This document is a bid package for a mechanical HVAC renovation project for the Clare-Gladwin Day School in Clare, Michigan. The project involves the replacement of an existing air handling unit (AHU) with a new AHU-1 unit and installation of a new air-cooled condensing unit (ACCU-1). The mechanical scope also includes modifying and connecting existing ductwork, piping, and controls to the new equipment. The electrical scope includes demolition of the existing AHU power and controls, and installation of new power and controls for the AHU-1 and ACCU-1. The project is scheduled for completion by February 1, 2024.
The bid package provides detailed specifications and drawings for the mechanical and electrical work. It specifies the use of particular manufacturers and models for the AHU and condensing unit. Pricing is not provided, but the bid package directs bidders to provide add/deduct pricing for any substitutions to the specified equipment. The project will be awarded based on the base bid price. No specific funding sources or set-asides are mentioned. The project will be subject to prevailing wage requirements and the contractor must obtain all necessary permits and inspections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HVAC RFP 2024.pdf | ||
| 2024.02.01 Clare Gladwin Area Schools Gym AHU 100% Combined BID SET (1) (1) (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2/ 3/
1:
A
M
JO
SE
PH
B R
EE
N
(J
BR
EE
N
M
AC
M
IL
LA
N
AS
SO
C
IA
TE
S.
C
O M
F:
\0 1-
M
IS
C \2
3-
C
LA
R
E G
LA
D
W
IN
A R
EA
S
C H
O O
L G
YM
N
AS
IU
M A
H U
R
EP
LA
C
EM
EN
T W
IT
H
A C
\2
3-
- C O
VE
R
S H
EE
T
AL
L
RI
GH
TS
R
ES
ER
VE
D.
C
OP
YR
IG
HT
M ac M
IL
LA
N
AS
SO
CI
AT
ES
, I
NC
. 2
SITE PLAN
NORTH
CLARE-GLADWIN RESD
2024 AHU RENOVATION
4041 MANNSIDING RD, CLARE, MICHIGAN
BID PACKAGE
Since 1963
(989) 894-4300
714 East Midland Street Bay City, Michigan 48706 www.macmillanassociates.com
CONSULTING ENGINEERS
MacMILLAN ASSOCIATES
CLARE, MICHIGAN
CLARE-GLADWIN
PUBLIC SCHOOL DISTRICT
LOCATION MAP
NONE
NORTH
DRAWING INDEX
M1.01 MECHANICAL HVAC DEMOLITION PLAN
M2.01 MECHANICAL HVAC RENOVATION PLAN
M3.01 MECHANICAL SCHEDULE AND DETAILS
M3.02 MECHANICAL SPECIFICATIONS
E1.01 ELECTRICAL DEMOLITION PLAN
E2.01 ELECTRICAL REVISED PLAN
E3.01 ELECTRICAL INFORMATION
CODE SUMMARY
BUILDING CODES
2015 MICHIGAN BUILDING CODE (MBC)
2015 INTERNATIONAL FIRE CODE (IFC)
2015 MICHIGAN MECHANICAL CODE (IMC)
2018 MICHIGAN PLUMBING CODE (IPC)
NEC 2017 (STATE OF MICHIGAN ELECTRICAL CODE)
2017 NATIONAL ELECTRICAL CODE WITH PART 8 AMENDMENTS
2015 MICHIGAN UNIFORM ENERGY CODE - CHAPTER 5 & MICHIGAN
UNIFORM ENERGY CODE,
PART 10A RULES (ANSI/ASHRAE 90.1-2013)
BUILDING STANDARDS
2009 ICC ANSI A117.1 ACCESSIBILITY STANDARD
2013 NFPA 10 - STANDARD FOR PORTABLE FIRE EXTINGUISHERS
2013 NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE
2012 NFPA 101 - LIFE SAFETY CODE
FIRE SUPPRESSION
NO
USE AND OCCUPANCY CLASSIFICATIONS (CHAPTER 3)
PROPOSED OCCUPANCIES
E, EDUCATION
SPECIAL DETAILED REQUIREMENTS (CHAPTER 4)
NONE
PROJECT
LOCATION
STORAGE
STORAGE
STORAGE
ACTIVITY
MUSIC
CLASSROOM
CLASSROOM
TOILET
TOILET
RAMP
PASSAGE
BOYS
TOILET
CORRIDOR
PRE-VOCATIONAL
TRAINING
COAT RM
GIRLS
TOILET
HALL
136a
STAFF
STORAGE
MECH
CLASSROOM
PASS
ITINERANT
WORK
RECEPTION
TLT
OFFICE
OFFICE
CONFERENCE
OFFICE
ASSESS'T
THERAPY
HEAR'G
STOR
TLT
TLT
CLASSROOM
CORRIDOR
VEST
TOILET
STORAGE
STORAGE
MECH
JC
113 JC
KITCHEN
CAFETERIA
OFFICE
OFFICE
CONFERENCE
RECEPTION
OFFICE
BATH
FIRST AID
SHWR
TLT
SHWR
TLT
HALL
LIBRARY
CLASSROOM
CORRIDOR
CORRIDOR
CLASSROOM
STOR
TLT
TLT
TLT
122 TLT
STOR
STOR
CLASSROOM
VEST
AREA OF WORK
NONE
February 1, 2024
MAI #2023-01119
February 1, 2024
MAI #2023-01119
http://www.macmillanassociates.com
AHU REPLACEMENT - MECHANICAL DEMOLITION PLAN
1/4"=1'-0"
DISCONNECT AND REMOVE EXISTING HEATED
HOT WATER SUPPLY AND RETURN PIPING
SERVING THE EXISTING AHU. REMOVE
ASSOCIATED CONTROL VALVE, SHUT OFF
VALVES, ETC.
DISCONNECT EXISTING SUPPLY DISCHARGE AIR
DUCT FROM AIR HANDLING UNIT. DISCONNECTED
DUCTWORK IS TO REMAIN AND BE REUSED FOR
THE NEW AIR HANDLING UNIT.
EXISTING OUTSIDE AIR INTAKE LOUVER TO
REMAIN. CONTRACTOR SHALL CLEAN LOUVER
AND BIRDSCREEN.
REMOVE EXISTING AHU AND ASSOCIATED
CONTROLS, PIPING, DUCTWORK ETC. AS
NECESSARY TO ALLOW INSTALLATION OF NEW
AHU-1, PIPING, DUCTWORK, ETC.
DISCONNECT AND REMOVE EXISTING
THERMOSTAT. (CONTRACTOR WILL FURNISH
NEW THERMOSTAT.)
REMOVE EXISTING OUTSIDE AIR DUCTWORK AND
FLEX CONNECTION AS REQUIRED TO INSTALL
NEW AHU-1 AND NEW FLEX CONNECTION.
EXISTING DUCT SMOKE DETECTOR TO BE
REUSED. EXISTING WIRING TO BE REVISED AND
EXTENDED AS REQUIRED FOR NEW UNIT.
KEYED NOTES
T
Since 1963
(989) 894-4300
714 East Midland Street Bay City, Michigan 48706 www.macmillanassociates.com
CONSULTING ENGINEERS
MacMILLAN ASSOCIATES
REV. DESCRIPTION BY DATE
0.5"0.0" 1.0" 2.0"1.5"2/ 3/
1:
A
M
JO
SE
PH
B R
EE
N
(J
BR
EE
N
M
AC
M
IL
LA
N
AS
SO
C
IA
TE
S.
C
O M
F:
\0 1-
M
IS
C \2
3-
C
LA
R
E G
LA
D
W
IN
A R
EA
S
C H
O O
L G
YM
N
AS
IU
M A
H U
R
EP
LA
C
EM
EN
T W
IT
H
A C
\2
3-
9-
M -M
1.
-M
EC
H
AN
IC
AL
H
VA
C D
EM
O
LI
TI
O N
P
LA
N
PROJECT DESCRIPTION
SHEET DESCRIPTION
AL
L
RI
GH
TS
R
ES
ER
VE
D.
C
OP
YR
IG
HT
M ac M
IL
LA
N
AS
SO
CI
AT
ES
, I
NC
SHEET No.
JOB No.DRAWN BY
DESIGNED BY
APPROVED BY
95% OWNER REVIEW MAI 01.24.2024
100% BID SET MAI 02.01.2024
CLARE-GLADWIN DAY SCHOOL
AHU REPLACEMENT
MECHANICAL HVAC
DEMOLITION PLAN VIEW
M1.01
2023-01119JWB
JWB
RAM
EX AHU
H W
W S
H W
W S
HWWS
H H
W R
H W
W S
H H
W R
EX 2" HWWS
EX 1 1/4" HHWR
EX 1 1/4" HWWS
EX 2" HHWR
H W
W S
HHWR
HWWSHWWS
HHWR
HWWS
HHWR HHWR
EX 1 1/4" HWWS
EX 1 1/4" HHWR
D S D
February 1, 2024
AHU REPLACEMENT - MECHANICAL RENOVATION PLAN
1/4"=1'-0"
INSTALL AND FURNISH NEW AIR HANDLING UNIT
PER MANUFACTURERS INSTRUCTIONS. UTILIZE
/REVISE THE EXISTING STRUCTURAL STEEL TO
SUPPORT SYSTEM.
CONNECT EXISTING SUPPLY AIR DISCHARGE
DUCT TO NEW AIR HANDLING UNIT.
CONNECT NEW OUTSIDE AIR DUCTWORK TO
EXISTING LOUVER AND WALL SLEEVE. FIELD
VERIFY EXACT DUCT SIZES. CONNECT NEW DUCT
TO OUTSIDE AIR CONNECTION ON FILTER MIXING
BOX WITH FLEXIBLE CONNECTION.
THE OWNERS TEMPERATURE CONTROL
CONTRACTOR SHALL FURNISH AND INSTALL NEW
SPACE SENSOR WALL THERMOSTAT.
MECHANICAL TRADES SHALL INCLUDE ALL
TEMPERATURE CONTROL COSTS.
FURNISH AND INSTALL NEW AIR COOLED
CONDENSING UNIT PER MANUFACTURERS
INSTRUCTIONS. FURNISH WITH 6" THICK
REINFORCED CONCRETE PAD.
ROUTE NEW REFRIGERANT PIPING UP WALL TO
ABOVE BOTTOM CHORD OF JOISTS. ROUTE PIPE
THROUGH JOISTS TO NEW AHU-1. FURNISH WALL
PIPE SUPPORT AS NECESSARY. ROUTE PIPING
TO THE BOTTOM OF STEEL WITHIN THE GYM FOR
ELEVATION. REFRIGERANT LINES ARE TO HAVE
3/4" ARMAFLEX INSULATION. INSULATION
OUTDOORS SHALL BE COVERED BY VENTURE
CLAD.
CONNECT NEW HEATING HOT WATER SUPPLY
AND RETURN PIPE TO EXISTING PIPING. (SEE
HEATED HOT WATER PIPE DETAIL FOR VALVES,
FITTINGS, ETC.)
DISCHARGE CONDENSATE DRAIN PIPE AT 24"
ABOVE GRADE. EXTEND DRAIN PIPE OUT WITH
GOOSENECK DOWN 2" FROM BUILDING.
REFRIGERANT LINES (RF) THROUGH WALL SHALL
BE INSULATED WITH ARMAFLEX AND EXTERIOR
INSULATION SHALL BE COVERED WITH VENTURE
CLAD.
EXISTING DUCT SMOKE DETECTOR TO BE
REMOUNTED AND HAVE WIRING REVISED AND
EXTENDED AS REQUIRED.
KEYED NOTES
Since 1963
(989) 894-4300
714 East Midland Street Bay City, Michigan 48706 www.macmillanassociates.com
CONSULTING ENGINEERS
MacMILLAN ASSOCIATES
REV. DESCRIPTION BY DATE
0.5"0.0" 1.0" 2.0"1.5"2/ 3/
1:
A
M
JO
SE
PH
B R
EE
N
(J
BR
EE
N
M
AC
M
IL
LA
N
AS
SO
C
IA
TE
S.
C
O M
F:
\0 1-
M
IS
C \2
3-
C
LA
R
E G
LA
D
W
IN
A R
EA
S
C H
O O
L G
YM
N
AS
IU
M A
H U
R
EP
LA
C
EM
EN
T W
IT
H
A C
\2
3-
9-
M -M
2.
-M
EC
H
AN
IC
AL
H
VA
C R
EN
O
VA
TI
O N
P
LA
N
PROJECT DESCRIPTION
SHEET DESCRIPTION
AL
L
RI
GH
TS
R
ES
ER
VE
D.
C
OP
YR
IG
HT
M ac M
IL
LA
N
AS
SO
CI
AT
ES
, I
NC
SHEET No.
JOB No.DRAWN BY
DESIGNED BY
APPROVED BY
95% OWNER REVIEW MAI 01.24.2024
100% BID SET MAI 02.01.2024
CLARE-GLADWIN DAY SCHOOL
AHU REPLACEMENT
MECHANICAL HVAC
RENOVATION PLAN VIEW
M2.01
2023-01119JWB
JWB
RAM
H W
W S
H W
W S
HWWS
H H
W R
H W
W S
H H
W R
EX 2" HWWS
EX 1 1/4" HHWR
EX 1 1/4" HWWS
EX 2" HHWR
H W
W S
HHWR
HWWSHWWS
HHWR
HWWS
HHWR HHWR
T
AHU-1
AC-1
R F
R F
R F
HWWS
HHWR
CD
C D
C D
CDCD
EX 1 1/4" HWWS
EX 1 1/4" HHWR
RF
RF
TEMPERATURE CONTROL NOTES:
1. THE MECHANICAL TRADE SHALL BE RESPONSIBLE
FOR CONTACTING THE OWNERS TEMPERATURE
CONTROL CONTRACTOR AND SHALL INCLUDE ALL
COSTS FOR THE TEMPERATURE CONTROL
CONTRACTOR TO PROVIDE AND INSTALL THE
TEMPERATURE CONTROL SYSTEM. THE NEW
AHU-1 SHALL BE ADDED INTO THE EXISTING
TEMPERATURE CONTROL SYSTEM ON SITE.
2. THE TEMPERATURE CONTROL CONTRACTOR
SHALL PROVIDE ALL CONTROL DEVICES,
ACTUATORS, WIRING, ETC. TO MATCH EXISTING
AHU CONTROL SEQUENCE.
EXISTING LOUVER
D S D
February 1, 2024
Since 1963
(989) 894-4300
714 East Midland Street Bay City, Michigan 48706 www.macmillanassociates.com
CONSULTING ENGINEERS
MacMILLAN ASSOCIATES
REV. DESCRIPTION BY DATE
0.5"0.0" 1.0" 2.0"1.5"2/ 3/
1:
A
M
JO
SE
PH
B R
EE
N
(J
BR
EE
N
M
AC
M
IL
LA
N
AS
SO
C
IA
TE
S.
C
O M
F:
\0 1-
M
IS
C \2
3-
C
LA
R
E G
LA
D
W
IN
A R
EA
S
C H
O O
L G
YM
N
AS
IU
M A
H U
R
EP
LA
C
EM
EN
T W
IT
H
A C
\2
3-
9-
M -M
3.
-M
EC
H
AN
IC
AL
S C
H
ED
U
LE
A N
D D
ET
AI
LS
PROJECT DESCRIPTION
SHEET DESCRIPTION
AL
L
RI
GH
TS
R
ES
ER
VE
D.
C
OP
YR
IG
HT
M ac M
IL
LA
N
AS
SO
CI
AT
ES
, I
NC
SHEET No.
JOB No.DRAWN BY
DESIGNED BY
APPROVED BY
95% OWNER REVIEW MAI 01.24.2024
100% BID SET MAI 02.01.2024
CLARE-GLADWIN DAY SCHOOL
AHU REPLACEMENT
MECHANICAL
SCHEDULE AND DETAILS
M3.01
2023-01119JWB
JWB
RAM
DSD
`[B-250`]
`[A-250`]
MBD MANUAL BALANCING DAMPER
DUCT SMOKE DETECTOR
RETURN OR EXHAUST AIR GRILLE - TYPE "B", 250 CFM
SUPPLY AIR DIFFUSER - TYPE "A", 250 CFM
HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
VERTICAL FIRE DAMPER
MECHANICAL SYMBOL LIST
VENT THRU ROOFVTR
RC
EWC
JS
RA
SA
UR
WC
L
SK
EX
FD
V
G
CHWR
CHWS
HHWR
HHWS
AW
AW
ST
ST
SAN
SAN
RAIN WATER CONDUCTOR
ELECTRIC WATER COOLER
JANITORS SINK
RETURN AIR
SUPPLY AIR
URINAL
WATER CLOSET
LAVATORY
SINK
EXISTING
FLOOR DRAIN
DOMESTIC HOT WATER RETURN PIPING
DOMESTIC HOT WATER PIPING
DOMESTIC COLD WATER PIPING
VENT PIPING
NATURAL GAS PIPING
CHILLED WATER RETURN PIPING
CHILLED WATER SUPPLY PIPING
HEATING HOT WATER RETURN PIPING
HEATING HOT WATER SUPPLY PIPING
ACID WASTE PIPING BELOW FLOOR OR GRADE
SANITARY PIPING BELOW FLOOR OR GRADE
SANITARY PIPING ABOVE FLOOR
STORM PIPING BELOW FLOOR OR GRADE
STORM PIPING ABOVE FLOOR
ACID WASTE PIPING ABOVE FLOOR
FP
COND
STM (#150)
FIRE PROTECTION PIPING
STEAM CONDENSATE RETURN PIPING
STEAM SUPPLY PIPING
COMPRESSED AIR PIPING (INDUSTRIAL TYPE)CA
VAC VACUUM PIPING
NITROGEN
TRIPLE DUTY VALVE
BUTTERFLY VALVE
GRISWOLD AUTOMATIC FLOW LIMITING VALVE
THREE WAY CONTROL VALVE (PNEUMATIC)
TWO WAY CONTROL VALVE (PNEUMATIC)
STRAINER
FLEXIBLE CONNECTION
FLOW ARROW
EXPANSION JOINT
OS & Y GATE VALVE
GLOBE VALVE N.C.
ISOLATION GATE VALVE
CHECK VALVE
UNION
CAP
REDUCER
GLOBE VALVE N.O.
BALL VALVE
GAS COCK
EXTERIOR WALL HYDRANT
VALVE IN RISER
PRESSURE REGULATING VALVE
TEMPERATURE & PRESSURE RELIEF VALVE
INLINE PUMP
FS
FLOW SWITCH
PRESSURE GAUGE W/COCK
MANUAL AIR VENT
AUTOMATIC AIR VENT
PIPE ANCHOR
PIPE GUIDE
WATER PIPING LOCATED OUTSIDE OF BUILDINGW
HORIZONTAL SMOKE DAMPER
DRAIN TILEDT
SLOT DIFFUSER
S
S
HORIZONTAL COMBINATION FIRE/SMOKE DAMPER
VERTICAL COMBINATION FIRE/SMOKE DAMPER
MOTORIZED DAMPER
MANUAL DAMPER
PUMPED CONDENSATE RETURN PIPINGPCR
RF REFRIGERANT LINE
PRESSURE SENSOR OR SWITCH
PS
THERMOMETER
FS FLOOR SINK
DRAIN TILE CONNECTORDTC
PRV PRESSURE REGULATING OR REDUCING VALVE
VA VALVE
SERC SECONDARY EMERGENCY RAIN WATER CONDUCTOR
CO CLEAN OUT
WALL CLEAN OUTWCO
SERD SECONDARY EMERGENCY ROOF DRAIN
SECONDARY EMERGENCY DRAINAGESED
SERVICE SINKSS
RD ROOF DRAIN
INVERT ELEVATIONIE
ELEVATIONEL
VENTV
CAST IRONCI
VENT STACKVS
HOT WATER RADIANT PANELHWRP
FIN TUBE RADIATIONFTR
RADIANT SUPPLY PIPINGRADS
VARIABLE AIR VOLUME BOXVAV
PRESSURE REGULATING OR REDUCING VALVE
T
SERVICE SINK
FLUSH TANK WATER CLOSET
FLUSH VALVE FLOOR MOUNTED
FLUSH VALVE WALL MOUNTED
URINAL
LAVATORY OR SINK
FLOOR SINK
THERMOSTAT OR WALL SENSOR
FLOOR DRAIN
N NIGHT STAT OR NIGHT WALL SENSOR
H HUMIDISTAT
S SENSOR
ROOF DRAIN BELOW ROOF (FLOOR PLAN)
ROOF DRAIN ON ROOF (ROOF PLAN)
EXHAUST FAN WITH FAN ABOVE (FLOOR PLAN)
EXHAUST FAN ON ROOF (ROOF PLAN)
CO UP TO GRADE
CO ABOVE FLOOR
CO UP TO FLOOR
SAN
SAN
SAN
ELBOW DROPPING DOWN
ELBOW RISING UP
TEE WITH PIPE DOWN
TEE WITH PIPE UP
SECONDARY EMERGENCY DRAINAGE PIPINGSED
N
HOT WATER PIPE WITH ELECTRICAL HEAT TRACE
THREE WAY CONTROL VALVE (ELECTRIC)
TWO WAY CONTROL VALVE (ELECTRIC)
KITCHEN MASTER GAS VALVE
GAS REGULATOR
DF DRINKING FOUNTAIN
FAN POWERED VARIABLE AIR VOLUME BOXFVB
HEAT PUMPHP
FLUID COOLERFC
CABINET HEATERCH
UNIT VENTILATORUV
EXHAUST FANEF
AIR COOLED CONDENSING UNITACCU
AIR CONDITIONING UNITACU
AIR HANDLING UNITAHU
BELOW FINISHED GRADEBFG
ABOVE FINISHED FLOORAFF
ROOF TOP UNITRTU
SHOWERSH
TRAP PRIMERTP
MAKE UP AIR UNIT MUA
RELIEF AIR HOODRAH
AIR INTAKE HOODAIH
INTERIOR HOSE BIBHB
EXTERIOR WALL HYDRANTWHYD
EX. VERTICAL FIRE DAMPER
EX. HORIZONTAL FIRE DAMPER
R RHEOSTAT
CO2 CARBON DIOXIDE SENSOR
ABOVEABV
CUBIC FEET PER MINUTECFM
OUTSIDE AIROA
EXHAUST AIREA
HOT WATER RETURNHWR
COLD WATERCW
HOT WATERHW
GALLONS PER MINUTEGPM
UNLESS NOTED OTHERWISEUNO
STATIC PRESSURESP
BARRIER FREEBF
RADIANT RETURN PIPINGRADR
MISC. EQUIP. COND DRAIN PIPINGCD
NC NORMALLY CLOSED
NORMALLY OPENEDNO
GREASE INTERCEPTORGI
WATER HEATERWH
HEAT EXCHANGERHX
CIRCULATING PUMPCP
VARIABLE FREQUENCY DRIVEVFD
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE INCH GAUGEPSIG
EXHAUST AIR REGISTEREAR
RETURN AIR REGISTERRAR
SUPPLY AIR REGISTERSAR
FCV FLOW CONTROL VALVE
CTWS COOLING TOWER WATER SUPPLY PIPING
CTWR COOLING TOWER WATER RETURN PIPING
CWR CONDENSOR WATER RETURN PIPING
CWS CONDENSOR WATER SUPPLY PIPING
STEAM TRAPT
INTERIOR HOSE BIB
CONDENSATECOND
TRAPT
DUCT PRESSURE SENSOR
PRV
DIFFERENTIAL PRESSURE SENSOR
NITROUSOXIDENO2
AIRA
OXYGEN PIPINGO
REDUCED PRESURE BACKFLOW PREVENTERRPBP
TP TRAP PRIMER PIPING BELOW FLOOR
HPR
HPS
HEAT PUMP RETURN PIPING
HEAT PUMP SUPPLY PIPING
ELECTRIC VARIABLE AIR VOLUME BOXEVB
CONVECTORCONV
ENERGY RECOVERY UNITERUWASTE ANESTHESISWAGD
CARBON DIOXIDECO2
ACID VENT PIPINGAV
DEIONIZED WATER PIPINGDI
COMPRESSED AIRCA
DI DEIONIZED WATER
VARIABLE AIR VOLUME BOX W/ RE-HEAT COILVAVR
UNIT HEATERUH
RF RETURN AIR FAN
FAN COIL UNITFCU
COOLING TOWERCT
CABINET UNIT HEATERCUH
MECH. DRAWING SYMBOLIST
ONLY USE AS SYMBOL LIST ONLY (NOT FOR DRAFTING USE)
(REFERANCE ONLY)
VITRIFIED TILEVT
DS DRAINAGE STACK
GENERAL MECHANICAL NOTES
1. THE MECHANICAL TRADES SHALL FAMILIARIZE THEMSELVES WITH ALL
EXISTING AND NEW CONDITIONS, THESE DRAWINGS, ADDENDA & RELATED
SPECIFICATIONS. THEY SHALL COMPLETELY SATISFY THEMSELVES AS TO THE
CONDITIONS TO WHICH THE WORK IS TO BE PERFORMED BEFORE SUBMITTING
THEIR BID. NO ALLOWANCES OR CONSIDERATIONS WILL BE GIVEN AT A LATER
DATE FOR ALLEGED MISUNDERSTANDINGS AS TO THE REQUIREMENTS OF THE
WORK, MATERIALS TO BE FURNISHED, OR CONDITIONS REQUIRED BY THE
NATURE OF THIS PROJECT SITE DUE TO NEGLECT ON THE BIDDERS PART TO
MAKE SUCH AN EXAMINATION AND COORDINATION.
2. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO SHOW APPROXIMATE
LOCATION AND GENERAL ARRANGEMENT OF SYSTEMS AND EQUIPMENT.
DRAWINGS SHALL NOT BE SCALED FOR LOCATION OF SYSTEMS, EQUIPMENT,
ETC. ALL LOCATIONS OF SYSTEMS AND EQUIPMENT SHALL BE VERIFIED IN
FIELD AND COORDINATED WITH ALL OTHER TRADES AND EXISTING FIELD
CONDITIONS. SOME SYSTEMS (PIPING, DUCTWORK, ETC.) AND EQUIPMENT
LOCATIONS MAY REQUIRE CHANGES IN LOCATION DUE TO FIELD CONDITIONS
AND COORDINATION WITH OTHER TRADES. THESE CHANGES SHALL BE MADE
WITH NO ADDITIONAL COST TO THE OWNER. FAILURE TO VERIFY AND
COORDINATE WILL BE NO REASON FOR ADDITIONAL COMPENSATION.
3. THE INSTALLATION OF ALL SYSTEMS, EQUIPMENT, ETC., IS SUBJECT TO
CLARIFICATION WITH SUBMITTED SHOP DRAWINGS AND FIELD COORDINATION
REQUIREMENTS. EQUIPMENT OUTLINES SHOWN ON DRAWINGS OR
DIMENSIONED ON DRAWINGS ARE LIMITING DIMENSIONS. ANY EQUIPMENT
THAT REDUCES THE INDICATED CLEARANCES OR EXCEEDS SPECIFIED OR
SCHEDULED EQUIPMENT DIMENSIONS SHALL NOT BE USED.
4. THE MECHANICAL CONTRACTOR SHALL COORDINATE FINAL LOCATION OF ALL
EQUIPMENT WITH PIPING, DUCTWORK, ETC., AT THE TIME OF ROUGH-IN. ALL
EQUIPMENT TO BE SERVICEABLE. ABOVE CEILING EQUIPMENT SHALL BE
WITHIN 18” OF CEILING WITHOUT ANY OBSTRUCTIONS AND SHALL HAVE ALL
SERVICE AND ACCESS SPACES KEPT CLEAR. PERFORM ABOVE CEILING
COORDINATION WITH ALL TRADES.
5. THESE DRAWINGS AND THE ASSOCIATED SPECIFICATIONS ARE INTENDED TO
PROVIDE COMPLETELY FURNISHED, INSTALLED AND OPERATIONAL
MECHANICAL SYSTEM (HEATING, VENTILATING, AIR CONDITIONING, PLUMBING
AND PIPING, ETC.). IF THESE DRAWINGS AND ASSOCIATED SPECIFICATIONS
HAVE INFORMATION OMITTED THAT WOULD NOT ALLOW A COMPLETELY
OPERATIONAL SYSTEM AS IS THE INTENT OF THE ENGINEER, THE BIDDER
SHALL NOTIFY THE ENGINEER A MINIMUM ONE WEEK PRIOR TO THE BID DATE
TO ALLOW FOR ADDENDA. ONCE BIDS HAVE BEEN RECEIVED, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIAL, LABOR, ETC., TO
FURNISH AND INSTALL A COMPLETELY OPERATIONAL MECHANICAL SYSTEM AS
IS THE INTENT OF THESE DRAWINGS AND ASSOCIATED SPECIFICATION. ALL
EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. IF
ANY DISCREPANCIES ARE ON DRAWINGS, AS COMPARED TO MANUFACTURER'S
INSTALLATION INSTRUCTIONS, THE CONTRACTOR SHALL NOTIFY THE
ENGINEER AND INSTALL EQUIPMENT AS REQUIRED AT NO ADDITIONAL COST TO
THE PROJECT.
6. THE MECHANICAL TRADES SHALL TAKE OUT ALL PERMITS AND ARRANGE FOR
NECESSARY INSPECTIONS AND SHALL PAY ALL FEES AND COSTS.
7. THE MECHANICAL TRADES SHALL VERIFY AMOUNT OF EXISTING PIPING,
VALVES, DUCTWORK, ETC. TO BE REMOVED OR RELOCATED TO ALLOW FOR
INSTALLATION OF NEW PIPING, DUCTWORK, VALVES, EQUIPMENT, WALLS, ETC.
ALL ABANDONED PIPING, VALVES, ETC., SHALL BE REMOVED.
8. THE MECHANICAL TRADES SHALL COORDINATE ALL WORK WITH OTHER
TRADES AND SHALL COORDINATE ANY SYSTEMS SHUT-DOWN WITH THE
ARCHITECT/ENGINEER AND OWNER.
9. ALL EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. THAT IS TO BE REMOVED
SHALL REMAIN THE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL
REMOVE AND LOCATE THIS MATERIAL THAT REMAINS THE PROPERTY OF THE
OWNER TO A LOCATION DETERMINED BY THE OWNER SOMEWHERE ON SITE. IF
THE OWNER DOES NOT WANT TO MAINTAIN POSSESSION OF THE REMOVED
MATERIAL, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING
MATERIAL FROM THE SITE AND DISPOSING OF THIS MATERIAL AS NECESSARY
TO MEET ALL CODES AND REQUIREMENTS AND SHALL PAY ALL COSTS AS
REQUIRED FOR ANY DISPOSAL FEES, INSPECTIONS, PERMITS, ETC.
10. ATTACHMENTS OF MECHANICAL OR ELECTRICAL EQUIPMENT TO STRUCTURAL
MEMBERS ARE THE RESPONSIBILITY OF THE INSTALLING TRADE. STRUCTURAL
MEMBERS SHALL NOT BE FIELD CUT, WELDED OR OTHERWISE MODIFIED
WITHOUT APPROVAL OF THE ARCHITECT/ENGINEER. ATTACHMENT TO STEEL
JOISTS SHALL BE MADE AT PANEL POINTS WHENEVER POSSIBLE. STEEL
JOISTS SHALL BE REINFORCED FOR NON-PANEL POINT CONCENTRATED LOADS
IN ACCORDANCE WITH THE STRUCTURAL DETAILS; THIS WORK SHALL BE
PERFORMED BY CERTIFIED WELDERS AND IS THE RESPONSIBILITY OF THE
TRADE INSTALLING THE SUBJECT LOAD. STRUCTURAL MEMBERS SHALL NOT
BE OVERLOADED AS A RESULT OF ATTACHMENTS. ATTACHMENT/EQUIPMENT
LOADING FOR ALL TRADES RESULTING IN TOTAL LOAD GREATER THAN AN
EQUIVALENT UNIFORM 5 PSF FOR ANY MEMBER SHALL BE SUBMITTED TO THE
ARCHITECT/ENGINEER FOR REVIEW.
11. THE MECHANICAL TRADES SHALL FURNISH AND LOCATE CEILING AND/OR WALL
ACCESS DOORS AS REQUIRED TO GIVE ACCESS TO VALVES, EQUIPMENT, ETC.
COORDINATE WALL OR CEILING FIRE RATINGS AND FURNISH ACCESS DOOR
WITH RATING AS NECESSARY. THE GENERAL TRADES SHALL INSTALL ACCESS
DOORS.
12. FURNISH PREFABRICATED ROOF CURB FOR EACH EXHAUST FAN, WITH HEIGHT
OF CURB TO GIVE MINIMUM 12” CLEAR FROM FINISHED ROOF TO EXHAUST FAN
CURB CAP. THE MECHANICAL TRADE SHALL FURNISH THE ROOF CURB TO THE
GENERAL TRADE. THE GENERAL TRADE SHALL LEVEL CURB, PERFORM ALL
ROOFING AND FLASHING ETC.
13. SEE SPECIFICATION FOR FURTHER INFORMATION.
SPECIFIED AND SCHEDULED EQUIPMENT NOTE
EQUIPMENT MANUFACTURERS AND MATERIALS SPECIFIED OR SCHEDULED ON
THESE PROJECT DRAWINGS AND SPECIFICATIONS SHALL BE INCLUDED UNDER THE
BASE BID PRICE. SUBSTITUTE OR ALTERNATE EQUIPMENT SHALL BE PRICED AS AN
ADD OR DEDUCT PRICE TO THE CONTRACTOR'S BASE BID PRICE. IF ONE OR MORE
SUBSTITUTIONS ARE ACCEPTED WITH THE PROPOSAL AT THE CORRESPONDING
ALTERNATE PRICE, IT SHALL BE UNDERSTOOD THAT APPROVAL OF SAID
EQUIPMENT SHALL BE SUBJECT TO STRICT ADHERENCE TO THE PLANS AND
SPECIFICATIONS. SHOULD ANY OF THE SUBSTITUTE EQUIPMENT FAIL TO MEET THE
SPECIFICATIONS AFTER THE PROPOSAL HAS BEEN ACCEPTED, REGARDLESS IF
EQUIPMENT HAS BEEN SHIPPED TO THE SITE AND INSTALLED, THE CONTRACTOR
SHALL FURNISH AT NO EXTRA COST TO THE OWNER, THE SPECIFIED EQUIPMENT
MEETING THE REQUIREMENTS AS STATED IN THESE SPECIFICATIONS AND COVER
ALL COSTS NECESSARY FOR REMOVAL AND REINSTALLATION OF EQUIPMENT.
BOOSTER COIL PIPING DETAIL
NO SCALE
COIL
WITH 3-WAY CONTROL VALVE
HEATING HOT WATER
HEATING HOT WATER
AUTOMATIC FLOW LIMITING
UNION (TYP)
3-WAY CONTROL VALVE
MANUAL AIR VENT AT HIGH POINT IN PIPING
(1/4" BALL VALVE PIPED TO ACCESSIBLE LOCATION)
#110 PETES PLUG WITH NORDELL VALVE CORE,
FURNISH ONE TEST KIT FOR PROJECT
HOT WATER BOOSTER COIL
BALL SHUT-OFF VALVE
SUPPLY PIPING
RETURN PIPING
CONTROL VALVE
1 2 3 4 5 6
10 8
STRAINER WITH DRAIN VALVE AND PRESSURE PORTS
COOLING COIL CONDENSATE DRAIN TRAP DETAIL
NO SCALE
COOLING COIL
COOLING COIL CONDENSATE
DRAIN CONNECTION
UNION
MINIMUM 6" DEEP TRAP
SEAL FOR AIR HANDLERS
MIN. 3" DEEP TRAP SEAL
FOR U.V.'S AND FAN COIL
UNITS
SAME DEPTH AS
CLEANOUT FITTING
CONDENSATE DRAIN - EXTEND
TO FLOOR DRAIN, FLOOR
SINK, AS NOTED ON DRAWINGS
OR REQUIRED.
6 7
NOTE: REFER TO MANUFACTURERS
INSTALLATION INSTRUCTIONS
AND MEET ALL REQUIREMENTS.
COIL-TYPE VERTICAL AIR HANDLING UNITS
MARK MANUFACTURER MODEL TYPE SUPPLY
AIRFLOW
RETURN
AIRFLOW
OUTSIDE
AIRFLOW
STATIC PRESSURE (IN
WG) FAN MOTOR (HP)
HEATING
CAPACITY
(INPUT)
HEATING
CAPACITY
(OUTPUT)
MAX
TEMP.
RISE (F)
UNIT
WEIGHT
(LBS)
UNIT DIMENSIONS
(L x W x H)
ELECTRICAL
NOTES
VOLTS PHASE MCA MOPEXT. TOTAL SUPPLY RETURN MBH MBH
AHU-1 TRANE UCCAG06A0G0RD13300000ADD884DA1AC00000BB1 COIL 2,400 2,040 360 0.60 2.77 3.0 2.17 117 45 1,028 97 15/16" X 47" X 38 1/2" 208 3 19.5 30 1,2,3,4
NOTES:
1. A VARIABLE FREQUENCY DRIVE (VFD) SHALL BE PROVIDED TO ENSURE PROPER OPERATION AND TO OPTIMIZE OPERATING LIFE.
2. UNIT CONSTRUCTION: 18 GA. CASING, DOUBLE-WALL, 1" INSULATION. HINGED ACCESS DOORS.
3. AIR FILTERS PROVIDED BY MANUFACTURER. FURNISH (1) COMPLETE EXTRA SET OF FILTERS FOR FUTURE USE.
4. UNIT WITH GREATER THAN 2,000 CFM SHALL HAVE DRY CONTACTS FOR DUCT SMOKE DETECTOR CIRCUIT FACTORY WIRED TO STOP UNIT UPON DETECTION OF SMOKE. DUCT SMOKE DETECTOR SHALL BE FURNISHED AND WIRED BY ELECTRICAL CONTRACTOR, WITH SHEET METAL INSTALLATION BY MECHANICAL TRADES.
AIR COOLED CONDENSING UNIT SCHEDULE
Mark Serving REFRIGERANT NOMINAL
TONNAGE COMPRESSOR RLA COMPRESSOR
QUANTITY
ELECTRICAL
MANUFACTURER MODEL NUMBER SEER REMARKS
MCA MOP RLA VOLTS/Hz/PH
ACCU-1 AHU-1 R-410A 7.5 TON 26.9 1 36.0 60 26.9 208/60/3 TRANE TTA0903AAA**BS010001 14 1,2,3,4,5,6
NOTES:
1. UNIT CASING IS CONSTRUCTED OF HEAVY GAUGE GALVANIZED STEEL AND PAINTED WITH WEATHER RESISTANT BAKED ENAMEL FINISH.
2. ALUMINUM COIL WITH INTEGRATED SLIDE DECK FOR EASY REMOVAL, ENHANCED COIL FIN WITH BLOW THROUGH DESIGN.
3. TOP DISCHARGE AREA SHOULD BE UNRESTRICTED FOR AT LEAST 72" ABOVE UNIT. UNIT SHOULD BE PLACED SO ROOF RUN-OFF WATER DOES NOT POUR DIRECTLY ON UNIT.
4. UNIT SHOULD BE AT LEAST 6" FROM WALL. MAINTAIN A MINIMUM OF 36" BETWEEN CONDENSING UNITS ON NON-SERVICE SIDE AND 48" MINIMUM CLEARANCE FROM SERVICE SIDE OF CONDENSING UNIT.
February 1, 2024
714 East Midland Street Bay City, Michigan 48706 www.macmillanassociates.com
CONSULTING ENGINEERS
MacMILLAN ASSOCIATES
REV. DESCRIPTION BY DATE
0.5"0.0" 1.0" 2.0"1.5"2/ 3/
1:
A
M
JO
SE
PH
B R
EE
N
(J
BR
EE
N
M
AC
M
IL
LA
N
AS
SO
C
IA
TE
S.
C
O M
F:
\0 1-
M
IS
C \2
3-
C
LA
R
E G
LA
D
W
IN
A R
EA
S
C H
O O
L G
YM
N
AS
IU
M A
H U
R
EP
LA
C
EM
EN
T W
IT
H
A C
\2
3-
9-
M -M
3.
-M
EC
H
AN
IC
AL
S
PE
C
IF
IC
AT
IO
N
S
PROJECT DESCRIPTION
SHEET DESCRIPTION
AL
L
RI
GH
TS
R
ES
ER
VE
D.
C
OP
YR
IG
HT
M ac M
IL
LA
N
AS
SO
CI
AT
ES
, I
NC
SHEET No.
JOB No.DRAWN BY
DESIGNED BY
APPROVED BY
95% OWNER REVIEW MAI 01.24.2024
100% BID SET MAI 02.01.2024
CLARE-GLADWIN DAY SCHOOL
AHU REPLACEMENT
MECHANICAL
SPECIFICATIONS
M3.02
2023-01119JWB
JWB
RAM
MECHANICAL SPECIFICATIONS
REFERENCE
INSTRUCTIONS TO BIDDERS, CONDITIONS OF THE CONTRACT, DIVISION 1, AND THIS
SECTION SHALL APPLY TO THIS DIVISION.
CODES, PERMITS & INSPECTIONS
CONTRACTOR SHALL SECURE PERMITS, INSPECTIONS AND TESTS, PAY ALL FEES,
DEPOSITS, AND COSTS FOR ALL MECHANICAL UTILITIES AND SERVICES INVOLVED AND
PRESENT THE OWNER A CERTIFICATE OF INSPECTION AND APPROVAL FROM THE
DEPARTMENT HAVING JURISDICTION OVER HIS WORK. SHOULD ANY CHANGE IN THE
DRAWINGS AND SPECIFICATIONS BE REQUIRED TO COMPLY WITH ALL APPLICABLE CODES,
RULES, REGULATIONS, ETC., CONTRACTOR SHALL NOTIFY THE ENGINEER BEFORE
SUBMITTING BID. AFTER ENTERING INTO CONTRACT, ALL WORK NECESSARY TO MEET THE
REQUIREMENTS SHALL BE COMPLETED WITHOUT ADDITION TO THE CONTRACT AMOUNT.
WHERE WORK INDICATED IS MORE THAN REQUIRED BY CODES, ETC., SUCH WORK SHALL
BE AS INDICATED.
JOB OBSERVATION
NOTWITHSTANDING ANY REFERENCE TO ANY CODE, RULE OR REGULATION, ENGINEER
SHALL HAVE NO RESPONSIBILITY FOR SAFETY ON THE JOB SITE, SHALL HAVE NO RIGHT TO
CHANGE OR STOP THE WORK, SHALL NOT CONTROL THE MEANS OF THE WORK, AND SHALL
NOT HAVE ANY DUTY TO PROVIDE SUPERVISION OF MEANS, METHODS, PROCESSES OR
PROCEDURES OF CONSTRUCTION.
FIRST-CLASS WORKABLE SYSTEMS
FIRST CLASS WORKABLE SYSTEMS SHALL BE PROVIDED BY THE CONTRACTOR. IF, IN THE
OPINION OF THE CONTRACTOR, CHANGES IN THE DRAWINGS OR SPECIFICATIONS ARE
REQUIRED TO PRODUCE FIRST-CLASS WORKABLE SYSTEMS, CONTRACTOR SHALL
REQUEST AN INTERPRETATION FROM THE ENGINEER BEFORE PROCEEDING WITH THE
WORK. IF THE CONTRACTOR FAILS TO MAKE SUCH A REQUEST, NO EXCUSE WILL
THEREAFTER BE ENTERTAINED FOR FAILURE TO PROVIDE FIRST-CLASS WORKABLE
SYSTEMS.
DRAWINGS
DRAWINGS ARE INTENDED TO SHOW THE GENERAL ARRANGEMENT, DESIGN, AND EXTENT
OF THE WORK AND ARE DIAGRAMMATIC. THEY ARE NOT INTENDED TO BE SCALED FOR
ROUGH-IN MEASUREMENTS NOR TO SERVE AS SHOP DRAWINGS. THE ENGINEERS AND
OWNER RESERVE THE RIGHT TO MAKE MINOR CHANGES IN THE LOCATION OF EQUIPMENT,
DUCTWORK, PIPING, ETC. AT THE TIME OF ROUGH-IN WITHOUT ADDITIONAL COST TO THE
OWNER. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, LOCATIONS, ETC. FOR
ACCURACY AND POSSIBILITY OF INTERFERENCES DUE TO FIELD CONDITIONS AND ACTUAL
BUILDING STRUCTURE. FAILURE TO CHECK WILL BE NO REASON FOR ADDITIONAL
COMPENSATION.
SHOP DRAWINGS
SUBMIT ELECTRONIC SET OF COMPLETE SHOP DRAWINGS FOR ALL MECHANICAL
EQUIPMENT AND MATERIALS TO THE ENGINEER FOR REVIEW BEFORE FABRICATION OF
WORK OR ORDERING OF EQUIPMENT. DRAWINGS MUST BE REVIEWED BY THE ENGINEER
BEFORE ORDERING EQUIPMENT. ALL SHOP DRAWINGS REJECTED SHALL BE CORRECTED
AND RESUBMITTED TO THE ENGINEER BEFORE ORDERING.
STANDARDS OF INDUSTRY
STANDARDS OF INDUSTRY SHALL BE FOLLOWED WHEN APPLICABLE.
GUARANTEE
CONTRACTOR SHALL GUARANTEE EQUIPMENT, MATERIALS AND WORKMANSHIP IN HIS
CONTRACT AND SHALL MAKE GOOD AT HIS OWN EXPENSE ANY DEFECTS WHICH MAY
DEVELOP WITHIN ONE YEAR AFTER START-UP OF EACH PIECE OF EQUIPMENT,
OCCUPANCY BY OWNER, OR FINAL ACCEPTANCE OF THE JOB, WHICHEVER OCCURS FIRST.
CONTRACTORS RECORD/AS-BUILT DRAWINGS
CONTRACTOR SHALL MAINTAIN AND KEEP AN UP-TO-DATE SET OF “RECORD” DRAWINGS
REFLECTING "AS-BUILT" CONDITIONS OF THEIR WORK. CONTRACTOR SHALL INDICATE
EXACT DIMENSIONS AND ELEVATIONS FOR ALL UNDERGROUND WORK. UPON COMPLETION
OF THIS PROJECT, THE CONTRACTOR SHALL DELIVER TO THE ENGINEER THE “RECORD”
DRAWINGS.
LOCAL CONDITIONS
BEFORE SUBMITTING BIDS AND/OR PROCEEDING WITH THE PROJECT, THE CONTRACTOR
SHALL EXAMINE ALL DRAWINGS, SPECIFICATIONS AND ADDENDA ISSUED FOR THE
PROJECT AND SHALL EXAMINE THE PROJECT SITE. THE CONTRACTOR SHALL
THOROUGHLY INVESTIGATE THE PROJECT SITE AND BECOME FULLY INFORMED AS TO THE
EXTENT OF HIS WORK AND COORDINATION OF THIS WORK WITH ALL OTHER TRADES AND
INCLUDE ALL COST TO PERFORM AND COMPLETE WORK FOR THIS PROJECT PER
DRAWINGS AND SPECIFICATION AND ALL CODES.
OPERATION AND MAINTENANCE MANUALS
CONTRACTOR SHALL FURNISH TO THE ARCHITECT/ENGINEER TWO (2) COPIES OF AN
APPROVED BOUND (3-RING BINDER) BOOK WITH TABS FOR SECTIONS COVERING EACH
ITEM OF EQUIPMENT. THESE NOTEBOOKS SHALL INCLUDE SHOP DRAWINGS,
MAINTENANCE MANUALS, OPERATING MANUALS AND PARTS LIST AS NECESSARY TO
INSTRUCT THE OWNER ON PROPER OPERATION AND USE AS WELL AS MAINTENANCE FOR
EACH PIECE OF EQUIPMENT FOR THIS PROJECT. THESE BOOKS SHALL ALSO INCLUDE
CONTRACTOR'S, SUBCONTRACTOR'S AND MANUFACTURER'S NAMES, TELEPHONE
NUMBERS AND ADDRESSES. MANUALS SHALL ALSO INCLUDE SEQUENCE OF OPERATION,
CONTROL EQUIPMENT LITERATURE, WIRING AND CONTROL DIAGRAMS, CERTIFICATES OF
GUARANTEES, CERTIFICATES OF INSPECTION, MECHANICAL SYSTEM TEST AND BALANCING
REPORTS. THE CONTRACTOR SHALL ACCUMULATE AND SUMMARIZE THE CONTROL AND
MAINTENANCE SEQUENCE IN TYPEWRITTEN SHEET TO BE INCLUDED IN THE REPORT.
THESE MANUALS SHOULD BE HARD BOUND IN BEST QUALITY BINDERS AND TURNED OVER
TO THE ARCHITECT/ENGINEER FOR APPROVAL AT COMPLETION OF PROJECT.
START-UP SERVICE
CONTRACTOR SHALL ARRANGE WITH EQUIPMENT MANUFACTURERS FOR PROVIDING
COMPLETE START-UP SERVICE FOR ALL EQUIPMENT ON THIS PROJECT. ALL START-UP
SERVICES SHALL BE PERFORMED IN THE PRESENCE OF THE OWNER AND/OR ENGINEER. A
WRITTEN REPORT SHALL BE SUBMITTED TO THE ENGINEER STATING DATE OF START-UP,
MANUFACTURER APPROVAL OF SYSTEM OPERATION AND INSTALLATION.
CUTTING AND PATCHING
CUTTING AND PATCHING SHALL BE BY TRADES REGULARLY ENGAGED IN THIS TYPE OF
WORK, EXCEPT DRILLING OF HOLES SHALL BE DONE BY THE TRADES REQUIRING SAME.
STRUCTURAL MEMBERS SHALL NOT BE CUT OR DRILLED.
SALVAGEABLE MATERIAL
SALVAGEABLE MATERIAL SHALL REMAIN THE PROPERTY OF THE OWNER AND SHALL BE
STORED AT LOCATIONS AS DIRECTED BY THE OWNER, EXCEPT THE OWNER RESERVES
THE RIGHT TO DESIGNATE CERTAIN ITEMS OF SALVAGEABLE MATERIAL TO BE REMOVED
FROM THE PROJECT SITE.
RIGGING AND HOISTING
PERFORM ALL REQUIRED RIGGING, HOISTING, TRANSPORTATION, MOVING, ETC. OF ALL
EQUIPMENT, MATERIALS, ETC. TO BE FURNISHED AND/OR INSTALLED AS SHOWN ON
DRAWINGS, WHETHER FURNISHED BY THIS CONTRACTOR OR BY THE OWNER OR OTHER
TRADES.
STORAGE FACILITY
FURNISH AND MAINTAIN A WEATHERPROOF STORAGE FACILITY ON THE SITE OF ADEQUATE
SIZE TO STORE MISCELLANEOUS EQUIPMENT AND/OR MATERIALS TO PREVENT EXPOSURE
TO THE WEATHER. LOCATION OF SHED SHALL BE DETERMINED BY THE OWNER AND
ARCHITECT/ENGINEER. THE OWNER RESERVES THE RIGHT TO DENY STORAGE OF
MATERIALS OR EQUIPMENT IN ANY EXISTING OR NEW BUILDINGS.
PROTECTION FROM DAMAGE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS, EQUIPMENT, ETC. AND
ALL WORK INSTALLED BY HIMSELF AND SHALL PROTECT IT FROM DAMAGE UNTIL FINAL
ACCEPTANCE OF THIS PROJECT BY THE OWNER.
FURNISH ALL COVERINGS AND PROTECTION FROM DIRT, DUST, RAIN, STORM, HEAT,
TRAFFIC, WEAR, ETC. AND ALL POSSIBLE INJURY INCLUDING THAT BY OTHER WORKMEN.
ANY EQUIPMENT, WORKMANSHIP, MATERIALS, ETC. DAMAGED PRIOR TO FINAL
ACCEPTANCE BY THE OWNER OF THIS PROJECT SHALL BE PROPERLY REPAIRED AT NO
EXPENSE TO THE OWNER.
PROTECT ALL PLUMBING FIXTURES AND OTHER EQUIPMENT FROM DAMAGE BY COVERING
OR COATING. ANY DENTED, SCRATCHED, RUSTED OR MARRED SURFACE FINISHES WILL
NOT BE ACCEPTED.
PROTECT ALL EQUIPMENT, MATERIALS, ETC. FROM FREEZING.
PLUMBING AND PIPING BASIC MATERIALS AND METHODS:
HEATING HOT WATER PIPING
PIPING 3" AND SMALLER: COPPER TUBING: ASTM B88, TYPE L, HARD DRAWN, SEAMLESS.
FITTINGS: ASME B16.18 CAST BRONZE TEE TAP OR ASME B16.22 SOLDER WROUGHT
COPPER.
JOINTS: 95-5 TIN - ANTIMONY OR TIN AND SILVER WITH MELTING RANGE 430 TO 535
DEGREES F.
JOINTS: 2" THRU 6" MAY BE MECHANICAL PIPE COUPLINGS OF A BOLTED TYPE WITH A
CENTRAL CAVITY DESIGN PRESSURE-RESPONSIVE GASKET ALONG WITH GROOVED END
COPPER OR BRONZE FITTINGS AS AVAILABLE, AS MANUFACTURED BY VICTAULIC OR
GRUVLOK AS FOLLOWS:
COPPER TUBE: ASTM B88 (TYPE K OR L) - ROLL GROOVED ONLY.
MECHANICAL COUPLINGS: SHALL BE VICTAULIC STYLE 606 RIGID COUPLINGS FOR COPPER
CONSISTING OF A DUCTILE IRON CAST HOUSING, A SYNTHETIC RUBBER GASKET OF A
CENTRAL CAVITY PRESSURE-RESPONSIVE DESIGN, WITH PLATED NUTS AND BOLTS TO
SECURE UNIT TOGETHER.
COUPLING HOUSINGS: SHALL BE DUCTILE IRON CONFORMING TO ASTM A395 AND ASTM
A536 (GRADE 65-45-12), WITH A COPPER COLORED ALKYD ENAMEL PAINT COATING, AS
MANUFACTURED BY VICTAULIC COMPANY OF AMERICA.
GASKETS: SHALL BE MOLDED OF SYNTHETIC RUBBER IN A FLUSHSEAL® CONFIGURATION
CONFORMING TO THE COPPER TUBE SIZE (CTS) OUTSIDE DIAMETER AND COUPLING
HOUSING, OF ELASTOMERS HAVING PROPERTIES AS DESIGNATED IN ASTM D-2000.
GASKET SUPPLIED FOR WATER SERVICES FROM -30 TO +230 DEGREES F GRADE "E" EPDM
COMPOUND MOLDED OF MATERIALS CONFORMING TO ASTM D-2000, DESIGNATION
2CA615A25B24F17Z.
FLANGE ADAPTERS: SIMILAR TO VICTAULIC STYLE 641 VIC-FLANGE ADAPTERS 2" - 6",
DUCTILE IRON ASTM A-536 OR MALLEABLE IRON ASTM A-47, ENGAGING DIRECTLY INTO
ROLL GROOVED COPPER TUBE AND FITTINGS AND BOLTING DIRECTLY TO ANSI CLASS 125
CAST IRON AND CLASS 150 STEEL FLANGED COMPONENTS; INSTALLER TO SUPPLY
STANDARD FLANGE BOLTS. FLANGE CASTING SHALL BE AS IN 7.2.A ABOVE WITH A
CORRESPONDING VIC-FLANGE GASKET AS IN 7.3 ABOVE.
FITTINGS: FITTINGS SHALL BE FULL FLOW (SMOOTH TURN ELBOWS) COPPER FITTINGS
WITH GROOVES DESIGNED TO ACCEPT GROOVED END COUPLINGS.
VICTAULIC OR GRUV-LOK MECHANICAL PIPE COUPLINGS, FITTING, VALVES AND OTHER
GROOVED COMPONENTS MAY BE USED AS AN OPTION TO WELDING, THREADING OR
FLANGED METHODS. ALL GROOVED COMPONENTS SHALL BE OF ONE MANUFACTURER
AND SHALL CONFORM TO LOCAL CODE APPROVAL AND/OR AS LISTED BY ANSI B31.1, B 31.9,
ASME, UL/FM IAPMO OR BOC. GROOVED END PRODUCT MANUFACTURER TO BE ISO-9001
CERTIFIED.
ROLL OR CUT GROOVED ENDS AS APPROPRIATE TO PIPE MATERIAL, WALL THICKNESS,
PRESSURES, SIZE AND METHOD OF JOINING. PIPE ENDS SHALL BE GROOVED IN
ACCORDANCE WITH MANUFACTURERS CURRENT LISTED STANDARDS CONFORMING TO
ANSI/AWWA C-606.
MECHANICAL COUPLINGS SHALL BE SIMILAR TO VICTAULIC STYLE 07 (ZERO-FLEX) RIGID
COUPLING OR STYLE HP-70 RIGID COUPLING FOR HIGH PRESSURE SERVICE. VICTAULIC
STYLE 77 OR 75 COUPLING SHALL BE USED WHERE SYSTEM FLEXIBILITY IS DESIRED AT
PUMPS AND OTHER MECHANICAL EQUIPMENT TO REDUCE NOISE AND VIBRATION. NOISE
AND VIBRATION REDUCTION IS ACHIEVED BY INSTALLING (3) STYLE 77 OR 75 FLEXIBLE
COUPLINGS NEAR THE VIBRATION SOURCE. COUPLINGS SHALL BE OF CAST DUCTILE IRON
CONFORMING TO ASTM A536, GRADE 65-45-12 OR MALLEABLE IRON CONFORMING TO ASTM
A47, GRADE 32-510.
MECHANICAL REDUCING COUPLINGS SHALL BE SIMILAR TO VICTAULIC STYLE 750 FOR PIPE
RUNS FOR REDUCTION ON PIPE SIZES 4" THRU 8".
REFRIGERANT PIPING AND SPECIALTIES
COPPER TUBING: ASTM B280, TYPE ACR HARD DRAWN; TYPE K.
FITTINGS: ASME B16.22 WROUGHT COPPER.
JOINTS: BRAZE, AWS A5.8 BCUP SILVER/PHOSPHORUS/COPPER ALLOY WITH MELTING
RANGE 1190 TO 1480 DEGREES F.
COPPER TUBING TO 7/8 INCH OD: ASTM B88, TYPE K, ANNEALED.
FITTINGS: ASME B16.26 CAST COPPER.
JOINTS: FLARED.
PIPE SUPPORTS AND ANCHORS:
CONFORM TO ASME B31.5, ASTM F708, MSS SP58, MSS SP69 AND MSS SP89.
HANGERS FOR PIPE SIZES 1/2 TO 1 1/2 INCH: MALLEABLE IRON, ADJUSTABLE SWIVEL, SPLIT
RING.
HANGERS FOR PIPE SIZES 2 INCHES AND OVER: CARBON STEEL, ADJUSTABLE, CLEVIS.
MULTIPLE OR TRAPEZE HANGERS: STEEL CHANNELS WITH WELDED SPACERS AND
HANGER RODS.
WALL SUPPORT FOR PIPE SIZES TO 3 INCHES: CAST IRON HOOK.
WALL SUPPORT FOR PIPE SIZES 4 INCHES AND OVER: WELDED STEEL BRACKET AND
WROUGHT STEEL CLAMP. VERTICAL SUPPORT: STEEL RISER CLAMP.
FLOOR SUPPORT: CAST IRON ADJUSTABLE PIPE SADDLE, LOCK NUT, NIPPLE, FLOOR
FLANGE, AND CONCRETE PIER OR STEEL SUPPORT.
COPPER PIPE SUPPORT: CARBON STEEL RING, ADJUSTABLE, COPPER PLATED.
HANGER RODS: MILD STEEL THREADED BOTH ENDS, THREADED ONE END, OR
CONTINUOUS THREADED. INSERTS: MALLEABLE IRON CASE OF STEEL SHELL AND
EXPANDER PLUG FOR THREADED CONNECTION WITH LATERAL ADJUSTMENT, TOP SLOT
FOR REINFORCING RODS, LUGS FOR ATTACHING TO FORMS; SIZE INSERTS TO SUIT
THREADED HANGER RODS.
REAM PIPE AND TUBE ENDS. REMOVE BURRS. BEVEL PLAIN END FERROUS PIPE. REMOVE
SCALE AND DIRT ON INSIDE AND OUTSIDE BEFORE ASSEMBLY. PREPARE PIPING
CONNECTIONS TO EQUIPMENT WITH FLANGES OR UNIONS.
INSTALL REFRIGERATION PIPING AND SPECIALTIES IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS. THE MECHANICAL TRADE SHALL VERIFY THE ACTUAL
INSTALLATION REQUIREMENTS AND COORDINATE WITH THE AIR COOLED CONDENSING
UNIT MANUFACTURER ALL PIPE SIZES, VALVES AND CONTROLS, REQUIRED FOR PROPER
OPERATION OF THE AIR COOLED CONDENSING UNIT SYSTEM.
ROUTE PIPING IN ORDERLY MANNER, WITH PLUMBING PARALLEL TO BUILDING STRUCTURE,
AND MAINTAIN GRADIENT. INSTALL PIPING TO CONSERVE BUILDING SPACE AND NOT
INTERFERE WITH USE OF SPACE. GROUP PIPING WHENEVER PRACTICAL AT COMMON
ELEVATIONS AND LOCATIONS. SLOPE PIPING ONE PERCENT IN DIRECTION OF OIL RETURN.
INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION WITHOUT STRESSING PIPE,
JOINTS, OR CONNECTED EQUIPMENT. ARRANGE PIPING TO RETURN OIL TO COMPRESSOR.
PROVIDE TRAPS AND LOOPS IN PIPING, AND PROVIDE DOUBLE RISERS AS REQUIRED.
SLOPE HORIZONTAL PIPING 0.40 PERCENT IN DIRECTION OF FLOW. PROVIDE CLEARANCE
FOR INSTALLATION OF INSULATION AND ACCESS TO VALVES AND FITTINGS. FLOOD PIPING
SYSTEM WITH NITROGEN WHEN BRAZING. FOLLOW ASHRAE 15 PROCEDURES FOR
CHARGING AND PURGING OF SYSTEMS AND FOR DISPOSAL OF REFRIGERANT. PROVIDE
REPLACEABLE CARTRIDGE FILTER-DRYERS, WITH ISOLATION VALVES AND VALVED BYPASS.
LOCATE EXPANSION VALVE SENSING BULB IMMEDIATELY DOWNSTREAM OF EVAPORATOR
ON SUCTION LINE. PROVIDE EXTERNAL EQUALIZER PIPING ON EXPANSION VALVES WITH
REFRIGERANT DISTRIBUTOR CONNECTED TO EVAPORATOR. INSTALL FLEXIBLE
CONNECTORS AT RIGHT ANGLES TO AXIAL MOVEMENT OF COMPRESSOR, PARALLEL TO
CRANKSHAFT. FULLY CHARGE COMPLETED SYSTEM WITH REFRIGERANT AFTER TESTING.
PROVIDE ELECTRICAL CONNECTION TO SOLENOID VALVES.
WHERE MORE THAN ONE PIPING SYSTEM MATERIAL IS SPECIFIED ENSURE SYSTEM
COMPONENTS ARE COMPATIBLE AND JOINED TO ENSURE THE INTEGRITY OF THE SYSTEM
IS NOT JEOPARDIZED. PROVIDE NECESSARY JOINING FITTINGS. ENSURE FLANGES, UNION,
AND COUPLINGS FOR SERVICING ARE CONSISTENTLY PROVIDED.
FIELD INSPECTION AND TESTING WILL BE PERFORMED. TEST REFRIGERATION SYSTEM IN
ACCORDANCE WITH ASME B31.5. PRESSURE TEST SYSTEM WITH DRY NITROGEN TO 200
PSIG. PERFORM FINAL TESTS AT 27 INCHES VACUUM AND 200 PSIG USING HALIDE TORCH.
TEST TO NO LEAKAGE.
VALVES
GATE VALVES:
UP TO AND INCLUDING 3 INCHES: BRONZE BODY, BRONZE TRIM, SCREWED BONNET, RISING
STEM, HANDWHEEL, INSIDE SCREW WITH BACKSEATING STEM, SOLID WEDGE DISC, ALLOY
SEAT RINGS, SOLDER OR THREADED ENDS.
OVER 3 INCHES: IRON BODY, BRONZE TRIM, BOLTED BONNET, RISING STEM, HANDWHEEL,
OUTSIDE SCREW AND YOKE, SOLID WEDGE DISC WITH BRONZE SEAT RINGS, FLANGED OR
GROOVED ENDS. (GROOVED ENDS ONLY IF APPROVED BY ARCHITECT/ENGINEER).
GLOBE OR ANGLE VALVES:
UP TO AND INCLUDING 3 INCHES: BRONZE BODY, BRONZE TRIM, SCREWED BONNET, RISING
STEM AND HANDWHEEL, INSIDE SCREW WITH BACKSEATING STEM, RENEWABLE
COMPOSITION DISC AND BRONZE SEAT, SOLDER ENDS.
OVER 3 INCHES: IRON BODY, BRONZE TRIM, BOLTED BONNET, RISING STEM, HANDWHEEL,
OUTSIDE SCREW AND YOKE, ROTATING PLUG-TYPE DISC WITH RENEWABLE SEAT RING
AND DISC, FLANGED ENDS.
SWING CHECK VALVES:
UP TO AND INCLUDING 3 INCHES: BRONZE BODY, BRONZE TRIM, BRONZE ROTATING SWING
DISC, WITH COMPOSITION DISC, SOLDER OR THREADED ENDS.
OVER 3 INCHES: IRON BODY, BRONZE TRIM, BRONZE OR BRONZE FACED ROTATING SWING
DISC, RENEWABLE DISC AND SEAT, FLANGED ENDS OR GROOVED ENDS IF VICTAULIC
GROOVED END FITTINGS ARE USED.
BALL VALVES:
UP TO AND INCLUDING 2 INCHES: BRONZE ONE PIECE BODY, STAINLESS STEEL BALL,
TEFLON SEATS AND STUFFING BOX RING, LEVER HANDLE WITH BALANCING STOPS,
SOLDER OR THREADED ENDS.
OVER 2 INCHES: CAST STEEL BODY, CHROME PLATED STEEL BALL, TEFLON SEAT AND
STUFFING BOX SEALS, LEVER HANDLE, OR GEAR DRIVE HANDWHEEL FOR SIZES 10 INCHES
AND OVER, FLANGED. DUCTILE IRON BODY, CHROME PLATED CARBON STEEL BALL AND
STEM, TFE SEATS, LEVER HANDLE OR GEAR OPERATOR, GROOVED ENDS. VICTAULIC
SERIES 726.
PLUG VALVES:
UP TO AND INCLUDING 3 INCHES: BRONZE BODY, BRONZE TAPERED PLUG, FULL PORT
OPENING, NON-LUBRICATED, TEFLON PACKING, THREADED ENDS. OPERATOR: ONE PLUG
VALVE WRENCH FOR EVERY TEN PLUG VALVES MINIMUM OF ONE.
OVER 3 INCHES: CAST IRON BODY AND PLUG, FULL PORT OPENING, PRESSURE
LUBRICATED, TEFLON PACKING, FLANGED ENDS OR GROOVED ENDS IF VICTAULIC
GROOVED END FITTINGS ARE USED. DUCTILE IRON BODY AND PLUG, STANDARD PORT
OPENING, NON-LUBRICATED ECCENTRIC-TYPE, WELDED-IN NICKEL SEAT, GROOVED ENDS.
VICTAULIC SERIES 377. OPERATOR: EACH PLUG VALVE SHALL HAVE A WRENCH HANDLE
WITH SET SCREW.
BUTTERFLY VALVES:
BODY: PPS (POLYPPHENYLENE SULFIDE) COATED CAST OR DUCTILE IRON WITH RESILIENT
REPLACEABLE EPDM SEAT, WAFER OR LUG ENDS OR GROOVED ENDS IF VICTAULIC
GROOVED END FITTINGS ARE USED. DISC: ALUMINUM BRONZE, EPDM ENCAPSULATED
DUCTILE IRON OR STAINLESS STEEL. OPERATOR: 10 POSITION LEVER HANDLE UP TO 4”.
LARGER THAN 4” SHALL HAVE GEAR DRIVE HANDWHEEL.
UNIONS
UNIONS OR FLANGES SHALL BE USED AT EQUIPMENT CONNECTIONS. DIELECTRIC
CONNECTIONS BETWEEN COPPER AND IRON OR STEEL PIPE SHALL BE MADE WITH
DIELECTRIC NIPPLES SIMILAR TO VICTAULIC STYLE 47. A BRASS ADAPTER DIELECTRIC
UNION IS NOT ACCEPTABLE.
PLATES AND SLEEVES
PROVIDE AND INSTALL PIPE SLEEVES FOR ALL PIPING AND DUCTS PASSING THROUGH
WALLS, FLOORS AND CEILINGS. SLEEVES THROUGH WALLS BELOW GRADE AND AT ALL
FLOOR SHALL BE BLACK STEEL. SLEEVES THROUGH WALLS AND CEILINGS MAY BE 20
GAUGE GALVANIZED SHEET METAL. WHERE PIPES ARE INSULATED, SLEEVES SHALL BE
LARGE ENOUGH TO PASS THE INSULATION. ALL PENETRATION VOIDS SHALL BE SEALED
SMOKE TIGHT WITH NON-COMBUSTIBLE MATERIALS SIMILAR TO 3M OR HILTI FIRESTOP
SYSTEMS TO MAINTAIN THE INTEGRITY OF THE FIRE RATED STRUCTURE. IN A NON-FIRE
RATED ASSEMBLY, SEAL ALL VOIDS WITH NON-HARDENING SEALANT.
HANGERS AND SADDLES
SHALL BE MODERN PIPE SUPPORTS CORP., GRINNELL/ANVIL, AUTO GRIP OR M-CO. FOR
COPPER PIPE WITH STEEL HANGERS, CLEAN AND WRAP PIPE WITH TWO LAYERS OF
PLASTIC INSULATING TAPE AT POINTS OF CONTACT. HANGERS FOR PIPING WITH VAPOR
BARRIER SEALED INSULATION SHALL BE MULTIPURPOSE PIPE SADDLES FITTING OVER THE
INSULATION. WIRE OR PERFORATED STRAP IRON WILL NOT BE PERMITTED FOR PIPE
SUPPORTS. HANGERS SHALL BE CLEVIS OR SPLIT RING TYPE WITH VERTICAL
ADJUSTMENT AND BEAM CLAMP SIMILAR TO GRINNELL/ANVIL FIG. 260, WITH MAXIMUM
SPACING PER ASHRAE STANDARDS:
PIPE SIZE STEEL PIPE COPPER PIPE PVC PIPE ROD SIZE
1/2 TO 3/4 INCH 6 FEET 5 FEET 4 FEET 3/8”
1 INCH 7 FEET 5 FEET 4 FEET 3/8”
1 1/4 INCH 7 FEET 7 FEET 4 FEET 3/8”
1 1/2 INCH 7 FEET 7 FEET 4 FEET 1/2”
2 INCH 10 FEET 8 FEET 4 FEET 1/2"
2 1/2 INCH 11 FEET 9 FEET 4 FEET 5/8”
3 INCH 11 FEET 9 FEET 4 FEET 5/8”
3 1/2 INCH 13 FEET 11 FEET 4 FEET 5/8”
TESTING, FLUSHING AND CLEANING OF PIPING SYSTEMS
HEATING PIPING: HYDROSTATICALLY TEST TO AT LEAST TWICE THE OPERATING
PRESSURE BUT IN NO CASE LESS THAN 100 PSIG FOR FOUR (4) HOURS. THIS PRESSURE
TO BE ON PIPING ONLY, NOT ON EQUIPMENT.
PIPE INSULATION ON INDOOR SYSTEMS
PIPE INSULATION SHALL BE AS MANUFACTURED BY ARMSTRONG, CERTAINTEED, KNAUF,
MANSVILLE OR OWENS-CORNING. OWENS-CORNING NUMBERS ARE GIVEN TO ESTABLISH
TYPES. ALL INSULATIONS, COVERINGS, VAPOR BARRIERS, ADHESIVES, ETC. SHALL BE
CLASS A, MAXIMUM OF 25 FLAME SPREAD, 35 FUEL CONTRIBUTED AND 50 SMOKE
DEVELOPED RATING. INSULATION SHALL HAVE VAPOR BARRIER AND BE UL RATED.
INSULATION SHALL BE OWENS-CORNING FIBERGLAS ASJ-SSL II PIPE COVERING WITH
FACTORY APPLIED DOUBLE PRESSURE SENSITIVE ADHESIVE SYSTEM TO PROVIDE
POSITIVE CLOSURES AND VAPOR BARRIER INTEGRITY.
ALL LONGITUDINAL JOINTS SHALL BE SECURED WITH SELF SEALING LAPS. ALL
TRANSVERSE JOINTS SHALL BE SECURED WITH SELF-SEALING BUTT STRIPS. BUTT STRIPS
SHALL BE MINIMUM 3" WIDE. APPLY INSULATION TO PIPE WITH ALL JOINTS BUTTED
TIGHTLY TOGETHER. FITTINGS, INCLUDING VALVES, FLANGES, UNIONS, ETC. SHALL BE
INSULATED WITH THE SAME THICKNESS AS THE REQUIRED PIPE INSULATION AND
COVERED WITH ZESTON OR SPEEDLINE PVC FITTING COVER.
PIPE INSULATION ON OUTDOOR SYSTEMS
ALL PIPING, VALVES, FITTINGS, DUCT, AND EQUIPMENT SCHEDULED TO BE INSULATED
SHALL IS TO HAVE ALL INSULATION APPLIED IN STRICT ACCORDANCE WITH
MANUFACTURER'S INSTALLATION INSTRUCTIONS, AND PRACTICES DESCRIBED IN THE
NATIONAL COMMERCIAL AND INDUSTRIAL INSULATION STANDARDS MANUAL.
MANUFACTURER'S INSTALLATION GUIDELINES AND INSTRUCTIONS WILL BE USED IF
CONFLICTS EXIST.
INSULATING PIPE SADDLES ARE TO BE INSTALLED AT ALL PIPE HANGER AND CLAMP
LOCATIONS. SADDLES ARE TO BE INSTALLED AT THE TIME THAT PIPING IS BEING
INSTALLED, SO THAT INSULATION SYSTEM CAN BE INSTALLED IN A CONTINUOUS MANNER
THROUGH THE PIPE SUPPORT SYSTEM.
INSULATION THICKNESS SHALL BE AS FOLLOWS:
INSULATION
CONDUCTIVITY
BTU IN
PIPING SYSTEM PIPE SIZE INSULATION THICKNESS H-FT2-F
HEATING HOT WATER AND AIR UP THRU 1¼” 1½” 0.29
SEPARATOR TANK 1½” AND LARGER 2”
(200F AND BELOW)
REFRIGERANT PIPING UP TO 1¼” ¾” 0.28
(ARMAFLEX INSULATION) 1 ½” AND LARGER 1”
REFRIGERANT PIPING, CONDENSATE DRAIN PIPING AND/OR UNDERGROUND DOMESTIC
WATER PIPING SHALL BE COVERED WITH ARMSTRONG TYPE AP ARMAFLEX INSULATION,
3/4" THICK, BLACK IN COLOR, CLOSED CELL WITH A FLAME SPREAD RATING OF 25 OR LESS
AND A SMOKE DEVELOPED RATING OF 50 OR LESS. USE ARMSTRONG #520 ADHESIVE.
ARMAFLEX INSULATION LOCATED OUTDOORS SHALL BE JACKETED AND THAT JACKETING
SHALL BE A MULTI-PLY, FABRIC REINFORCED, SELF ADHESIVE INSULATION CLADDING
MATERIAL WITH A VAPOR BARRIER AND A THICKNESS OF 0.015”. JACKETING SYSTEM
SHALL BE VENTURE CLAD PLUS #1579CW-E OR EQUAL WITH MOISTURE BARRIER,
INSTALLED IN ACCORDANCE WITH THE JACKET MANUFACTURER'S RECOMMENDATIONS.
EACH SECTION OF JACKETING SHALL OVERLAP THE ADJOINING SECTION BY 3”. ALL SEAMS
SHALL BE TAPED WITH VENTURE CLAD JOINING/SEAMING TAPE. PLACE THE WRAP SO
THAT THE EDGE OF THE SEALING FLAP FACES DOWN.
CLEAN ALL SURFACES BEFORE APPLYING COVERING. INSULATION SHALL BE CONTINUOUS
THROUGH WALLS, FLOORS, CEILINGS, ETC. TERMINATE AND SEAL INSULATION AT BOTH
ENDS OF UNINSULATED UNIONS AND FLANGES BY A NEAT 45 DEGREE BEVEL. INSTALL ALL
INSULATION IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS.
ASBESTOS INSULATION
ALL EXISTING ASBESTOS INSULATION ON EXISTING PIPING, EQUIPMENT, ETC. WHERE
TIE-INS ARE REQUIRED, SHALL BE REMOVED BY THE OWNER.
PIPE IDENTIFICATION
ALL PIPING SHALL BE IDENTIFIED PER ANSI/OSHA OR OWNER'S STANDARDS WITH COLOR
PIPE BANDS, IDENTIFICATION LABELS AND FLOW ARROWS. PIPES SHALL BE BANDED AND
LABELED ON 10'-0" CENTERS ON CONTINUOUS LINES, AT EQUIPMENT CONNECTIONS, AT
BOTH SIDES OF A WALL THROUGH WHICH PIPE PASSES AT EVERY BRANCH CONNECTION,
ON PIPING WITHIN SIGHT OF AN ACCESS DOOR OR PANEL. SHOW SLOPE DIRECTIONAL
ARROWS AT EACH IDENTIFICATION POINT. LABELS, FLOW ARROWS AND STENCIL AND
PAINT SHALL BE 1" HIGH ON PIPING UP TO 2 1/2" AND SHALL BE 2" HIGH ON PIPE SIZES OF 3"
AND LARGER. BANDS SHALL BE 1 1/2" WIDE. LABELS SHALL BE AS MANUFACTURED BY
SETON OR W.H. BRADY COMPANY OR EQUAL. VERIFY TYPE, SIZE AND COLORS OF PIPE
IDENTIFICATION WITH OWNER.
GENERAL PLUMBING AND PIPING NOTES
INSTALL MANUAL AIR VENTS AT ALL HIGH POINTS OR POINTS THAT CAN TRAP AIR ON
CHILLED WATER AND HEATING HOT WATER PIPING. WHERE DISSIMILAR MATERIAL PIPING
ARE JOINED, DIELECTRIC NIPPLES SHALL BE UTILIZED AND SHALL BE NON-CONDUCTING
FOR CONNECTION OF DISSIMILAR MATERIALS. DIELETRIC NIPPLES SHALL BE SIMILAR TO
VICTAULIC STYLE 47. A BRASS ADAPTOR DIELECTRIC UNION IS NOT ACCEPTABLE.
SHUT OFF VALVES SHALL BE INSTALLED AT ALL BRANCH LINES OFF MAIN PIPING, OR
WHERE MAINS DIVIDE/SEPARATE TO SERVE DIFFERENT AREAS, TO ALLOW ISOLATION OF
ALL BRANCH PIPING AND SYSTEMS THEY SERVE SUCH AS TOILET ROOMS, AREAS OR
WINGS OF THE BUILDING, ETC.
DUCTWORK
DUCTS, CASINGS, HOUSINGS, ETC. SHALL BE FABRICATED FROM, PRIME QUALITY, HOT DIP
GALVANIZED STEEL SHEET AS RECOMMENDED IN THE LATEST ISSUES OF ASHRAE GUIDE
AND SMACNA DUCT MANUALS IN VARIABLE AIR VOLUME SYSTEMS, WHEN USED. SUPPLY
AIR DUCTWORK AND OUTSIDE AIR INTAKE AND RELIEF AIR DUCTS, DUCT CONSTRUCTION
AND INSTALLATION SHALL MEET SMACNA STANDARDS FOR 2" W.C.
RECTANGULAR DUCTS SHALL HAVE TEES, ELBOWS AND BENDS WITH A MINIMUM THROAT
RADIUS OF 1 TIMES THE DUCT WIDTH AND BE OF THE SAME GAUGE AND MATERIAL AS THE
STRAIGHT DUCT. INCREASE DUCT SIZES GRADUALLY, NOT EXCEEDING 15 DEGREES
DIVERGENCE IF POSSIBLE; MAXIMUM 30 DEGREES DIVERGENCE UPSTREAM OF EQUIPMENT
AND 45 DEGREES CONVERGENCE DOWNSTREAM.
PIPING AND EQUIPMENT SUPPORT
ATTACHMENTS OF MECHANICAL EQUIPMENT TO STRUCTURAL MEMBERS ARE THE
RESPONSIBILITY OF THE INSTALLING TRADE. STRUCTURAL MEMBERS SHALL NOT BE FIELD
CUT, WELDED OR OTHERWISE MODIFIED WITHOUT APPROVAL OF THE
ARCHITECT/ENGINEER. ATTACHMENT TO STEEL JOIST SHALL BE MADE AT PANEL POINTS.
WHEN ROUTING PIPING OR DUCTWORK PERPENDICULAR TO JOIST, A SUPPORT SHALL BE
PROVIDED AT EVERY STEEL JOIST; WHEN PARALLEL TO JOIST, A SUPPORT SHALL BE
PROVIDED AT NO MORE THAN 6' ON CENTERS OR TWO PANEL BAYS. STRUCTURAL
MEMBERS SHALL NOT BE OVERLOADED AS A RESULT OF ATTACHMENTS.
ATTACHMENT/EQUIPMENT LOADING FOR ALL TRADES RESULTING IN TOTAL LOAD GREATER
THAN AN EQUIVALENT UNIFORM 5 PSF FOR ANY MEMBER SHALL BE SUBMITTED TO THE
ARCHITECT/ENGINEER FOR REVIEW. MECHANICAL TRADES MAY CONTACT THE PROJECT
STRUCTURAL ENGINEER AS REQUIRED FOR PANEL POINT LOCATION ASSISTANCE AND
WELDER CERTIFICATION REQUIREMENTS. ELECTRICAL TRADES ARE STILL RESPONSIBLE
FOR DESIGN, LAYOUT, AND FABRICATION AND INSTALLATION OF ELECTRICAL SUPPORTS
AND SUPPORT ATTACHMENT METHODS. MECHANICAL TRADES SHALL SUBMIT
ATTACHMENT METHODS TO THE STRUCTURAL ENGINEER FOR REVIEW.
DUCT SEALANT
ALL DUCTWORK INCLUDING SUPPLY AIR, OUTSIDE AIR, RETURN AIR, EXHAUST AIR AND
RELIEF AIR DUCT SYSTEMS SHALL HAVE ALL JOINTS SEALED. DUCTWORK DESIGNED AT
SMACNA 2” PRESSURE SHALL MEET SMACNA CLASS “C” SEAL REQUIREMENTS.
DUCT HANGERS
HORIZONTAL STEEL DUCTWORK SHALL BE SUPPORTED BY MEANS OF TRAPEZE BARS AND
ROUND STEEL ROD OF SIZES LISTED BELOW. ROUND STEEL RODS SHALL BE
ELECTRO-GALVANIZED ALL-THREAD ROD. HANGERS SHALL BE PROVIDED AT BOTH SIDES
OF FLAT SIDED DUCTWORK FOR THE FULL HEIGHT OF DUCT. ROUND DUCTWORK SHALL BE
PROVIDED WITH A BAND OF THE SAME SIZE AS THE HANGER TO COMPLETELY ENCIRCLE
THE DUCT. BAND SHALL BE SECURED TO THE HANGER BY MEANS OF A MINIMUM 3/16"
BOLT. MINIMUM DUCT HANGER SIZES SHALL BE AS LISTED BELOW
MIN. UPPER MINIMUM
DUCT ATTACHMENT STEEL MAXIMUMNO. OF TRAPEZE
SIZE RATING ROD SPACING HANGERS SHELF ANGLE
UP TO 16" 750 LBS. 3/8" 10' 2 1 1/2" X 1 1/2" X 3/16"
19" TO 36" 1000 LBS. 3/8" 10' 2 1 1/2" X 1 1/2" X 3/16"
37" TO 120" 3000 LBS. 3/8" 8' 2 2" X 2" X 1/4"
DUCT INSULATION
OUTSIDE AIR DUCTWORK LOCATED IN EXPOSED AREAS SHALL BE INSULATED WITH
OWENS-CORNING, KNAUF, MANSVILLE OR EQUAL, FIBERGLAS TYPE 705, 1 1/2” THICK, 6.0
LBS. PER CUBIC FOOT DENSITY RIGID BOARD, FACED WITH REINFORCED FOIL KRAFT
LAMINATE MEETING REQUIREMENTS OF ASTM C612. BOARD SHALL BE SECURED TO
DUCTWORK WITH MECHANICAL FASTENERS WITHIN 3” (MAX.) OF BOARD EDGES, AND
APPROXIMATELY 12” ON CENTERS. CLOSE ALL JOINTS WITH 3” PRESSURE SENSITIVE
VAPOR BARRIER MASTIC REINFORCED GLASS SCRIM TAPE.
TEMPERATURE CONTROL SYSTEM
SCOPE OF WORK THE TEMPERATURE CONTROL MANUFACTURER SHALL FURNISH
INSTALLATION DEVICES, ELECTRONIC DAMPER ACTUATORS, ELECTRONIC CONTROL
VALVES, RELAYS, SWITCHES, A UNITARY AIR HANDLING UNIT CONTROLLER, COLOR
GRAPHICS OPERATOR INTERFACE TO BE INSTALLED IN THE OWNER'S PERSONAL
COMPUTER AND ALL NECESSARY DEVICES, HARDWARE, ETC. FOR A COMPLETE
TEMPERATURE CONTROL SYSTEM FOR A DUAL DUCT AIR HANDLING UNIT WITH A STEAM
HEATING COIL AND CHILLED WATER COOLING COIL PER TEMPERATURE CONTROL
DRAWING AND SEQUENCE OF CONTROL.
FURNISH DIAGRAMMATICAL LAYOUT, WIRING DIAGRAMS, DEVICE LOCATION DRAWINGS,
ETC. TO DESCRIBE THE SYSTEM OPERATION AND INSTALLATION AS WELL AS INCLUDE ALL
COST TO FURNISH TECHNICAL ASSISTANCE DURING THE INSTALLATION OF THE SYSTEM.
SUBMIT 4 COPIES OF DIAGRAMS, SEQUENCES, VALVES ETC. TO THE ARCHITECT/ENGINEER
FOR APPROVAL. INCLUDE COST FOR TWO COMPLETE INSPECTIONS, ONE IN EACH
SEASON, TO INSPECT, CALIBRATE AND ADJUST CONTROLS AS REQUIRED AND SUBMIT
WRITTEN REPORTS.
CONTROL VALVES TEMPERATURE CONTROL MANUFACTURER SHALL FURNISH GLOBE
VALVE TYPE CONTROL VALVES SIZED AT 1.5 PSIG WATER PRESSURE DROP ACROSS VALVE
FOR CHILLED WATER COIL AND 50% STEAM PRESSURE DROP ACROSS VALVE FOR THE
STEAM COIL.
OPERATOR INTERFACE THE SYSTEM SHALL BE ABLE TO COMMUNICATE BY USING AN
EXISTING DOS BASED PC WITH A COLOR GRAPHICS SOFTWARE PACKAGE PROVIDED BY
THE TEMPERATURE CONTROL CONTRACTOR. THIS SOFTWARE SHALL UTILIZE A COLOR
GRAPHIC REPRESENTATION OF EACH PIECE OF EQUIPMENT SPECIFIED TO ALLOW FOR
COMPLETE MONITORING AND MODIFICATION CAPABILITIES. THE SOFTWARE SHALL ALSO
BE CUSTOMIZED FOR THIS PARTICULAR PROJECT, AS PART OF THE TEMPERATURE
CONTROL CONTRACTOR'S BASE BID, BY UTILIZING AN ICON-BASED SYSTEM TO LINK THE
VARIOUS COLOR SCREENS TO ONE ANOTHER. THE TEMPERATURE CONTROL
CONTRACTOR SHALL PROVIDE ALL THE NECESSARY COMMUNICATION CONVERTERS,
CABLING, AND CONNECTORS NECESSARY TO INTERFACE.
CONTROL DAMPERS AND ACTUATORS MIXING BOX OUTSIDE AIR AND RETURN AIR
DAMPERS SHALL BE FURNISHED WITH THE AIR HANDLING UNIT. THE TEMPERATURE
CONTROL CONTRACTOR SHALL FURNISH THE RELIEF AIR DAMPER WITH BLADE, JAMB
SEALS AND ALL DAMPER ACTUATORS.
UNITARY CONTROLLER SHALL BE A DEDICATED, STAND ALONE, MICROPROCESSOR BASED,
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .