2024-08-01 Amendment 2 - Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25524R0088002
About this file
This document is Amendment 2 to a solicitation for the Renovate and Expand Urology Clinic project at the Harry S. Truman Memorial Veterans' Hospital in Columbia, Missouri with Project Number 589A4-23-050.
The solicitation is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The amendment appears to contain drawing sheets providing additional details on the renovation and expansion work, including architectural, structural, mechanical, plumbing, and electrical plans. Key details shown include demolition plans, floor plans, reflected ceiling plans, details, and equipment schedules for the first floor of the facility. No additional information is provided on the overall scope, timeline, pricing, or other contractual requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25524R0088 0002.pdf | ||
| 2024-08-01 Amendment 2 - Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEDICAL CENTER DIRECTOR
DOCUMENT SIGNATURE BLOCK
PRINT NAME SIGNATURE
ASSOCIATE DIRECTOR
PRINT NAME SIGNATURE
ASSOCIATE DIRECTOR OF PATIENT SERVICES
PRINT NAME SIGNATURE
ASSISTANT DIRECTOR
PRINT NAME SIGNATURE
CHIEF ENGINEER
PRINT NAME SIGNATURE
INFECTION CONTROL PRACTITIONER
PRINT NAME SIGNATURE
SAFETY OFFICER
PRINT NAME SIGNATURE
CHIEF OF STAFF
PRINT NAME SIGNATURE
HRO DIRECTOR
PRINT NAME SIGNATURE
ABBREVIATIONS
PROJ(D)
PLBG
PLYWD
PREFIN
RAD(R)
RESIL
REINF
REQ'D
SECT
SHWR
SPECS
REFRIG
GALVANIZEDGALVBMRK BENCHMARK
CONCRETE
MASONRY UNIT
CEILINGCLG
CLR
CMU
COL
CLO
CLEAR/CLEARANCE
COLUMN
CLOSET
CAB
CJ
CC
CB
BW
CL
BOC
BRZ
BRK
BO
BRG
BUR
BTM
BS
BUILT-UP ROOF
CENTER TO CENTER
CHALKBOARD
BOTTOM OF WALL
CENTER LINE
CONTROL JOINT/
CONSTRUCTION JOINT
CABINET
BACK OF CURB
BOTH SIDES
BOTTOM OF
BRONZE
BRICK
BEARING
BOTTOM
FOUNDATION
FLOOR DRAIN
FIRE EXTINGUISHER
FIRE
EXTINGUISHER
CABINET
FE
FEC
FDN
FD
EAST
EACH
EQUIPMENT
EXPOSED
EACH WAY
EXISTING
ELECTRICAL
EXTERIOR INSULATION
FINISH SYSTEM
ELEVATION/ELEVATOR
EXPANSION JOINT
EXISTING GRADE
ELECTRICAL CONTRACTOR
EXTERIOR
ETHYLENE PROPYLENE
DIENE TERPOLYMER
ELEV
EQUIP
EW
EPDM
EXP
EXIST
EXT
E
EA
EC
EG
EIFS
EJ
ELEC
INSULATION
INTERIOR
INSIDE DIAMETER
INSUL
IN(")
INT
ID
INCH
GRAB BAR
GENERAL CONTRACTOR
GYPSUM
GLASS/GLAZING
HOLLOW METAL
HIGH PRESSURE
DECORATIVE LAMINATE
HORIZONTAL
HARDWARE
HARDWOOD
HOSE BIB
HOT WATER
HEATING, VENTILATING
& AIR CONDITIONING
HDWR
HM
HORZ
HT
HPDL
HVAC
HW
HEIGHT
GB
GL
GRD
GYP
GC
HDWD
HB
GRADE
PART
PLAS
OVHD
PARTITION
PLASTER
OVERHEAD
SRT
SS
SQ
MISCELLANEOUS
MASONRY OPENING
NOT IN CONTRACT
NOT APPLICABLE
OUTSIDE DIAMETER
NUMBERNO(#)
NTS
OC
OA
NOM
OFF
OPNG
OD
ON CENTER
OVERALL
NOMINAL
NOT TO SCALE
OFFICE
OPENING
MISC
N
MO
MULL
MTL
NIC
NA
NORTH
MULLION
METAL
SHT
SF
SB
SND
SIM
S
RM
ROW
RO
SAT
SAN
ARCHITECT/
ARCHITECTURAL
AB ANCHOR BOLT
APPROX
BLDG
BD
ARCH
BM
BLK
ADJ
AFF
AC
ACCU
ALUM
ANOD
ALT
APPROXIMATE
BLOCK/BLOCKING
AT
BOARD
BEAM
BUILDING
AIR COOLED
CONDENSING UNIT
ABOVE FINISHED FLOOR
ADJUSTABLE
ALTERNATE
ANODIZED
ACOUSTICAL
ALUMINUM
A/C AIR CONDITIONING
PLUS OR MINUS
CONSTRUCTIONCONST
COURSE
CERAMIC TILE
CONTINUOUS
CARPET
CORRIDOR
DIAMETER
DOOR
DOWN
DITTO
DIMENSION
DOUBLE
DRINKING FOUNTAIN
DETAIL
DRAWING
DOWNSPOUT
DIA
DR
DS
DN
DO
DIM
DTL
DWG
CRS
CT
CONT
CORR
CPT
DBL
DF
CONFERENCE
CONCRETE
CONF
CONC
FINISHFIN
FLUORESCENT
FLOW LINE
FOLDING
FIELD VERIFY
FURNACE
FOOTING
FIRE RETARDANT
FOOT SCRAPER
FIBERGLASS
REINFORCED PLASTIC
FV
FT(')
FURR
FURN
FTG
G
GA
FOOT
FURRING
GAS
GAUGE
FRP
FLR
FLDG
FL
FRT
FS
FLUOR
FLOOR
FINISH GRADE
FINISH FLOOR
FG
FF
JOISTJST
LOW VOLUME CHANGE
MASONRYMAS
MANUF
MATL
MAX
MECH
MEMB
MH
MIN
MIRR
MANUFACTURER
MATERIAL
MECHANICAL
MEMBRANE
MAXIMUM
MINIMUM
MANHOLE
MIRROR
LDR
LF
LAV
LAM
LVC
LOCN
LINEAL FEET
LADDER
LAVATORY
LAMINATE
LOCATION
REF
R
RAG
RD
PT
PR
QT
PTD
JT
JAN JANITOR
JOINT
PL
UNDER CABINET LIGHTREQUIRED
PHYSICAL THERAPY
RESPIRATORY CARE
SURGICAL INTENSIVE CARE UNIT
STUDDED RUBBER TILE
STAINLESS STEEL
SQUARE
SPECIFICATIONS
YD
SUSPENDED
ACOUSTICAL TILE
SIMILAR
SANITARY NAPKIN
DISPENSER
SECTION
SHOWER
SHEET
SQUARE FEET
SPLASH BLOCK
RESILIENT
SOUTH
SANITARY
RIGHT OF WAY
ROUGH OPENING
ROOM
WD
WNDW
WH
WNSCT
WC
WT
WWF
WP
VCT
VWC
VEST
VERT
W
W/
W/O
YARD
WATERPROOFING
/WATERPROOF
WELDED WIRE FABRIC
WATER HEATER
WATER CLOSET
WINDOW
WOOD
WAINSCOT
WEIGHT
VINYL COMPOSITION TILE
VINYL WALL COVERING
VERTICAL
VESTIBULE
WEST
WITH
WITH OUT
RC
SICU
CENTRAL STERILE
LONG TERM CARE
INTENSIVE CARE UNIT
OCCUPATIONAL THERAPY
MAGNETIC RESONANCE IMAGING
POST ANESTHETIC CARE UNIT
MEDICAL INTENSIVE CARE UNIT
LABOR-DELIVERY-RECOVERY-POST PARTUM
OPERATING ROOM
FOR MEDICAL
FACILITIES ONLY
EMERGENCY ROOM
COMPUTED TOMOGRAPHY
STORPLUMBING
PROJECT/(PROJECTED)
REFER/REFERENCE
ROOF DRAIN
RADIUS
RETURN AIR GRILLE
REINFORCING
REFRIGERATOR
RISER
PRESSURE TREATED
PAINTED
QUARRY TILE
PLYWOOD
PREFINISHED
PAIR
TLT
TV
TW
TOC
TPH
TO
TYP
UCL
T&B
T
SUSP
STRUCT
TEL
TB
T&G
PLATE/PLASTIC/
PROPERTY LINE STL
STD
STORAGE
TOILET PAPER HOLDER
TOP OF CURB
TOILET
TELEVISION
TOP OF
TYPICAL
TOP OF WALL
TONGUE & GROOVE
TOP & BOTTOM
STRUCTURE/STRUCTURAL
TREAD
TELEPHONE
TACKBOARD
SUSPENDED
ICU
OR
LDRP
MRI
MICU
LTC
PT
PACU
OT
CS
CT
ER
STEEL
STANDARD
UNLESS NOTED OTHERWISEUNO
CUT STONE
STEEL
PLYWOOD
FINISH WOOD
CONT WD FRAMING
WOOD BLOCKING
MATERIAL SYMBOLS
LVC FILL
GRANULAR FILL
CONCRETE MASONRY
FACE BRICK
CONCRETE
EARTH
EXISTING CONSTRUCTION
ASPHALT
GLASS
RIGID OR TAPERED
INSULATION, EIFS
BATT INSULATION
GYPSUM BOARD
DRAWING SYMBOLS
95.00
TOC
98.5
TOC
98.5 E
B
NEW ELEVATION
ELEVATION DESCRIPTION
EXISTING CONTOUR
NEW CONTOUR
TEST BORING (SITE PLANS ONLY)
EXISTING ELEVATION
ELEVATION DESCRIPTION
PROPERTY LINE
/1 A101
/1 A101 MATCHLINE
SHT. REFERENCE
ELEVATION DATUM
(SECTIONS, ELEVATIONS ONLY)
BUILDING SECTION
WALL SECTION
DETAIL DRAWING
BUILDING ELEVATION
AI-201
INTERIOR ELEVATION
A100
WINDOW ID TAG
DOOR NUMBER
ROOM NAME
ROOM NAME & NUMBER
PARTITION SYMBOL
1 REVISION TAG
COLUMN LINE GRID
EQUIPMENT NUMBER
SITE PLAN NOTES
DEMOLITION PLAN NOTES
VICINITY MAP
NO SCALE
PRECAST CONCRETE
WALL PANEL TAG
XXX
AE-101
A-4 ALTERNATE TAG
PT-XX PAINT COLOR TAG
# PLAN NOTES &
ROOF PLAN NOTES
PROJECT
LOCATION
AE-201
AE-301
AE-310
N
600 EAST 7TH STREET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
A
B
C
D on e e ig ht h in ch o ne fo ot on e q ua rt er i nc h th re e e ig ht hs o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e a nd on e h al f in ch es o ne f oo t th re e in es ne f oo t
1 2 3 4 5 6
A
B
C
D
1 2 3 4 5 6
VA FORM 08-6231
Office of Construction and Facilities Management
Department of Veterans AffairsDwg.
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
CONSULTANTS: ARCHITECT OF RECORD:
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
2550 UNIVERSITY AVE. W., SUITE 423-S
ST. PAUL, MINNESOTA 55114
651.251.7570
330 N MEAD ST, SUITE 100
WICHITA, KANSAS 67202
316.262.2500
GI001
TITLE SHEET
RENOVATE & EXPAND
UROLOGY CLINIC
800 HOSPITAL DRIVE COLUMBIA, MO 65201
03-22-2024
589A4-23-050
RENOVATE & EXPAND UROLOGY CLINIC
HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL
DEPT OF VETERANS AFFAIRS
800 HOSPITAL DRIVE COLUMBIA, MO 65201
FINAL BID DOCUMENTS
FINAL BID DOCUMENTS
589A4-23-050
JSJIEP
SHEET INDEX
SHEET # SHEET NAME R.1
GENERAL
GI001 TITLE SHEET X
GI002 ABAAS SHEET
GI003 ABAAS SHEET
GI104 LIFE SAFETY PLAN - 1ST FLOOR
GI110 PHASING PLANS - 1ST FLOOR
GENERAL: 5
STRUCTURAL
S-100 FLOOR PLAN - 1ST FLOOR
STRUCTURAL: 1
ARCHITECTURAL
AD100 DEMOLITION RCP - BASEMENT - ABOVE CEILING
AD101 DEMOLITION PLAN - 1ST FLOOR
AD110 DEMOLITION RCP - 1ST FLOOR
AE101 FLOOR PLAN - 1ST FLOOR
AE102 FLOOR PLAN - DIMENSIONS - 1ST FLOOR
AE120 REFLECTED CEILING PLAN - 1ST FLOOR
AE401 ENLARGED PLANS
AE501 DETAILS
AE601 SCHEDULES
ARCHITECTURAL: 9
ARCHITECTURAL INTERIORS
AI101 FINISH PLAN & SCHEDULE - 1ST FLOOR
AI201 EQUIPMENT PLAN & SCHEDULE - 1ST FLOOR
AI301 WALL PROTECTION PLAN - 1ST FLOOR
AI401 INTERIOR ELEVATIONS
AI402 INTERIOR ELEVATIONS
AI403 INTERIOR ELEVATIONS
AI501 MILLWORK SECTION DETAILS
AI601 SIGNAGE PLAN & SCHEDULE - 1ST FLOOR
ARCHITECTURAL INTERIORS: 8
FIRE SUPPRESSION AND ALARM
FG101 FIRE SUPPRESSION SYMBOLS LEGEND, GENERAL NOTES, AND DETAILS
FD101 FIRE SUPPRESSION DEMOLITION PLAN - 1ST FLOOR
FX100 FIRE SUPPRESSION ZONING PLAN - 1ST FLOOR
FX101 FIRE SUPPRESSION PLAN - 1ST FLOOR
FA101 FIRE ALARM PLAN - 1ST FLOOR
FIRE SUPPRESSION AND ALARM: 5
MECHANICAL
MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES
MD101 MECHANICAL DEMOLITION PLAN - 1ST FLOOR
MH101 HVAC PLAN - 1ST FLOOR
MP101 MECHANICAL PIPING PLAN - 1ST FLOOR
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-701 MECHANICAL SCHEDULES
MECHANICAL: 7
PLUMBING
PD101 PLUMBING DEMOLITION PLAN - 1ST FLOOR X
PL100 PLUMBING PLAN - BASEMENT
PL101 PLUMBING PLAN - 1ST FLOOR X
PM101 MEDICAL GASES PLAN - 1ST FLOOR
P-501 PLUMBING DETAILS
P-701 PLUMBING SCHEDULES
PLUMBING: 6
ELECTRICAL
EG101 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES
ED101 ELECTRICAL DEMOLITION PLAN - 1ST FLOOR
EL101 LIGHTING PLAN - 1ST FLOOR
EP101 POWER & SPECIAL SYSTEMS PLAN - 1ST FLOOR
E-501 ELECTRICAL DETAILS
ELECTRICAL: 5
TOTAL SHEETS: 46
# Revision Date
1 AMENDMENT #2 08/01/2024
T T
T
FIRST FLOOR KEY PLAN
N
JKLMMa LaPQ Nb
V (E)
SAN (E)
SAN (E)
V (E)
V (E)
SAN (E)
SAN (E)
DCW (E)
DHW (E)
RHW (E)
DHW (E)
DCW (E)
C1C9
C184
D100A
D151
C1C1
C1D9
C102
C103
G163
C189
C188
C185
C187
C186
C193
C180
C182
C181
C105
D194
C1C19
C179
C178
D151C
C101C
C101B
D151B
D150
C101E
C1C2
C101A
C101D
C101
C1C20
#6
C1D5
C186B
1. ANY WORK TO BE DONE THAT AFFECTS AREAS OUTSIDE OF THE SCOPE OF THIS
PROJECT SHALL BE PERFORMED AT NIGHT.
2. PLANS REFLECT THE RATED WALL LOCATIONS. RATED WALLS ARE IDENTIFIED
BY THE COLORED BOLD LINES. SEE BUILDING & LIFE SAFETY REQUIREMENTS
LEGEND FOR WALL RATING DESIGNATIONS.
3. EXISTING SPRINKLER MAIN SIZES TAKEN FROM EXISTING SHOP DRAWINGS.
CONTRACTOR SHALL FIELD VERIFY PRIOR TO CREATION OF SHOP DRAWINGS.
4. ALL SPRINKLER DESIGN LOCATED WITHIN PROJECT AREA SHALL BE SERVED
FROM SPRINKLER MAIN LOCATED WITHIN THE SAME SMOKE ZONE AS THE
PROJECT AREA. DO NOT CROSS SMOKE BARRIER WITH SPRINKLER PIPING.
GENERAL NOTES:
OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY
FARRIS ENGINEERING
farris-usa.com
FE#:232047
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STREET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
ARCHITECT OF RECORD:
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
2550 UNIVERSITY AVE. W., SUITE 423-S
ST. PAUL, MINNESOTA 55114
651.251.7570
330 N MEAD ST, SUITE 100
WICHITA, KANSAS 67202
316.262.2500
03/22/2024
PD101
PLUMBING DEMOLITION PLAN - 1ST
FLOOR
RENOVATE & EXPAND
UROLOGY CLINIC
800 HOSPITAL DRIVE COLUMBIA, MO 65201
03-22-2024
589A4-23-050
FINAL BID DOCUMENTS
MKMDOV
0' 2'-0" 4'-0" 8'-0"
N
KEYNOTES
1 REMOVE EXISTING PLUMBING FIXTURE. REMOVE WATER/WASTE/VENT PIPING BACK TO MAIN AND
CAP. PATCH HOLES IN EXISTING STRUCTURE AS REQUIRED.
2 REMOVE EXISTING HOT WATER HEATER. REMOVE ASSOCIATED EXPANSION TANK, MIXING VALVE, AND BACKFLOW PREVENTER. REMOVE ALL HOT WATER PIPING ASSOCIATED WITH WATER HEATER.
REMOVE COLD WATER PIPING BACK TO MAIN AND CAP. REMOVE ASSOCIATED FLOOR DRAIN.
REMOVE WASTE PIPING BACK TO MAIN AND CAP. PATCH HOLES IN FLOOR.
3 THIS OUTLINE SHOWS THE APPROXIMATE AREA OF WORK ASSOCIATED WITH PHASE 1, UNLESS
NOTED OTHERWISE. THE WORK OUTSIDE OF THIS AREA WILL BE PERFORMED UNDER PHASE 2.
4 EXISTING PIPING UP AND DOWN IN CHASE TO REMAIN. FIELD VERIFY EXACT LOCATION OF PIPING
WITHIN CHASE.
5 REMOVE PORTION OF VENT PIPE SERVING SINK. EXISTING VENT PIPING ABOVE CEILING TO REMAIN
FOR RECONNECTION.
6 RELOCATE EXISTING WATER PIPING DOWN IN CHASE, TO ROUTE DOWN IN NEW WALL.
7 RELOCATE EXISTING SEWER PIPING DOWN IN CHASE, TO ROUTE DOWN IN NEW WALL.
8 REMOVE EXISTING PLUMBING FIXTURE. CAP PIPING TEMPORARILY, TO BE REUSED FOR NEW SINK.
REFER TO NEW WORK PLANS.
9 REMOVE VENT PIPE UP TO PLENUM AND CAP TEMPORARILY, TO BE REUSED FOR NEW SINK. REFER
TO NEW WORK PLANS.
10 EXISTING MED GAS OUTLETS TO REMAIN.
11 EXISTING PIPING TO REMAIN, AND EXTENDED DURING PHASE 1 WORK.
SCALE: 1/4" = 1'-0"
1 PLUMBING DEMOLITION PLAN - 1ST FLOOR
# Revision Date
1 AMENDMENT #2 08/01/2024
JT
JT
JT
JT
JT
JT
FEC
JT
JT
JT
JT
JT
FEC
T T
T
JKLMMa LaPQ Nb
EXAM #7
C101G
EXAM #5
C101E
TLT.
C181
NURSE
ALCOVE
TLT.
C182
TLT.
C180
URO
PROCEDURE
C184
URO
PROCEDURE
C186
TLT.
C189
TLT.
C177A
TLT.
D150A
WAITING
C177
CORR.
C1C19
HALL
C101
MSA
C178
SOILED
C188
SUPPLIES
ALCOVE
NAVIGATOR
C183
PROVIDER
SWAMP
C187
STOR.
C185
EXAM #6
C101F
EXAM #4
C101D
EXAM #2
C101B
EXAM #3
C101C
EXAM #1
C101A
CLEAN
UTILITY
C179
ELEC
D194
CORR.
C1C18
EQUIP.
CORR.
C1D5
NAVIGATOR
SWAMP
D150
(TYP)
(TYP)2
23 (TYP)2 (TYP)2
P-600
P-600
P-528
P-101
P-528
P-528 P-528
P-408
P-408
P-101
P-101
P-408
P-528
P-528
P-528
VB-1
3/4" DCW
3/4" DHW
3/4" RHW
2" V
1 1/4" DCW
3/4" DHW
3/4" RHW
1 1/4" DCW
3/4" DHW
2" V
3/4" RHW
3/4" DHW
1 1/2" DCW
3/4" RHW
3/4" DHW
2" DCW
3/4" DHW
3/4" DCW
(TYP)10 (TYP)11
(TYP)
FIRST FLOOR KEY PLAN
N
1. ANY WORK TO BE DONE THAT AFFECTS AREAS OUTSIDE OF THE SCOPE OF THIS
PROJECT SHALL BE PERFORMED AT NIGHT.
2. PLANS REFLECT THE RATED WALL LOCATIONS. RATED WALLS ARE IDENTIFIED
BY THE COLORED BOLD LINES. SEE BUILDING & LIFE SAFETY REQUIREMENTS
LEGEND FOR WALL RATING DESIGNATIONS.
3. PROVIDE WATER HAMMER ARRESTORS ON
ALL RUNS WITH QUICK-CLOSING VALVES. PROVIDE ACCESS PANELS FOR ALL
INACCESSIBLE VALVES AND WATER HAMMER ARRESTORS.
4. PROVIDE ISOLATION VALVES FOR ALL
DOMESTIC WATER BRANCH PIPING.
GENERAL NOTES:
OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY
FARRIS ENGINEERING
farris-usa.com
FE#:232047
A
2 3 4 5 6
B
C
D
1 2 3 4 5 6
A
B
C
D
VA FORM 08-6231
on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t
CONSULTANTS:
Drawing Title
Office of Construction and Facilities ManagementApproved: Project Director
Project Title
Location
Date Checked Drawn
Dwg.
Drawing Number
Building Number
Project Number
Department of Veterans Affairs
600 EAST 7TH STREET
SIOUX FALLS, SOUTH DAKOTA 57103
605.274.2893
ARCHITECT OF RECORD:
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
402.330.5900
2550 UNIVERSITY AVE. W., SUITE 423-S
ST. PAUL, MINNESOTA 55114
651.251.7570
330 N MEAD ST, SUITE 100
WICHITA, KANSAS 67202
316.262.2500
03/22/2024
PL101
PLUMBING PLAN - 1ST FLOOR
RENOVATE & EXPAND
UROLOGY CLINIC
800 HOSPITAL DRIVE COLUMBIA, MO 65201
03-22-2024
589A4-23-050
FINAL BID DOCUMENTS
MKMDOV
0' 2'-0" 4'-0" 8'-0"
N
SCALE: 1/4" = 1'-0"
1 PLUMBING PLAN - 1ST FLOOR
KEYNOTES
1 PROVIDE NEW AUTOMATIC FLOW CONTROL VALVE. BALANCE TO 0.5 GPM.
2 ROUTE PIPING DOWN IN CHASE / WALL AND OVER TO CORRESPONDING FIXTURE(S).
3 CONNECT NEW VENT PIPING TO EXISTING VENT RISER.
4 CONNECT NEW VENT PIPING TO EXISTING VENT MAIN.
5 THIS OUTLINE SHOWS THE APPROXIMATE AREA OF WORK ASSOCIATED WITH PHASE 1, UNLESS
NOTED OTHERWISE. THE WORK OUTSIDE OF THIS AREA WILL BE PERFORMED UNDER PHASE 2.
6 LOCATE VALVE BOX ABOVE COUNTERTOP.
7 CONNECT NEW VENT PIPING TO EXISTING VENT PIPING PREVIOUSLY SERVING DEMOLISHED SINK.
FIELD VERIFY EXACT ROUTING OF EXISTING VENT PIPING.
8 RECONNECT TO EXISTING WASTE / VENT / WATER THAT SERVED DEMOLISHED SINK.
9 REROUTE EXISTING WASTE / WATER PIPING RISERS IN NEW WALL.
10 PROVIDE NEW SHUT-OFF VALVES DURING PHASE 1, FOR CONNECTION TO NEW WATER MAINS TO BE
INSTALLED IN PHASE 2.
11 PROVIDE NEW SHUT-OFF VALVES.
12 EXTEND PIPING DURING PHASE 1, REMOVE PIPING UP TO SHUT OFF VALVES DURING PHASE 2, AFTER NEW PHASE 2 MAINS ARE IN PLACE.
# Revision Date
1 AMENDMENT #2 08/01/2024
| Sheets |
| GI001 - TITLE SHEET |
File details come from the government source that posted it. Updated .