About this file

This is a Performance Work Statement (PWS) for repair services of APX-114/APX-119 IFF systems, MAGR 2K/MAGR 2K-M GPS receivers, and F-15E LANTIRN Navigation PODs for the Air Force Sustainment Center. The contract has a 3-year period of performance and will be performed at the contractor's facility. The incumbent contractor is Raytheon.

Key requirements include repair services with no more than 1 PQDR per quarter and no more than 5 late deliveries per contract year. The contractor must maintain an AS9100-compliant quality management system, report production data in CAV-AF, conduct annual physical inventory, and implement a comprehensive Supply Chain Risk Management plan. Additional requirements include counterfeit parts prevention, cybersecurity protection, and proper handling of government property. The contractor must provide multiple CDRLs including production reports, inventory reports, and accident/incident reports. All work requires adherence to security protocols, though specific clearance levels are not specified in this document.

View the file

Other files

File Type Posted
2024-12-11 407 Raytheon Corp RFI.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-25-XXXXX PWS REVISION: 0 1

Performance Work Statement for

APX-114 / APX-119 IFF, MAGR 2K/MAGR 2K-M and F-15E LANTIRN Repair

Purchase Request: FD2060-25-XXXXX

Date QAPC signs QASP.

PR: FD2060-25-XXXXX PWS REVISION: 0 2

1.0 Description of Services

1.1 Objective(s): Obtain Repair services for MAGR-2K, LANTIRN and APX-114/119

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States

Air Force (USAF) by supporting mission requirements

1.3 Background: All systems previously repaired by Raytheon.

2.0 Services Summary

Performance Objective PWS

Reference

Performance Threshold

Quality of repair

4.3.5 There shall be no more than 1 PQDRs per quarter. A

valid PQDR shall be returned to the contractor for repair at no additional cost to the government, and delivered within 30 calendar days of receipt.

Delivery of repair

4.5.1 Repaired assets shall be delivered in accordance with

the schedule defined by the contract/order.

There shall be no more than 5 late deliveryies per contract year. The Contractor shall notify the

Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government.

CAV-AF reporting 4.3.3.1 The Contractor shall report production in CAV-AF.

The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur.

Quality of CDRL deliverable

4.2.1 There shall be no more than one rejection of any

deliverable. There shall be no more than 2 total rejection of deliverables per contract year. The

Government will reject a deliverable if 3 or more technical errors or 2 or more minor errors are found within the deliverable. The rejected deliverable shall be corrected and resubmitted within 15 business days of notification of Government rejection.

Receipt of CDRL deliverable

4.2.2 There shall be no more than 3 late submission(s) of

deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

Adherence to Contractor

Quality Management

System (QMS)

5.9 The contractor must establish an AS9100

compliant quality management system, ensure its functionality and compliance through internal

PR: FD2060-25-XXXXX PWS REVISION: 0 3

auditing, and undergo a certification audit conducted by an external registrar.

100% compliance with the QMS is required.

3.0 Government Property

3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.

3.2 Government Property to be Provided: Government property to be provided includes the below reparable assets for NSNs listed on the contract.

3.3 Base Support: The Government will furnish property incidental to the place of performance including office space and equipment, i.e., computer equipment, software, phone/phone line, and reproduction equipment.

3.4 Reporting of Government Property: The Contractor shall have a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) Government property in its possession in accordance with FAR 52.245-1, and its property management system shall be adequate to satisfy the requirements of this clause. The contractor shall record receipt and return of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption, disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise

Environment (PIEE), https://piee.eb.mil, as stipulated by DFARS 252.245-7005. This reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract. GFP training and guidance is located at the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/.

3.5 Loss of Government Property

3.5.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of

Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of

Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.

3.5.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/.

3.6 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but https://piee.eb.mil/ https://dodprocurementtoolbox.com/ https://piee.eb.mil/piee-landing/

PR: FD2060-25-XXXXX PWS REVISION: 0 4

no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All

Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.

4.0 Technical Requirements

4.1 Period and Place of Performance

4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order will extend 3 years

4.1.2 Place of Performance: These services will be performed at the Contractor’s Facility

4.2 Contract Data Requirements List(s) (CDRL)

Document

Identifier

Base Year

Ordering

Year

Ordering

Year

Ordering

Year

Ordering

Year

DID Title PWS

Reference(s)

A001 B001 C001 D001 E001 DI-

MGMT-

81838

Commercial Asset

Visibility Air Force

(CAVAF) Contractor

Furnished Material

End Item Reporting

4.3.3.1

A002 B002 C002 D002 E002 DI-

MGMT-

80441D

Government

Property Inventory

Report

4.3.3.2

A003 B003 C003 D003 E003 DI-PSSS-

81995

Contract Depot

Maintenance

Production Report

4.3.3.3

A004 B004 C004 D004 E004 DI-

MGMT-

82256

Supply Chain Risk

Management Plan

4.4.1

A005 B005 C005 D005 E005 DI-

MGMT-

81580/T

Contractor’s

Standard Operating

Procedures

5.5.2

A006 B006 C006 D006 E006 DI-

SAFT-

81563

Accident/Incident

Report

5.5.3

4.2.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any deliverable. There shall be no more than 2 total rejection(s) of deliverables per contract year.

The Government will reject a deliverable if 3 or more technical errors or 2 or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with

PR: FD2060-25-XXXXX PWS REVISION: 0 5

the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within 15 business days of notification of Government rejection.

4.2.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via WAWF and/or submitted directly to the MFT member identified on the CDRL. Separately priced data must be submitted and accepted in WAWF in order for the Contractor to receive payment. There shall be no more than 3 late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.3 Repair

4.3.1 Item Unique Identification

4.3.1.1 Marking Requirement: Unique Item Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR.

4.3.1.2 Reporting in IUID Registry

4.3.1.2.1 Transmission of Government property must be recorded in the IUID Registry. The

Government is required to record the transfer of GFP to the Contractor. The Contractor is required to record the receipt of GFP from the Government. The Contractor is required to record the return of GFP to the Government.

4.3.1.2.2 The Government or contractor/subcontractor personnel responsible for causing a “life cycle event” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record in the IUID Registry.

4.3.2 Packaging: The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable Government regulations. The Contractor shall ensure that classified material is packaged, marked and delivered in accordance with 32 CFR Part 117, National Industrial

Security Program Operating Manual (NISPOM).

4.3.3 Commercial Asset Visibility-Air Force (CAVAF):

4.3.3.1 The Contractor shall report production using CAVAF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur. The following metrics will be monitored: GFM In-Transit, Repairable GFM Accountability and

Assets Not on Contract. If CAVAF training is required, Contractor personnel may send an email

PR: FD2060-25-XXXXX PWS REVISION: 0 6

to: 406scms.CAVAF.af.ar@us.af.mil. [CDRL A/B/C001, DI-MGMT-81838, Commercial

Asset Visibility Air Force (CAVAF) Contractor Furnished Material End Item Reporting]

4.3.3.2 Government Property Inventory Report: The Contractor report shall provide to the DoD

Service/Agency an inventory listing of Government Property (i.e., both Government Furnished

Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) applicable to this contract. This Data Item Description (DID) is applicable where Government Property will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of this contract. Contractor shall provide in Microsoft Excel (.xls or .xlsx compatible) format. The contractor shall conduct an annual 100% physical inventory over the course of a year’s time of each NIIN as not to impede maintenance operations. Upon completion of each NIINs 100% physical inventory, the contractor shall provide the AF government an inventory listing of the result of all AF Government Furnished Property (GFP) in the contractor's possession, by contract, and by National Stock Number (NSN). The Contractor shall submit a Table for each designated repair facility / DoDAAC location for which the contractor has received inventory during the reporting period, including Subcontractor facilities. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request. [CDRL A/B/C002, DI-MGMT-

80441D, Government Property Inventory Report]

4.3.3.3 The Contractor report shall provide the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period. [CDRL A/B/C003, DI-PSSS-81995, Contract Depot

Maintenance Production Report]

4.3.4 Counterfeit Electronic Parts: The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end items or otherwise entering the USAF/DoD inventory.

4.3.5 There shall be no more than one valid Product Quality Deficiency Report (PQDR) action per contract quarter. End items not meeting this criteria will be returned to the Contractor for re-evaluation/repair. A valid PQDR shall be returned to the contractor for repair at no additional cost to the government, and delivered within 30 calendar days of receipt.

4.4 Supply Chain Risk Management

4.4.1 Contractor must provide a comprehensive Supply Chain Risk Management (SCRM) Plan in accordance with the instructions to offeror prior to award. This plan must be maintained during performance of this contract, will be incorporated into the contract at award, and must illustrate executable processes for identifying supply chain risks as early as possible. The SCRM plan will address the broad spectrum of supply chain risks that have the potential to jeopardize the integrity of products, services, people, and technologies; compromise intellectual property;

disrupt the flow of product, materiel, information, and finances needed for continued Air Force operations; and/or drive materiel cost increases to the program. The plan and processes apply to the Contractor and their suppliers, subcontractors, associated integrators, and vendors, spanning mailto:406scms.cav.af.ar@us.af.mil

PR: FD2060-25-XXXXX PWS REVISION: 0 7

the entirety of the supply chain from raw material stage to delivery of a finished product.

[CDRL A/B/C004, DI-MGMT-82256, Supply Chain Risk Management Plan]

4.4.2 The SCRM plan must clearly address the following:

4.4.2.1 Continuity of Operations (COOP) – Contractor will develop and/or update a Continuity of Operations Procedure/Plan (COOP), which outlines the processes and actions to prepare for, and respond to, planned/unplanned supply chain challenges.

4.4.2.2 Foreign Influence – The Contractor will disclose any Foreign Ownership, Control, or

Influence (FOCI) for the purpose of initial or continued facility clearance eligibility. A Standard

Form 328 Certificate Pertaining to Foreign Interest must be submitted to the Government cognizant security office.

4.4.2.3 Cybersecurity -The Contractor will implement a cybersecurity protection of supply chain information plan and provide a copy to the U. S. Government. As part of this process, the

Contractor will conduct early and continuous monitoring throughout the life of the agreement to prevent or reduce impacts of cyber vulnerabilities where adversaries are able to exploit, steal, alter, manipulate, interrupt, or destroy system functionality, information, or technology. The plan must:

4.4.2.4 Include a description of how the Contractor and any of the Contractor’s subcontractors will provide to the government a system security plan (or extract thereof) in accordance with the

NIST Special Publication (SP) 800-171, “Protecting Controlled Unclassified Information in

Nonfederal Systems and Organizations” in effect at the time the solicitation is issued or as authorized by the contracting officer, to describe the Contractor’s unclassified information system(s)/network(s) where covered defense information associated with the execution and performance of this contract is processed, is stored, or transmits.

4.4.2.5 Include a description of how Contractor will protect the supply chain from exploitation due to the insertion of counterfeits/malware, unauthorized production, tampering, theft, insertion of malicious software and hardware, functionality alteration, and any other elements that would allow adversaries to gain unauthorized access to data, alter data, interrupt communications, or otherwise disrupt operations.

4.4.2.6 Inform the U. S. Government of any instances of unauthorized access and/or compromise, such as those listed in item “b” to the Contractor’s digital information and parts and components.

4.5 Delivery of Repair

4.5.1 Repaired assets shall be delivered in accordance with the schedule defined by the contract/order. There shall be no more than 5 late deliveries per contract year. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date

PR: FD2060-25-XXXXX PWS REVISION: 0 8

and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government.

4.6 Holidays and Facility Closings: Contractor/subcontractor personnel shall observe holidays and facility closings as authorized for government personnel. Contractor/subcontractor personnel shall only be permitted access to Government facilities when Government personnel are present.

4.7 Travel: Travel requests for contractor/subcontractor personnel shall be submitted for approval to the Contracting Officer prior to costs being incurred and a minimum of 10 business days in advance of departure. Receipts must be presented with the invoice for reimbursement of actual travel costs.

5.0 General Information

5.1 Continuation of Mission-Essential Services During a Crisis: The Functional

Commander/Director has determined these services are not mission-essential and will not continue in the event of a crisis.

5.2 Security Requirements

5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall ensure contractor/subcontractor personnel who perform work on a Government facility comply with the security requirements of the facility.

5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of

USAF missions to adversary collection and exploitation of critical information. DoDD 5205.02E and DoD Manual 5205.02-M require contractors supporting DoD activities use OPSEC to protect critical information for specified contracts, sub contracts, and information used in the performance of duties in support of Air Force requirements/missions. The Contractor shall ensure Contractor personnel who perform work on (or in) a Government facility comply with the

OPSEC procedures and training requirements of the facility as specified in AFI 10-701.

Include 1 of the 2 following paragraphs on security clearances.

If security clearances will not be required, include the following paragraph.

5.2._ Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements.

Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.

OR

PR: FD2060-25-XXXXX PWS REVISION: 0 9

If security clearances will be required, include the following paragraph.

5.2._ Security Clearance: The Contractor shall ensure applicable contractor/subcontractor personnel have security clearance(s) at the _____ level for proper accomplishment of contract/order requirements. The security clearance(s) shall be obtained in accordance with the

Department of Defense (DD) Form 254, Department of Defense Contract Security Classification

Specification.

5.2._ Security Incident or Violation: The Contractor shall immediately notify the Government

Security Office of any potential or actual security incident or violation.

Include 1 of the 2 following paragraphs on access to Government system(s).

5.2._ Access to Government System(s): Access to Government system(s) will not be required to perform tasks under the contract/order.

5.2._ Access to Government System(s): The Government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The

Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified Government Automated Information System (AIS) have the respective background check or security investigation conducted. At a minimum, the Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a National

Agency Check with Inquiries (NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.

Include 1 of the 2 following paragraphs on access to a Government facility.

If access to a Government facility other than Robins AFB will be required to perform services, include the following paragraph.

5.2._ Access to Government Facility or Military Installation: The Contractor shall ensure contractor/subcontractor personnel who require access to a Government facility or military installation comply with the security requirements of the facility or installation.

If access to Robins AFB will be required to perform services, include the following paragraph.

5.2._ Access to Robins Air Force Base (AFB): The Contractor shall ensure contractor/subcontractor personnel who require access to Robins AFB comply with the security requirements of the installation. The Contractor shall provide the PCO a list of all contractor/subcontractor personnel requiring access to Robins AFB, the contract/order number and the period of performance. The Contractor shall also provide, if possible, the location of the

PR: FD2060-25-XXXXX PWS REVISION: 0 10

work site and the days/hours during which the contractor/subcontractor personnel will require access to Robins AFB.

Include 1 of the 2 following subsections if identification will be required for access to a

Government facility.

Include the following subsection if contractor/subcontractor personnel will require access to a

Government facility, but NOT access to Government computer network/system(s).

5.2._ Identification (ID) Card/Badge

5.2._.1 The Contractor shall ensure an ID card is obtained by all contractor/subcontractor personnel who require recurring access to a Government facility, but not local area network

(LAN) access. The Contractor shall submit a letter to the PCO listing all contractor/subcontractor personnel requiring access to the facility. The PCO will approve the request and forward it to the issuing/registration office for processing. Contractor/subcontractor personnel shall report to the issuing/registration office to obtain the ID card(s).

5.2._.2 The Contractor shall submit a letter to the PCO immediately if contractor/subcontractor personnel no longer require access, upon transfer/termination of contractor/subcontractor personnel or upon completion/termination of the contract/order. The letter shall identify the name(s) and social security number(s) of the contractor/subcontractor personnel. The Contractor shall return the ID card(s) to the issuing/registration office upon expiration, upon transfer/termination of contractor/subcontractor personnel, or once contractor/subcontractor personnel no longer require access to the facility. The Contractor shall return any and all ID cards to the issuing/registration office upon completion/termination of the contract.

Include the following subsection if contractor/subcontractor personnel will require access to a

Government facility and access to Government computer network/system(s).

5.2._ Common Access Card (CAC)

5.2._.1 The Contractor shall ensure a CAC is obtained by all contractor/subcontractor personnel who require access to DoD computer networks/systems, for DoD facility entry control and/or for physical access to facilities and buildings to perform tasks under the contract/order. The

Contractor shall provide a list of contractor/subcontractor personnel who require a CAC to the

PCO. The Government will provide the Contractor instruction on how to utilize Mission Partner

Identity, Credential and Access Management (MP-ICAM) and notify the Contractor of approval/disapproval of contractor/subcontractor personnel application. Contractor/subcontractor personnel shall obtain the CAC from the local Real Time Automated Personnel Identification

Documentation System (RAPIDS) issuing facility [usually the Military Personnel Flight (MPF)].

5.2._.2 The Contractor shall immediately report a lost or stolen CAC as directed by local

Government policy. The Contractor shall notify the PCO of any change to the list of

PR: FD2060-25-XXXXX PWS REVISION: 0 11

contractor/subcontractor personnel who require a CAC and provide an updated list within five business days. The Contractor shall return a CAC within five business days once contractor/subcontractor personnel no longer require computer network/system access and/or facility access. The Contractor shall return an expired CAC within five business days after the expiration date. The Contractor shall return any and all CACs within five business days after completion/termination of the contract as directed by local Government policy.

5.3 Environmental Management System (EMS): Contractor/subcontractor personnel who perform work on any Government facility shall comply with the EMS requirements established by the facility. Contractor/subcontractor personnel may be required to complete EMS training prior to beginning work.

5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of

Environmental Protection Agency (EPA)-designated products or United States Department of

Agriculture (USDA)-designated products; therefore, the requirement does not apply.

5.5 Safety Requirements

5.5.1 Contractor Environmental, Safety, and Occupational Health Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoD Directive 4715.1E, Environmental, Safety, and Occupational Health (ESOH). The Contractor shall require all subcontractors to comply with required safety, health and fire standards. If applicable, add local policy

5.5.2. Contractor Safety & Health Program/Plan. The Contractor shall establish and maintain a safety and health program detailed in a written Contractor’s Safety and Health Plan (SHP) in accordance with OSHA and ESOH and tailored to the contract. The SHP shall address the requirements established in the Safety Appendix (Environmental, Safety and Occupational

Health Requirements) to the contract. The Contractor shall submit the SHP to the MFT member identified on the CDRL [CDRL Reference in paragraph 4.2, DI-SAFT-82313, Environmental, Safety, and Occupational Health (ESOH) Plan]. The cognizant Government safety office will review the SHP to determine if safety requirements are correctly addressed. The Contractor shall notify the cognizant Government safety office of any revisions made to its SHP after contract award. All changes to the SHP must also be submitted in writing and approved by the cognizant

Government safety office [CDRL A/B/C005, DI-MGMT-81580/T, Contractor’s Standard

Operating Procedures – Company Safety Plan]

5.5.3 Mishap Notification/Investigation: In accordance with DAFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to USAF assets/interests. The Contractor shall ensure the USAF is notified of mishaps. The Contractor shall contact the Contracting Officer (CO) or the Contracting Officer’s Representative (COR), if available, or another MFT member by telephone within eight (8) hours of any damage to government property where the dollar value exceeds $600,000.00, and within two workdays for any damage to government property less than $600,000.00 during the execution of the contract.

Mishap notifications shall contain, as a minimum, the following information:

PR: FD2060-25-XXXXX PWS REVISION: 0 12

a. Contract, contract number, name and title of person(s) reporting

b. Date, time and exact location of accident/incident

c. Brief narrative of accident/incident (events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated CO or COR, the Contractor shall immediately secure the mishap scene (and damaged property) and impound pertinent maintenance and training records until released by the Government’s safety office. Such release shall be accomplished through the

Contracting Officer. The Contractor shall cooperate and assist Government personnel in the investigation of the mishap and submit an Accident/Incident Report within 48 hours of the mishap [CDRL A/B/C006, DI-SAFT-81563, Accident/Incident Report].

5.5.4 Voluntary Protection Programs (VPP): Contractor personnel performing work on a USAF installation shall participate in the local VPP.

5.5.5 VPP Description: In 1982, OSHA created the Voluntary Protection Programs (VPP) to recognize and partner with worksites that implement exemplary systems to manage worker’s safety and health. These sites implement comprehensive Safety and Health Management Systems that exceed basic compliance with OSHA standards. VPP applies to all personnel at Robins AFB

- civil servants (both bargaining and non-bargaining), active duty (officer and enlisted), reservists and contractor employees. The Contractor shall ensure its employees and managers have a comprehensive understanding of VPP as well as full compliance with OSHA requirements. The

Contractor, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, shall follow the safety and health rules of the installation or VPP site. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html. The Contractor shall access the site to ensure their understanding of VPP and how their performance is linked to the Air Force installation’s pursuit of VPP recognition.

5.5.6 Department of Labor (DoL) Inspection of Contractor Operations. The Contractor is subject to DoL inspections and enforcement by OSHA health and safety officials while performing work on a Government installation. OSHA health and safety officials may access workplaces on

Government installations at any time, scheduled or unscheduled, during regular work hours.

OSHA health and safety officials must meet security requirements to enter restricted or classified areas. The Contractor shall immediately notify the COR and the contracting unit’s Safety Office upon notification of a visit.

5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

PR: FD2060-25-XXXXX PWS REVISION: 0 13

5.7 Service Contract Reporting (SCR): The contract does not meet the DoD Contract Reporting criteria; therefore, SCR does not apply.

5.8 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via WAWF.

5.9 Contractor’s Quality Program: The Contractor's Quality Management System (QMS) shall meet the requirements of AS9100, Quality Management Systems Requirements for Aviation, Space, and Defense Organizations, which is based on the standards of ISO 9001. The contractor must establish an AS9100 compliant quality management system, ensure its functionality and compliance through internal auditing, and undergo a certification audit conducted by an external registrar. The Contractor shall allow the Government access to the records and data collected to demonstrate the suitability and effectiveness of the quality management system. The

Government reserves the right to request corrective action if the quality system fails to meet objectives. The Contractor shall permit the program office or its designated representative to periodically review its quality program. 100% compliance with the QMS is required.

5.10 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about

Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and

Combat Trafficking in Persons. http://www.state.gov/j/tip http://www.state.gov/j/tip

PR: FD2060-25-XXXXX PWS REVISION: 0 14

6.0 Appendices

6.1 Appendix A, Reference(s)

Publication Title of Publication Date of Publication Sections(s) that Apply

DoDD

4715.1E

Environment, Safety, and Occupational Health (ESOH) March 19, 2005 Section 2, Para 2.2, DoD

Manual

5205.02-M

DoD Operations Security (OPSEC) Program Manual November 3, 2008 Enclosure

6, Para 2C, Page 33-34

Public

Law 91-

596 as amended by Public

Law 101-

Occupational Safety and Health Act of 1970 December 29, 1970 as amended through

January 1, 2004

Section 20

(7)(c), Page

ISO

9001:2010

Quality Management Systems Requirements 1 Dec 08 Sections

4,5,7, & 8

FAR Inspection of services February 2012 FAR52.246-

File details come from the government source that posted it. Updated .