street Bay City, Michigan 48706 www.macmillanassociates.com

CONSULTING ENGINEERS

MacMILLAN ASSOCIATES

REV. DESCRIPTION BY DATE

0.5"0.0" 1.0" 2.0"1.5"2/ 3/

1:

A

M

JO

SE

PH

B R

EE

N

(J

BR

EE

N

M

AC

M

IL

LA

N

AS

SO

C

IA

TE

S.

C

O M

F:

\0 1-

M

IS

C \2

3-

C

LA

R

E G

LA

D

W

IN

A R

EA

S

C H

O O

L G

YM

N

AS

IU

M A

H U

R

EP

LA

C

EM

EN

T W

IT

H

A C

\2

3-

9-

M -M

2.

-M

EC

H

AN

IC

AL

H

VA

C R

EN

O

VA

TI

O N

P

LA

N

PROJECT DESCRIPTION

SHEET DESCRIPTION

AL

L

RI

GH

TS

R

ES

ER

VE

D.

C

OP

YR

IG

HT

M ac M

IL

LA

N

AS

SO

CI

AT

ES

, I

NC

SHEET No.

JOB No.DRAWN BY

DESIGNED BY

APPROVED BY

95% OWNER REVIEW MAI 01.24.2024

100% BID SET MAI 02.01.2024

CLARE-GLADWIN DAY SCHOOL

AHU REPLACEMENT

MECHANICAL HVAC

RENOVATION PLAN VIEW

M2.01

2023-01119JWB

JWB

RAM

H W

W S

H W

W S

HWWS

H H

W R

H W

W S

H H

W R

EX 2" HWWS

EX 1 1/4" HHWR

EX 1 1/4" HWWS

EX 2" HHWR

H W

W S

HHWR

HWWSHWWS

HHWR

HWWS

HHWR HHWR

T

AHU-1

AC-1

R F

R F

R F

HWWS

HHWR

CD

C D

C D

CDCD

EX 1 1/4" HWWS

EX 1 1/4" HHWR

RF

RF

TEMPERATURE CONTROL NOTES:

1. THE MECHANICAL TRADE SHALL BE RESPONSIBLE

FOR CONTACTING THE OWNERS TEMPERATURE

CONTROL CONTRACTOR AND SHALL INCLUDE ALL

COSTS FOR THE TEMPERATURE CONTROL

CONTRACTOR TO PROVIDE AND INSTALL THE

TEMPERATURE CONTROL SYSTEM. THE NEW

AHU-1 SHALL BE ADDED INTO THE EXISTING

TEMPERATURE CONTROL SYSTEM ON SITE.

2. THE TEMPERATURE CONTROL CONTRACTOR

SHALL PROVIDE ALL CONTROL DEVICES,

ACTUATORS, WIRING, ETC. TO MATCH EXISTING

AHU CONTROL SEQUENCE.

EXISTING LOUVER

D S D

February 1, 2024

Since 1963

(989) 894-4300

714 East Midland Street Bay City, Michigan 48706 www.macmillanassociates.com

CONSULTING ENGINEERS

MacMILLAN ASSOCIATES

REV. DESCRIPTION BY DATE

0.5"0.0" 1.0" 2.0"1.5"2/ 3/

1:

A

M

JO

SE

PH

B R

EE

N

(J

BR

EE

N

M

AC

M

IL

LA

N

AS

SO

C

IA

TE

S.

C

O M

F:

\0 1-

M

IS

C \2

3-

C

LA

R

E G

LA

D

W

IN

A R

EA

S

C H

O O

L G

YM

N

AS

IU

M A

H U

R

EP

LA

C

EM

EN

T W

IT

H

A C

\2

3-

9-

M -M

3.

-M

EC

H

AN

IC

AL

S C

H

ED

U

LE

A N

D D

ET

AI

LS

PROJECT DESCRIPTION

SHEET DESCRIPTION

AL

L

RI

GH

TS

R

ES

ER

VE

D.

C

OP

YR

IG

HT

M ac M

IL

LA

N

AS

SO

CI

AT

ES

, I

NC

SHEET No.

JOB No.DRAWN BY

DESIGNED BY

APPROVED BY

95% OWNER REVIEW MAI 01.24.2024

100% BID SET MAI 02.01.2024

CLARE-GLADWIN DAY SCHOOL

AHU REPLACEMENT

MECHANICAL

SCHEDULE AND DETAILS

M3.01

2023-01119JWB

JWB

RAM

DSD

`[B-250`]

`[A-250`]

MBD MANUAL BALANCING DAMPER

DUCT SMOKE DETECTOR

RETURN OR EXHAUST AIR GRILLE - TYPE "B", 250 CFM

SUPPLY AIR DIFFUSER - TYPE "A", 250 CFM

HORIZONTAL FIRE DAMPER

VERTICAL SMOKE DAMPER

VERTICAL FIRE DAMPER

MECHANICAL SYMBOL LIST

VENT THRU ROOFVTR

RC

EWC

JS

RA

SA

UR

WC

L

SK

EX

FD

V

G

CHWR

CHWS

HHWR

HHWS

AW

AW

ST

ST

SAN

SAN

RAIN WATER CONDUCTOR

ELECTRIC WATER COOLER

JANITORS SINK

RETURN AIR

SUPPLY AIR

URINAL

WATER CLOSET

LAVATORY

SINK

EXISTING

FLOOR DRAIN

DOMESTIC HOT WATER RETURN PIPING

DOMESTIC HOT WATER PIPING

DOMESTIC COLD WATER PIPING

VENT PIPING

NATURAL GAS PIPING

CHILLED WATER RETURN PIPING

CHILLED WATER SUPPLY PIPING

HEATING HOT WATER RETURN PIPING

HEATING HOT WATER SUPPLY PIPING

ACID WASTE PIPING BELOW FLOOR OR GRADE

SANITARY PIPING BELOW FLOOR OR GRADE

SANITARY PIPING ABOVE FLOOR

STORM PIPING BELOW FLOOR OR GRADE

STORM PIPING ABOVE FLOOR

ACID WASTE PIPING ABOVE FLOOR

FP

COND

STM (#150)

FIRE PROTECTION PIPING

STEAM CONDENSATE RETURN PIPING

STEAM SUPPLY PIPING

COMPRESSED AIR PIPING (INDUSTRIAL TYPE)CA

VAC VACUUM PIPING

NITROGEN

TRIPLE DUTY VALVE

BUTTERFLY VALVE

GRISWOLD AUTOMATIC FLOW LIMITING VALVE

THREE WAY CONTROL VALVE (PNEUMATIC)

TWO WAY CONTROL VALVE (PNEUMATIC)

STRAINER

FLEXIBLE CONNECTION

FLOW ARROW

EXPANSION JOINT

OS & Y GATE VALVE

GLOBE VALVE N.C.

ISOLATION GATE VALVE

CHECK VALVE

UNION

CAP

REDUCER

GLOBE VALVE N.O.

BALL VALVE

GAS COCK

EXTERIOR WALL HYDRANT

VALVE IN RISER

PRESSURE REGULATING VALVE

TEMPERATURE & PRESSURE RELIEF VALVE

INLINE PUMP

FS

FLOW SWITCH

PRESSURE GAUGE W/COCK

MANUAL AIR VENT

AUTOMATIC AIR VENT

PIPE ANCHOR

PIPE GUIDE

WATER PIPING LOCATED OUTSIDE OF BUILDINGW

HORIZONTAL SMOKE DAMPER

DRAIN TILEDT

SLOT DIFFUSER

S

S

HORIZONTAL COMBINATION FIRE/SMOKE DAMPER

VERTICAL COMBINATION FIRE/SMOKE DAMPER

MOTORIZED DAMPER

MANUAL DAMPER

PUMPED CONDENSATE RETURN PIPINGPCR

RF REFRIGERANT LINE

PRESSURE SENSOR OR SWITCH

PS

THERMOMETER

FS FLOOR SINK

DRAIN TILE CONNECTORDTC

PRV PRESSURE REGULATING OR REDUCING VALVE

VA VALVE

SERC SECONDARY EMERGENCY RAIN WATER CONDUCTOR

CO CLEAN OUT

WALL CLEAN OUTWCO

SERD SECONDARY EMERGENCY ROOF DRAIN

SECONDARY EMERGENCY DRAINAGESED

SERVICE SINKSS

RD ROOF DRAIN

INVERT ELEVATIONIE

ELEVATIONEL

VENTV

CAST IRONCI

VENT STACKVS

HOT WATER RADIANT PANELHWRP

FIN TUBE RADIATIONFTR

RADIANT SUPPLY PIPINGRADS

VARIABLE AIR VOLUME BOXVAV

PRESSURE REGULATING OR REDUCING VALVE

T

SERVICE SINK

FLUSH TANK WATER CLOSET

FLUSH VALVE FLOOR MOUNTED

FLUSH VALVE WALL MOUNTED

URINAL

LAVATORY OR SINK

FLOOR SINK

THERMOSTAT OR WALL SENSOR

FLOOR DRAIN

N NIGHT STAT OR NIGHT WALL SENSOR

H HUMIDISTAT

S SENSOR

ROOF DRAIN BELOW ROOF (FLOOR PLAN)

ROOF DRAIN ON ROOF (ROOF PLAN)

EXHAUST FAN WITH FAN ABOVE (FLOOR PLAN)

EXHAUST FAN ON ROOF (ROOF PLAN)

CO UP TO GRADE

CO ABOVE FLOOR

CO UP TO FLOOR

SAN

SAN

SAN

ELBOW DROPPING DOWN

ELBOW RISING UP

TEE WITH PIPE DOWN

TEE WITH PIPE UP

SECONDARY EMERGENCY DRAINAGE PIPINGSED

N

HOT WATER PIPE WITH ELECTRICAL HEAT TRACE

THREE WAY CONTROL VALVE (ELECTRIC)

TWO WAY CONTROL VALVE (ELECTRIC)

KITCHEN MASTER GAS VALVE

GAS REGULATOR

DF DRINKING FOUNTAIN

FAN POWERED VARIABLE AIR VOLUME BOXFVB

HEAT PUMPHP

FLUID COOLERFC

CABINET HEATERCH

UNIT VENTILATORUV

EXHAUST FANEF

AIR COOLED CONDENSING UNITACCU

AIR CONDITIONING UNITACU

AIR HANDLING UNITAHU

BELOW FINISHED GRADEBFG

ABOVE FINISHED FLOORAFF

ROOF TOP UNITRTU

SHOWERSH

TRAP PRIMERTP

MAKE UP AIR UNIT MUA

RELIEF AIR HOODRAH

AIR INTAKE HOODAIH

INTERIOR HOSE BIBHB

EXTERIOR WALL HYDRANTWHYD

EX. VERTICAL FIRE DAMPER

EX. HORIZONTAL FIRE DAMPER

R RHEOSTAT

CO2 CARBON DIOXIDE SENSOR

ABOVEABV

CUBIC FEET PER MINUTECFM

OUTSIDE AIROA

EXHAUST AIREA

HOT WATER RETURNHWR

COLD WATERCW

HOT WATERHW

GALLONS PER MINUTEGPM

UNLESS NOTED OTHERWISEUNO

STATIC PRESSURESP

BARRIER FREEBF

RADIANT RETURN PIPINGRADR

MISC. EQUIP. COND DRAIN PIPINGCD

NC NORMALLY CLOSED

NORMALLY OPENEDNO

GREASE INTERCEPTORGI

WATER HEATERWH

HEAT EXCHANGERHX

CIRCULATING PUMPCP

VARIABLE FREQUENCY DRIVEVFD

POUNDS PER SQUARE INCHPSI

POUNDS PER SQUARE INCH GAUGEPSIG

EXHAUST AIR REGISTEREAR

RETURN AIR REGISTERRAR

SUPPLY AIR REGISTERSAR

FCV FLOW CONTROL VALVE

CTWS COOLING TOWER WATER SUPPLY PIPING

CTWR COOLING TOWER WATER RETURN PIPING

CWR CONDENSOR WATER RETURN PIPING

CWS CONDENSOR WATER SUPPLY PIPING

STEAM TRAPT

INTERIOR HOSE BIB

CONDENSATECOND

TRAPT

DUCT PRESSURE SENSOR

PRV

DIFFERENTIAL PRESSURE SENSOR

NITROUSOXIDENO2

AIRA

OXYGEN PIPINGO

REDUCED PRESURE BACKFLOW PREVENTERRPBP

TP TRAP PRIMER PIPING BELOW FLOOR

HPR

HPS

HEAT PUMP RETURN PIPING

HEAT PUMP SUPPLY PIPING

ELECTRIC VARIABLE AIR VOLUME BOXEVB

CONVECTORCONV

ENERGY RECOVERY UNITERUWASTE ANESTHESISWAGD

CARBON DIOXIDECO2

ACID VENT PIPINGAV

DEIONIZED WATER PIPINGDI

COMPRESSED AIRCA

DI DEIONIZED WATER

VARIABLE AIR VOLUME BOX W/ RE-HEAT COILVAVR

UNIT HEATERUH

RF RETURN AIR FAN

FAN COIL UNITFCU

COOLING TOWERCT

CABINET UNIT HEATERCUH

MECH. DRAWING SYMBOLIST

ONLY USE AS SYMBOL LIST ONLY (NOT FOR DRAFTING USE)

(REFERANCE ONLY)

VITRIFIED TILEVT

DS DRAINAGE STACK

GENERAL MECHANICAL NOTES

1. THE MECHANICAL TRADES SHALL FAMILIARIZE THEMSELVES WITH ALL

EXISTING AND NEW CONDITIONS, THESE DRAWINGS, ADDENDA & RELATED

SPECIFICATIONS. THEY SHALL COMPLETELY SATISFY THEMSELVES AS TO THE

CONDITIONS TO WHICH THE WORK IS TO BE PERFORMED BEFORE SUBMITTING

THEIR BID. NO ALLOWANCES OR CONSIDERATIONS WILL BE GIVEN AT A LATER

DATE FOR ALLEGED MISUNDERSTANDINGS AS TO THE REQUIREMENTS OF THE

WORK, MATERIALS TO BE FURNISHED, OR CONDITIONS REQUIRED BY THE

NATURE OF THIS PROJECT SITE DUE TO NEGLECT ON THE BIDDERS PART TO

MAKE SUCH AN EXAMINATION AND COORDINATION.

2. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO SHOW APPROXIMATE

LOCATION AND GENERAL ARRANGEMENT OF SYSTEMS AND EQUIPMENT.

DRAWINGS SHALL NOT BE SCALED FOR LOCATION OF SYSTEMS, EQUIPMENT,

ETC. ALL LOCATIONS OF SYSTEMS AND EQUIPMENT SHALL BE VERIFIED IN

FIELD AND COORDINATED WITH ALL OTHER TRADES AND EXISTING FIELD

CONDITIONS. SOME SYSTEMS (PIPING, DUCTWORK, ETC.) AND EQUIPMENT

LOCATIONS MAY REQUIRE CHANGES IN LOCATION DUE TO FIELD CONDITIONS

AND COORDINATION WITH OTHER TRADES. THESE CHANGES SHALL BE MADE

WITH NO ADDITIONAL COST TO THE OWNER. FAILURE TO VERIFY AND

COORDINATE WILL BE NO REASON FOR ADDITIONAL COMPENSATION.

3. THE INSTALLATION OF ALL SYSTEMS, EQUIPMENT, ETC., IS SUBJECT TO

CLARIFICATION WITH SUBMITTED SHOP DRAWINGS AND FIELD COORDINATION

REQUIREMENTS. EQUIPMENT OUTLINES SHOWN ON DRAWINGS OR

DIMENSIONED ON DRAWINGS ARE LIMITING DIMENSIONS. ANY EQUIPMENT

THAT REDUCES THE INDICATED CLEARANCES OR EXCEEDS SPECIFIED OR

SCHEDULED EQUIPMENT DIMENSIONS SHALL NOT BE USED.

4. THE MECHANICAL CONTRACTOR SHALL COORDINATE FINAL LOCATION OF ALL

EQUIPMENT WITH PIPING, DUCTWORK, ETC., AT THE TIME OF ROUGH-IN. ALL

EQUIPMENT TO BE SERVICEABLE. ABOVE CEILING EQUIPMENT SHALL BE

WITHIN 18” OF CEILING WITHOUT ANY OBSTRUCTIONS AND SHALL HAVE ALL

SERVICE AND ACCESS SPACES KEPT CLEAR. PERFORM ABOVE CEILING

COORDINATION WITH ALL TRADES.

5. THESE DRAWINGS AND THE ASSOCIATED SPECIFICATIONS ARE INTENDED TO

PROVIDE COMPLETELY FURNISHED, INSTALLED AND OPERATIONAL

MECHANICAL SYSTEM (HEATING, VENTILATING, AIR CONDITIONING, PLUMBING

AND PIPING, ETC.). IF THESE DRAWINGS AND ASSOCIATED SPECIFICATIONS

HAVE INFORMATION OMITTED THAT WOULD NOT ALLOW A COMPLETELY

OPERATIONAL SYSTEM AS IS THE INTENT OF THE ENGINEER, THE BIDDER

SHALL NOTIFY THE ENGINEER A MINIMUM ONE WEEK PRIOR TO THE BID DATE

TO ALLOW FOR ADDENDA. ONCE BIDS HAVE BEEN RECEIVED, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIAL, LABOR, ETC., TO

FURNISH AND INSTALL A COMPLETELY OPERATIONAL MECHANICAL SYSTEM AS

IS THE INTENT OF THESE DRAWINGS AND ASSOCIATED SPECIFICATION. ALL

EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. IF

ANY DISCREPANCIES ARE ON DRAWINGS, AS COMPARED TO MANUFACTURER'S

INSTALLATION INSTRUCTIONS, THE CONTRACTOR SHALL NOTIFY THE

ENGINEER AND INSTALL EQUIPMENT AS REQUIRED AT NO ADDITIONAL COST TO

THE PROJECT.

6. THE MECHANICAL TRADES SHALL TAKE OUT ALL PERMITS AND ARRANGE FOR

NECESSARY INSPECTIONS AND SHALL PAY ALL FEES AND COSTS.

7. THE MECHANICAL TRADES SHALL VERIFY AMOUNT OF EXISTING PIPING,

VALVES, DUCTWORK, ETC. TO BE REMOVED OR RELOCATED TO ALLOW FOR

INSTALLATION OF NEW PIPING, DUCTWORK, VALVES, EQUIPMENT, WALLS, ETC.

ALL ABANDONED PIPING, VALVES, ETC., SHALL BE REMOVED.

8. THE MECHANICAL TRADES SHALL COORDINATE ALL WORK WITH OTHER

TRADES AND SHALL COORDINATE ANY SYSTEMS SHUT-DOWN WITH THE

ARCHITECT/ENGINEER AND OWNER.

9. ALL EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. THAT IS TO BE REMOVED

SHALL REMAIN THE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL

REMOVE AND LOCATE THIS MATERIAL THAT REMAINS THE PROPERTY OF THE

OWNER TO A LOCATION DETERMINED BY THE OWNER SOMEWHERE ON SITE. IF

THE OWNER DOES NOT WANT TO MAINTAIN POSSESSION OF THE REMOVED

MATERIAL, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING

MATERIAL FROM THE SITE AND DISPOSING OF THIS MATERIAL AS NECESSARY

TO MEET ALL CODES AND REQUIREMENTS AND SHALL PAY ALL COSTS AS

REQUIRED FOR ANY DISPOSAL FEES, INSPECTIONS, PERMITS, ETC.

10. ATTACHMENTS OF MECHANICAL OR ELECTRICAL EQUIPMENT TO STRUCTURAL

MEMBERS ARE THE RESPONSIBILITY OF THE INSTALLING TRADE. STRUCTURAL

MEMBERS SHALL NOT BE FIELD CUT, WELDED OR OTHERWISE MODIFIED

WITHOUT APPROVAL OF THE ARCHITECT/ENGINEER. ATTACHMENT TO STEEL

JOISTS SHALL BE MADE AT PANEL POINTS WHENEVER POSSIBLE. STEEL

JOISTS SHALL BE REINFORCED FOR NON-PANEL POINT CONCENTRATED LOADS

IN ACCORDANCE WITH THE STRUCTURAL DETAILS; THIS WORK SHALL BE

PERFORMED BY CERTIFIED WELDERS AND IS THE RESPONSIBILITY OF THE

TRADE INSTALLING THE SUBJECT LOAD. STRUCTURAL MEMBERS SHALL NOT

BE OVERLOADED AS A RESULT OF ATTACHMENTS. ATTACHMENT/EQUIPMENT

LOADING FOR ALL TRADES RESULTING IN TOTAL LOAD GREATER THAN AN

EQUIVALENT UNIFORM 5 PSF FOR ANY MEMBER SHALL BE SUBMITTED TO THE

ARCHITECT/ENGINEER FOR REVIEW.

11. THE MECHANICAL TRADES SHALL FURNISH AND LOCATE CEILING AND/OR WALL

ACCESS DOORS AS REQUIRED TO GIVE ACCESS TO VALVES, EQUIPMENT, ETC.

COORDINATE WALL OR CEILING FIRE RATINGS AND FURNISH ACCESS DOOR

WITH RATING AS NECESSARY. THE GENERAL TRADES SHALL INSTALL ACCESS

DOORS.

12. FURNISH PREFABRICATED ROOF CURB FOR EACH EXHAUST FAN, WITH HEIGHT

OF CURB TO GIVE MINIMUM 12” CLEAR FROM FINISHED ROOF TO EXHAUST FAN

CURB CAP. THE MECHANICAL TRADE SHALL FURNISH THE ROOF CURB TO THE

GENERAL TRADE. THE GENERAL TRADE SHALL LEVEL CURB, PERFORM ALL

ROOFING AND FLASHING ETC.

13. SEE SPECIFICATION FOR FURTHER INFORMATION.

SPECIFIED AND SCHEDULED EQUIPMENT NOTE

EQUIPMENT MANUFACTURERS AND MATERIALS SPECIFIED OR SCHEDULED ON

THESE PROJECT DRAWINGS AND SPECIFICATIONS SHALL BE INCLUDED UNDER THE

BASE BID PRICE. SUBSTITUTE OR ALTERNATE EQUIPMENT SHALL BE PRICED AS AN

ADD OR DEDUCT PRICE TO THE CONTRACTOR'S BASE BID PRICE. IF ONE OR MORE

SUBSTITUTIONS ARE ACCEPTED WITH THE PROPOSAL AT THE CORRESPONDING

ALTERNATE PRICE, IT SHALL BE UNDERSTOOD THAT APPROVAL OF SAID

EQUIPMENT SHALL BE SUBJECT TO STRICT ADHERENCE TO THE PLANS AND

SPECIFICATIONS. SHOULD ANY OF THE SUBSTITUTE EQUIPMENT FAIL TO MEET THE

SPECIFICATIONS AFTER THE PROPOSAL HAS BEEN ACCEPTED, REGARDLESS IF

EQUIPMENT HAS BEEN SHIPPED TO THE SITE AND INSTALLED, THE CONTRACTOR

SHALL FURNISH AT NO EXTRA COST TO THE OWNER, THE SPECIFIED EQUIPMENT

MEETING THE REQUIREMENTS AS STATED IN THESE SPECIFICATIONS AND COVER

ALL COSTS NECESSARY FOR REMOVAL AND REINSTALLATION OF EQUIPMENT.

BOOSTER COIL PIPING DETAIL

NO SCALE

COIL

WITH 3-WAY CONTROL VALVE

HEATING HOT WATER

HEATING HOT WATER

AUTOMATIC FLOW LIMITING

UNION (TYP)

3-WAY CONTROL VALVE

MANUAL AIR VENT AT HIGH POINT IN PIPING

(1/4" BALL VALVE PIPED TO ACCESSIBLE LOCATION)

#110 PETES PLUG WITH NORDELL VALVE CORE,

FURNISH ONE TEST KIT FOR PROJECT

HOT WATER BOOSTER COIL

BALL SHUT-OFF VALVE

SUPPLY PIPING

RETURN PIPING

CONTROL VALVE

1 2 3 4 5 6

10 8

STRAINER WITH DRAIN VALVE AND PRESSURE PORTS

COOLING COIL CONDENSATE DRAIN TRAP DETAIL

NO SCALE

COOLING COIL

COOLING COIL CONDENSATE

DRAIN CONNECTION

UNION

MINIMUM 6" DEEP TRAP

SEAL FOR AIR HANDLERS

MIN. 3" DEEP TRAP SEAL

FOR U.V.'S AND FAN COIL

UNITS

SAME DEPTH AS

CLEANOUT FITTING

CONDENSATE DRAIN - EXTEND

TO FLOOR DRAIN, FLOOR

SINK, AS NOTED ON DRAWINGS

OR REQUIRED.

6 7

NOTE: REFER TO MANUFACTURERS

INSTALLATION INSTRUCTIONS

AND MEET ALL REQUIREMENTS.

COIL-TYPE VERTICAL AIR HANDLING UNITS

MARK MANUFACTURER MODEL TYPE SUPPLY

AIRFLOW

RETURN

AIRFLOW

OUTSIDE

AIRFLOW

STATIC PRESSURE (IN

WG) FAN MOTOR (HP)

HEATING

CAPACITY

(INPUT)

HEATING

CAPACITY

(OUTPUT)

MAX

TEMP.

RISE (F)

UNIT

WEIGHT

(LBS)

UNIT DIMENSIONS

(L x W x H)

ELECTRICAL

NOTES

VOLTS PHASE MCA MOPEXT. TOTAL SUPPLY RETURN MBH MBH

AHU-1 TRANE UCCAG06A0G0RD13300000ADD884DA1AC00000BB1 COIL 2,400 2,040 360 0.60 2.77 3.0 2.17 117 45 1,028 97 15/16" X 47" X 38 1/2" 208 3 19.5 30 1,2,3,4

NOTES:

1. A VARIABLE FREQUENCY DRIVE (VFD) SHALL BE PROVIDED TO ENSURE PROPER OPERATION AND TO OPTIMIZE OPERATING LIFE.

2. UNIT CONSTRUCTION: 18 GA. CASING, DOUBLE-WALL, 1" INSULATION. HINGED ACCESS DOORS.

3. AIR FILTERS PROVIDED BY MANUFACTURER. FURNISH (1) COMPLETE EXTRA SET OF FILTERS FOR FUTURE USE.

4. UNIT WITH GREATER THAN 2,000 CFM SHALL HAVE DRY CONTACTS FOR DUCT SMOKE DETECTOR CIRCUIT FACTORY WIRED TO STOP UNIT UPON DETECTION OF SMOKE. DUCT SMOKE DETECTOR SHALL BE FURNISHED AND WIRED BY ELECTRICAL CONTRACTOR, WITH SHEET METAL INSTALLATION BY MECHANICAL TRADES.

AIR COOLED CONDENSING UNIT SCHEDULE

Mark Serving REFRIGERANT NOMINAL

TONNAGE COMPRESSOR RLA COMPRESSOR

QUANTITY

ELECTRICAL

MANUFACTURER MODEL NUMBER SEER REMARKS

MCA MOP RLA VOLTS/Hz/PH

ACCU-1 AHU-1 R-410A 7.5 TON 26.9 1 36.0 60 26.9 208/60/3 TRANE TTA0903AAA**BS010001 14 1,2,3,4,5,6

NOTES:

1. UNIT CASING IS CONSTRUCTED OF HEAVY GAUGE GALVANIZED STEEL AND PAINTED WITH WEATHER RESISTANT BAKED ENAMEL FINISH.

2. ALUMINUM COIL WITH INTEGRATED SLIDE DECK FOR EASY REMOVAL, ENHANCED COIL FIN WITH BLOW THROUGH DESIGN.

3. TOP DISCHARGE AREA SHOULD BE UNRESTRICTED FOR AT LEAST 72" ABOVE UNIT. UNIT SHOULD BE PLACED SO ROOF RUN-OFF WATER DOES NOT POUR DIRECTLY ON UNIT.

4. UNIT SHOULD BE AT LEAST 6" FROM WALL. MAINTAIN A MINIMUM OF 36" BETWEEN CONDENSING UNITS ON NON-SERVICE SIDE AND 48" MINIMUM CLEARANCE FROM SERVICE SIDE OF CONDENSING UNIT.

February 1, 2024

714 East Midland Street Bay City, Michigan 48706 www.macmillanassociates.com

CONSULTING ENGINEERS

MacMILLAN ASSOCIATES

REV. DESCRIPTION BY DATE

0.5"0.0" 1.0" 2.0"1.5"2/ 3/

1:

A

M

JO

SE

PH

B R

EE

N

(J

BR

EE

N

M

AC

M

IL

LA

N

AS

SO

C

IA

TE

S.

C

O M

F:

\0 1-

M

IS

C \2

3-

C

LA

R

E G

LA

D

W

IN

A R

EA

S

C H

O O

L G

YM

N

AS

IU

M A

H U

R

EP

LA

C

EM

EN

T W

IT

H

A C

\2

3-

9-

M -M

3.

-M

EC

H

AN

IC

AL

S

PE

C

IF

IC

AT

IO

N

S

PROJECT DESCRIPTION

SHEET DESCRIPTION

AL

L

RI

GH

TS

R

ES

ER

VE

D.

C

OP

YR

IG

HT

M ac M

IL

LA

N

AS

SO

CI

AT

ES

, I

NC

SHEET No.

JOB No.DRAWN BY

DESIGNED BY

APPROVED BY

95% OWNER REVIEW MAI 01.24.2024

100% BID SET MAI 02.01.2024

CLARE-GLADWIN DAY SCHOOL

AHU REPLACEMENT

MECHANICAL

SPECIFICATIONS

M3.02

2023-01119JWB

JWB

RAM

MECHANICAL SPECIFICATIONS

REFERENCE

INSTRUCTIONS TO BIDDERS, CONDITIONS OF THE CONTRACT, DIVISION 1, AND THIS

SECTION SHALL APPLY TO THIS DIVISION.

CODES, PERMITS & INSPECTIONS

CONTRACTOR SHALL SECURE PERMITS, INSPECTIONS AND TESTS, PAY ALL FEES,

DEPOSITS, AND COSTS FOR ALL MECHANICAL UTILITIES AND SERVICES INVOLVED AND

PRESENT THE OWNER A CERTIFICATE OF INSPECTION AND APPROVAL FROM THE

DEPARTMENT HAVING JURISDICTION OVER HIS WORK. SHOULD ANY CHANGE IN THE

DRAWINGS AND SPECIFICATIONS BE REQUIRED TO COMPLY WITH ALL APPLICABLE CODES,

RULES, REGULATIONS, ETC., CONTRACTOR SHALL NOTIFY THE ENGINEER BEFORE

SUBMITTING BID. AFTER ENTERING INTO CONTRACT, ALL WORK NECESSARY TO MEET THE

REQUIREMENTS SHALL BE COMPLETED WITHOUT ADDITION TO THE CONTRACT AMOUNT.

WHERE WORK INDICATED IS MORE THAN REQUIRED BY CODES, ETC., SUCH WORK SHALL

BE AS INDICATED.

JOB OBSERVATION

NOTWITHSTANDING ANY REFERENCE TO ANY CODE, RULE OR REGULATION, ENGINEER

SHALL HAVE NO RESPONSIBILITY FOR SAFETY ON THE JOB SITE, SHALL HAVE NO RIGHT TO

CHANGE OR STOP THE WORK, SHALL NOT CONTROL THE MEANS OF THE WORK, AND SHALL

NOT HAVE ANY DUTY TO PROVIDE SUPERVISION OF MEANS, METHODS, PROCESSES OR

PROCEDURES OF CONSTRUCTION.

FIRST-CLASS WORKABLE SYSTEMS

FIRST CLASS WORKABLE SYSTEMS SHALL BE PROVIDED BY THE CONTRACTOR. IF, IN THE

OPINION OF THE CONTRACTOR, CHANGES IN THE DRAWINGS OR SPECIFICATIONS ARE

REQUIRED TO PRODUCE FIRST-CLASS WORKABLE SYSTEMS, CONTRACTOR SHALL

REQUEST AN INTERPRETATION FROM THE ENGINEER BEFORE PROCEEDING WITH THE

WORK. IF THE CONTRACTOR FAILS TO MAKE SUCH A REQUEST, NO EXCUSE WILL

THEREAFTER BE ENTERTAINED FOR FAILURE TO PROVIDE FIRST-CLASS WORKABLE

SYSTEMS.

DRAWINGS

DRAWINGS ARE INTENDED TO SHOW THE GENERAL ARRANGEMENT, DESIGN, AND EXTENT

OF THE WORK AND ARE DIAGRAMMATIC. THEY ARE NOT INTENDED TO BE SCALED FOR

ROUGH-IN MEASUREMENTS NOR TO SERVE AS SHOP DRAWINGS. THE ENGINEERS AND

OWNER RESERVE THE RIGHT TO MAKE MINOR CHANGES IN THE LOCATION OF EQUIPMENT,

DUCTWORK, PIPING, ETC. AT THE TIME OF ROUGH-IN WITHOUT ADDITIONAL COST TO THE

OWNER. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, LOCATIONS, ETC. FOR

ACCURACY AND POSSIBILITY OF INTERFERENCES DUE TO FIELD CONDITIONS AND ACTUAL

BUILDING STRUCTURE. FAILURE TO CHECK WILL BE NO REASON FOR ADDITIONAL

COMPENSATION.

SHOP DRAWINGS

SUBMIT ELECTRONIC SET OF COMPLETE SHOP DRAWINGS FOR ALL MECHANICAL

EQUIPMENT AND MATERIALS TO THE ENGINEER FOR REVIEW BEFORE FABRICATION OF

WORK OR ORDERING OF EQUIPMENT. DRAWINGS MUST BE REVIEWED BY THE ENGINEER

BEFORE ORDERING EQUIPMENT. ALL SHOP DRAWINGS REJECTED SHALL BE CORRECTED

AND RESUBMITTED TO THE ENGINEER BEFORE ORDERING.

STANDARDS OF INDUSTRY

STANDARDS OF INDUSTRY SHALL BE FOLLOWED WHEN APPLICABLE.

GUARANTEE

CONTRACTOR SHALL GUARANTEE EQUIPMENT, MATERIALS AND WORKMANSHIP IN HIS

CONTRACT AND SHALL MAKE GOOD AT HIS OWN EXPENSE ANY DEFECTS WHICH MAY

DEVELOP WITHIN ONE YEAR AFTER START-UP OF EACH PIECE OF EQUIPMENT,

OCCUPANCY BY OWNER, OR FINAL ACCEPTANCE OF THE JOB, WHICHEVER OCCURS FIRST.

CONTRACTORS RECORD/AS-BUILT DRAWINGS

CONTRACTOR SHALL MAINTAIN AND KEEP AN UP-TO-DATE SET OF “RECORD” DRAWINGS

REFLECTING "AS-BUILT" CONDITIONS OF THEIR WORK. CONTRACTOR SHALL INDICATE

EXACT DIMENSIONS AND ELEVATIONS FOR ALL UNDERGROUND WORK. UPON COMPLETION

OF THIS PROJECT, THE CONTRACTOR SHALL DELIVER TO THE ENGINEER THE “RECORD”

DRAWINGS.

LOCAL CONDITIONS

BEFORE SUBMITTING BIDS AND/OR PROCEEDING WITH THE PROJECT, THE CONTRACTOR

SHALL EXAMINE ALL DRAWINGS, SPECIFICATIONS AND ADDENDA ISSUED FOR THE

PROJECT AND SHALL EXAMINE THE PROJECT SITE. THE CONTRACTOR SHALL

THOROUGHLY INVESTIGATE THE PROJECT SITE AND BECOME FULLY INFORMED AS TO THE

EXTENT OF HIS WORK AND COORDINATION OF THIS WORK WITH ALL OTHER TRADES AND

INCLUDE ALL COST TO PERFORM AND COMPLETE WORK FOR THIS PROJECT PER

DRAWINGS AND SPECIFICATION AND ALL CODES.

OPERATION AND MAINTENANCE MANUALS

CONTRACTOR SHALL FURNISH TO THE ARCHITECT/ENGINEER TWO (2) COPIES OF AN

APPROVED BOUND (3-RING BINDER) BOOK WITH TABS FOR SECTIONS COVERING EACH

ITEM OF EQUIPMENT. THESE NOTEBOOKS SHALL INCLUDE SHOP DRAWINGS,

MAINTENANCE MANUALS, OPERATING MANUALS AND PARTS LIST AS NECESSARY TO

INSTRUCT THE OWNER ON PROPER OPERATION AND USE AS WELL AS MAINTENANCE FOR

EACH PIECE OF EQUIPMENT FOR THIS PROJECT. THESE BOOKS SHALL ALSO INCLUDE

CONTRACTOR'S, SUBCONTRACTOR'S AND MANUFACTURER'S NAMES, TELEPHONE

NUMBERS AND ADDRESSES. MANUALS SHALL ALSO INCLUDE SEQUENCE OF OPERATION,

CONTROL EQUIPMENT LITERATURE, WIRING AND CONTROL DIAGRAMS, CERTIFICATES OF

GUARANTEES, CERTIFICATES OF INSPECTION, MECHANICAL SYSTEM TEST AND BALANCING

REPORTS. THE CONTRACTOR SHALL ACCUMULATE AND SUMMARIZE THE CONTROL AND

MAINTENANCE SEQUENCE IN TYPEWRITTEN SHEET TO BE INCLUDED IN THE REPORT.

THESE MANUALS SHOULD BE HARD BOUND IN BEST QUALITY BINDERS AND TURNED OVER

TO THE ARCHITECT/ENGINEER FOR APPROVAL AT COMPLETION OF PROJECT.

START-UP SERVICE

CONTRACTOR SHALL ARRANGE WITH EQUIPMENT MANUFACTURERS FOR PROVIDING

COMPLETE START-UP SERVICE FOR ALL EQUIPMENT ON THIS PROJECT. ALL START-UP

SERVICES SHALL BE PERFORMED IN THE PRESENCE OF THE OWNER AND/OR ENGINEER. A

WRITTEN REPORT SHALL BE SUBMITTED TO THE ENGINEER STATING DATE OF START-UP,

MANUFACTURER APPROVAL OF SYSTEM OPERATION AND INSTALLATION.

CUTTING AND PATCHING

CUTTING AND PATCHING SHALL BE BY TRADES REGULARLY ENGAGED IN THIS TYPE OF

WORK, EXCEPT DRILLING OF HOLES SHALL BE DONE BY THE TRADES REQUIRING SAME.

STRUCTURAL MEMBERS SHALL NOT BE CUT OR DRILLED.

SALVAGEABLE MATERIAL

SALVAGEABLE MATERIAL SHALL REMAIN THE PROPERTY OF THE OWNER AND SHALL BE

STORED AT LOCATIONS AS DIRECTED BY THE OWNER, EXCEPT THE OWNER RESERVES

THE RIGHT TO DESIGNATE CERTAIN ITEMS OF SALVAGEABLE MATERIAL TO BE REMOVED

FROM THE PROJECT SITE.

RIGGING AND HOISTING

PERFORM ALL REQUIRED RIGGING, HOISTING, TRANSPORTATION, MOVING, ETC. OF ALL

EQUIPMENT, MATERIALS, ETC. TO BE FURNISHED AND/OR INSTALLED AS SHOWN ON

DRAWINGS, WHETHER FURNISHED BY THIS CONTRACTOR OR BY THE OWNER OR OTHER

TRADES.

STORAGE FACILITY

FURNISH AND MAINTAIN A WEATHERPROOF STORAGE FACILITY ON THE SITE OF ADEQUATE

SIZE TO STORE MISCELLANEOUS EQUIPMENT AND/OR MATERIALS TO PREVENT EXPOSURE

TO THE WEATHER. LOCATION OF SHED SHALL BE DETERMINED BY THE OWNER AND

ARCHITECT/ENGINEER. THE OWNER RESERVES THE RIGHT TO DENY STORAGE OF

MATERIALS OR EQUIPMENT IN ANY EXISTING OR NEW BUILDINGS.

PROTECTION FROM DAMAGE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS, EQUIPMENT, ETC. AND

ALL WORK INSTALLED BY HIMSELF AND SHALL PROTECT IT FROM DAMAGE UNTIL FINAL

ACCEPTANCE OF THIS PROJECT BY THE OWNER.

FURNISH ALL COVERINGS AND PROTECTION FROM DIRT, DUST, RAIN, STORM, HEAT,

TRAFFIC, WEAR, ETC. AND ALL POSSIBLE INJURY INCLUDING THAT BY OTHER WORKMEN.

ANY EQUIPMENT, WORKMANSHIP, MATERIALS, ETC. DAMAGED PRIOR TO FINAL

ACCEPTANCE BY THE OWNER OF THIS PROJECT SHALL BE PROPERLY REPAIRED AT NO

EXPENSE TO THE OWNER.

PROTECT ALL PLUMBING FIXTURES AND OTHER EQUIPMENT FROM DAMAGE BY COVERING

OR COATING. ANY DENTED, SCRATCHED, RUSTED OR MARRED SURFACE FINISHES WILL

NOT BE ACCEPTED.

PROTECT ALL EQUIPMENT, MATERIALS, ETC. FROM FREEZING.

PLUMBING AND PIPING BASIC MATERIALS AND METHODS:

HEATING HOT WATER PIPING

PIPING 3" AND SMALLER: COPPER TUBING: ASTM B88, TYPE L, HARD DRAWN, SEAMLESS.

FITTINGS: ASME B16.18 CAST BRONZE TEE TAP OR ASME B16.22 SOLDER WROUGHT

COPPER.

JOINTS: 95-5 TIN - ANTIMONY OR TIN AND SILVER WITH MELTING RANGE 430 TO 535

DEGREES F.

JOINTS: 2" THRU 6" MAY BE MECHANICAL PIPE COUPLINGS OF A BOLTED TYPE WITH A

CENTRAL CAVITY DESIGN PRESSURE-RESPONSIVE GASKET ALONG WITH GROOVED END

COPPER OR BRONZE FITTINGS AS AVAILABLE, AS MANUFACTURED BY VICTAULIC OR

GRUVLOK AS FOLLOWS:

COPPER TUBE: ASTM B88 (TYPE K OR L) - ROLL GROOVED ONLY.

MECHANICAL COUPLINGS: SHALL BE VICTAULIC STYLE 606 RIGID COUPLINGS FOR COPPER

CONSISTING OF A DUCTILE IRON CAST HOUSING, A SYNTHETIC RUBBER GASKET OF A

CENTRAL CAVITY PRESSURE-RESPONSIVE DESIGN, WITH PLATED NUTS AND BOLTS TO

SECURE UNIT TOGETHER.

COUPLING HOUSINGS: SHALL BE DUCTILE IRON CONFORMING TO ASTM A395 AND ASTM

A536 (GRADE 65-45-12), WITH A COPPER COLORED ALKYD ENAMEL PAINT COATING, AS

MANUFACTURED BY VICTAULIC COMPANY OF AMERICA.

GASKETS: SHALL BE MOLDED OF SYNTHETIC RUBBER IN A FLUSHSEAL® CONFIGURATION

CONFORMING TO THE COPPER TUBE SIZE (CTS) OUTSIDE DIAMETER AND COUPLING

HOUSING, OF ELASTOMERS HAVING PROPERTIES AS DESIGNATED IN ASTM D-2000.

GASKET SUPPLIED FOR WATER SERVICES FROM -30 TO +230 DEGREES F GRADE "E" EPDM

COMPOUND MOLDED OF MATERIALS CONFORMING TO ASTM D-2000, DESIGNATION

2CA615A25B24F17Z.

FLANGE ADAPTERS: SIMILAR TO VICTAULIC STYLE 641 VIC-FLANGE ADAPTERS 2" - 6",

DUCTILE IRON ASTM A-536 OR MALLEABLE IRON ASTM A-47, ENGAGING DIRECTLY INTO

ROLL GROOVED COPPER TUBE AND FITTINGS AND BOLTING DIRECTLY TO ANSI CLASS 125

CAST IRON AND CLASS 150 STEEL FLANGED COMPONENTS; INSTALLER TO SUPPLY

STANDARD FLANGE BOLTS. FLANGE CASTING SHALL BE AS IN 7.2.A ABOVE WITH A

CORRESPONDING VIC-FLANGE GASKET AS IN 7.3 ABOVE.

FITTINGS: FITTINGS SHALL BE FULL FLOW (SMOOTH TURN ELBOWS) COPPER FITTINGS

WITH GROOVES DESIGNED TO ACCEPT GROOVED END COUPLINGS.

VICTAULIC OR GRUV-LOK MECHANICAL PIPE COUPLINGS, FITTING, VALVES AND OTHER

GROOVED COMPONENTS MAY BE USED AS AN OPTION TO WELDING, THREADING OR

FLANGED METHODS. ALL GROOVED COMPONENTS SHALL BE OF ONE MANUFACTURER

AND SHALL CONFORM TO LOCAL CODE APPROVAL AND/OR AS LISTED BY ANSI B31.1, B 31.9,

ASME, UL/FM IAPMO OR BOC. GROOVED END PRODUCT MANUFACTURER TO BE ISO-9001

CERTIFIED.

ROLL OR CUT GROOVED ENDS AS APPROPRIATE TO PIPE MATERIAL, WALL THICKNESS,

PRESSURES, SIZE AND METHOD OF JOINING. PIPE ENDS SHALL BE GROOVED IN

ACCORDANCE WITH MANUFACTURERS CURRENT LISTED STANDARDS CONFORMING TO

ANSI/AWWA C-606.

MECHANICAL COUPLINGS SHALL BE SIMILAR TO VICTAULIC STYLE 07 (ZERO-FLEX) RIGID

COUPLING OR STYLE HP-70 RIGID COUPLING FOR HIGH PRESSURE SERVICE. VICTAULIC

STYLE 77 OR 75 COUPLING SHALL BE USED WHERE SYSTEM FLEXIBILITY IS DESIRED AT

PUMPS AND OTHER MECHANICAL EQUIPMENT TO REDUCE NOISE AND VIBRATION. NOISE

AND VIBRATION REDUCTION IS ACHIEVED BY INSTALLING (3) STYLE 77 OR 75 FLEXIBLE

COUPLINGS NEAR THE VIBRATION SOURCE. COUPLINGS SHALL BE OF CAST DUCTILE IRON

CONFORMING TO ASTM A536, GRADE 65-45-12 OR MALLEABLE IRON CONFORMING TO ASTM

A47, GRADE 32-510.

MECHANICAL REDUCING COUPLINGS SHALL BE SIMILAR TO VICTAULIC STYLE 750 FOR PIPE

RUNS FOR REDUCTION ON PIPE SIZES 4" THRU 8".

REFRIGERANT PIPING AND SPECIALTIES

COPPER TUBING: ASTM B280, TYPE ACR HARD DRAWN; TYPE K.

FITTINGS: ASME B16.22 WROUGHT COPPER.

JOINTS: BRAZE, AWS A5.8 BCUP SILVER/PHOSPHORUS/COPPER ALLOY WITH MELTING

RANGE 1190 TO 1480 DEGREES F.

COPPER TUBING TO 7/8 INCH OD: ASTM B88, TYPE K, ANNEALED.

FITTINGS: ASME B16.26 CAST COPPER.

JOINTS: FLARED.

PIPE SUPPORTS AND ANCHORS:

CONFORM TO ASME B31.5, ASTM F708, MSS SP58, MSS SP69 AND MSS SP89.

HANGERS FOR PIPE SIZES 1/2 TO 1 1/2 INCH: MALLEABLE IRON, ADJUSTABLE SWIVEL, SPLIT

RING.

HANGERS FOR PIPE SIZES 2 INCHES AND OVER: CARBON STEEL, ADJUSTABLE, CLEVIS.

MULTIPLE OR TRAPEZE HANGERS: STEEL CHANNELS WITH WELDED SPACERS AND

HANGER RODS.

WALL SUPPORT FOR PIPE SIZES TO 3 INCHES: CAST IRON HOOK.

WALL SUPPORT FOR PIPE SIZES 4 INCHES AND OVER: WELDED STEEL BRACKET AND

WROUGHT STEEL CLAMP. VERTICAL SUPPORT: STEEL RISER CLAMP.

FLOOR SUPPORT: CAST IRON ADJUSTABLE PIPE SADDLE, LOCK NUT, NIPPLE, FLOOR

FLANGE, AND CONCRETE PIER OR STEEL SUPPORT.

COPPER PIPE SUPPORT: CARBON STEEL RING, ADJUSTABLE, COPPER PLATED.

HANGER RODS: MILD STEEL THREADED BOTH ENDS, THREADED ONE END, OR

CONTINUOUS THREADED. INSERTS: MALLEABLE IRON CASE OF STEEL SHELL AND

EXPANDER PLUG FOR THREADED CONNECTION WITH LATERAL ADJUSTMENT, TOP SLOT

FOR REINFORCING RODS, LUGS FOR ATTACHING TO FORMS; SIZE INSERTS TO SUIT

THREADED HANGER RODS.

REAM PIPE AND TUBE ENDS. REMOVE BURRS. BEVEL PLAIN END FERROUS PIPE. REMOVE

SCALE AND DIRT ON INSIDE AND OUTSIDE BEFORE ASSEMBLY. PREPARE PIPING

CONNECTIONS TO EQUIPMENT WITH FLANGES OR UNIONS.

INSTALL REFRIGERATION PIPING AND SPECIALTIES IN ACCORDANCE WITH

MANUFACTURER'S INSTRUCTIONS. THE MECHANICAL TRADE SHALL VERIFY THE ACTUAL

INSTALLATION REQUIREMENTS AND COORDINATE WITH THE AIR COOLED CONDENSING

UNIT MANUFACTURER ALL PIPE SIZES, VALVES AND CONTROLS, REQUIRED FOR PROPER

OPERATION OF THE AIR COOLED CONDENSING UNIT SYSTEM.

ROUTE PIPING IN ORDERLY MANNER, WITH PLUMBING PARALLEL TO BUILDING STRUCTURE,

AND MAINTAIN GRADIENT. INSTALL PIPING TO CONSERVE BUILDING SPACE AND NOT

INTERFERE WITH USE OF SPACE. GROUP PIPING WHENEVER PRACTICAL AT COMMON

ELEVATIONS AND LOCATIONS. SLOPE PIPING ONE PERCENT IN DIRECTION OF OIL RETURN.

INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION WITHOUT STRESSING PIPE,

JOINTS, OR CONNECTED EQUIPMENT. ARRANGE PIPING TO RETURN OIL TO COMPRESSOR.

PROVIDE TRAPS AND LOOPS IN PIPING, AND PROVIDE DOUBLE RISERS AS REQUIRED.

SLOPE HORIZONTAL PIPING 0.40 PERCENT IN DIRECTION OF FLOW. PROVIDE CLEARANCE

FOR INSTALLATION OF INSULATION AND ACCESS TO VALVES AND FITTINGS. FLOOD PIPING

SYSTEM WITH NITROGEN WHEN BRAZING. FOLLOW ASHRAE 15 PROCEDURES FOR

CHARGING AND PURGING OF SYSTEMS AND FOR DISPOSAL OF REFRIGERANT. PROVIDE

REPLACEABLE CARTRIDGE FILTER-DRYERS, WITH ISOLATION VALVES AND VALVED BYPASS.

LOCATE EXPANSION VALVE SENSING BULB IMMEDIATELY DOWNSTREAM OF EVAPORATOR

ON SUCTION LINE. PROVIDE EXTERNAL EQUALIZER PIPING ON EXPANSION VALVES WITH

REFRIGERANT DISTRIBUTOR CONNECTED TO EVAPORATOR. INSTALL FLEXIBLE

CONNECTORS AT RIGHT ANGLES TO AXIAL MOVEMENT OF COMPRESSOR, PARALLEL TO

CRANKSHAFT. FULLY CHARGE COMPLETED SYSTEM WITH REFRIGERANT AFTER TESTING.

PROVIDE ELECTRICAL CONNECTION TO SOLENOID VALVES.

WHERE MORE THAN ONE PIPING SYSTEM MATERIAL IS SPECIFIED ENSURE SYSTEM

COMPONENTS ARE COMPATIBLE AND JOINED TO ENSURE THE INTEGRITY OF THE SYSTEM

IS NOT JEOPARDIZED. PROVIDE NECESSARY JOINING FITTINGS. ENSURE FLANGES, UNION,

AND COUPLINGS FOR SERVICING ARE CONSISTENTLY PROVIDED.

FIELD INSPECTION AND TESTING WILL BE PERFORMED. TEST REFRIGERATION SYSTEM IN

ACCORDANCE WITH ASME B31.5. PRESSURE TEST SYSTEM WITH DRY NITROGEN TO 200

PSIG. PERFORM FINAL TESTS AT 27 INCHES VACUUM AND 200 PSIG USING HALIDE TORCH.

TEST TO NO LEAKAGE.

VALVES

GATE VALVES:

UP TO AND INCLUDING 3 INCHES: BRONZE BODY, BRONZE TRIM, SCREWED BONNET, RISING

STEM, HANDWHEEL, INSIDE SCREW WITH BACKSEATING STEM, SOLID WEDGE DISC, ALLOY

SEAT RINGS, SOLDER OR THREADED ENDS.

OVER 3 INCHES: IRON BODY, BRONZE TRIM, BOLTED BONNET, RISING STEM, HANDWHEEL,

OUTSIDE SCREW AND YOKE, SOLID WEDGE DISC WITH BRONZE SEAT RINGS, FLANGED OR

GROOVED ENDS. (GROOVED ENDS ONLY IF APPROVED BY ARCHITECT/ENGINEER).

GLOBE OR ANGLE VALVES:

UP TO AND INCLUDING 3 INCHES: BRONZE BODY, BRONZE TRIM, SCREWED BONNET, RISING

STEM AND HANDWHEEL, INSIDE SCREW WITH BACKSEATING STEM, RENEWABLE

COMPOSITION DISC AND BRONZE SEAT, SOLDER ENDS.

OVER 3 INCHES: IRON BODY, BRONZE TRIM, BOLTED BONNET, RISING STEM, HANDWHEEL,

OUTSIDE SCREW AND YOKE, ROTATING PLUG-TYPE DISC WITH RENEWABLE SEAT RING

AND DISC, FLANGED ENDS.

SWING CHECK VALVES:

UP TO AND INCLUDING 3 INCHES: BRONZE BODY, BRONZE TRIM, BRONZE ROTATING SWING

DISC, WITH COMPOSITION DISC, SOLDER OR THREADED ENDS.

OVER 3 INCHES: IRON BODY, BRONZE TRIM, BRONZE OR BRONZE FACED ROTATING SWING

DISC, RENEWABLE DISC AND SEAT, FLANGED ENDS OR GROOVED ENDS IF VICTAULIC

GROOVED END FITTINGS ARE USED.

BALL VALVES:

UP TO AND INCLUDING 2 INCHES: BRONZE ONE PIECE BODY, STAINLESS STEEL BALL,

TEFLON SEATS AND STUFFING BOX RING, LEVER HANDLE WITH BALANCING STOPS,

SOLDER OR THREADED ENDS.

OVER 2 INCHES: CAST STEEL BODY, CHROME PLATED STEEL BALL, TEFLON SEAT AND

STUFFING BOX SEALS, LEVER HANDLE, OR GEAR DRIVE HANDWHEEL FOR SIZES 10 INCHES

AND OVER, FLANGED. DUCTILE IRON BODY, CHROME PLATED CARBON STEEL BALL AND

STEM, TFE SEATS, LEVER HANDLE OR GEAR OPERATOR, GROOVED ENDS. VICTAULIC

SERIES 726.

PLUG VALVES:

UP TO AND INCLUDING 3 INCHES: BRONZE BODY, BRONZE TAPERED PLUG, FULL PORT

OPENING, NON-LUBRICATED, TEFLON PACKING, THREADED ENDS. OPERATOR: ONE PLUG

VALVE WRENCH FOR EVERY TEN PLUG VALVES MINIMUM OF ONE.

OVER 3 INCHES: CAST IRON BODY AND PLUG, FULL PORT OPENING, PRESSURE

LUBRICATED, TEFLON PACKING, FLANGED ENDS OR GROOVED ENDS IF VICTAULIC

GROOVED END FITTINGS ARE USED. DUCTILE IRON BODY AND PLUG, STANDARD PORT

OPENING, NON-LUBRICATED ECCENTRIC-TYPE, WELDED-IN NICKEL SEAT, GROOVED ENDS.

VICTAULIC SERIES 377. OPERATOR: EACH PLUG VALVE SHALL HAVE A WRENCH HANDLE

WITH SET SCREW.

BUTTERFLY VALVES:

BODY: PPS (POLYPPHENYLENE SULFIDE) COATED CAST OR DUCTILE IRON WITH RESILIENT

REPLACEABLE EPDM SEAT, WAFER OR LUG ENDS OR GROOVED ENDS IF VICTAULIC

GROOVED END FITTINGS ARE USED. DISC: ALUMINUM BRONZE, EPDM ENCAPSULATED

DUCTILE IRON OR STAINLESS STEEL. OPERATOR: 10 POSITION LEVER HANDLE UP TO 4”.

LARGER THAN 4” SHALL HAVE GEAR DRIVE HANDWHEEL.

UNIONS

UNIONS OR FLANGES SHALL BE USED AT EQUIPMENT CONNECTIONS. DIELECTRIC

CONNECTIONS BETWEEN COPPER AND IRON OR STEEL PIPE SHALL BE MADE WITH

DIELECTRIC NIPPLES SIMILAR TO VICTAULIC STYLE 47. A BRASS ADAPTER DIELECTRIC

UNION IS NOT ACCEPTABLE.

PLATES AND SLEEVES

PROVIDE AND INSTALL PIPE SLEEVES FOR ALL PIPING AND DUCTS PASSING THROUGH

WALLS, FLOORS AND CEILINGS. SLEEVES THROUGH WALLS BELOW GRADE AND AT ALL

FLOOR SHALL BE BLACK STEEL. SLEEVES THROUGH WALLS AND CEILINGS MAY BE 20

GAUGE GALVANIZED SHEET METAL. WHERE PIPES ARE INSULATED, SLEEVES SHALL BE

LARGE ENOUGH TO PASS THE INSULATION. ALL PENETRATION VOIDS SHALL BE SEALED

SMOKE TIGHT WITH NON-COMBUSTIBLE MATERIALS SIMILAR TO 3M OR HILTI FIRESTOP

SYSTEMS TO MAINTAIN THE INTEGRITY OF THE FIRE RATED STRUCTURE. IN A NON-FIRE

RATED ASSEMBLY, SEAL ALL VOIDS WITH NON-HARDENING SEALANT.

HANGERS AND SADDLES

SHALL BE MODERN PIPE SUPPORTS CORP., GRINNELL/ANVIL, AUTO GRIP OR M-CO. FOR

COPPER PIPE WITH STEEL HANGERS, CLEAN AND WRAP PIPE WITH TWO LAYERS OF

PLASTIC INSULATING TAPE AT POINTS OF CONTACT. HANGERS FOR PIPING WITH VAPOR

BARRIER SEALED INSULATION SHALL BE MULTIPURPOSE PIPE SADDLES FITTING OVER THE

INSULATION. WIRE OR PERFORATED STRAP IRON WILL NOT BE PERMITTED FOR PIPE

SUPPORTS. HANGERS SHALL BE CLEVIS OR SPLIT RING TYPE WITH VERTICAL

ADJUSTMENT AND BEAM CLAMP SIMILAR TO GRINNELL/ANVIL FIG. 260, WITH MAXIMUM

SPACING PER ASHRAE STANDARDS:

PIPE SIZE STEEL PIPE COPPER PIPE PVC PIPE ROD SIZE

1/2 TO 3/4 INCH 6 FEET 5 FEET 4 FEET 3/8”

1 INCH 7 FEET 5 FEET 4 FEET 3/8”

1 1/4 INCH 7 FEET 7 FEET 4 FEET 3/8”

1 1/2 INCH 7 FEET 7 FEET 4 FEET 1/2”

2 INCH 10 FEET 8 FEET 4 FEET 1/2"

2 1/2 INCH 11 FEET 9 FEET 4 FEET 5/8”

3 INCH 11 FEET 9 FEET 4 FEET 5/8”

3 1/2 INCH 13 FEET 11 FEET 4 FEET 5/8”

TESTING, FLUSHING AND CLEANING OF PIPING SYSTEMS

HEATING PIPING: HYDROSTATICALLY TEST TO AT LEAST TWICE THE OPERATING

PRESSURE BUT IN NO CASE LESS THAN 100 PSIG FOR FOUR (4) HOURS. THIS PRESSURE

TO BE ON PIPING ONLY, NOT ON EQUIPMENT.

PIPE INSULATION ON INDOOR SYSTEMS

PIPE INSULATION SHALL BE AS MANUFACTURED BY ARMSTRONG, CERTAINTEED, KNAUF,

MANSVILLE OR OWENS-CORNING. OWENS-CORNING NUMBERS ARE GIVEN TO ESTABLISH

TYPES. ALL INSULATIONS, COVERINGS, VAPOR BARRIERS, ADHESIVES, ETC. SHALL BE

CLASS A, MAXIMUM OF 25 FLAME SPREAD, 35 FUEL CONTRIBUTED AND 50 SMOKE

DEVELOPED RATING. INSULATION SHALL HAVE VAPOR BARRIER AND BE UL RATED.

INSULATION SHALL BE OWENS-CORNING FIBERGLAS ASJ-SSL II PIPE COVERING WITH

FACTORY APPLIED DOUBLE PRESSURE SENSITIVE ADHESIVE SYSTEM TO PROVIDE

POSITIVE CLOSURES AND VAPOR BARRIER INTEGRITY.

ALL LONGITUDINAL JOINTS SHALL BE SECURED WITH SELF SEALING LAPS. ALL

TRANSVERSE JOINTS SHALL BE SECURED WITH SELF-SEALING BUTT STRIPS. BUTT STRIPS

SHALL BE MINIMUM 3" WIDE. APPLY INSULATION TO PIPE WITH ALL JOINTS BUTTED

TIGHTLY TOGETHER. FITTINGS, INCLUDING VALVES, FLANGES, UNIONS, ETC. SHALL BE

INSULATED WITH THE SAME THICKNESS AS THE REQUIRED PIPE INSULATION AND

COVERED WITH ZESTON OR SPEEDLINE PVC FITTING COVER.

PIPE INSULATION ON OUTDOOR SYSTEMS

ALL PIPING, VALVES, FITTINGS, DUCT, AND EQUIPMENT SCHEDULED TO BE INSULATED

SHALL IS TO HAVE ALL INSULATION APPLIED IN STRICT ACCORDANCE WITH

MANUFACTURER'S INSTALLATION INSTRUCTIONS, AND PRACTICES DESCRIBED IN THE

NATIONAL COMMERCIAL AND INDUSTRIAL INSULATION STANDARDS MANUAL.

MANUFACTURER'S INSTALLATION GUIDELINES AND INSTRUCTIONS WILL BE USED IF

CONFLICTS EXIST.

INSULATING PIPE SADDLES ARE TO BE INSTALLED AT ALL PIPE HANGER AND CLAMP

LOCATIONS. SADDLES ARE TO BE INSTALLED AT THE TIME THAT PIPING IS BEING

INSTALLED, SO THAT INSULATION SYSTEM CAN BE INSTALLED IN A CONTINUOUS MANNER

THROUGH THE PIPE SUPPORT SYSTEM.

INSULATION THICKNESS SHALL BE AS FOLLOWS:

INSULATION

CONDUCTIVITY

BTU IN

PIPING SYSTEM PIPE SIZE INSULATION THICKNESS H-FT2-F

HEATING HOT WATER AND AIR UP THRU 1¼” 1½” 0.29

SEPARATOR TANK 1½” AND LARGER 2”

(200F AND BELOW)

REFRIGERANT PIPING UP TO 1¼” ¾” 0.28

(ARMAFLEX INSULATION) 1 ½” AND LARGER 1”

REFRIGERANT PIPING, CONDENSATE DRAIN PIPING AND/OR UNDERGROUND DOMESTIC

WATER PIPING SHALL BE COVERED WITH ARMSTRONG TYPE AP ARMAFLEX INSULATION,

3/4" THICK, BLACK IN COLOR, CLOSED CELL WITH A FLAME SPREAD RATING OF 25 OR LESS

AND A SMOKE DEVELOPED RATING OF 50 OR LESS. USE ARMSTRONG #520 ADHESIVE.

ARMAFLEX INSULATION LOCATED OUTDOORS SHALL BE JACKETED AND THAT JACKETING

SHALL BE A MULTI-PLY, FABRIC REINFORCED, SELF ADHESIVE INSULATION CLADDING

MATERIAL WITH A VAPOR BARRIER AND A THICKNESS OF 0.015”. JACKETING SYSTEM

SHALL BE VENTURE CLAD PLUS #1579CW-E OR EQUAL WITH MOISTURE BARRIER,

INSTALLED IN ACCORDANCE WITH THE JACKET MANUFACTURER'S RECOMMENDATIONS.

EACH SECTION OF JACKETING SHALL OVERLAP THE ADJOINING SECTION BY 3”. ALL SEAMS

SHALL BE TAPED WITH VENTURE CLAD JOINING/SEAMING TAPE. PLACE THE WRAP SO

THAT THE EDGE OF THE SEALING FLAP FACES DOWN.

CLEAN ALL SURFACES BEFORE APPLYING COVERING. INSULATION SHALL BE CONTINUOUS

THROUGH WALLS, FLOORS, CEILINGS, ETC. TERMINATE AND SEAL INSULATION AT BOTH

ENDS OF UNINSULATED UNIONS AND FLANGES BY A NEAT 45 DEGREE BEVEL. INSTALL ALL

INSULATION IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS.

ASBESTOS INSULATION

ALL EXISTING ASBESTOS INSULATION ON EXISTING PIPING, EQUIPMENT, ETC. WHERE

TIE-INS ARE REQUIRED, SHALL BE REMOVED BY THE OWNER.

PIPE IDENTIFICATION

ALL PIPING SHALL BE IDENTIFIED PER ANSI/OSHA OR OWNER'S STANDARDS WITH COLOR

PIPE BANDS, IDENTIFICATION LABELS AND FLOW ARROWS. PIPES SHALL BE BANDED AND

LABELED ON 10'-0" CENTERS ON CONTINUOUS LINES, AT EQUIPMENT CONNECTIONS, AT

BOTH SIDES OF A WALL THROUGH WHICH PIPE PASSES AT EVERY BRANCH CONNECTION,

ON PIPING WITHIN SIGHT OF AN ACCESS DOOR OR PANEL. SHOW SLOPE DIRECTIONAL

ARROWS AT EACH IDENTIFICATION POINT. LABELS, FLOW ARROWS AND STENCIL AND

PAINT SHALL BE 1" HIGH ON PIPING UP TO 2 1/2" AND SHALL BE 2" HIGH ON PIPE SIZES OF 3"

AND LARGER. BANDS SHALL BE 1 1/2" WIDE. LABELS SHALL BE AS MANUFACTURED BY

SETON OR W.H. BRADY COMPANY OR EQUAL. VERIFY TYPE, SIZE AND COLORS OF PIPE

IDENTIFICATION WITH OWNER.

GENERAL PLUMBING AND PIPING NOTES

INSTALL MANUAL AIR VENTS AT ALL HIGH POINTS OR POINTS THAT CAN TRAP AIR ON

CHILLED WATER AND HEATING HOT WATER PIPING. WHERE DISSIMILAR MATERIAL PIPING

ARE JOINED, DIELECTRIC NIPPLES SHALL BE UTILIZED AND SHALL BE NON-CONDUCTING

FOR CONNECTION OF DISSIMILAR MATERIALS. DIELETRIC NIPPLES SHALL BE SIMILAR TO

VICTAULIC STYLE 47. A BRASS ADAPTOR DIELECTRIC UNION IS NOT ACCEPTABLE.

SHUT OFF VALVES SHALL BE INSTALLED AT ALL BRANCH LINES OFF MAIN PIPING, OR

WHERE MAINS DIVIDE/SEPARATE TO SERVE DIFFERENT AREAS, TO ALLOW ISOLATION OF

ALL BRANCH PIPING AND SYSTEMS THEY SERVE SUCH AS TOILET ROOMS, AREAS OR

WINGS OF THE BUILDING, ETC.

DUCTWORK

DUCTS, CASINGS, HOUSINGS, ETC. SHALL BE FABRICATED FROM, PRIME QUALITY, HOT DIP

GALVANIZED STEEL SHEET AS RECOMMENDED IN THE LATEST ISSUES OF ASHRAE GUIDE

AND SMACNA DUCT MANUALS IN VARIABLE AIR VOLUME SYSTEMS, WHEN USED. SUPPLY

AIR DUCTWORK AND OUTSIDE AIR INTAKE AND RELIEF AIR DUCTS, DUCT CONSTRUCTION

AND INSTALLATION SHALL MEET SMACNA STANDARDS FOR 2" W.C.

RECTANGULAR DUCTS SHALL HAVE TEES, ELBOWS AND BENDS WITH A MINIMUM THROAT

RADIUS OF 1 TIMES THE DUCT WIDTH AND BE OF THE SAME GAUGE AND MATERIAL AS THE

STRAIGHT DUCT. INCREASE DUCT SIZES GRADUALLY, NOT EXCEEDING 15 DEGREES

DIVERGENCE IF POSSIBLE; MAXIMUM 30 DEGREES DIVERGENCE UPSTREAM OF EQUIPMENT

AND 45 DEGREES CONVERGENCE DOWNSTREAM.

PIPING AND EQUIPMENT SUPPORT

ATTACHMENTS OF MECHANICAL EQUIPMENT TO STRUCTURAL MEMBERS ARE THE

RESPONSIBILITY OF THE INSTALLING TRADE. STRUCTURAL MEMBERS SHALL NOT BE FIELD

CUT, WELDED OR OTHERWISE MODIFIED WITHOUT APPROVAL OF THE

ARCHITECT/ENGINEER. ATTACHMENT TO STEEL JOIST SHALL BE MADE AT PANEL POINTS.

WHEN ROUTING PIPING OR DUCTWORK PERPENDICULAR TO JOIST, A SUPPORT SHALL BE

PROVIDED AT EVERY STEEL JOIST; WHEN PARALLEL TO JOIST, A SUPPORT SHALL BE

PROVIDED AT NO MORE THAN 6' ON CENTERS OR TWO PANEL BAYS. STRUCTURAL

MEMBERS SHALL NOT BE OVERLOADED AS A RESULT OF ATTACHMENTS.

ATTACHMENT/EQUIPMENT LOADING FOR ALL TRADES RESULTING IN TOTAL LOAD GREATER

THAN AN EQUIVALENT UNIFORM 5 PSF FOR ANY MEMBER SHALL BE SUBMITTED TO THE

ARCHITECT/ENGINEER FOR REVIEW. MECHANICAL TRADES MAY CONTACT THE PROJECT

STRUCTURAL ENGINEER AS REQUIRED FOR PANEL POINT LOCATION ASSISTANCE AND

WELDER CERTIFICATION REQUIREMENTS. ELECTRICAL TRADES ARE STILL RESPONSIBLE

FOR DESIGN, LAYOUT, AND FABRICATION AND INSTALLATION OF ELECTRICAL SUPPORTS

AND SUPPORT ATTACHMENT METHODS. MECHANICAL TRADES SHALL SUBMIT

ATTACHMENT METHODS TO THE STRUCTURAL ENGINEER FOR REVIEW.

DUCT SEALANT

ALL DUCTWORK INCLUDING SUPPLY AIR, OUTSIDE AIR, RETURN AIR, EXHAUST AIR AND

RELIEF AIR DUCT SYSTEMS SHALL HAVE ALL JOINTS SEALED. DUCTWORK DESIGNED AT

SMACNA 2” PRESSURE SHALL MEET SMACNA CLASS “C” SEAL REQUIREMENTS.

DUCT HANGERS

HORIZONTAL STEEL DUCTWORK SHALL BE SUPPORTED BY MEANS OF TRAPEZE BARS AND

ROUND STEEL ROD OF SIZES LISTED BELOW. ROUND STEEL RODS SHALL BE

ELECTRO-GALVANIZED ALL-THREAD ROD. HANGERS SHALL BE PROVIDED AT BOTH SIDES

OF FLAT SIDED DUCTWORK FOR THE FULL HEIGHT OF DUCT. ROUND DUCTWORK SHALL BE

PROVIDED WITH A BAND OF THE SAME SIZE AS THE HANGER TO COMPLETELY ENCIRCLE

THE DUCT. BAND SHALL BE SECURED TO THE HANGER BY MEANS OF A MINIMUM 3/16"

BOLT. MINIMUM DUCT HANGER SIZES SHALL BE AS LISTED BELOW

MIN. UPPER MINIMUM

DUCT ATTACHMENT STEEL MAXIMUMNO. OF TRAPEZE

SIZE RATING ROD SPACING HANGERS SHELF ANGLE

UP TO 16" 750 LBS. 3/8" 10' 2 1 1/2" X 1 1/2" X 3/16"

19" TO 36" 1000 LBS. 3/8" 10' 2 1 1/2" X 1 1/2" X 3/16"

37" TO 120" 3000 LBS. 3/8" 8' 2 2" X 2" X 1/4"

DUCT INSULATION

OUTSIDE AIR DUCTWORK LOCATED IN EXPOSED AREAS SHALL BE INSULATED WITH

OWENS-CORNING, KNAUF, MANSVILLE OR EQUAL, FIBERGLAS TYPE 705, 1 1/2” THICK, 6.0

LBS. PER CUBIC FOOT DENSITY RIGID BOARD, FACED WITH REINFORCED FOIL KRAFT

LAMINATE MEETING REQUIREMENTS OF ASTM C612. BOARD SHALL BE SECURED TO

DUCTWORK WITH MECHANICAL FASTENERS WITHIN 3” (MAX.) OF BOARD EDGES, AND

APPROXIMATELY 12” ON CENTERS. CLOSE ALL JOINTS WITH 3” PRESSURE SENSITIVE

VAPOR BARRIER MASTIC REINFORCED GLASS SCRIM TAPE.

TEMPERATURE CONTROL SYSTEM

SCOPE OF WORK THE TEMPERATURE CONTROL MANUFACTURER SHALL FURNISH

INSTALLATION DEVICES, ELECTRONIC DAMPER ACTUATORS, ELECTRONIC CONTROL

VALVES, RELAYS, SWITCHES, A UNITARY AIR HANDLING UNIT CONTROLLER, COLOR

GRAPHICS OPERATOR INTERFACE TO BE INSTALLED IN THE OWNER'S PERSONAL

COMPUTER AND ALL NECESSARY DEVICES, HARDWARE, ETC. FOR A COMPLETE

TEMPERATURE CONTROL SYSTEM FOR A DUAL DUCT AIR HANDLING UNIT WITH A STEAM

HEATING COIL AND CHILLED WATER COOLING COIL PER TEMPERATURE CONTROL

DRAWING AND SEQUENCE OF CONTROL.

FURNISH DIAGRAMMATICAL LAYOUT, WIRING DIAGRAMS, DEVICE LOCATION DRAWINGS,

ETC. TO DESCRIBE THE SYSTEM OPERATION AND INSTALLATION AS WELL AS INCLUDE ALL

COST TO FURNISH TECHNICAL ASSISTANCE DURING THE INSTALLATION OF THE SYSTEM.

SUBMIT 4 COPIES OF DIAGRAMS, SEQUENCES, VALVES ETC. TO THE ARCHITECT/ENGINEER

FOR APPROVAL. INCLUDE COST FOR TWO COMPLETE INSPECTIONS, ONE IN EACH

SEASON, TO INSPECT, CALIBRATE AND ADJUST CONTROLS AS REQUIRED AND SUBMIT

WRITTEN REPORTS.

CONTROL VALVES TEMPERATURE CONTROL MANUFACTURER SHALL FURNISH GLOBE

VALVE TYPE CONTROL VALVES SIZED AT 1.5 PSIG WATER PRESSURE DROP ACROSS VALVE

FOR CHILLED WATER COIL AND 50% STEAM PRESSURE DROP ACROSS VALVE FOR THE

STEAM COIL.

OPERATOR INTERFACE THE SYSTEM SHALL BE ABLE TO COMMUNICATE BY USING AN

EXISTING DOS BASED PC WITH A COLOR GRAPHICS SOFTWARE PACKAGE PROVIDED BY

THE TEMPERATURE CONTROL CONTRACTOR. THIS SOFTWARE SHALL UTILIZE A COLOR

GRAPHIC REPRESENTATION OF EACH PIECE OF EQUIPMENT SPECIFIED TO ALLOW FOR

COMPLETE MONITORING AND MODIFICATION CAPABILITIES. THE SOFTWARE SHALL ALSO

BE CUSTOMIZED FOR THIS PARTICULAR PROJECT, AS PART OF THE TEMPERATURE

CONTROL CONTRACTOR'S BASE BID, BY UTILIZING AN ICON-BASED SYSTEM TO LINK THE

VARIOUS COLOR SCREENS TO ONE ANOTHER. THE TEMPERATURE CONTROL

CONTRACTOR SHALL PROVIDE ALL THE NECESSARY COMMUNICATION CONVERTERS,

CABLING, AND CONNECTORS NECESSARY TO INTERFACE.

CONTROL DAMPERS AND ACTUATORS MIXING BOX OUTSIDE AIR AND RETURN AIR

DAMPERS SHALL BE FURNISHED WITH THE AIR HANDLING UNIT. THE TEMPERATURE

CONTROL CONTRACTOR SHALL FURNISH THE RELIEF AIR DAMPER WITH BLADE, JAMB

SEALS AND ALL DAMPER ACTUATORS.

UNITARY CONTROLLER SHALL BE A DEDICATED, STAND ALONE, MICROPROCESSOR BASED,

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .