About this file
This document is a Geotechnical Engineering Report prepared by ESP Associates, Inc. for Consor Engineers, LLC for the Paukie Island Causeway Repair project located in Beaufort County, South Carolina. The project involves replacing the existing culvert underneath the Paukie Island Causeway, specifically constructing two new 8-foot by 8-foot concrete box culverts from stations 12+08.00 to 12+28.00 to replace existing dual 48-inch corrugated steel culverts. The project will include shallow grading with sliver fill depths less than 5 feet, 2:1 side slopes, sheet pile wingwalls, riprap protection, and an 18-foot-wide temporary detour road approximately 4 to 13 feet in height.
The geotechnical investigation involved two soil test borings, two manual hand augers, and one bulk sample. The subsurface conditions revealed fill overlying Coastal Plain deposits, with soil classifications ranging from poorly graded sand with silt to silty sand. The borings encountered loose to very loose soil conditions, with groundwater levels approximately 7 feet below the original ground surface. The culvert bottom will bear at elevation -3 feet (NAVD88), with a maximum factored strength load contact pressure of 2,310 psf and a maximum factored service load contact pressure of 1,699 psf. The settlement analysis predicts total settlement of approximately 2 to 4 inches at the culvert, which will be primarily elastic and immediate in nature.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GEOTECHNICAL
ENGINEERING REPORT
Paukie Island Causeway Repair Beaufort County, South Carolina ESP Project Number: 24-01110
Prepared For:
Consor Engineers, LLC 3900 Leeds Ave., Suite 103 North Charleston, South Carolina 29405
Prepared By:
ESP Associates, Inc.
2154 North Center Street, Suite E-503 North Charleston, South Carolina 29406
December 17, 2024
2154 North Center Street, Suite E-503 ▪ North Charleston, SC 29406
843.714.2040 ▪ fax 803.802.2515 www.espassociates.com
December 17, 2024
Consor Engineers, LLC 3900 Leeds Ave., Suite 103 North Charleston, South Carolina 29405
Attention: Joshua Gray, PE, CCM, PMP
Reference: GEOTECHNICAL ENGINEERING REPORT Paukie Island Causeway Repair Beaufort County, South Carolina ESP Project No. 24-01110
Dear Mr. Gray, ESP Associates, Inc. (ESP) is pleased to submit this Geotechnical Engineering Report (GER) for the referenced project. Our services were performed pursuant to ESP Proposal No. 24-01110 dated July 3, 2024, and Task Order No. 2 Subconsultant Agreement between Consor Engineers, LLC (Consor) and ESP signed July 7, 2024. The purpose of this GER is to provide information that may be used in the design of the referenced project. This report presents our understanding of the project and findings, conclusions, and recommendations.
ESP appreciates the opportunity to provide geotechnical services to this project. If you have questions concerning this report, or if we may be of further assistance, please contact us.
Sincerely, Matthew M. Lattin, PE Michael S. Ulmer, PE Senior Geotechnical Engineer Senior Geotechnical Engineer Electronic submission (1) cc:/ec:
GEOTECHNICAL ENGINEERING REPORT
PAUKIE ISLAND CAUSEWAY REPAIR
ESP Project No. 24-01110 | December 17, 2024 i
Table of Contents
1.0 PROJECT INFORMATION
1.1 Project Description
1.2 Field Exploration
1.3 Laboratory Testing
2.0 GEOLOGY AND SUBSURFACE CONDITIONS
2.1 Geology
2.2 Subsurface Conditions
2.3 Subsurface Water
3.0 RECOMMENDATIONS
3.1 Foundation Support
3.2 Embankments
3.2.1 Slope Stability
3.2.2 Strength Limit State
3.3 Settlement Analyses
3.3.1 Service Limit State
3.4 Construction Considerations
3.5 Lateral Earth Pressure Parameters
4.0 LIMITATIONS of REPORT
APPENDICES
Appendix I – Geotechnical Subsurface Data
Appendix II – Laboratory Tests Data
Appendix III – Calculations
ESP Project No. 24-01110 | December 17, 2024
1.0 PROJECT INFORMATION
1.1 Project Description
We understand Beaufort County will replace the existing culvert underneath the Paukie Island Causeway in Beaufort County, South Carolina. The project is located near the southern end of the causeway, and the provided 30% plans1 indicate improvements will include constructing two new 8-foot by 8-foot concrete box culverts below the existing causeway from stations 12+08.00 to 12+28.00 to replace the existing dual 48-inch corrugated steel culverts. Grading will be shallow with sliver fill depths less than 5 feet to match the existing roadway. Side slopes are inclined 2:1 (H:V). Sheet pile wingwalls will be constructed at the corners of the culverts. Riprap protection is planned at the toe of the wingwalls, and new embankment fill from the culvert corners approximately 20 feet up and down station.
The new culvert will be 18 feet wide and 35 feet long, the maximum factored strength load contact pressure is 2,310 psf, and the maximum factored service load contact pressure is 1,699 psf. The bottom of the culver will bear at -3.0 feet (NAVD88). There is no significant vertical load on the sheet pile wingwalls.
The project will include the construction of an 18-foot-wide detour road left of station tying in at stations
11+14.01 (Paukie_Detour Sta. 20+00.00) to 13+21.88 (Paukie_Detour Sta. 22+23.61). The temporary detour road fill will be retained with sheet piles. Based on the topography at the detour road, we assume fill heights will be approximately 4 to 13 feet to match the existing road elevation. We understand that the detour road will be removed after culvert construction. There are no bridges, permanent earth retaining structures (ERS), or other structures planned.
The project information and assumptions presented herein should be reviewed and confirmed by the appropriate team members. Modifications to our findings and recommendations may be required if the actual conditions vary substantially from the project information stated herein. The project has been designed using the SCDOT’s Geotechnical Design Manual dated January 2022.
1.2 Field Exploration
The culvert was explored with two soil test borings, two manual hand augers, and one bulk sample. Table
1-1 summarizes the test locations, elevations, and depths. Plan sheets showing the test locations are included in Appendix I.
1 Proposed Roadway Plans for Beaufort County, Paukie Island Road Culvert and Roadway Improvements, by Consor dated October 9, 2024.
ESP Project No. 24-01110 | December 17, 2024
Table 1-1: Soil Testing Location Table
Boring No. Test Type Latitude Longitude Elevation
(feet NAVD88)
Depth
(feet)
B-1 SPT 32.50793 -80.69998 6.9 31.5
B-2 SPT 32.50782 -80.70002 6.8 32.0
B-2A Bulk 32.50783 -80.70005 4.8 3.0
HA-1 MA 32.50795 -80.70004 -0.5 1.0
Locations and elevations of borings are approximate
The soil test borings were advanced using mud rotary drilling techniques, and split-spoon sampling and
Standard Penetration Testing (N values) was performed continuously in the top 10 feet and at 5-foot intervals thereafter in general accordance with ASTM D1586. Samples were collected for laboratory testing.
The manual auger borings were drilled to a target depth of 2-5 feet. Cuttings were collected for laboratory testing. The Soil Test Logs and Manual Auger Logs are presented in Appendix I.
1.3 Laboratory Testing
Representative split-spoon samples from the pond borings were subject to laboratory testing using applicable ASTM or AASHTO standards. The results are presented in Appendix II.
ESP Project No. 24-01110 | December 17, 2024
2.0 GEOLOGY AND SUBSURFACE CONDITIONS
2.1 Geology
The project is in Beaufort County, South Carolina, which is in the Lower Coastal Plain Physiographic Unit of South Carolina. In general, this region contains near surface Quaternary alluvial deposits underlain by
Tertiary aged, well-consolidated layers of sands, silts, or clays that were deposited by marine or fluvial action during the periods of retreating ocean shoreline. Below the Quaternary sediments, marl and limestone deposits were formed during the Eocene epoch of the Tertiary period.
2.2 Subsurface Conditions
Within the depths explored, the generalized stratigraphy includes fill overlying Coastal Plain deposits.
Surface materials encountered in the borings included 1 to 4 inches of asphalt overlain by 5 to 6 inches of base course. A generalized subsurface stratification along the culvert is presented in Table 2-1 and depicted in the borings in Appendix I.
Table 2-1: Culvert Generalized Subsurface Stratigraphy Table
Soil Origin
Depth to Top of Layer
(feet)
USCS Soil
Classification
AASHTO Soil
Classification
Range of
N-values
Fill 0 to 7 SP-SM A-1-b 4-25
Coastal Plain Deposits 7 to 32 SM, SP-SM, CH A-2-4, A-2-6, A-1-b, A-7 0-23
2.3 Subsurface Water
Subsurface water levels were measured immediately following the completion of the borings at a depth of approximately 7 feet below the original ground surface. This is approximately elevations -0.1 to -0.2 feet
(NAVD 88). The water levels are presented on the Soil Test Boring Logs in Appendix I, and the levels will be influenced by tidal stage.
ESP Project No. 24-01110 | December 17, 2024
3.0 RECOMMENDATIONS
3.1 Foundation Support
A new 35-foot long, 18-foot-wide duel reinforced concrete box culverts with sheet-pile wingwalls are planned below the Paukie Island Causeway from stations 12+08.00 to 12+28.00. The bottom of the culvert will bear at elevation -3 feet (NAVD88).
The borings encountered Coastal Plain soils below the roadway fill at depths from approximately 6 to 30 feet below the ground surface. As such, the culvert bottom will bear on loose to very loose silty sand (SM, A-2-6) soils with a maximum contact pressure of 2,310 psf. Using a geotechnical resistance factor (ϕ) of
0.45 for a shallow spread footing, the required nominal (or ultimate) bearing capacity is 5,133 psf. A value of approximately 6,740 is predicted, which exceeds the required nominal value. (In allowable stress design
(ASD), this equates to an allowable bearing pressure of 2,000 psf with a safety factor of at least 3.0.)
Calculations are presented in Appendix III.
The culverts should be supported on at least 18 inches of bedding stone. The bedding stone will provide uniform support, is a good leveling course, and will help stabilize soft subgrades. Foundation excavations should be dewatered, cleaned of loose material, and a stabilization geotextile (SC-M-203-1) should be placed. Stone bedding consisting of washed No 57 stone should then be placed on the geotextile.
3.2 Embankments
The provided plans were reviewed, and the embankment slopes with wing walls were identified for analysis as 6-foot fill slopes with 2:1 inclination. The provided cross sections were reviewed, and the following side slopes were identified for analyses as representative of the project and site conditions.
Table 3-1: Analyzed Roadway Embankment & Site Slopes
Station Cut/Fill Inclination Height (ft)
11+00 Fill 2:1 5
12+00 Fill 2:1 6
12+28 Culvert Wingwall -- 6
3.2.1 Slope Stability
The slope stability analyses were performed with the computer program Slide2 using the Spencer circular search modes to find the critical failure surface. The soils exhibit sand-like behavior, and fines content at the depths of interest are less than 20 percent. The embankment stability analyses and results are presented in Appendix III. The attached output files present the design values used in our analyses.
ESP Project No. 24-01110 | December 17, 2024
3.2.2 Strength Limit State
Stability under the strength limit state was performed using peak strength parameters for fill slopes. There are no cut slopes on the project. A factor of safety of 1.3 (equivalent to a resistance factor of 0.75) is required for stability under the strength limit state. The computed factors of safety for the fill slopes meet the requirements; however, the analyses indicate sloughing of the slope face, so erosion control measures will be required to stabilize the slope face.
Sheet pile type and lengths have not been provided. We understand plans call for fiberglass sheet piles on each side of the road tied together with struts, and the sheet pile wall will be designed by the contractor.
The contractor’s design should evaluate global and well as internal stability.
Slope stability analyses were not performed on the temporary detour road and should be addressed by the temporary shoring designer.
3.3 Settlement Analyses
The proposed project will have new roadway embankments constructed at the culvert that will require small volumes of fill. The settlement model included the proposed embankment geometry, and the analyses were performed using the computer program Settle3. Review of the boring data indicates no highly-compressible soils were identified within or directly below the embankments, and settlement is expected to be primarily elastic or immediate in nature. However, the sands directly below the embankment are very loose and exhibit low modulus based on N value correlations. Soil modulus (Es) and consolidation (Cc, Cr, OCR) were estimated from the boring and laboratory data. The attached output files present the design values used in our analyses.
3.3.1 Service Limit State
Total settlement is predicted to be approximately 2 to 4 inches at the culvert, will be elastic in nature (i.e., immediate), and does not include a significant long-term consolidation component. We understand the culvert will be constructed first, and then the wingwalls will be added. The settlement between the culvert and wingwalls will be totally differential. Total post-construction settlement is predicted to be on the order of ½ inch and meet performance requirements for embankments.
Total settlement is estimated to be approximately 1 to 6 inches at the detour road. Where the detour road connects to the existing road, approximately 1 to 5 inches of total settlement is predicted. Performance requirements for temporary fill have not been established for the project.
3.4 Construction Considerations
Extensive mucking or ground improvement are not necessary to achieve acceptable performance.
Long waiting periods are not anticipated.
Dewatering and/or stream diversion may be required to construct the culvert.
Permanent Earth retaining systems (ERS) consisting of sheet piles are proposed at the wingwalls.
ESP Project No. 24-01110 | December 17, 2024
Temporary shoring systems associated with the construction of the detour road and permanent ERS proposed at the wingwalls should be designed using the design parameters presented in Section 4.5, Table
4-1.
ESP assumes that the borrow materials will be derived from offsite. Therefore, direct shear testing results from the SCDOT’s “Borrow Materials Database Spreadsheet” values for Beaufort County soils were used.
3.5 Lateral Earth Pressure Parameters
We understand that temporary shoring will be required for culvert construction and permanent sheet piles may be used to support the wingwalls. Temporary shoring systems and sheet piles associated with the construction of the culvert should be designed using the design parameters presented in Table 4-1.
Table 4-1: Lateral Earth Pressure Parameters
Approximate
Elevation
(ft)
Soil
Description
C
(ksf)
Phi, ϕ
(degrees)
Saturated
Unit Weight
(ksf)
K0 Ka Kp
New Fill 0 29 0.120 0.52 0.35 2.88
7 to 1 Silty SAND 0 29 0.105 0.52 0.35 2.88
1 to -6 Silty SAND 0 25 0.105 0.58 0.41 2.46
-6 to -10 SAND with Silt 0 31 0.105 0.48 0.32 3.12
-10 to -21 Silty SAND /
SAND with Silt 0 24 0.105 0.59 0.42 2.37
-21 to -25 Silty SAND 0 28 0.105 0.53 0.36 2.77
ESP Project No. 24-01110 | December 17, 2024
4.0 LIMITATIONS of REPORT
This report has been prepared in accordance with generally accepted geotechnical engineering practice with regard to the specific conditions and requirements of this site. The conclusions and recommendations contained in this report were based on the applicable standards of our practice in this geographic area at the time this report was prepared. No other warranty, expressed or implied, is made.
The analysis and recommendations submitted herein are based, in part, upon the data obtained from the subsurface exploration. The nature and extent of variations between the borings will not be known until construction is underway. If variations appear evident, then we request the opportunity to re-evaluate the recommendations of this report. In the event that any changes in the nature, design, or location of the roadway are planned, the conclusions and recommendations contained in this report will not be considered valid unless the changes are reviewed and conclusions modified or verified in writing by ESP.
Appendix I
Site Location Map
Test Location Plan
Soil Test Logs
SPT Hammer Efficiency
0.1 0.5
6.0
12.0
17.0
23.0
31.5
ASPHALT 1 inch
ABC STONE 5 inches
FILL:Medium dense to very loose, moist, grayish brown to gray, fine, POORLY
GRADED SAND WITH SILT, (SP-SM),
(A-1-b) trace fine angular gravel, 10YR 5/2, 10YR 6/1
COASTAL PLAIN DEPOSITS:Very loose, moist to wet, gray and grayish brown, fine, SILTY SAND, (SM), (A-2-6) trace organics, trace clay seams, 10YR 6/1, 10YR 5/2
SS-4: LL=NP, PL=NP, PI=NP, NMC=31.4,
%#200=25.0
Loose, wet, gray, fine, POORLY GRADED SAND WITH SILT, (SP-SM), (A-1-b), 10YR 6/1
Very loose, wet, dark gray, fine, SILTY
SAND, (SM), (A-2-4), 10YR 4/1
SS-7: LL=NP, PL=NP, PI=NP, NMC=40.7,
%#200=23.0
Very loose to medium dense, wet, dark gray, fine, SILTY SAND, (SM), (A-2-4), 10YR 4/1
End of boring at 31.5 feet
0.5
2.0
4.0
6.0
8.0
15.0
20.0
25.0
30.0
SS-1
SS-2
SS-3
SS-4
SS-5
SS-6
SS-7
SS-8
SS-9
Offset: Alignment:
TOB
Y
Mud rotaryCME550X (ATV)
32.50793
7 ft
Paukie Island Causeway Repair
08/26/2024 8/26/2024
Site Description:
Sampler Configuration Liner Required:
0.0
Project ID:
Eng./Geo.:
Core Size:
Date Started:
1s t 6
2n d
6"
3r d
6"
4t h
6"
Total Depth: Date Completed:
Bore Hole Diameter (in):
Drill Machine:
RW
RC
HSA
CFA
DC
Matt Lattin
Elev.:
Rotary Wash Rock Core
Rock Core, 1-7/8" Cuttings Continuous Tube
SAMPLER TYPE
-80.69998
Driller:
Energy Ratio:
4.25 Drill Method:
Soil Depth: Core Depth:
LEGEND
Boring Location:
ft
Hollow Stem Auger Continuous Flight Augers Driving Casing
Hammer Type:
Route:
Groundwater: 24HR
Liner Used:
31.5 ft
6.9 ft
E le va tio n (f t)
1.9
-3.1
-8.1
-13.1
-18.1
-23.1
D ep th (f
t) MATERIAL DESCRIPTION
S am pl e
D ep th (f t)
N V al ue
G ra ph ic
Lo g ft Y
S am pl e
N o.
/T yp e
SPT N VALUE
BeaufortCounty:
DRILLING METHOD
91%
NQ
CU
CT
Boring No.:
Split Spoon Undisturbed Sample Rock Core, 1-1/8"
24-01110
Automatic
B-1
Soil Test Log
SS
UD
AWG
SCI
Latitude: Longitude:
FINES CONTENT (%)
10 20 30 40 50 60 70 80 900
PL LLMC
RQD (%) REC (%)
S C
_D O
T
4-
0.
G P
J S
C D
O T
_D A
T A
T E
M P
LA
T
E .G
D T
1/
/2
NN
0.3 0.8
7.0
12.0
28.5
32.0
ASPHALT 4 inches
ABC STONE 6 inches
FILL:Medium dense, moist, yellow to very pale brown, fine, POORLY GRADED SAND WITH SILT, (SP-SM), (A-1-b) trace fine angular gravel, 10YR 7/8, 10YR 8/4
SS-3: LL=NP, PL=NP, PI=NP, NMC=24.9,
%#200=6.0
COASTAL PLAIN DEPOSITSVery loose, moist, dark gray, fine, SILTY SAND, (SM), (A-2-4), 10YR 4/1
Loose to very loose, wet, gray, fine, POORLY
GRADED SAND WITH SILT, (SP-SM),
(A-1-b), 10YR 6/1
SS-7: LL=NP, PL=NP, PI=NP, NMC=26.2,
%#200=8.0
Very soft, wet, dark gray, FAT CLAY with
SAND, (CH), (A-7), 10YR 4/1
ST-2: LL=73, PL=28, PI=45, NMC=72.3,
%#200=75.9
End of boring at 32 feet
0.8
2.0
4.0
6.0
8.0
15.0
18.5
25.0
26.5
28.5
30.0
SS-1
SS-2
SS-3
SS-4
SS-5
SS-6
SS-7
SS-8
ST-1
SS-9
ST-2
Offset: Alignment:
TOB
Y
Mud rotaryCME550X (ATV)
32.50782
7 ft
Paukie Island Causeway Repair
08/26/2024 8/26/2024
Site Description:
Sampler Configuration Liner Required:
0.0
Project ID:
Eng./Geo.:
Core Size:
Date Started:
1s t 6
2n d
6"
3r d
6"
4t h
6"
Total Depth: Date Completed:
Bore Hole Diameter (in):
Drill Machine:
RW
RC
HSA
CFA
DC
Matt Lattin
Elev.:
Rotary Wash Rock Core
Rock Core, 1-7/8" Cuttings Continuous Tube
SAMPLER TYPE
-80.70002
Driller:
Energy Ratio:
4.25 Drill Method:
Soil Depth: Core Depth:
LEGEND
Boring Location:
ft
Hollow Stem Auger Continuous Flight Augers Driving Casing
Hammer Type:
Route:
Groundwater: 24HR
Liner Used:
32 ft
6.8 ft
E le va tio n (f t)
1.8
-3.2
-8.2
-13.2
-18.2
-23.2
D ep th (f
t) MATERIAL DESCRIPTION
S am pl e
D ep th (f t)
N V al ue
G ra ph ic
Lo g ft Y
S am pl e
N o.
/T yp e
SPT N VALUE
BeaufortCounty:
DRILLING METHOD
91%
NQ
CU
CT
Boring No.:
Split Spoon Undisturbed Sample Rock Core, 1-1/8"
24-01110
Automatic
B-2
Soil Test Log
SS
UD
AWG
SCI
Latitude: Longitude:
FINES CONTENT (%)
10 20 30 40 50 60 70 80 900
PL LLMC
RQD (%) REC (%)
S C
_D O
T
4-
0.
G P
J S
C D
O T
_D A
T A
T E
M P
LA
T
E .G
D T
1/
/2
NN
2.0
5.0
See soil test log B-2 for soil descriptions
FILL:Moist, grayish brown, fine, POORLY
GRADED SAND WITH SILT, (SP-SM),
(A-3), 10YR 5/2
CU-1: LL=NP, PL=NP, PI=NP, NMC=16.4,
%#200=9.0
End of boring at 5 feet
2.0
CU-1
Latitude: Longitude: Date Started:
Total Depth: Date Completed:
RW
RC
HSA
CFA
DC
PL LLMC
0.0
Dynamic Cone Penetrometer Test Procedure:
Driller: Offset: Alignment:
32.50783
Paukie Island Causeway Repair
08/26/2024
1s t 6
2n d
6"
3r d
6"
4t h
6"
8/26/2024
Site Description:
Elev.:
E le va tio n (f t)
-0.2
-5.2
-10.2
-15.2
-20.2
-25.2
D ep th (f
t) MATERIAL DESCRIPTION
S am pl e
D ep th (f t)
G ra ph ic
Lo g
S am pl e
N o.
/T yp e
DCP-VALUE
Rotary Wash Rock Core
SAMPLER TYPE
-80.70005
LEGEND
Boring Location:
Hollow Stem Auger Continuous Flight Augers Driving Casing
FINES CONTENT (%)
10 20 30 40 50 60 70 80 900D
C P
-V al ue
Route:
Groundwater:5 ft
4.8 ft
24-01110
Dynamic Cone Penetrometer Cuttings Continuous Tube
BeaufortCounty:
DRILLING METHOD
Boring No.:
Split Spoon Undisturbed Sample Rock Core, 1-1/8"
B-2A
SS
UD
AWG
Manual Auger Log
DCP
CU
CT
24 hrTOB
Project ID:
ESP
M A
N U
A L
A U
G E
R L
O G
4-
0.
G
P J
S C
D O
T D
A T
A T
E M
P
LA
T E
_0 1_
0_
5.
G
D T
1/
/2
1.0 COASTAL PLAIN DEPOSITS:Moist to wet, gray, fine, POORLY GRADED SAND WITH
SILT, (SP-SM), (A-2-4), 10YR 6/1
CU-1: LL=NP, PL=NP, PI=NP, %#200=7.0
End of boring at 1 feet
0.0 CU-1
Latitude: Longitude: Date Started:
Total Depth: Date Completed:
RW
RC
HSA
CFA
DC
PL LLMC
0.0
Dynamic Cone Penetrometer Test Procedure:
Driller: Offset: Alignment:
32.50795
Paukie Island Causeway Repair
08/26/2024
1s t 6
2n d
6"
3r d
6"
4t h
6"
8/26/2024
Site Description:
Elev.:
E le va tio n (f t)
-5.5
-10.5
-15.5
-20.5
-25.5
-30.5
D ep th (f
t) MATERIAL DESCRIPTION
S am pl e
D ep th (f t)
G ra ph ic
Lo g
S am pl e
N o.
/T yp e
DCP-VALUE
Rotary Wash Rock Core
SAMPLER TYPE
-80.70004
LEGEND
Boring Location:
Hollow Stem Auger Continuous Flight Augers Driving Casing
FINES CONTENT (%)
10 20 30 40 50 60 70 80 900D
C P
-V al ue
Route:
Groundwater:1 ft -0.5 ft
24-01110
Dynamic Cone Penetrometer Cuttings Continuous Tube
0 ft
BeaufortCounty:
DRILLING METHOD
Boring No.:
Split Spoon Undisturbed Sample Rock Core, 1-1/8"
HA-1
SS
UD
AWG
Manual Auger Log
DCP
CU
CT
24 hrTOB
Project ID:
ESP
M A
N U
A L
A U
G E
R L
O G
4-
0.
G
P J
S C
D O
T D
A T
A T
E M
P
LA
T E
_0 1_
0_
5.
G
D T
1/
/2
Drill Rig: SCI CME 550X Test Date: 11/30/2020 Boring ID: TB-1
Hammer: Automatic Project No. : Rod Type: BW
Rig Operator: Benbow Location: SCI Yard Analyzer ID: 216BW
Engineer: Henderson Drilling Method: Mud Rotary Rod Area: 1.81 in2
Depth: 40 ft Depth: 45 ft Depth: 50 ft
LE: 43 ft LE: 48 ft LE: 53 ft
Blow Count: 0, 1, 2 Blow Count: 10, 21, 22 Blow Count: 8, 15, 16
Blow No. Energy Blow No. Energy Blow No. Energy Blow No. Energy Blow No. Energy Blow No. Energy
1 0.309 1 0.318 26 0.315 51 0.319 1 0.339 26 0.330
2 0.289 2 0.296 27 0.315 52 0.323 2 0.326 27 0.321
3 0.309 3 0.313 28 0.319 53 0.319 3 0.325 28 0.323
4 4 0.310 29 0.317 54 4 0.326 29 0.324
5 5 0.314 30 0.316 55 5 0.327 30 0.328
6 6 0.313 31 0.307 56 6 0.320 31 0.323
7 7 0.313 32 0.326 57 7 0.327 32 0.327
8 8 0.317 33 0.307 58 8 0.326 33 0.323
9 9 0.316 34 0.320 59 9 0.324 34 0.320
10 10 0.309 35 0.312 60 10 0.327 35 0.312
11 11 0.311 36 0.316 61 11 0.316 36 0.319
12 12 0.311 37 0.312 62 12 0.321 37 0.323
13 13 0.310 38 0.321 63 13 0.317 38 0.321
14 14 0.319 39 0.310 64 14 0.318 39 0.324
15 15 0.323 40 0.315 65 15 0.324 40
16 16 0.318 41 0.318 66 16 0.322 41
17 17 0.319 42 0.315 67 17 0.322 42
18 18 0.319 43 0.311 68 18 0.317 43
19 19 0.318 44 0.316 69 19 0.320 44
20 20 0.318 45 0.316 70 20 0.320 45
21 21 0.320 46 0.321 71 21 0.318 46
22 22 0.322 47 0.319 72 22 0.313 47
23 23 0.316 48 0.314 73 23 0.324 48
24 24 0.314 49 0.324 74 24 0.324 49
25 25 0.314 50 0.319 75 25 0.318 50
Average Energy: 0.302 kip-ft Average Energy: 0.316 kip-ft Average Energy: 0.323 kip-ft
Max. Rated Energy: 0.350 kip-ft Max. Rated Energy: 0.350 kip-ft Max. Rated Energy: 0.350 kip-ft
Efficiency: 86% Efficiency: 90% Efficiency: 92%
Std. Deviation: 0.012 kip-ft Std. Deviation: 0.005 kip-ft Std. Deviation: 0.005 kip-ft
Average efficiency from all tests: 91%
Comments: LE = length of rod from below gages to bottom of sampler.
Maximum rated energy based on a hammer weight of 0.14 kips and a drop height of 2.5 feet.
SPT HAMMER EFFICIENCY
Appendix II
Summary of Laboratory Results
Grain Size Distribution
Standard Proctor
Consolidation
Direct Shear
B-1 6.0 NP NP NP 0.075 25 SM 31.4
B-1 20.0 NP NP NP 0.075 23 SM 40.7
B-2 4.0 NP NP NP 0.075 6 24.9
B-2 18.5 NP NP NP 0.075 8 26.2
B-2 30.0 73 28 45 0.075 76 CH 72.3
B-2A 2.0 NP NP NP 4.75 9 SP-SM 16.4
HA-1 0.0 NP NP NP 9.5 7 SP-SM
Liquid Limit
Satur-ation
Void Ratio
Class-ification
Water Content
Dry Density
(pcf) DepthBorehole
SUMMARY OF LABORATORY RESULTS
Plastic Limit
Plasticity Index
Maximum Size (mm)
%<#200 Sieve
PROJECT NAME Paukie Island Causeway RepairPROJECT ID 24-01110
PROJECT COUNTY Beaufort
LA
B
S U
M M
A R
Y
-0
.G P
J S
C D
O T
D A
T A
T E
M P
LA
T
E _0
1_
0_
5.
G D
T
1/
9/
SP-SM
SP-SM
0.0010.010.1110100
PI Cc
NP
NP
NP
NP
NP
NP
NP
NP
CuLL PL
NP
NP
NP
NP
GRAIN SIZE DISTRIBUTION
COBBLES
GRAVEL
25.0
23.0
6.0
8.0
75.9
0.075
0.075
0.075
0.075
0.075
SAND
GRAIN SIZE IN MILLIMETERS
coarse fine
SILTY SAND(SM)
SILTY SAND(SM)
FAT CLAY with SAND(CH)
Classification
D100 D60 D30 D10 %Gravel
B-1
B-1
B-2
B-2
B-2 coarse
SILT OR CLAY
finemedium
6.0
20.0
4.0
18.5
30.0
%Sand %Silt %Clay
BOREHOLE DEPTH
BOREHOLE DEPTH
3 100
B-1
B-1
B-2
B-2
B-2
24 16 30
1 2006 10 501/2
HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS
1403 4 20 406 601.5 8 143/4 3/8
6.0
20.0
4.0
18.5
30.0
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
PROJECT NAME Paukie Island Causeway RepairPROJECT ID 24-01110
PROJECT COUNTY Beaufort
G R
A
IN
S
IZ
E
4-
0.
G P
J S
C D
O T
D A
T A
T E
M P
LA
T
E _0
1_
0_
5.
G D
T
1/
9/
POORLY GRADED SAND with SILT (SP-SM) POORLY GRADED SAND with SILT (SP-SM)
>>>>0
0.0010.010.1110100
PI Cc
NP
NP
NP
NP
CuLL PL
2.57
1.79
1.20
0.89
NP
NP
GRAIN SIZE DISTRIBUTION
COBBLES
GRAVEL
9.04.75
9.5
SAND
GRAIN SIZE IN MILLIMETERS
coarse fine
POORLY GRADED SAND with SILT(SP-SM)
POORLY GRADED SAND with SILT(SP-SM)
Classification
D100 D60 D30 D10 %Gravel
0.2
0.139 4.6
B-2A
HA-1
coarse
SILT OR CLAY
finemedium
2.0
0.0
%Sand %Silt %Clay
0.137
0.098
0.078
0.078
0.0
0.0
91.0
93.2 2.2
BOREHOLE DEPTH
BOREHOLE DEPTH
3 100
B-2A
HA-1
24 16 30
1 2006 10 501/2
HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS
1403 4 20 406 601.5 8 143/4 3/8
2.0
0.0
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
PROJECT NAME Paukie Island Causeway RepairPROJECT ID 24-01110
PROJECT COUNTY Beaufort
G R
A
IN
S
IZ
E
4-
0.
G P
J S
C D
O T
D A
T A
T E
M P
LA
T
E _0
1_
0_
5.
G D
T
1/
9/
Acct. No: Project No: 240071ES005 10/11/2024Date Sampled:
Report Date: 10/18/2024 SCISampled By:
Project: Paukie Island Causeway Repair, Paukie Island, SC, ESP
Project No. 24-01110 ClientBy Order Of:
REPORT:
Client:
LAB NO: 94876-3
ESP ASSOCIATES, INC - Charleston
Proctor Material: Test Method: See BelowBulk Sample
Order Number:Location: Bullk Sample B-2A, 2'-5'
Special InspectionsNondestructiveGeotechnicalConstruction Materials
94876-3Report No:TEST RESULTS
SOIL CONSULTANTS, INC.
Engineering and Testing Since 1951
Charleston, South Carolina 29402 www.SoilConsultantsInc.com P: 843.723.4539 F: 843.723.3648
PO Drawer 698
Visual Classification:
Supplier:
Material Application: Bulk Sample
Rammer Type:
Prep. Method:
Mechanical
Dry
NP
NP
Test Results:
Properties:
AASHTO: A-3
Group Symbol: SP-SM
NP
Optimum Water Content: 14.5 %
Maximum Dry Unit Weight:
Liquid Limit:
Plastic Limit:
Plasticity Index:
103.0 pcf
Brown Poorly graded Sand with silt
Onsite material
ASTM D698 Method-ATest Methods:
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
Orig: ESP ASSOCIATES, INC - Charleston Attn: Mr. Matt Lattin E-Mail: mlattin@espassociates.com (1-ec copy)
Respectfully Submitted, SOIL CONSULTANTS, INC.
David J. Hale, P.E.
Project Engineer
11/05/2024
Report Date: 11/12/2024 SCISampled By:
Project: Paukie Island Causeway Repair, Paukie Island, SC, ESP
Project No. 24-01110 ClientBy Order Of:
REPORT:
Client:
LAB NO: 94876-1
ESP ASSOCIATES, INC - Charleston
One-Dimensional Consolidation Properties of Soils
Order Number:Location:
Special InspectionsNondestructiveGeotechnicalConstruction Materials
94876-B2, ST2Report No:TEST RESULTS
SOIL CONSULTANTS, INC.
Engineering and Testing Since 1951
Charleston, South Carolina 29402 www.SoilConsultantsInc.com P: 843.723.4539 F: 843.723.3648
PO Drawer 698
A s reques ted, Soil Consultants , Inc . perform ed one-dim ensional consolidation tes ting. Results are attached.
ASTM D2435Test Method (As Applicable):
Orig: ESP ASSOCIATES, INC - Charleston Attn: Mr. Matt Lattin E-Mail: mlattin@espassociates.com (1-ec copy)
Respectfully Submitted, SOIL CONSULTANTS, INC.
David J. Hale, P.E.
Project Engineer
11/12/2024
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
Client ESP Associates, Inc. (Charleston) Project Name Paukie Island Causeway Repair, Paukie Island, SC Project Number Work Order 94876
R E
M A
R K
S Based on the e-log p diagram, SCI interpreted the preconsolidation pressure. The geotechnical engineer of record should independently determine the preconsolidation pressure for specific use.
96.53 Void Ratio, eo 1.603 Final Differential Height, in. -0.067 Preconsolidation Pressure (estimated) 1.0 tsf
F
IN
A L
C O
N D
IT
IO
N S
Water Content, % 56.9 Source of Water Content Sample Full sample Wet Density, pcf 102.4 Dry Density, pcf 65.2 Saturation, %
93.3 Dry Density, pcf 54.2 Saturation, % 92.07 Void Ratio, eo 2.135
Coefficient of consolidation method Methods 1 and 2
IN
IT
IA
L
C O
N D
IT
IO
N S Average Diameter, in. 2.498
Average Height, in. 1.000 Water Content, % 72.3 Source of Water Content Sample Cuttings Wet Density, pcf
T E
S T
P R
O C
E D
U R
E
Stress at inundation 0.024 tsf
Preparation procedure A. Chubb
Starting Date 10/21/2024 Apparatus Consolidation Load Frame #1 Technician
Test method Method A
Specific Gravity (ASSUMED) 2.72
USCS Classification CH Color Gray
Ring lined sampler Condition of test Inundated
Test water Potable tap water
Visual Description Fat Clay with Sand Visual Classification
Fines Content, % 72.3 Liquid Limit 73 Plastic Limit 28
ONE DIMENSIONAL CONSOLIDATION PROPERTIES OF SOILS
ASTM D2435
240071 (ESP Project No.
S A
M P
L E
I N
F O
R M
A T
IO
N
Specimen Number 1
Specimen ID ST-2 Boring No. B-2 Depth (ft) 30-32 Sample Type Thin-walled tube
Location
SCI Project 240071, WO 94876 Page 1 of 6 Boring B2, ST2 30-32 ft
Project Name Paukie Island Causeway Repair, Paukie Island, SC
Project Number Work Order 94876
Test One Dimensional Consolidation Properties of Soils Method ASTM D2435
Time t90, hr cv 90, in2/min
Time t50, hr cv 50, in2/min
0.125 0.0115 0.9885 0.669 1.1500 2.093 0.1008 0.1370 0.0507 0.0633
0.25 0.0203 0.9797 0.660 2.0300 2.065 0.1451 0.0935 0.0745 0.0423
0.5 0.0380 0.9620 0.642 3.8000 2.010 0.1611 0.0812 0.1082 0.0281
1 0.0692 0.9308 0.611 6.9200 1.912 0.2519 0.0486 0.1258 0.0226
0.5 0.0647 0.9353 0.616 6.4700 1.927
0.25 0.0594 0.9406 0.621 5.9400 1.943
0.5 0.0624 0.9376 0.618 6.2400 1.934 0.1435 0.0866 0.0280 0.0902
1 0.0736 0.9264 0.607 7.3600 1.899 0.1585 0.0765 0.0358 0.0679
2 0.1389 0.8611 0.542 13.8900 1.694 0.6214 0.0169 0.1477 0.0132
4 0.2372 0.7628 0.443 23.7200 1.387 2.0428 0.0040 0.3483 0.0055
8 0.3154 0.6846 0.365 31.5400 1.142 0.9209 0.0072 0.3019 0.0051
2 0.2933 0.7067 0.387 29.3300 1.211
0.5 0.2568 0.7432 0.424 25.6800 1.325
0.125 0.2403 0.7597 0.440 24.0300 1.377
REMARKS
The coefficient of consolidation was generated by HUMBOLDT consolidation software.
240071 (ESP Project No. 24-01110)
TEST DATA SUMMARY
Load, tsf
Cumulative Change in
Height, in.
Specimen Height, in.
Void Height, in.
Vertical Strain, Void Ratio, ef
Logarithm of Time Method
Square Root of Time Method
SCI Project 240071, WO 94876 Page 2 of 6 Boring B2, ST2 30-32 ft
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.1 1 10 100
S tr a in
Pressure, tsf
1.00
1.20
1.40
1.60
1.80
2.00
2.20
0.1 1 10 100
V o id r a ti o e f
Pressure, tsf
1.10
1.30
1.50
1.70
1.90
2.10
2.30
0.001 0.010 0.100 1.000
A v e ra g e
V o id R a ti o , e
Coefficient of Consolidation, cv, in2/min
Log Time Method Square Root Time
SCI Project 240071, WO 94876 Page 3 of 6 Boring B2, ST2 30-32 ft
0.0000
0.0020
0.0040
0.0060
0.0080
0.0100
0.0120
0.0140
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
0.125 tsf
0.0000
0.0050
0.0100
0.0150
0.0200
0.0250
0.0300
0.0350
0.0400
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
0.5 tsf
0.0640 0.0645 0.0650 0.0655 0.0660 0.0665 0.0670 0.0675 0.0680 0.0685 0.0690 0.0695
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
0.5 tsf
0.0000
0.0050
0.0100
0.0150
0.0200
0.0250
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
0.25 tsf
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.1 1 10 100 1000 10000
D e fo rm a tio n, in
Time, min.
1 tsf
0.0590
0.0600
0.0610
0.0620
0.0630
0.0640
0.0650
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
0.25 tsf
SCI Project 240071, WO 94876 Page 4 of 6 Boring B2, ST2 30-32 ft
0.0590
0.0595
0.0600
0.0605
0.0610
0.0615
0.0620
0.0625
0.0630
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
0.5 tsf
0.0000
0.0200
0.0400
0.0600
0.0800
0.1000
0.1200
0.1400
0.1600
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
2 tsf
0.0000
0.0500
0.1000
0.1500
0.2000
0.2500
0.3000
0.3500
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
8 tsf
0.0620
0.0640
0.0660
0.0680
0.0700
0.0720
0.0740
0.0760
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
1 tsf
0.0000
0.0500
0.1000
0.1500
0.2000
0.2500
0.1 1 10 100 1000 10000
D e fo rm a tio n, in
Time, min.
4 tsf
0.2900
0.2950
0.3000
0.3050
0.3100
0.3150
0.3200
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
2 tsf
SCI Project 240071, WO 94876 Page 5 of 6 Boring B2, ST2 30-32 ft
0.2500 0.2550 0.2600 0.2650 0.2700 0.2750 0.2800 0.2850 0.2900 0.2950
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
0.5 tsf
0.2350
0.2400
0.2450
0.2500
0.2550
0.2600
0.1 1 10 100 1000 10000
D e fo rm a tio n , i n
Time, min.
0.125 tsf
SCI Project 240071, WO 94876 Page 6 of 6 Boring B2, ST2 30-32 ft
Report Date: 11/05/2024 SCISampled By:
Project: Paukie Island Causeway Repair, Paukie Island, SC, ESP
Project No. 24-01110 ClientBy Order Of:
REPORT:
Client:
LAB NO: 94876-4
ESP ASSOCIATES, INC - Charleston Direct Shear
Order Number:Location: Bulk Sample B-2A, 2'-5'
Special InspectionsNondestructiveGeotechnicalConstruction Materials
94876-DSReport No:TEST RESULTS
SOIL CONSULTANTS, INC.
Engineering and Testing Since 1951
Charleston, South Carolina 29402 www.SoilConsultantsInc.com P: 843.723.4539 F: 843.723.3648
PO Drawer 698
Soil Consultants, Inc. performed direct shear testing on samples provided to us. Results are attached.
ASTM D3080Test Method
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
Orig: ESP ASSOCIATES, INC - Charleston Attn: Mr. Matt Lattin E-Mail: mlattin@espassociates.com (1-ec copy)
Respectfully Submitted, SOIL CONSULTANTS, INC.
David J. Hale, P.E.
Project Engineer
11/12/2024
Project Name Paukie Island Causewy Repair, Paukie Island, SC Project Number Work Order 94876
Maximum Dry Density, lb/ft3
Optimum Moisture Content, % 1 2 3
Square Square Square Remolded Remolded Remolded
Remolded Density (ASTM D698) 95% 95% 95%
2.00 2.00 2.00
1.00 1.00 1.00
Water Content (%) 14.4 14.3 14.3
112.4 112.4 112.4
98.3 98.4 98.3
55.8 55.4 55.6
0.684 0.682 0.683
24.8 24.7 25.3
125.1 127.7 126.1
100.2 102.4 100.6
101.1 106.4 104.0
0.650 0.616 0.644
0.65 33.7
DS-1
11/5/2024 Chubb, A
2.65
SA
M
PL
E
D A
TA
Specimen Number
2-5
103.0 14.5
SP-SMUSCS Classification
Bulk 8.8
NP
NP
Dry Density (pcf) Saturation (%) Void Ratio
Dry Density (pcf) Saturation (%) Void Ratio Water Content (%) Wet Density (pcf)
Sample Shape Sample Structure
Average Width (in.)
Average Height (in.)
Wet Density (pcf)
Liquid Limit Plastic Limit
Specific Gravity (Assumed)
Sample Source Location Specimen ID Depth (ft) Sample Type
ASTM D3080
DIRECT SHEAR TEST OF SOILS UNDER CONSOLIDATED DRAINED CONDITIONS
Angle of Internal Friction, φ, degrees
Peak Conditions Cohesion, c, psi
IN
IT
IA
L
TE
ST
D A
TA
M
A
TE
R
IA
L
IN
FO
R
M A
TI
O
N
SA
M
PL
E C
O N
D
IT
IO
N
S
Bulk Sample
FI
N
A L
240071(ESP No. 24-01110)
Equipment ID Test Date Test Technician
Fines Content, %
0 2 4 6 8 10
Sh ea r S tre ss , p si
Normal Stress, psi
-0.1 0 0.1 0.2 0.3 0.4 0.5
N om in al
S he ar S tr es s, p si
Lateral Displacement, in.
Specimen 1 Specimen 2 Specimen 3
-0.008 -0.006 -0.004 -0.002
0.002 0.004 0.006 0.008 0.01
0 0.1 0.2 0.3 0.4 0.5
N or m al
D is pl ac em en t, in
Lateral Displacement, in.
Specimen 1 Specimen 2 Specimen 3
Appendix III
Bearing Capacity Estimates
Slide2 Results Figures
Settle3 Results Figures
Bearing Capacity for Shallow Foundations
Project: Paukie Island Causeway Repair
Number: 24-01110
Location: CULVERT
Date: 12/11/2024 c = 0 psf
Φ = 28 degrees = 0.489 radians ɣ = 105 pcf ɣb = 42.6 pcf ɣɣ = 42.6 pcf ɣq = 42.6 pcf
Df = 2 ft
Dw = 0 ft
B = 18 ft
L = 35 ft β= 0 degrees
I. General Bearing Capacity equation after Reissner, Prandtl and Vesic (Das 1995)
Nc = 25.80 Fcs = 1.29 Fcd = 1.04 Fci = 1.00
Nq = 14.72 Fqs = 1.27 Fqd = 1.03 Fqi = 1.00
Nγ = 16.72 Fγs = 0.79 Fγd = 1.00 Fγi = 1.00 qu = 6,741 psf FS = 1.5 2.0 2.5 3.0 qnet(u) = 6,656 psf qnet(a) = 4,437 3,328 2,662 2,219
2.12.1
W
250.00 lbs/ft2 250.00 lbs/ft2
2.12.1 Phi
Cohesion
(psf)
Strength
Type
Unit Weight (lbs/ ft3) ColorMaterial Name
Mohr-
Coulomb
Existing Fill
(Total)
Mohr-
Coulomb 115New Fill (Total)
Mohr-
Coulomb 105V. Loose SM
Mohr-
Coulomb 105Loose SP-SM
Mohr-
Coulomb 105V. Loose SP-SM
Mohr-
Coulomb 105M. Dense SM
STA. 11+00
-1
-2
-50 -40 -30 -20 -10 0 10 20 30 40 50
Analysis Description STA. 11+00 Slope Stability - short-term
Company ESP Associates, Inc.
Drawn By
PB
File Name Paukie Island Causeway Repair Stability.slmd
Date
11/7/2024, 5:03:14 PM
Project
Paukie Island Causeway Repair
SLIDEINTERPRET 9.036
2.02.0
250.00 lbs/ft2 250.00 lbs/ft2
2.02.0
STA. 11+00
Phi
Cohesion
(psf)
Strength
Type
Unit Weight (lbs/ ft3) ColorMaterial Name
Mohr-
Coulomb
Existing Fill
(Total)
Mohr-
Coulomb 115New Fill (Total)
Mohr-
Coulomb 105V. Loose SM
Mohr-
Coulomb 105Loose SP-SM
Mohr-
Coulomb 105V. Loose SP-SM
Mohr-
Coulomb 105M. Dense SM
-1
-2
-50 -40 -30 -20 -10 0 10 20 30 40 50
Analysis Description STA. 11+00 Slope Stability - short-term
Company ESP Associates, Inc.
Drawn By
PB
File Name Paukie Island Causeway Repair Stability.slmd
Date
11/7/2024, 5:03:14 PM
Project
1.91.9
250.00 lbs/ft2 250.00 lbs/ft2 1.91.9
Phi
Cohesion
(psf)
Strength
Type
Unit Weight
(lbs/ft3) Color
Material
Name
Mohr-
Coulomb
Existing Fill
(Total)
Mohr-
Coulomb
New Fill
(Total)
Mohr-
Coulomb 105V. Loose SM
Mohr-
Coulomb 105Loose SP-SM
Mohr-
Coulomb
V. Loose SP-
SM
Mohr-
Coulomb 105M. Dense SM
STA. 11+00
-1
-2
-50 -40 -30 -20 -10 0 10 20 30 40 50
Analysis Description STA. 11+00 Slope Stability - short-term
Company ESP Associates, Inc.
Drawn By
PB
File Name Paukie Island Causeway Repair Stability.slmd
Date
11/7/2024, 5:03:14 PM
Project
1.91.9
250.00 lbs/ft2 250.00 lbs/ft2
1.91.9
STA. 11+00
Phi
Cohesion
(psf)
Strength
Type
Unit Weight
(lbs/ft3) Color
Material
Name
Mohr-
Coulomb
Existing Fill
(Total)
Mohr-
Coulomb
New Fill
(Total)
Mohr-
Coulomb 105V. Loose SM
Mohr-
Coulomb 105Loose SP-SM
Mohr-
Coulomb
V. Loose SP-
SM
Mohr-
Coulomb 105M. Dense SM
-1
-2
-50 -40 -30 -20 -10 0 10 20 30 40 50
Analysis Description STA. 11+00 Slope Stability - short-term
Company ESP Associates, Inc.
Drawn By
PB
File Name Paukie Island Causeway Repair Stability.slmd
Date
11/7/2024, 5:03:14 PM
Project
250.00 lbs/ft2 250.00 lbs/ft2
1.3
STA. 11+00
Phi
Cohesion
(psf)
Strength
Type
Unit Weight (lbs/ ft3) ColorMaterial Name
Mohr-
Coulomb
Existing Fill
(Effective)
Mohr-
Coulomb 115New Fill (Effective)
Mohr-
Coulomb 105V. Loose SM
Mohr-
Coulomb 105Loose SP-SM
Mohr-
Coulomb 105V. Loose SP-SM
Mohr-
Coulomb 105M. Dense SM
-1
-2
-50 -40 -30 -20 -10 0 10 20 30 40 50
Analysis Description STA. 11+00 Slope Stability - long-term
Company ESP Associates, Inc.
Drawn By
PB
File Name Paukie Island Causeway Repair Stability.slmd
Date
11/7/2024, 5:03:14 PM
Project
1.31.3
250.00 lbs/ft2 250.00 lbs/ft2
1.31.3
STA. 11+00
Phi
Cohesion
(psf)
Strength
Type
Unit Weight
(lbs/ft3) ColorMaterial Name
Mohr-
Coulomb
Existing Fill
(Effective)
Mohr-
Coulomb
New Fill
(Effective)
Mohr-
Coulomb 105V. Loose SM
Mohr-
Coulomb 105Loose SP-SM
Mohr-
Coulomb 105V. Loose SP-SM
Mohr-
Coulomb 105M. Dense SM
-1
-2
-50 -40 -30 -20 -10 0 10 20 30 40 50
Analysis Description STA. 11+00 Slope Stability - long-term
Company ESP Associates, Inc.
Drawn By
PB
File Name Paukie Island Causeway Repair Stability.slmd
Date
11/7/2024, 5:03:14 PM
Project
250.00 lbs/ft2 250.00 lbs/ft2
1.3
STA. 11+00
Phi
Cohesion
(psf)
Strength
Type
Unit Weight
(lbs/ft3) ColorMaterial Name
Mohr-
Coulomb
Existing Fill
(Effective)
Mohr-
Coulomb
New Fill
(Effective)
Mohr-
Coulomb 105V. Loose SM
Mohr-
Coulomb 105Loose SP-SM
Mohr-
Coulomb 105V. Loose SP-SM
Mohr-
Coulomb 105M. Dense SM
-1
-2
-50 -40 -30 -20 -10 0 10 20 30 40 50
Analysis Description STA. 11+00 Slope Stability - long-term
Company ESP Associates, Inc.
Drawn By
PB
File Name Paukie Island Causeway Repair Stability.slmd
Date
11/7/2024, 5:03:14 PM
Project
1.31.3
250.00 lbs/ft2 250.00 lbs/ft2
1.31.3
STA. 11+00
Phi
Cohesion
(psf)
Strength
Type
Unit Weight (lbs/ ft3) ColorMaterial Name
Mohr-
Coulomb
Existing Fill
(Effective)
Mohr-
Coulomb 115New Fill (Effective)
Mohr-
Coulomb 105V. Loose SM
Mohr-
Coulomb 105Loose SP-SM
Mohr-
Coulomb 105V. Loose SP-SM
Mohr-
Coulomb 105M. Dense SM
-1
-2
-50 -40 -30 -20 -10 0 10 20 30 40 50
Analysis Description STA. 11+00 Slope Stability - long-term
Company ESP Associates, Inc.
Drawn By
PB
File Name Paukie Island Causeway Repair Stability.slmd
Date
11/7/2024, 5:03:14 PM
Project
Detour Road
Culvert
STA. 11+00
STA. 12+08STA. 12+08
STA. 11+00
Culvert
Detour Road
3.2
.7
.5 e -0
.6
.9 e -0
.7 e -0
5.2
0.4
Material Name Color
Unit
Weight
(kips/ft3)
Es
(ksf) Cc/Cce Cr/Cre OCR
V. LOOSE SM 0.105 30 - - -
LOOSE SP-SM 0.105 75 - - -
V. LOOSE SP-SM 0.105 15 - - -
V. SOFT CH 0.105 - 0.27 0.04 2.2
Ex. Fill 0.12 200 - - -
MD SM 0.105 230 - - -
B-1
-50 0 50 100
Total Settlement (in) max (all): 7.55 in max (stage): 7.55 in
0.00
0.76
1.52
2.28
3.04
3.80
4.56
5.32
6.08
6.84
7.60
Analysis Description Culvert, Wingwalls, Embankments
Company ESP Associates, Inc.
Drawn By
MML
File Name 24-01110 Paukie.s3d
Date 11/7/2024
Project
SETTLE3 5.024
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180
Distance (ft)
0.5
1.5
2.5
3.5
4.5
5.5
T o ta l
S e tt le m e n t in
Culvert Longitudinal (Stage 1)
Culvert Transverse (Stage 1)
Longitudinal Detour Rd Edge (Stage 1)
Distance vs. Total Settlement
Analysis Description Culvert, Embankments
Company ESP Associates, Inc.
Drawn By
MML
File Name 24-01110 Paukie.s3d
Date 11/7/2024
Project
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180
Distance (ft)
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
T o ta l C o n s o li d a ti o n
S e tt le m e n t in
Culvert Longitudinal (Stage 1)
Culvert Transverse (Stage 1)
Longitudinal Detour Rd Edge (Stage 1)
Distance vs. Total Consolidation Settlement
Analysis Description Culvert, Embankments
Company ESP Associates, Inc.
Drawn By
MML
File Name 24-01110 Paukie.s3d
Date 11/7/2024
Project
ESP Corporate Office
3475 Lakemont Boulevard
Fort Mill, SC 29708
803.802.2440
Mailing Address: P.O. Box 7030 Charlotte, NC 28241
800.960.7317 | www.espassociates.com
Concord
7144 Weddington Rd. NW
Suite 110
Concord, NC 28027
704.793.9855
Cornelius
20484 Chartwell Center Dr.
Suite D
Cornelius, NC 28031
704.649.2863
Raleigh
2200 Gateway Centre Blvd.
Suite 216
Morrisville, NC 27560
919.678.1070
Greensboro
7011 Albert Pick Rd
Suite E
Greensboro, NC 27409
336.334.7724
Wilmington
211 Racine Drive
Suite 101
Wilmington, NC 28403
910.313.6648
Charleston
2154 North Center Street
Suite E-503
North Charleston, SC 29406
843.714.2040
Nashville
500 Wilson Pike Circle
Suite 310
Brentwood, TN 37027
615.760.8300
Pittsburgh
One Williamsburg Place
Suite G-5, Box 13
Warrendale, PA 15086
724.462.6606
Bradenton
518 13th Street
West Bradenton, FL 34205
941.345.5451
Indianapolis
8673 Bash Street
Indianapolis, IN 46256
317.537.6979
Albuquerque
1203 West Ella Drive
Corrales, NM 87048
505.314.1322
Birmingham
291 Cahaba Valley Parkway North Suite A
Pelham, AL 35124
205.664.8498
Vickrey & Associates, LLC - An ESP Company
San Antonio
12970 Country Parkway
San Antonio TX 78216
210.349.3271
Austin
3600 West Parmer Lane
Suite 175
Austin, TX 78727
512.494.8014
McAllen
1216 East Jasmine Avenue
Suite C
McAllen, TX 78501
956.340.0045
| 2024-12-17T10:54:59-0500 | |
| Matthew Mark Lattin |