2024-08-27 Orchard Hills Park Bid Set.pdf
PDF 9 MB Posted
- Attached to
- Orchard Hills Park
- Solicitation number
- 20554.00
- Issued by
- Macomb County, Brooklyn Village, Michigan
About this file
This is a comprehensive bid set document for the Orchard Hills Park project, prepared by the Washington, Bruce, & Romeo Parks and Recreation Commission in Bruce Township, Macomb County, Michigan. The project involves removing and replacing a 24-inch diameter CMP (corrugated metal pipe) culvert with two new end sections, installing 34 feet of valley gutter, and grading to improve stormwater drainage. The project is located in Section 30, Township 5 North, Range 12 East, with construction access from the existing 33 Mile Road. The total project disturbed area is approximately 0.07 acres, and the bid documents are dated August 2024, with permit submissions planned for August 22nd and 26th, 2024.
The bid set includes detailed engineering plans, soil erosion and sedimentation control notes, utility coordination requirements, and specific technical specifications for pavement, grading, and culvert replacement. The documents outline strict requirements for construction methods, including erosion control measures, dust management, utility coordination, and restoration of disturbed areas. The project will require compliance with Macomb County Department of Roads standards and Part 91 of Michigan's Soil Erosion and Sedimentation Control Act. Contractors will need to provide comprehensive erosion control, maintain site conditions, and complete vegetation stabilization within 15 days of final grading.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Orchard Hills Park Bid Book.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 30 T-05-N, R-12-E
N.T.S
LOCATION MAP
UTILITY STATEMENT
GIFFELS WEBSTER
6303 26 MILE ROAD, SUITE 100
WASHINGTON, MI 48094
(586) 781-8950 p
(313) 962-5068 f
ATTN: MIKE KOZAK, P.E.
ATTN: MARK HANSEN, R.L.A.
ATTN: CHRIS ASIALA, P.S.
MACOMB COUNTY DEPARTMENT OF ROADS
117 SOUTH GROESBECK HIGHWAY
MT CLEMENS, MI 48043
(586) 563-8671
ATTN: ROBERT BUSH
MACOMB COUNTY PUBLIC WORKS
21777 DUNHAM ROAD
CLINTON TOWNSHIP, MI 48036
(586) 469-5327
ATTN: LARA SUCHARSKI
DTE ENERGY
15600 19 MILE ROAD
CLINTON TOWNSHIP, MI 48038
(313) 269-4423
ATTN: MIRIAM HERNANDEZ
SEMCO ENERGY
56462 PRECISION DRIVE
CHESTERFIELD, MI 48051
(810) 887-5047
ATTN: ANDREW STONE
AT&T MICHIGAN
100 SOUTH MAIN STREET SUITE 314
MT CLEMENS, MI 48043
(586) 764-4793
ATTN: KEN DANDRON
CONTACTS
CIVIL ENGINEER
SURVEYOR
OWNER
WASHINGTON, BRUCE & ROMEO PARKS & RECREATION COMMISSION
BRUCE TOWNSHIP, MACOMB COUNTY, MICHIGAN
ORCHARD HILLS PARK
SHEET TABLE OF CONTENTS
ROMEO, WASHINGTON, AND BRUCE PARKS AND
RECREATION COMMISSION
361 MORTON STREET
ROMEO, MI 48065
(586) 752-6543
ATTN: CLARA RUSSELL
Z:
\20
4.0
0 O rch ar d H ills P ar k\D es ign
\C
AD
\W or k S he ets \C
P-
C ov er S he et.
dw g
Copyright © 2024 Giffels Webster.
No reproduction shall be made without the prior written consent of Giffels Webster.
Developed For:
Engineers Surveyors Planners
Landscape Architects
Executive:
Manager:
Designer:
Quality Control:
Section:
Project:
Sheet:
Scale:
Date:
ISSUE:DATE:
Professional Seal:
M.K.
B.K.
B.D.M.
B.K. / M.K.
T-05-N R-12-E
BRUCE TWP.
MACOMB COUNTY
MICHIGAN
AUGUST 2024
20554.00
ORCHARD HILLS PARK
6303 26 Mile Road Suite 100
Washington Twp, MI 48094 p (586) 781-8950 f (313) 962-5068 www.giffelswebster.com
Know what's below.
before you dig.Call
R
P: (586) 752-6543
WASHINGTON, BRUCE, &
ROMEO PARKS AND
RECREATION
COMMISSION
361 MORTON STREET
ROMEO, MI 48065
https://rwbparksrec.org/
08.22.2024 FOR MACOMB COUNTY PERMITS
08.26.2024 FOR MACOMB COUNTY SESC
PERMIT
08.30.2024 FOR BID
COVER SHEET
N/A
CP-01
ORCHARD
HILLS PARK
1. REFER TO THE GENERAL NOTES FOR ADDITIONAL REQUIREMENTS AND RESPONSIBILITIES.
2. WITH THE EXCEPTION OF EXCAVATED MATERIALS SUFFICIENT FOR BACKFILLING AND CONSTRUCTION OF FILLS AS CALLED FOR ON THE PLANS AND AS INDICATED BELOW, ALL BROKEN CONCRETE, STONE, AND
EXCESS EXCAVATED MATERIALS SHALL BE DISPOSED OF BY THE CONTRACTOR. THE CONTRACTOR WILL BE REQUIRED TO OBTAIN THEIR OWN DISPOSAL GROUND AND WILL RECEIVE NO ADDITIONAL COMPENSATION
FOR DISPOSING OF ANY OF THE EXCESS MATERIALS. MATERIALS ACCEPTABLE TO THE ENGINEER MAY BE DISPOSED OF ON-SITE AT THE CONTRACTOR'S EXPENSE IN A MANNER APPROVED IN ADVANCE BY THE
ENGINEER.
3. THE EDGE OF EXISTING PAVEMENT SHALL BE CLEANED OF EARTH AND OTHER FOREIGN MATERIAL BEFORE ADJACENT POURS ARE PLACED.
4. STREET SIGNS IN THE WAY OF CONSTRUCTION WILL BE REMOVED AND RESET IMMEDIATELY IN A TEMPORARY LOCATION, AS APPROVED BY ENGINEER.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING SIGNS AND POSTS SCHEDULED TO REMAIN, AS DIRECTED BY THE ENGINEER.
6. ALL UNDERGROUND UTILITIES NOT INDICATED FOR REMOVAL SHALL BE PROTECTED THROUGHOUT CONSTRUCTION.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL PRIVATE PROPERTY (INCLUDING BUILDINGS AND FOUNDATIONS) THROUGHOUT CONSTRUCTION AND SHALL MAINTAIN SAFE PEDESTRIAN ACCESS AT
ALL TIMES.
8. THE REMOVAL OF PAVEMENT, CURBS, AND WALKS SHALL INCLUDE ALL REQUIRED SAWCUTTING. CURB REMOVAL IS INCIDENTAL TO PAVEMENT REMOVAL.
1. REFER TO THE GENERAL NOTES FOR ADDITIONAL REQUIREMENTS AND RESPONSIBILITIES.
2. THE PAVING CONTRACTOR SHALL BE REQUIRED TO COORDINATE THE INSTALLATION OF GAS, ELECTRIC, PHONE, CABLE, SPRINKLERS, ETC. IN SUCH A MANNER THAT WILL FACILITATE THEIR PROPER INSTALLATION
PRIOR TO PLACING THE PAVEMENT MATERIALS. ENSURE THAT ALL REQUIRED PIPES, CONDUITS, CABLES, AND SLEEVES ARE PROPERLY PLACED AND THAT THE TRENCHES ARE PROPERLY BACKFILLED AND COMPACTED.
3. BUTT JOINTS SHALL BE PLACED AT ALL LOCATIONS WHERE AN EXISTING ASPHALT PAVEMENT SURFACE IS BEING DISTURBED BY REMOVALS AND/OR THE INSTALLATION OF NEW ASPHALT PAVEMENT.
4. ALL PAVEMENT AREAS SHOULD BE CLEARED AND GRUBBED BY REMOVING SURFACE VEGETATION, TOPSOIL, DEBRIS, AND OTHER DELETERIOUS MATERIALS.
5. THE PLACEMENT OF THE FINAL ASPHALT LIFT SHALL BE DELAYED UNTIL THE MAJORITY OF THE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED, OR AS APPROVED BY THE OWNER. A BOND COAT OF SS-1H
EMULSION SHALL BE APPLIED (AT A RATE OF 0.10 GALLONS/SYD) BETWEEN THE LEVELING AND WEARING COURSE WHEN 48 HOURS HAVE ELAPSED BETWEEN PLACEMENTS.
6. THE FINAL SUBGRADE SHALL BE THOROUGHLY PROOF ROLLED UNDER THE OBSERVATION OF THE SOILS ENGINEER.
7. PROPOSED AGGREGATE BASE SHALL EXTEND BEYOND THE PAVEMENT EDGE/BACK OF CURB BY THE FOLLOWING AMOUNTS OR BY THE AMOUNT STATED BY THE AGENCY HAVING JURISDICTION, WHICHEVER IS
STRICTER:
A. ROADS - 1 FT
B. DRIVES - 0.5 FT
C. PATHS - 0.25 FT
8. ALL TRENCHES WITHIN A ONE-ON-ONE SLOPE OF PAVEMENT SHALL BE BACKFILLED WITH SAND (MDOT CLASS II MINIMUM) AND MECHANICALLY COMPACTED IN NOT MORE THAN 9" LAYER TO 95% MAXIMUM DRY
DENSITY PER MODIFIED PROCTER COMPACTION TEST ASTM D-1557.
9. NO FROZEN MATERIAL SHALL BE PERMITTED AS BACKFILL UNDER ANY ROADWAY, DRIVEWAY, OR PARKING AREA.
10. PRIOR TO THE START OF ANY FILLING, THE CONTRACTOR SHALL REMOVE ALL TOPSOIL AND ALL OTHER UNACCEPTABLE SOIL FROM THE FILL AREAS, AND PROPERLY BACKFILL WITH ACCEPTABLE SOIL.
11. BARRIER-FREE SIGNAGE SHALL BE PLACED IN FRONT OF EVERY DESIGNATED BARRIER FREE STALL. THE CONTRACTOR SHALL COORDINATE STANDARD AND VAN ACCESSIBILITY SIGNAGE AS INDICATED ON THE
PLANS.
12. ALL BARRIER FREE RAMPS TO BE A.D.A. COMPLIANT.
13. GENERAL GRADING REQUIREMENTS ARE AS FOLLOWS:
A. FINISH GRADE AT EXISTING BUILDING SHALL MATCH BRICK LEDGES, DOORWAYS, OR BASEMENT WINDOWS
B. MAINTAIN POSITIVE DRAINAGE AWAY FROM ALL BUILDING (± 2%)
C. SIDEWALK CROSS SLOPE ±2% UNLESS OTHERWISE NOTED (EXCLUDING RAMPS)
D. PAVEMENT SLOPES (1.0% MINIMUM, 4.0% MAXIMUM) UNIFORMLY BETWEEN FINISH GRADE ON PLANS
E. LAWN AREAS ± 1% MINIMUM TO 25% (BERMS) MAXIMUM
14. ALL PROPOSED GRADES ARE AT THE GUTTER UNLESS OTHERWISE NOTED. SEE DETAILS FOR FACE OF CURB, TOP OF CURB, AND ASPHALT ADJUSTMENTS.
15. REFER TO UTILITY PLANS TO COORDINATE ALL:
A. WATER SUPPLY, METERING, SPRINKLER AND FDC PIPING, DESIGN, AND COORDINATION
B. BUILDING SEWER, BUILDING DRAIN DESIGN AND CONNECTIONS TO CLEAN OUTS AND ROOF CONNECTORS
C. GAS, ELECTRIC AND COMMUNICATION SERVICES AND LIGHTING DETAILS AND COORDINATION.
D. ALL BUILDING ACCESS WALKS AND ENTRY DETAILS, INCLUDING SUPPORTED SLABS
E. ALL WORK TO CONSTRUCT THE BUILDING AND ALL ITEMS CONNECTED TO IT
16. PRIOR TO THE PLACEMENT OF ANY BASE ASPHALT OR LEVELING COURSE, THE CURBS SHALL BE PARTIALLY BACKFILLED, AND THE SUBGRADE SHALL BE PROOF ROLLED UNDER THE SUPERVISION OF THE SOILS
ENGINEER.
17. ALL SIDEWALK AND PATHWAYS IN ANY PUBLIC R.O.W. SHALL BE INSPECTED BY THE AGENCY WITH JURISDICTION.
1. REFER TO THE GENERAL NOTES FOR ADDITIONAL REQUIREMENTS AND RESPONSIBILITIES.
2. REFER TO UTILITY PLANS TO COORDINATE ALL:
A. WATER SUPPLY, METERING, SPRINKLER AND FDC PIPING, DESIGN, AND COORDINATION
B. BUILDING SEWER, BUILDING DRAIN DESIGN AND CONNECTIONS TO CLEAN OUTS, AND ROOF CONNECTORS
C. GAS, ELECTRIC AND COMMUNICATION SERVICES, AND LIGHTING DETAILS
D. ALL BUILDING ACCESS WALKS AND ENTRY DETAILS, INCLUDING SUPPORTED SLABS
E. ALL WORK TO CONSTRUCT THE BUILDING AND ALL ITEMS CONNECTED TO IT
3. ALL TRENCHES WITHIN A ONE-ON-ONE SLOPE OF PAVEMENT SHALL BE BACKFILLED WITH SAND (MDOT CLASS II MINIMUM) AND MECHANICALLY COMPACTED IN NOT MORE THAN 9" LAYER TO 95% MAXIMUM DRY
DENSITY PER MODIFIED PROCTER COMPACTION TEST ASTM D-1557. COMPACTED SAND BACKFILL SHALL ALSO BE PROVIDED FOR ALL UTILITY TRENCHES LOCATED UNDER, OR WITHIN, THREE FEET OF PAVEMENT.
4. THE COST OF ALL TREE, STUMP, FOUNDATION, AND/OR STRUCTURE REMOVAL AND DISPOSAL NOT INCLUDED ON THE BID FORM SHALL BE CONSIDERED INCIDENTAL AND INCLUDED IN THE PRICE BID FOR PIPE WORK.
5. A MINIMUM VERTICAL CLEARANCE OF 18 INCHES IS REQUIRED AT UTILITY CROSSINGS (MEASURED FROM THE OUTSIDE OF PIPE TO THE OUTSIDE OF PIPE). POSITIVE PROVISIONS SHALL BE MADE TO ENSURE THAT ALL
UTILITY TRENCHES ARE FREE DRAINING DURING ALL PHASES OF CONSTRUCTION.
6. THE CONTRACTOR SHALL COORDINATE THE REMOVAL OF ALL UTILITY LINES AND STRUCTURES, AS OUTLINED ON THE DEMOLITION PLAN, WITH THE INSTALLATION OF UTILITY IMPROVEMENTS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING GRADE MODIFICATIONS INDICATED ON THE PLANS, AND COORDINATE THE ACTUAL FINISH GRADE OF FIRE HYDRANTS, GATE VALVE CASTINGS, MANHOLES, YARD DRAINS, CLEANOUTS, AND OTHER UTILITY STRUCTURES. ENSURE THAT ALL FINISH GRADING IS PERFORMED IN A MANNER THAT ACCOMPLISHES THE PROJECT DESIGN OBJECTIVES AND PROVIDES FOR POSITIVE
DRAINAGE OF ALL AREAS. ANY SUBSTANTIAL GRADE CHANGES WHICH MAY CAUSE FUNCTIONAL PROBLEMS SHALL BE REPORTED PROMPTLY TO THE ENGINEER WHO SHALL EVALUATE THE CONDITIONS AND PROVIDED
CORRECTIONAL RECOMMENDATIONS TO THE OWNER FOR FINAL DETERMINATION.
8. THE CONTRACTOR SHALL REMOVE UTILITIES, WHICH HAVE BEEN ABANDONED IN PLACE, AS REQUIRED TO COMPLETE INSTALLATION OF NEW UTILITIES. WHENEVER ABANDONED UTILITIES ARE CUT, CONTRACTOR
SHALL COMPLETELY CAP BOTH ENDS TO PREVENT THE INFILTRATION OF SOILS.
9. NO CONNECTION MAY BE MADE TO ANY EXISTING WATER MAIN UNTIL THE NEW MAIN HAS PASSED ALL PRESSURE AND BACTERIOLOGICAL TESTING.
10. ROADWAY, DRIVEWAY, AND PARKING AREA CROSSINGS SHALL BE TEMPORARILY CONDITIONED IMMEDIATELY AFTER CROSSING BY PLACING 8" OF MDOT 22A GRAVEL OR SLAG AGGREGATE AND SHALL BE
MAINTAINED IN GOOD, DUST-FREE CONDITION UNTIL PAVEMENT RESTORATION IS MADE.
11. ADEQUATE RESTRAINT MUST BE PROVIDED AT CONNECTIONS TO APPURTENANCES OR TRANSITIONS TO DIFFERENT PIPE MATERIALS USING A MECHANICAL JOINT ADAPTER WITH STAINLESS STEEL STIFFENER OR
APPROVED EQUAL.
12. ALL DIRECTIONAL DRILLED WATER MAIN PIPE SHALL INCLUDE TRACER WIRE NO. 8 INSULATED COPPER WIRE AS DETAILED IN SECTION 33 05 07.13 OF THE PROJECT MANUAL.
13. MAXIMUM PIPE DEFLECTION IS ASSUMED 1° FOR PVC AND 3° FOR DI. INSTALL ADDITIONAL BENDS AS NEEDED (INCIDENTAL).
STORM SEWER
SANITARY SEWER
WATER MAIN
GAS MAIN
UNDERGROUND ELECTRIC LINES
UNDERGROUND TELEPHONE LINES
UNDERGROUND CABLE TELEVISION LINES
OVERHEAD LINES
PUBLIC LIGHTING LINES
STEAM LINES
FENCE LINE
PROJECT PHASE LIMIT LINE
CONCRETE CURB AND GUTTER (STANDARD)
CONCRETE CURB AND GUTTER (REVERSED)
THICKENED SLAB CURB/WALK
STORM MANHOLE
CATCH BASIN
YARD BASIN
INLET BASIN
END SECTION
ROOF/DOWN SPOUT
OVERFLOW/OUTLET STRUCTURE
STORM CLEAN OUT
SANITARY MANHOLE
SANITARY CLEAN OUT
SANITARY RISER
SANITARY PUMP STATION
150.23
EXISTING PROPOSED
GATE VALVE
FIRE HYDRANT
STOP BOX AND VALVE
FDC CONNECTION
WATER METER
POST INDICATOR VALVE
WELL HEAD
IRRIGATION CONTROL BOX
LAWN IRRIGATION HEAD
GAS VALVE
GAS MANHOLE
GAS RISER
GAS METER
ELECTRIC MANHOLE
ELECTRIC RISER
ELECTRIC METER
ELECTRIC TRANSFORMER
LIGHT POLE
TELEPHONE MANHOLE
TELEPHONE RISER
TELEPHONE CROSS BOX
CABLE RISER
TRAFFIC CONTROL BOX
AIR CONDITIONER
PUBLIC LIGHTING MANHOLE
UTILITY POLE
GUY WIRE ANCHOR
UTILITY FLAG
SIGN POST
GUARD POST/BOLLARD
FENCE POST
PAY PHONE
PARKING METER
RESIDENTIAL MAILBOX
U.S. MAILBOX
BLDG CORNER (FIELD LOCATED)
TREE
WETLAND FLAG
SPOT ELEVATION
SOIL BORING
ASPH.
CONC.
A.C.
G.P.
C.L.F.
D.L.
F.F.
O.H.
F.I.
S.I.
F.I.P.
M. R.
F.M.
S.N.
1. ALL DAMAGE DONE TO THE EXISTING PAVEMENT DURING CONSTRUCTION MUST BE REMOVED AND REPLACED PER MCDR STANDARDS AND AT THE TOWNSHIP'S/CONTRACTOR'S EXPENSE. IT SHALL BE DONE AT THE
DIRECTION OF THE MCDR'S INSPECTIONS SUPERVISOR AND DISTRICT INSPECTOR.
2. WORK WITHIN THE ROAD RIGHT-OF-WAYS SHALL BE SUBJECT TO THE REVIEW, APPROVAL, AND INSPECTION OF MACOMB COUNTY DEPARTMENT OF ROADS ANY OTHER PUBLIC AGENCY HAVING JURISDICTION.
3. SEE MCDR DETAIL SHEETS FOR ALL PAVEMENT SECTION DETAILS WITHIN THE ROAD RIGHT-OF-WAY.
4. ALL UTILITIES CROSSING THE DRIVEWAY AREAS MUST BE BACKFILLED WITH COMPACTED SAND BACKFILL IN MAX 9" LIFTS TO 95% PROCTOR.
5. ALL EXISTING STORM CULVERT AND END SECTIONS SCHEDULED FOR REPLACEMENT SHALL BE OF EQUAL SIZE AND MATERIAL. PIPES AND CULVERTS MUST BE SET AT ELEVATIONS TO MAINTAIN POSITIVE DRAINAGE
AND IN ACCORDANCE WITH THE MACOMB COUNTY DEPARTMENT OF ROAD STANDARDS AND SPECIFICATIONS.
6. ALL DITCHING MUST BE RESTORED TO ITS ORIGINAL CONDITION AND MAINTAIN POSITIVE DRAINAGE, SEE FIGURE 4-5 IN THE MCDR SUBDIVISION DEVELOPMENT PROCEDURES, STANDARD & SPECIFICATIONS.
7. THE CONSTRUCTION OF A PAVED RESIDENTIAL APPROACH ON ALL PRIMARY AND LOCAL ROAD SYSTEMS SHALL CONSIST OF A MINIMUM OF 6" OF CONCRETE PLACED ON A SAND SURFACE (MDOT CLASS II SAND
MINIMUM) OF 4" OR A MINIMUM OF 4" OF ASPHALT PLACED ON 6" OF 21AA AGGREGATE BASE COMPACTED TO 95% MAXIMUM DENSITY.
TREE, REM
ASPHALT
CONCRETE
AIR CONDITIONER
GUARD POST
CHAIN-LINK FENCE
DOOR LEDGE
FINISHED FLOOR
OVERHANG
FOUND IRON
SET IRON
FOUND IRON PIPE
MEASURED RECORD
FOUND MONUMENT
SET NAIL
x.xx acDRAINAGE AREA
SEDIMENT INLET FILTER
MUD MAT ENTRANCE
CHECK DAM
SEDIMENT CONTROL FENCE
DRAINAGE AREA LINE
PICKLEBALL COURT HMA
SIDEWALK, CONC, 4 INCH
COMPACTED CL II SAND BACKFILL
1. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT STANDARDS, SPECIFICATIONS, AND GENERAL CONDITIONS OF THE CHARTER TOWNSHIP OF WASHINGTON, AND ANY/OR OTHER
AGENCIES HAVING JURISDICTION.
2. UTILITY INFORMATION SHOWN ON THESE PLANS WAS OBTAINED FROM UTILITY OWNERS AND THEREFORE MAY NOT BE ACCURATE OR COMPLETE. THE CONTRACTOR SHALL VERIFY AND OBTAIN ANY INFORMATION
NECESSARY REGARDING THE PRESENCE OF UNDERGROUND UTILITIES WHICH MIGHT HAVE AN IMPACT ON THIS PROJECT AND SHALL BE RESPONSIBLE FOR ANY DAMAGE TO ANY PUBLIC OR PRIVATE UTILITIES
WHETHER THEY ARE SHOWN OR NOT ON THE PLANS.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AT PROPOSED CONNECTIONS AND/OR CROSSINGS, AND TO NOTIFY THE ENGINEER OF ANY
DISCREPANCIES TO THESE PLANS.
4. 72 HOURS PRIOR TO EXCAVATION, THE CONTRACTOR SHALL CONTACT MISS DIG AT (800) 482-7171 FOR THE LOCATION OF UNDERGROUND GAS AND CABLE FACILITIES AND SHALL ALSO NOTIFY REPRESENTATIVES OF
OTHER UTILITIES LOCATED IN THE VICINITY OF THE WORK.
5. ALL PERMITS REQUIRED SHALL BE OBTAINED BY THE CONTRACTOR. ALL PERMIT FEES, BONDS, AND INSURANCE REQUIRED BY THE ISSUING AGENCIES SHALL BE PROVIDED BY THE CONTRACTOR AND MUST BE KEPT
CURRENT. THE CONTRACTOR IS RESPONSIBLE FOR ALL OTHER FEES, INSPECTION COSTS, ETC., AND SHALL ADHERE TO ALL REQUIREMENTS SET FORTH IN SAID PERMITS.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL WORK AREAS TO ENSURE THE SAFETY OF ALL OCCUPANTS, VISITORS, PEDESTRIANS, WORKERS, ETC. THE CONTRACTOR SHALL REPAIR AND MAINTAIN
ALL CONSTRUCTION FENCING AS NECESSARY.
7. THE CONTRACTOR SHALL PROVIDE FOR CONTROLLED ACCESS TO THE SITE FOR USE BY THE VARIOUS WORK FORCES, EMERGENCY VEHICLES, OCCUPANTS, VISITORS, ETC. THROUGHOUT CONSTRUCTION. THIS
ACCESS MUST PROVIDE FOR THE REMOVAL OF MUD FROM VEHICLES TIRES. ROADWAYS AND DRIVEWAYS SHALL BE MAINTAINED AND OPEN FOR EMERGENCY VEHICLES AT ALL TIMES. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO NOTIFY THE RESIDENTS AND BUSINESSES WHOSE DRIVEWAYS ARE AFFECTED BY THEIR SCHEDULE 24 HOURS IN ADVANCE. CONTRACTOR SHALL SCHEDULE CONSTRUCTION AT NON-PEAK USE
HOURS AND SHALL MINIMIZE DRIVEWAY CLOSURE BY EXPEDITING CONSTRUCTION.
8. THE CONTRACTOR SHALL PROVIDE NECESSARY SIGNS, BARRICADES, AND LIGHTS TO PROTECT THE TRAFFIC AND THE WORK AS DIRECTED BY THE PLANS AND BY THE MACOMB COUNTY DEPARTMENT OF ROADS. ALL
TRAFFIC CONTROLS SHALL BE IN ACCORDANCE WITH THE MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD).
9. THE CONTRACTOR IS REQUIRED TO CONFINE CONSTRUCTION ACTIVITIES TO THE LIMITS OF THE SITE AS SHOWN ON THE CONSTRUCTION PLANS. ANY DAMAGE OR DISRUPTION TO ADJACENT SITES IS THE
RESPONSIBILITY OF THE CONTRACTOR TO CORRECT IMMEDIATELY. NO OFF-SITE WORK SHALL BE PERFORMED OUTSIDE OF PUBLIC RIGHTS-OF-WAY OR DEDICATED EASEMENTS WITHOUT PRIOR WRITTEN APPROVAL OF
THE PROPERTY OWNER.
10. GREAT CARE SHALL BE TAKEN TO AVOID DAMAGE TO VEGETATION OUTSIDE THE CLEARING AND GRUBBING LIMITS. NO DRIVING OR PARKING OF VEHICLES AND/OR STORAGE OF MATERIALS AND SUPPLIES SHALL BE
PERMITTED OUTSIDE THE LIMITS OF CONSTRUCTION.
11. ALL ELEVATIONS ON THESE PLANS ARE ON THE NAVD88 DATUM.
12. THE PROTECTION OF EXISTING TREES, AS REQUIRED, SHALL BE SOLELY THE CONTRACTOR'S RESPONSIBILITY.
13. ALL CONSTRUCTION SHALL HAVE INSPECTION PROVIDED BY THE CHARTER TOWNSHIP OF WASHINGTON. THE CONTRACTOR SHALL CONTACT THE TOWNSHIP 48 HOURS BEFORE THE START OF CONSTRUCTION.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL AND SHALL PROVIDE ALL NECESSARY MATERIAL AND EQUIPMENT TO KEEP DUST IN CHECK AT ALL TIMES. THE CONTRACTOR SHALL RESPOND
IMMEDIATELY TO ANY AND ALL COMPLAINTS. DUST CONTROL SHALL BE INCIDENTAL TO THE PROJECT.
15. DURING CONSTRUCTION, THE CONTRACTOR MAY ENCOUNTER SPRINKLER HEADS, PIPING, LIGHTING, AND BURIED ELECTRICAL CABLE, MAILBOXES, FENCES, SIGNS, ETC., THAT MAY OR MAY NOT BE INDICATED ON
THESE PLANS. THE CONTRACTOR SHALL REPLACE AND/OR RESTORE ALL COMPONENTS OF SUCH SYSTEMS. ALL DISTURBED AREAS SHALL BE RESTORED TO THEIR ORIGINAL CONDITION, MINIMUM STANDARD
REQUIREMENTS, OR AS SPECIFIED HEREIN; WHICHEVER IS MORE STRINGENT.
16. ROADWAY, DRIVEWAY, AND PARKING AREA FINAL RESTORATION SHALL BE PERFORMED WITH SURFACE AND BASE MATERIALS MATCHING EITHER THE EXISTING MATERIALS IN QUALITY AND THICKNESS, PER MINIMUM
REQUIREMENTS, OR PER THE FOLLOWING, WHICHEVER IS MORE STRINGENT:
A. ASPHALT
1. ROADS - 8” MDOT 5/4/2E3 ASPHALT-21AA BASE
2. DRIVES - 4” MDOT 1100 ASPHALT-21AA BASE
3. PATHS - 4” MDOT 1100 ASPHALT -22A BASE
B. CONCRETE
1. ROADS - 6” 3500 PSI CONCRETE-21AA BASE
2. DRIVES - 6” 3500 PSI CONCRETE-21AA BASE
3. PATHS - 4” 3500 PSI CONCRETE-CL II BASE
C. GRAVEL
1. ROADS - 12" MDOT 22A GRAVEL
2. DRIVES - 12” MDOT 21AA GRAVEL
17. ALL LOT MARKERS AND MONUMENT POINTS DISTURBED DURING CONSTRUCTION SHALL BE REPLACED BY A REGISTERED LAND SURVEYOR AT THE EXPENSE OF THE CONTRACTOR.
18. FINAL CLEANUP AND RESTORATION SHALL CONSIST OF FINE GRADING OF CONSTRUCTION AREAS, REMOVAL OF CONSTRUCTION SIGNS, ETC. TOPSOIL SHALL BE SPREAD OVER ALL DISTURBED AREAS, FOLLOWED BY
SEED, FERTILIZER AND EROSION MAT OR STRAW MULCH, OR AS FURTHER REQUIRED BY THE CONTRACT DOCUMENTS. ALL REQUIRED RESTORATION ITEMS NOT SPECIFICALLY IDENTIFIED AS A PAY ITEM SHALL BE
CONSIDERED INCIDENTAL TO THE CONTRACT.
19. THE UTILITY POLES SHOWN ON THESE DRAWINGS ARE INTENDED TO SHOW ONLY THE LOCATION OF EXISTING POLES. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE QUANTITY AND DIRECTION OF
OVERHEAD LINES. THE COST FOR SUPPORTING AND RELOCATING POLES SHALL BE INCIDENTAL TO THE PROJECT.
20. THE MEANS AND METHODS OF CONTROLLING GROUNDWATER AND DEWATERING ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL COST ASSOCIATED WITH DEWATERING SHALL BE INCIDENTAL TO THE
CONTRACT.
GENERAL NOTES
DEMOLITION NOTES
UTILITY NOTES
PAVING AND GRADING NOTES
MACOMB COUNTY DEPARTMENT OF ROADS
GENERAL LEGEND DEMOLITION LEGEND
PAVING AND GRADING HATCH LEGEND
EROSION CONTROL LEGENDEXISTING EXISTINGPROPOSED PROPOSED
LEGEND - EXISTING
GROUND LIGHT
REINFORCED CONCRETE
PIPE
CORREGATED METAL PIPE
SURVEY CONTROL POINT
FINISHED FLOOR
SET NAIL
FOUND MONUMENT
OVERHANG
CHAIN-LINK FENCE
DOOR LEDGE
GUARD POST
FOUND IRON PIPE
MEASURED
RECORD
AIR CONDITIONER
FOUND IRON
CONCRETE
ASPHALT
SET IRON
MISC. TOPO. SHOT
FOUND MON.
FOUND PIPE
BENCHMARK
FENCE POST
SECTION COR.
F. CUT CROSS
FOUND NAIL
FOUND IRON
DEAD TREE
PROT. POST/GUARD POST
BLDG. CORNER (FIELD LOCATED)
EXISTING ELEVATION
HANDICAP PARKING
CONIFEROUS TREE
DECIDUOUS TREE
MANHOLE
CENTERLINE R.R. TRACK
PAY PHONE
MONITORING WELL
LAWN IRRIG. HEAD
SOIL BORING
RESIDENTIAL MAILBOX
U.S. MAILBOX
PARKING METER
BUSH/SHRUB
WETLAND FLAG
UTILITY FLAG
GUY
SIGN
CABLE RISER
TELE. MH
TELE. CROSS BOX
TELE. RISER
GAS MH
GAS VALVE
GAS RISER
GAS METER
STEAM MH
COMB. MH
POST INDICATOR VALVE
STORM CLEAN OUT
ROUND CB
TRAFFIC CONTROL BOX
IRRIGATION CONTROL BOX
FDC CONNECTION
ELEC. RISER
ELEC. METER
ELEC. MH
AIR CONDITIONER
ELEC. TRANS.
UTILITY POLE
LIGHT POLE
OVERFLOW/OUTLET STRUCTURE
ROOF/DOWN SPOUT
CULVERT E.S.
BEEHIVE CB
CATCH BASIN
STORM MH
WELL HEAD
WATER METER
WATER VALVE
HYDRANT
GATE VALVE
SAN. PUMP STATION
SAN. RISER
SAN. CLEAN OUT
SAN. MH
WALL
CL DITCH/STREAM
TELEPHONE OVERHEAD
ELECTRIC OVERHEAD
SECTION LINE
TREE LINE
SHRUB LINE
CURB
MISC. LINE
STEAM LINE
PAINT STRIPE
UG CABLE TV LINE
PLD LINE
UG TELE. LINE
UG ELEC. LINE
COMBINED SEWER
OVERHANG LINE
RAILING
E/ BRICK
WATER LINE
SAN. LINE
STORM LINE
GAS LINE
WETLAND LINE
WATER EDGE
B/ BANK
T/ BANK
OVERHEAD WIRES
BLDG. LINE
GUARD RAIL
FENCE
RAILROAD
E/ WALK
CL ROAD
E/ GRAVEL
E/ PAVEMENT
PUBLIC LIGHTING MH
EX PARCEL LINE
EX ROW
Z:
\20
4.0
0 O rch ar d H ills P ar k\D es ign
\C
AD
\W or k S he ets \C
P-
G en er al
No tes
Le ge nd
.dw g
Copyright © 2024 Giffels Webster.
No reproduction shall be made without the prior written consent of Giffels Webster.
Developed For:
Engineers Surveyors Planners
Landscape Architects
Executive:
Manager:
Designer:
Quality Control:
Section:
Project:
Sheet:
Scale:
Date:
ISSUE:DATE:
Professional Seal:
M.K.
B.K.
B.D.M.
B.K. / M.K.
T-05-N R-12-E
BRUCE TWP.
MACOMB COUNTY
MICHIGAN
AUGUST 2024
20554.00
ORCHARD HILLS PARK
6303 26 Mile Road Suite 100
Washington Twp, MI 48094 p (586) 781-8950 f (313) 962-5068 www.giffelswebster.com
Know what's below.
before you dig.Call
R
P: (586) 752-6543
WASHINGTON, BRUCE, &
ROMEO PARKS AND
RECREATION
COMMISSION
361 MORTON STREET
ROMEO, MI 48065
https://rwbparksrec.org/
08.22.2024 FOR MACOMB COUNTY PERMITS
08.26.2024 FOR MACOMB COUNTY SESC
PERMIT
08.30.2024 FOR BID
GENERAL NOTES &
LEGEND
N/A
CP-02
0 80
808 807
802803
810 809
3 801
40'20'
SCALE: 1" = 20'
STRUCTURE TYPE SIZE OF PIPE RIM DROP INVERT DIRECTION COMMENTS
42 BEEHIVE CB
18" 799.01 -1.96 797.05 NORTH TO END SECTION
12" 799.01 -2.40 796.61 SOUTH-SOUTHEAST
T/DEBRIS 799.01 -3.10 795.91
T/WATER 799.01 -1.50 797.51
Z:
\20
4.0
0 O rch ar d H ills P ar k\D es ign
\C
AD
\W or k S he ets \C
P-
E xis tin g C on dit ion s.d wg
Copyright © 2024 Giffels Webster.
No reproduction shall be made without the prior written consent of Giffels Webster.
Developed For:
Engineers Surveyors Planners
Landscape Architects
Executive:
Manager:
Designer:
Quality Control:
Section:
Project:
Sheet:
Scale:
Date:
ISSUE:DATE:
Professional Seal:
M.K.
B.K.
B.D.M.
B.K. / M.K.
T-05-N R-12-E
BRUCE TWP.
MACOMB COUNTY
MICHIGAN
AUGUST 2024
20554.00
ORCHARD HILLS PARK
6303 26 Mile Road Suite 100
Washington Twp, MI 48094 p (586) 781-8950 f (313) 962-5068 www.giffelswebster.com
Know what's below.
before you dig.Call
R
P: (586) 752-6543
WASHINGTON, BRUCE, &
ROMEO PARKS AND
RECREATION
COMMISSION
361 MORTON STREET
ROMEO, MI 48065
https://rwbparksrec.org/
08.22.2024 FOR MACOMB COUNTY PERMITS
08.26.2024 FOR MACOMB COUNTY SESC
PERMIT
08.30.2024 FOR BID
EXISTING
CONDITIONS
1" = 20'
CP-03
0 80
808 807
802803
810 809
3 801
803.70 GU
803.75 T/C
803.11 GU
803.23 T/C
803.52 M
803.90 M
802.84 M
803.76 FG
803.80 FG
803.83 FG
803.87 M 803.03 M 802.48 M
802.48 M802.45 M
802.40 FG 801
0+00 0+45
PROPOSED 24" CULVERT
WITH END SECTIONS
PROPOSED
GRADING LIMITS
SILT FENCE
61 LF
SILT FENCE
21 LF
RIPRAP, PLAIN
21 SY
RIPRAP, PLAIN
6 SY
CULV, REM, 24
INCH TO 48 INCH
40 LF
45' - 24" MDOT CL F CMP
@ 3.97%
ES
24" INV: 800.63 E
ES
24" INV: 798.84 W
VALLEY GUTTER, CONC
34 LF
SEE DETAIL THIS SHEET
HORIZ: 1" = 20'
VERT: 1" = 5'
-0 +5
0+
0+
1+
45' - 24" MDOT CL F CMP @ 3.97%
EXISTING GRADE AT
CULVERT CENTERLINE
PROPOSED
GRADE AT
CULVERT
CENTERLINE
PROPOSED CULVERT
IE
0.6 3 E
IE
8.8 4 W
ES
" E
ND
S
EC
TI
ON
ES
" E
ND
S
EC
TI
ON
Z:
\20
4.0
0 O rch ar d H ills P ar k\D es ign
\C
AD
\W or k S he ets \C
P-
Im pr ov em en ts
Pl an
.dw g
Copyright © 2024 Giffels Webster.
No reproduction shall be made without the prior written consent of Giffels Webster.
Developed For:
Engineers Surveyors Planners
Landscape Architects
Executive:
Manager:
Designer:
Quality Control:
Section:
Project:
Sheet:
Scale:
Date:
ISSUE:DATE:
Professional Seal:
M.K.
B.K.
B.D.M.
B.K. / M.K.
T-05-N R-12-E
BRUCE TWP.
MACOMB COUNTY
MICHIGAN
AUGUST 2024
20554.00
ORCHARD HILLS PARK
6303 26 Mile Road Suite 100
Washington Twp, MI 48094 p (586) 781-8950 f (313) 962-5068 www.giffelswebster.com
Know what's below.
before you dig.Call
R
P: (586) 752-6543
WASHINGTON, BRUCE, &
ROMEO PARKS AND
RECREATION
COMMISSION
361 MORTON STREET
ROMEO, MI 48065
https://rwbparksrec.org/
08.22.2024 FOR MACOMB COUNTY PERMITS
08.26.2024 FOR MACOMB COUNTY SESC
PERMIT
08.30.2024 FOR BID
IMPROVEMENTS
PLAN
1" = 20'
CP-04
40'20'
SCALE: 1" = 20'
QUANTITIES
ITEM DESCRIPTION QUANTITY
SILT FENCE 82 LF
CULV, REM, 24 INCH TO 48 INCH 40 LF
CULV, MDOT CL F CMP, 24 INCH 45 LF
CULV, END SECTION, CMP, 24 INCH 2 EA
AGGREGATE BASE, 6 INCH, 21AA 18 SY
VALLEY GUTTER, CONC 34 LF
GRADING FOR DRAINAGE 1 LS
RIPRAP, PLAIN 27 SY
GEOTEXTILE, SEPARATOR 27 SY
NOTES:
1. EXISTING 40' OF 24" DIAMETER CULVERT INCLUDING STRUCTURES TO BE
COMPLETELY REMOVED (CULV, REM, 24 INCH TO 48 INCH) AND REPLACED WITH
45' OF NEW CULVERT (CULV, MDOT CL F CMP, 24 INCH) WITH TWO END SECTIONS
(CULV, END SECTION, CMP, 24 INCH).
2. CULV, MDOT CL F CMP, 24 INCH SHALL INCLUDE ALL REQUIRED CL II SAND
BACKFILL.
3. AGGREGATE BASE, 6 INCH 21AA IS INTENDED TO BE USED TO REPLACE THE
AGGREGATE REMOVED FOR REPLACEMENT OF THE EXISTING CULVERT.
4. GRADING FOR DRAINAGE INCLUDES ALL GRADING TO MEET PROPOSED GRADES.
IT IS NOT EXPECTED THAT ANY NEW FILL WILL BE REQUIRED. ALL CUT MATERIAL
TO BE DISPOSED OF OFFSITE.
5. GEOTEXTILE FABRIC (GEOTEXTILE, SEPARATOR) TO BE PLACED UNDER
PROPOSED RIP RAP (RIPRAP, PLAIN).
SOIL EROSION &
SEDIMENTATION
CONTROL NOTES
AND DETAILS
FRONT VIEW
SECTION A SECTION B
TOP VIEW
PLAN VIEW
SEDIMENT CONTROL FENCING
TOTAL PROJECT DISTURBED AREA 0.07 ACRES +/-
PARCEL INFORMATION
PROJECT START DATE:
PROJECT COMPLETION DATE:
TIMING REQUIREMENTS
CONTACT FOR ALL TEMPORARY AND
PERMANENT EROSION CONTROL
MEASURES
SOIL TYPE ON SITE
NOTES
NOTE:
CONSTRUCTION ACCESS IS FROM EXISTING 33 MILE RD.
WATERCOURSE
DUST CONTROL PROVISIONS
ADDITIONAL EROSION CONTROL NOTES
1. SOIL EROSION CONTROL PRACTICES WILL BE ESTABLISHED IN EARLY STAGES OF CONSTRUCTION BY CONTRACTOR. SEDIMENTATION CONTROL PRACTICES WILL BE APPLIED AS A PERIMETER DEFENSE AGAINST ANY TRANSPORTING OF DIRT OUT OF THE WORK AREA.
2. CONTRACTOR SHALL PRESERVE NATURAL VEGETATION AS MUCH AS POSSIBLE.
3. PROTECT ALL EXISTING TREES, INCLUDING THEIR BRANCHES AND ROOTS, FROM DAMAGE DUE TO THIS WORK UNLESS SPECIFICALLY IDENTIFIED FOR REMOVAL.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING COMPLIANCE WITH ALL APPLICABLE NPDES REGULATIONS, INCLUDING INSPECTION, RESTORATION, AND RECORD KEEPING REQUIREMENTS.
5. CONSTRUCTION ACTIVITIES (INCLUDING INSTALLATION OF PIPE, ASSOCIATED VALVES, STRUCTURES, BACKFILLING, SURFACE RESTORATION, AND REMOVAL OF EXCESS EXCAVATED MATERIAL) SHALL BE ACCOMPLISHED IN ONE CONTINUOUS OPERATION.
6. IF PERMANENT STABILIZATION CANNOT BE PROVIDED WITHIN 15 DAYS OF THE COMPLETION OF PIPE LAYING OPERATIONS, TEMPORARY STABILIZATION SHALL BE PROVIDED AT ALL DISTURBED AREAS. TEMPORARY STABILIZATION SHALL FURTHERMORE BE PROVIDED
DURING THE NON-GROWING SEASON (OCTOBER 1 THROUGH APRIL 20) FOR ALL AREAS TO BE SEEDED.
7. TEMPORARY STABILIZATION SHALL CONSIST OF EITHER SMALL GRAIN STRAW OR GRASS HAY SPREAD AT THE RATE OF 1.5 TO 2 TONS PER ACRE, OR MULCH BLANKETS, WHICH SHALL BE ANCHORED IN PLACE TO PREVENT DISPLACEMENT FROM WIND AND RAIN.
TEMPORARY STABILIZATION SHALL BE REPAIRED AS OFTEN AS NECESSARY, AS DETERMINED BY THE AGENCY WITH JURISDICTION.
MACOMB COUNTY SOIL EROSION AND SEDIMENTATION CONTROL NOTES
1. REFER TO GENERAL NOTES ON SHEET CP-02 FOR ADDITIONAL REQUIREMENTS AND RESPONSIBILITIES.
2. PROJECT SHALL BE CONSTRUCTED IN COMPLIANCE WITH PART 91 OF ACT 451 OF 1994, AS AMENDED, THE SOIL EROSION AND SEDIMENTATION CONTROL ACT, AND THE MACOMB COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE.
3. ALL EROSION AND SEDIMENTATION CONTROL WORK SHALL CONFORM TO THE STANDARDS AND SPECIFICATIONS OF THE MACOMB COUNTY PUBLIC WORKS OFFICE.
4. EROSION AND ANY SEDIMENTATION FROM WORK ON THIS SITE SHALL BE CONTAINED ON-SITE AND NOT ALLOWED TO COLLECT ON ANY OFF-SITE AREAS OR IN WATERWAYS. WATERWAYS INCLUDE BOTH NATURAL AND MANMADE OPEN DITCHES, STREAMS, STORM
DRAINS, LAKES, AND PONDS.
5. STAGING THE WORK WILL BE DONE BY THE CONTRACTOR AS DIRECTED IN THESE PLANS AND AS REQUIRED TO ENSURE PROGRESSIVE STABILIZATION OF DISTURBED EARTH CHANGE.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SOIL EROSION AND SEDIMENTATION CONTROL DEVICES. ANY MODIFICATIONS OR ADDITIONS TO SOIL EROSION CONTROL MEASURES DUE TO CONSTRUCTION OR CHANGED CONDITIONS
SHALL BE COMPLIED WITH AS REQUIRED OR DIRECTED BY THE MACOMB COUNTY PUBLIC WORKS OFFICE.
7. IF ANY SESC MEASURES ON THE SITE ARE DEEMED INADEQUATE OR INEFFECTIVE, THE MACOMB COUNTY PUBLIC WORKS OFFICE SESC DIVISION HAS THE RIGHT TO REQUIRE ADDITIONAL SESC MEASURES AT THE EXPENSE OF THE CONTRACTOR.
8. CONTRACTOR SHALL INSTALL A CRUSHED CONCRETE ACCESS DRIVE PLACED ON GEOTEXTILE FABRIC AS INDICATED ON THE PLAN. THE ACCESS DRIVE MUST BE A MINIMUM OF 30'X20'X8”.
A. NEW LAYERS OF CRUSHED CONCRETE WILL BE ADDED AS OLD LAYERS BECOME COMPACTED.
9. CONTRACTOR SHALL INSTALL SILT FENCE AS INDICATED ON THE PLAN AND AT ADDITIONAL AREAS AS NECESSARY.
A. SILT FENCE SHALL BE INSTALLED PER DETAIL ON SHEET THIS SHEET.
B. BUILDUP OF SEDIMENT SHALL BE REMOVED WHEN SEDIMENT ACCUMULATES TO 1/3 TO 1/2 OF THE HEIGHT OF THE SILT FENCE.
C. IF SILT FENCE FABRIC DECOMPOSES OR BECOMES INEFFECTIVE PRIOR TO THE END OF EXPECTED USABLE LIFE AND THE BARRIER IS STILL REQUIRED, THE SILT FENCE SHALL BE REPLACED PROMPTLY.
D. SILT FENCE SHALL IN INSPECTED WEEKLY UNDER NORMAL CONDITIONS, WITHIN 24 HOURS OF RAINFALL AND DAILY DURING A PROLONGED RAIN EVENT. REQUIRED MAINTENANCE SHALL BE PROVIDED PROMPTLY.
10. CONTRACTOR SHALL INSTALL INLET FILTER ON ALL PAVEMENT CATCH BASINS PER DETAIL ON SHEET THIS SHEET.
A. INLET FILTERS SHALL BE INSPECTED WEEKLY UNDER NORMAL CONDITIONS, WITHIN 24 HOURS OF A RAINFALL, AND DAILY DURING A PROLONGED RAIN EVENT.
B. BUILDUP OF SEDIMENT AND DEBRIS SHALL BE REMOVED PROMPTLY.
C. IF FABRIC DECOMPOSES OR BECOMES INEFFECTIVE PRIOR TO THE END OF EXPECTED USABLE LIFE AND THE BARRIER IS STILL REQUIRED, THE FABRIC SHALL BE REPLACED PROMPTLY.
11. CONTRACTOR SHALL INSTALL DRAIN GUARD ON ALL CATCH BASINS PER DETAIL ON SHEET THIS SHEET, SEED OR SOD THE AREA BETWEEN THE SILT FENCE AND THE INLET.
A. DRAIN GUARDS SHALL BE INSPECTED WEEKLY UNDER NORMAL CONDITIONS, WITHIN 24 HOURS OF RAINFALL, AND DURING A PROLONGED RAIN EVENT.
B. BUILDUP OF SEDIMENT SHALL BE REMOVED WHEN SEDIMENT ACCUMULATES TO 1/3 TO 1/2 OF THE HEIGHT OF THE SILT FENCE.
C. IF FABRIC DECOMPOSES OR BECOME INEFFECTIVE PRIOR TO THE END OF EXPECTED USABLE LIFE AND THE BARRIER IS STILL REQUIRED, THE FABRIC SHALL BE REPLACED PROMPTLY.
12. INLET SEDIMENT TRAPS AND ALL DITCH SEDIMENT TRAPS SHALL BE INSPECTED DAILY. SEDIMENT PITS SHALL BE CLEANED OUT WHEN HALF FULL, OR AS DIRECTED BY THE MACOMB COUNTY PUBLIC WORKS OFFICE.
13. UTILITIES AND PUMP STATION
A. THE ROAD RIGHT-OF-WAY MUST BE SEEDED AND MULCHED WITHIN 5 DAYS AFTER UTILITIES HAVE BEEN INSTALLED. IF THIS IS NOT POSSIBLE, ALL SESC MEASURES MUST STAY IN PLACE AND MUST BE MAINTAINED UNTIL PERMANENT STABILIZATION IS COMPLETED.
14. ALL STOCKPILED SOILS SHALL BE MAINTAINED IN SUCH A WAY AS TO PREVENT SEDIMENT FROM LEAVING THE SITE. IF THE STOCKPILE WILL BE ON-SITE FOR MORE THAN 30 DAYS, THEN THE STOCKPILE MUST BE SEEDED. SILT FENCE MUST BE INSTALLED AROUND THE
PERIMETER OF THE STOCKPILE. IMMEDIATELY AFTER SEEDING, MULCH ALL SEEDED AREAS WITH UNWEATHERED SMALL GRAIN STRAW, SPREAD UNIFORMLY AT THE RATE OF 1 TO 2 TONS PER ACRE OR 100 POUNDS (2-3 BALES) PER 1,000 SQUARE FEET. THIS MULCH
SHOULD BE ANCHORED WITH DISC TYPE MULCH ANCHORING TOOL OR OTHER MEANS AS APPROVED BY THE MACOMB COUNTY PUBLIC WORKS OFFICE. MULCH MATTING MAY BE USED IN LIEU OF LOOSE MULCH.
15. IF ANY DEWATERING IS NEEDED, IT SHALL BE DISCHARGED THROUGH A FILTER BAG OVER A WELL-VEGETATED AREA. THE PUMP MUST DISCHARGE AT A NON-EROSIVE VELOCITY. IF NECESSARY, AN APPROVED ENERGY DISSIPATER MAY BE USED.
16. ALL DIRT TRACKED ONTO ANY ROADWAY SHALL BE REMOVED IMMEDIATELY.
17. STREETS AND OR PARKING AREAS SHALL BE SCRAPED DAILY AND SWEPT AT A MINIMUM OF ONCE PER WEEK BY CONTRACTOR.
18. DURING DRY PERIODS, ALL DISTURBED AREAS SHALL BE WATERED FOR DUST CONTROL.
19. PERMANENT SOIL EROSION CONTROL MEASURES FOR ALL SLOPES, CHANNELS, DITCHES, OR ANY DISTURBED LAND AREA SHALL BE COMPLETED WITHIN 5 CALENDAR DAYS AFTER FINAL GRADING OR THE FINAL EARTH CHANGE HAS BEEN COMPLETED. WHEN IT IS NOT
POSSIBLE TO PERMANENTLY STABILIZE A DISTURBED AREA AFTER EARTH CHANGE ACTIVITY CEASES, TEMPORARILY SOIL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED IMMEDIATELY. ALL TEMPORARY SOIL EROSION CONTROL SHALL BE MAINTAINED UNTIL
PERMANENT SOIL EROSION CONTROL MEASURES ARE IMPLEMENTED. ALL PERMANENT SOIL EROSION CONTROL MEASURES WILL BE IMPLEMENTED AND ESTABLISHED BEFORE A CERTIFICATE OF COMPLIANCE IS ISSUED.
20. CONTRACTOR SHALL ESTABLISH FINAL GRADING, VEGETATION, AND/OR LANDSCAPE OF ALL DISTURBED AREAS NOT BUILT OR PAVED UPON. VEGETATION STABILIZATION OF ALL DISTURBED AREAS SHALL BE ESTABLISHED WITHIN 15 DAYS OF COMPLETION OF FINAL
GRADING.
Z:
\20
4.0
0 O rch ar d H ills P ar k\D es ign
\C
AD
\W or k S he ets \C
P-
S oil
E ro sio n a nd S ed im en tat ion C on tro l N ote s a nd
D eta ils .dw g
Copyright © 2024 Giffels Webster.
No reproduction shall be made without the prior written consent of Giffels Webster.
Developed For:
Engineers Surveyors Planners
Landscape Architects
Executive:
Manager:
Designer:
Quality Control:
Section:
Project:
Sheet:
Scale:
Date:
ISSUE:DATE:
Professional Seal:
M.K.
B.K.
B.D.M.
B.K. / M.K.
T-05-N R-12-E
BRUCE TWP.
MACOMB COUNTY
MICHIGAN
AUGUST 2024
20554.00
ORCHARD HILLS PARK
6303 26 Mile Road Suite 100
Washington Twp, MI 48094 p (586) 781-8950 f (313) 962-5068 www.giffelswebster.com
Know what's below.
before you dig.Call
R
P: (586) 752-6543
WASHINGTON, BRUCE, &
ROMEO PARKS AND
RECREATION
COMMISSION
361 MORTON STREET
ROMEO, MI 48065
https://rwbparksrec.org/
08.22.2024 FOR MACOMB COUNTY PERMITS
08.26.2024 FOR MACOMB COUNTY SESC
PERMIT
08.30.2024 FOR BID
NONE
CP-05
EROSION CONTROL SEQUENCE
MAINTENANCE SCHEDULE
DET-PAV-1.dgn 04/03/2018 2:53:04 PM
File details come from the government source that posted it. Updated .