This is a Request for Expressions of Interest and Qualifications document issued by the City of Appleton, Wisconsin, acting through the Department of Valley Transit, to identify qualified private developers for a joint development project. The City seeks to construct a new transit center with 14 bus bays and multi-family residential housing above the facility at 100 E. Washington Street in downtown Appleton. The project replaces a 30-year-old transit center and includes ground-floor passenger waiting areas, secure bike storage, restrooms, ticketing office, Appleton Police Department substation, and utilities to support EV charging stations. The developer will construct five to seven stories of residential units above the transit facility, with the structure permitted to reach 200 feet in height under city zoning ordinances. The project is located in Census Tract 101, an Area of Persistent Poverty and Historically Disadvantaged Community. The Notice of RAISE Award was announced on June 28, 2024, with the RFP/Selection of Developer occurring October through December 2024. The project timeline indicates design and permitting from May 2025 through May 2026, with construction scheduled for July 2026 through July 2028, and project completion by September 30, 2028.

The City requests $25 million in 2024 RAISE (Rebuilding American Infrastructure with Sustainability and Equity) Program funds toward a total eligible project cost of $26.8 million. The joint development is designed to achieve climate, social, and economic goals while improving environmental justice and equitable accessibility within the community. Key project benefits include improved transit system efficiency and reliability, increased modal connectivity, downtown economic development stimulus, energy-efficient facility design, affordable transportation access, and housing diversity. The project is supported by Valley Transit's partnerships with nine municipalities and three counties, and has endorsements from community stakeholders including VPI, Inc., and Appleton Downtown Inc. The development includes a skyway connection to the adjacent Yellow Ramp municipal parking facility and the vacation of Oneida Street to create a pedestrian zone connecting the Transit Center to the Appleton Public Library. The primary contact is Ron McDonald, Valley Transit General Manager, at 920.832.5800 or Ronald.McDonald@appleton.org, with supporting information available through SRF Consulting.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Valley Transit Center Joint Development

2024 Rebuilding American Infrastructure with Sustainability and Equity (RAISE) Program

STREETFRONT RENDERING

220544 | Appleton Valley Transit Center 12/19/22

12" = 1'-0"1 STREETFRONT - ENSCAPE 2023-02-13-17-41-20 (Enscape)

Rendering by LHB, Inc.

Attachment A

The Downtown Appleton: Valley Transit Regional Multimodal/ Joint Development Project will replace the existing 30-year old Transit Center to meet the growing needs for high-quality public transit and a diverse mix of housing options in the Fox Valley region of Wisconsin. The Project, located at 100 E Washington Street in downtown Appleton, Wisconsin, is in the Area of Persistent Poverty and Historically Disadvantaged Communities Census Tract 101.

The Project will be a new, more energy-efficient facility that includes 14 bus bays, ground-floor indoor and covered outdoor waiting areas, public restrooms, secure bike storage, outdoor bike racks, vending machines, a ticketing office, supervisor’s office, Appleton Police Department Substation and security office, and utilities to support EV charging stations.

Project Goals • Improve System Efficiency, Reliability, and Growth • Increase Modal Connectivity and Accessibility • Provide Downtown Economic Development Stimulus

PROPOSED IMPROVEMENTS

The Project will increase the bus capacity of the Transit Center and significantly enhance the rider experience, as well as provide the foundation for five to seven stories of residential units, which will be designed and constructed by a developer as part of the Joint Development project.

Bus congestion at existing Transit Center

685 SF

OTR WAITING

109 SF

OTR TLT

385 SF

BIKE STORAGE

SF

VE

ST

228 SF

OTR OFFICE

SF

VE

ST

245 SF

SECURITY

902 SF

PASSENGER WAITING

LEGEND

PASSENGER AREAS

PEDESTRIAN

RESIDENTIAL

SITE SPACES

SUPPORT SPACES

TRANSIT ADMINISTRATION

VERTICAL CIRCULATION

1,724 SF

RESIDENTIAL LOBBY

138 SF

ELEV

138 SF

ELEV

219 SF

WATER47

SF

EL

EC

M

ET

ER

IN

G

SF

ST

AI

R

211 SF

FIRE

404 SF

TRASH ROOM

56 SF

GAS METERING

CI

RC

275 SF

ELEV LOBBY

SF

ST

AI

R

915 SF

PLAZA

SITE LENGTH

332' - 9"

SI

TE

D

EP

TH

6'

- 3

RIGHT OF WAY

60' - 0"

RIGHT OF WAY

60' - 0"

RIGHT OF WAY

60' - 0"

RIGHT OF WAY

60' - 0"

RI

GH

T

OF

W

AY

0"

BI

KE

R

AC

KS

TBD BY DEVELOPER

188' - 9"

RAISED TRAFFIC TABLE

24' - 0"120' - 0"

1,236 SF

CROSSWALK

PROJECT SITE PROPERTY LINE

CONTEXTUAL PROPERTY LINE

547 SF

CROSSWALK

4,991 SF

PLATFORM

WEST BUSWAY (NORTHBOUND)

CENTRAL BUSWAY (SOUTHBOUND)

DIRECTION OF TRAFFIC

DIRECTION OF TRAFFIC

SI

DE

W

AL

K

0"

RESIDENTIAL DROP-OFF

212 SF

SUPERVISOR306 SF

TICKETING

556 SF

CIRC.

SERVICE SIDEWALK

SF

ME

N

SF

W

OM

EN

WORK AREA

68 SF

ELEV

SF

ST

AI

R

SF

FA

CI

LI

TI

ES

S

TO

RA

GE

245 SF

VENDING

65 SF

JAN

51 SF

VEST.

80 SF

TLT

140 SF

TOILET

S

F

CH

AS

E

16 SF

TRASH CHUTE

1,747 SF

PLATFORM

EAST BUSWAY (SOUTHBOUND)

297 SF

CROSSWALK

7'

- 0

0"

0"

5'

- 3

6"

0"

4'

- 6

3'

- 6

3'

- 0

0"

0"

DIRECTION OF TRAFFIC12

0" 3'

- 6

0"

0"

3"

OPEN-AIR

TRANSFORMER

SCREENING AT CORNER

SERVICE SIDEWALK

ST

RE

ET

0"

WEST BUSWAY (NORTHBOUND)

CENTRAL BUSWAY (SOUTHBOUND)

1'

- 6

437 SF

XFORMER RECESS

BUS PARKING

3,131 SF

RESIDENTIAL STORAGE UNITS

68 SF

ELEV

SF

ST

AI

R

1,767 SF

MECHANICAL

294 SF

STORAGE

S

F

CH

AS

E

SF

ST

AI

R

138 SF

ELEV

138 SF

ELEV

EGRESS

CIRC

SF

TL

T/

SH

OW

ER

83 SF

TLT 684 SF

DRIVER'S LOUNGE

1,276 SF

CONFERENCE

0"

38' - 0"

1,414 SF

ELECTRICAL

SF

ST

AI

R

104 SF

EQUIP

104 SF

EQUIP

100 SF

EQUIP

CONCEPTUAL MASTER PLAN

220544 | Appleton Valley Transit Center 11/23/2022

1" = 20'-0"1 GROUND LEVEL CONCEPT PLAN

20 40100

NORTH

1" = 20'-0"2 BASEMENT CONCEPT PLAN

685 SF

OTR WAITING

109 SF

OTR TLT

385 SF

BIKE STORAGE

SF

VE

ST

228 SF

OTR OFFICE

SF

VE

ST

245 SF

SECURITY

902 SF

PASSENGER WAITING

LEGEND

PASSENGER AREAS

PEDESTRIAN

RESIDENTIAL

SITE SPACES

SUPPORT SPACES

TRANSIT ADMINISTRATION

VERTICAL CIRCULATION

1,724 SF

RESIDENTIAL LOBBY

138 SF

ELEV

138 SF

ELEV

219 SF

WATER47

SF

EL

EC

M

ET

ER

IN

G

SF

ST

AI

R

211 SF

FIRE

404 SF

TRASH ROOM

56 SF

GAS METERING

CI

RC

275 SF

ELEV LOBBY

SF

ST

AI

R

915 SF

PLAZA

SITE LENGTH

332' - 9"

SI

TE

D

EP

TH

6'

- 3

RIGHT OF WAY

60' - 0"

RIGHT OF WAY

60' - 0"

RIGHT OF WAY

60' - 0"

RIGHT OF WAY

60' - 0"

RI

GH

T

OF

W

AY

0"

BI

KE

R

AC

KS

TBD BY DEVELOPER

188' - 9"

RAISED TRAFFIC TABLE

24' - 0"120' - 0"

1,236 SF

CROSSWALK

PROJECT SITE PROPERTY LINE

CONTEXTUAL PROPERTY LINE

547 SF

CROSSWALK

4,991 SF

PLATFORM

WEST BUSWAY (NORTHBOUND)

CENTRAL BUSWAY (SOUTHBOUND)

DIRECTION OF TRAFFIC

DIRECTION OF TRAFFIC

SI

DE

W

AL

K

0"

RESIDENTIAL DROP-OFF

212 SF

SUPERVISOR306 SF

TICKETING

556 SF

CIRC.

SERVICE SIDEWALK

SF

ME

N

SF

W

OM

EN

WORK AREA

68 SF

ELEV

SF

ST

AI

R

SF

FA

CI

LI

TI

ES

S

TO

RA

GE

245 SF

VENDING

65 SF

JAN

51 SF

VEST.

80 SF

TLT

140 SF

TOILET

S

F

CH

AS

E

16 SF

TRASH CHUTE

1,747 SF

PLATFORM

EAST BUSWAY (SOUTHBOUND)

297 SF

CROSSWALK

7'

- 0

0"

0"

5'

- 3

6"

0"

4'

- 6

3'

- 6

3'

- 0

0"

0"

DIRECTION OF TRAFFIC12

0" 3'

- 6

0"

0"

3"

OPEN-AIR

TRANSFORMER

SCREENING AT CORNER

SERVICE SIDEWALK

ST

RE

ET

0"

WEST BUSWAY (NORTHBOUND)

CENTRAL BUSWAY (SOUTHBOUND)

1'

- 6

437 SF

XFORMER RECESS

BUS PARKING

3,131 SF

RESIDENTIAL STORAGE UNITS

68 SF

ELEV

SF

ST

AI

R

1,767 SF

MECHANICAL

294 SF

STORAGE

S

F

CH

AS

E

SF

ST

AI

R

138 SF

ELEV

138 SF

ELEV

EGRESS

CIRC

SF

TL

T/

SH

OW

ER

83 SF

TLT 684 SF

DRIVER'S LOUNGE

1,276 SF

CONFERENCE

0"

38' - 0"

1,414 SF

ELECTRICAL

SF

ST

AI

R

104 SF

EQUIP

104 SF

EQUIP

100 SF

EQUIP

CONCEPTUAL MASTER PLAN

220544 | Appleton Valley Transit Center 11/23/2022

1" = 20'-0"1 GROUND LEVEL CONCEPT PLAN

20 40100

NORTH

1" = 20'-0"2 BASEMENT CONCEPT PLAN

The current Transit Center serves as a central hub for fixed-route transit service in the Fox Cities, including Amtrak Thruway Connector service and three additional intercity bus services that provide daily service to Wausau, Milwaukee and Chicago. Valley Transit partners with nine municipalities, three counties and many other entities to provide diverse transportation services across the Fox Valley. The level of transit service and number of riders served by the Transit Center has increased significantly since the facility was constructed.

Transportation is, and always has been, one of the core challenges for those we serve, and Valley Transit has always been there for us as a key partner. We believe their vision of improving connectivity to a diverse population through this project is spot on, and will have a significant impact on the community as a whole.

- VPI, Inc President

MERIT CRITERIA

SAFETY

■ Accessibility (ADA) upgrades
■ Improved bus staging area
■ Personal safety and security

ECONOMIC

COMPETITIVENESS

AND OPPORTUNITY

■ Contributes to regional economic vitality

■ Supports equitable housing
■ Strategic downtown location

ENVIRONMENTAL

SUSTAINABILITY

■ Energy-efficient investments
■ Efficient land use
■ Improved resilience

STATE OF GOOD REPAIR

■ Vital to maintain transit services

■ Replaces facility that has exceeded its useful design life

■ Provides operational efficiency and sustainability

QUALITY OF LIFE

■ Affordable transportation
■ Adds to housing diversity
■ Access to daily destinations

(employers, healthcare, grocery, schools, parks)

PARTNERSHIP AND

COLLABORATION

■ Public engagement
■ Key local and regional

agencies and funding partners

MOBILITY & COMMUNITY

CONNECTIVITY

■ Allows individuals to work, live, play and move freely with or without a car

INNOVATION

■ New technologies and state-of-the-art facility

■ Joint Development adding a housing component

■ Financing approach

PROJECT SCHEDULE

2023 2024 2025 2026 2027 2028

Mar 2023-July 2028 Project Management and Public Involvement

May 2025 – May 2026 Design/Permitting

Mar 2023-June 2024 Environmental Review

Jan 2023-June 2024 Geotechnical Analysis

Jan-Mar, 2025 RFP/Selection of A&E Team

June 2026 Bidding

Apr 30, 2025 Expected RAISE Funding Obligation/Grant Agreement

Sept 30, 2028

FY 24 RAISE

obligation deadline

July 2026-July 2028 Construction

Oct -Dec 2024 RFP/Selection of

Developer

Jun 28, 2024 Jun 28, 2024 Notice of Notice of RAISE AwardRAISE Award

The Project is designed to support Joint Development with housing developed above the transit facility. The ground floor will house a residential lobby to be designed by a developer with elevator and stairwell access to upper-floor residential development. The Project will add a skyway connection between the residential development and the Yellow Ramp, which is a seven-story municipal parking ramp adjacent to the existing facility that will provide convenient parking for residents and park-and-ride transit users. The Project will also vacate Oneida Street between the Transit Center and the Appleton Public Library located next door to serve as a pedestrian zone connecting the two facilities.

This project has been designed and engineered to achieve our climate, social, and economic goals along with improving environmental justice within our community.

- Sustainability and Resiliency Manager

We support this Project as an essential service improvement that supports equitable accessibility and housing.

- Appleton Downtown Inc

BUSWAY RENDERING

220544 | Appleton Valley Transit Center 12/19/22

12" = 1'-0"1 BUSWAY - ENSCAPE 2023-01-13-13-51-04 (Enscape)

Rendering by LHB, Inc.

Project Name Downtown Appleton: Valley Transit Regional Multimodal/Joint Development Project Project Type Urban Capital Project Future Eligible Project Costs $26.8 million 2024 RAISE Funds Requested $25 million

Primary Contact:

Ron McDonald, Valley Transit General Manager 801 S. Whitman Avenue, Appleton, WI 54914

920.832.5800 | Ronald.McDonald@appleton.org

Supporting Information can be found at:

https://www.srfconsulting.com/valley-transit-appleton/ http://www.srfconsulting.com/valley-transit-appleton/

Request For Expression of Interest, April 2024
17144 Valley Transit Center 2024-FundingBrochure