2024-10PC Addendum 1 031524.pdf
PDF 241 KB Posted
- Solicitation number
- 2024-10PC
- Issued by
- Portage County, Wisconsin
About this file
This is Addendum 1 to RFB #2024-10PC issued by Portage County, Wisconsin's Purchasing Department for an air handlers and air-cooled scroll compressor chiller procurement. The County seeks to establish a contract to purchase two (2) air handling units and one (1) air-cooled scroll compressor chiller for a remodeling project at the Portage County Health and Human Services Building. The bid covers the purchase portion only, with installation to be bid separately as part of future bid packages for the facility remodeling with no specified timeline for release of those installation packages.
Addendum 1, issued on March 15, 2024, contains revisions and clarifications to the original bid documents. Key revisions include updates to Section 23 30 01 (Heating, Ventilation, & Air Conditioning) requiring minimum 24-gauge construction thickness in lieu of 20-gauge for both Paragraph 2.02.C.3 and Paragraph 2.02.C.4. The addendum clarifies that all contractors must submit all required bid forms completed in their entirety or face bid rejection, and each contractor is responsible for permit fees. No pricing terms, award dates, or contract term details are specified in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024-10PC Bid Document 022924.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFB #2024-10PC
Air Handlers & Air Cooled Scroll Compressor
Chiller
ADDENDUM #1
Date=03/15/24 The following changes are hereby added to and made part of Bid #2024-10PC
General Notes, Revision/Clarifications, and Questions/Answers:
General Notes:
A. All contractors are required to submit all bid forms included within the contract documents.
Failure to submit all forms, completed in their entirety, shall be grounds for rejection of the bid.
B. Each contractor, when applicable, is responsible for Permit Fees.
Revisions/Clarifications:
See Revision Below:
A. Section 23 30 01 – Heating, Ventilation, & Air Conditioning
1. Paragraph 2.02.C.3 shall be updated to specify a minimum thickness of 24 gauge construction in lieu of 20 gauge.
2. Paragraph 2.02.C.4 shall be updated to specify a minimum thickness of 24 gauge construction in lieu of 20 gauge.
Questions and Answers:
Q1. Is the above bid for just the purchasing portion or do we need to also price up the install portion or has that been awarded already?
A. The bid is just for the purchase portion. The installation portion will be bid out later as part of various bid packages for the remodeling of the Portage County Health and Human Services Building.
No time has been placed on those bid packages being released.
*******End of Addendum 1*******
| The following changes are hereby added to and made part of Bid #2024-10PC |
| *******End of Addendum 1******* |
File details come from the government source that posted it. Updated .