This document is Amendment 2 to a solicitation for the Renovate and Expand Urology Clinic project at the Harry S. Truman Memorial Veterans' Hospital in Columbia, Missouri with Project Number 589A4-23-050.

The solicitation is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The amendment appears to contain drawing sheets providing additional details on the renovation and expansion work, including architectural, structural, mechanical, plumbing, and electrical plans. Key details shown include demolition plans, floor plans, reflected ceiling plans, details, and equipment schedules for the first floor of the facility. No additional information is provided on the overall scope, timeline, pricing, or other contractual requirements.

View the file

Other files

File Type Posted
36C25524R0088 0002.pdf PDF
2024-08-01 Amendment 2 - Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEDICAL CENTER DIRECTOR

DOCUMENT SIGNATURE BLOCK

PRINT NAME SIGNATURE

ASSOCIATE DIRECTOR

PRINT NAME SIGNATURE

ASSOCIATE DIRECTOR OF PATIENT SERVICES

PRINT NAME SIGNATURE

ASSISTANT DIRECTOR

PRINT NAME SIGNATURE

CHIEF ENGINEER

PRINT NAME SIGNATURE

INFECTION CONTROL PRACTITIONER

PRINT NAME SIGNATURE

SAFETY OFFICER

PRINT NAME SIGNATURE

CHIEF OF STAFF

PRINT NAME SIGNATURE

HRO DIRECTOR

PRINT NAME SIGNATURE

ABBREVIATIONS

PROJ(D)

PLBG

PLYWD

PREFIN

RAD(R)

RESIL

REINF

REQ'D

SECT

SHWR

SPECS

REFRIG

GALVANIZEDGALVBMRK BENCHMARK

CONCRETE

MASONRY UNIT

CEILINGCLG

CLR

CMU

COL

CLO

CLEAR/CLEARANCE

COLUMN

CLOSET

CAB

CJ

CC

CB

BW

CL

BOC

BRZ

BRK

BO

BRG

BUR

BTM

BS

BUILT-UP ROOF

CENTER TO CENTER

CHALKBOARD

BOTTOM OF WALL

CENTER LINE

CONTROL JOINT/

CONSTRUCTION JOINT

CABINET

BACK OF CURB

BOTH SIDES

BOTTOM OF

BRONZE

BRICK

BEARING

BOTTOM

FOUNDATION

FLOOR DRAIN

FIRE EXTINGUISHER

FIRE

EXTINGUISHER

CABINET

FE

FEC

FDN

FD

EAST

EACH

EQUIPMENT

EXPOSED

EACH WAY

EXISTING

ELECTRICAL

EXTERIOR INSULATION

FINISH SYSTEM

ELEVATION/ELEVATOR

EXPANSION JOINT

EXISTING GRADE

ELECTRICAL CONTRACTOR

EXTERIOR

ETHYLENE PROPYLENE

DIENE TERPOLYMER

ELEV

EQUIP

EW

EPDM

EXP

EXIST

EXT

E

EA

EC

EG

EIFS

EJ

ELEC

INSULATION

INTERIOR

INSIDE DIAMETER

INSUL

IN(")

INT

ID

INCH

GRAB BAR

GENERAL CONTRACTOR

GYPSUM

GLASS/GLAZING

HOLLOW METAL

HIGH PRESSURE

DECORATIVE LAMINATE

HORIZONTAL

HARDWARE

HARDWOOD

HOSE BIB

HOT WATER

HEATING, VENTILATING

& AIR CONDITIONING

HDWR

HM

HORZ

HT

HPDL

HVAC

HW

HEIGHT

GB

GL

GRD

GYP

GC

HDWD

HB

GRADE

PART

PLAS

OVHD

PARTITION

PLASTER

OVERHEAD

SRT

SS

SQ

MISCELLANEOUS

MASONRY OPENING

NOT IN CONTRACT

NOT APPLICABLE

OUTSIDE DIAMETER

NUMBERNO(#)

NTS

OC

OA

NOM

OFF

OPNG

OD

ON CENTER

OVERALL

NOMINAL

NOT TO SCALE

OFFICE

OPENING

MISC

N

MO

MULL

MTL

NIC

NA

NORTH

MULLION

METAL

SHT

SF

SB

SND

SIM

S

RM

ROW

RO

SAT

SAN

ARCHITECT/

ARCHITECTURAL

AB ANCHOR BOLT

APPROX

BLDG

BD

ARCH

BM

BLK

ADJ

AFF

AC

ACCU

ALUM

ANOD

ALT

APPROXIMATE

BLOCK/BLOCKING

AT

BOARD

BEAM

BUILDING

AIR COOLED

CONDENSING UNIT

ABOVE FINISHED FLOOR

ADJUSTABLE

ALTERNATE

ANODIZED

ACOUSTICAL

ALUMINUM

A/C AIR CONDITIONING

PLUS OR MINUS

CONSTRUCTIONCONST

COURSE

CERAMIC TILE

CONTINUOUS

CARPET

CORRIDOR

DIAMETER

DOOR

DOWN

DITTO

DIMENSION

DOUBLE

DRINKING FOUNTAIN

DETAIL

DRAWING

DOWNSPOUT

DIA

DR

DS

DN

DO

DIM

DTL

DWG

CRS

CT

CONT

CORR

CPT

DBL

DF

CONFERENCE

CONCRETE

CONF

CONC

FINISHFIN

FLUORESCENT

FLOW LINE

FOLDING

FIELD VERIFY

FURNACE

FOOTING

FIRE RETARDANT

FOOT SCRAPER

FIBERGLASS

REINFORCED PLASTIC

FV

FT(')

FURR

FURN

FTG

G

GA

FOOT

FURRING

GAS

GAUGE

FRP

FLR

FLDG

FL

FRT

FS

FLUOR

FLOOR

FINISH GRADE

FINISH FLOOR

FG

FF

JOISTJST

LOW VOLUME CHANGE

MASONRYMAS

MANUF

MATL

MAX

MECH

MEMB

MH

MIN

MIRR

MANUFACTURER

MATERIAL

MECHANICAL

MEMBRANE

MAXIMUM

MINIMUM

MANHOLE

MIRROR

LDR

LF

LAV

LAM

LVC

LOCN

LINEAL FEET

LADDER

LAVATORY

LAMINATE

LOCATION

REF

R

RAG

RD

PT

PR

QT

PTD

JT

JAN JANITOR

JOINT

PL

UNDER CABINET LIGHTREQUIRED

PHYSICAL THERAPY

RESPIRATORY CARE

SURGICAL INTENSIVE CARE UNIT

STUDDED RUBBER TILE

STAINLESS STEEL

SQUARE

SPECIFICATIONS

YD

SUSPENDED

ACOUSTICAL TILE

SIMILAR

SANITARY NAPKIN

DISPENSER

SECTION

SHOWER

SHEET

SQUARE FEET

SPLASH BLOCK

RESILIENT

SOUTH

SANITARY

RIGHT OF WAY

ROUGH OPENING

ROOM

WD

WNDW

WH

WNSCT

WC

WT

WWF

WP

VCT

VWC

VEST

VERT

W

W/

W/O

YARD

WATERPROOFING

/WATERPROOF

WELDED WIRE FABRIC

WATER HEATER

WATER CLOSET

WINDOW

WOOD

WAINSCOT

WEIGHT

VINYL COMPOSITION TILE

VINYL WALL COVERING

VERTICAL

VESTIBULE

WEST

WITH

WITH OUT

RC

SICU

CENTRAL STERILE

LONG TERM CARE

INTENSIVE CARE UNIT

OCCUPATIONAL THERAPY

MAGNETIC RESONANCE IMAGING

POST ANESTHETIC CARE UNIT

MEDICAL INTENSIVE CARE UNIT

LABOR-DELIVERY-RECOVERY-POST PARTUM

OPERATING ROOM

FOR MEDICAL

FACILITIES ONLY

EMERGENCY ROOM

COMPUTED TOMOGRAPHY

STORPLUMBING

PROJECT/(PROJECTED)

REFER/REFERENCE

ROOF DRAIN

RADIUS

RETURN AIR GRILLE

REINFORCING

REFRIGERATOR

RISER

PRESSURE TREATED

PAINTED

QUARRY TILE

PLYWOOD

PREFINISHED

PAIR

TLT

TV

TW

TOC

TPH

TO

TYP

UCL

T&B

T

SUSP

STRUCT

TEL

TB

T&G

PLATE/PLASTIC/

PROPERTY LINE STL

STD

STORAGE

TOILET PAPER HOLDER

TOP OF CURB

TOILET

TELEVISION

TOP OF

TYPICAL

TOP OF WALL

TONGUE & GROOVE

TOP & BOTTOM

STRUCTURE/STRUCTURAL

TREAD

TELEPHONE

TACKBOARD

SUSPENDED

ICU

OR

LDRP

MRI

MICU

LTC

PT

PACU

OT

CS

CT

ER

STEEL

STANDARD

UNLESS NOTED OTHERWISEUNO

CUT STONE

STEEL

PLYWOOD

FINISH WOOD

CONT WD FRAMING

WOOD BLOCKING

MATERIAL SYMBOLS

LVC FILL

GRANULAR FILL

CONCRETE MASONRY

FACE BRICK

CONCRETE

EARTH

EXISTING CONSTRUCTION

ASPHALT

GLASS

RIGID OR TAPERED

INSULATION, EIFS

BATT INSULATION

GYPSUM BOARD

DRAWING SYMBOLS

95.00

TOC

98.5

TOC

98.5 E

B

NEW ELEVATION

ELEVATION DESCRIPTION

EXISTING CONTOUR

NEW CONTOUR

TEST BORING (SITE PLANS ONLY)

EXISTING ELEVATION

ELEVATION DESCRIPTION

PROPERTY LINE

/1 A101

/1 A101 MATCHLINE

SHT. REFERENCE

ELEVATION DATUM

(SECTIONS, ELEVATIONS ONLY)

BUILDING SECTION

WALL SECTION

DETAIL DRAWING

BUILDING ELEVATION

AI-201

INTERIOR ELEVATION

A100

WINDOW ID TAG

DOOR NUMBER

ROOM NAME

ROOM NAME & NUMBER

PARTITION SYMBOL

1 REVISION TAG

COLUMN LINE GRID

EQUIPMENT NUMBER

SITE PLAN NOTES

DEMOLITION PLAN NOTES

VICINITY MAP

NO SCALE

PRECAST CONCRETE

WALL PANEL TAG

XXX

AE-101

A-4 ALTERNATE TAG

PT-XX PAINT COLOR TAG

# PLAN NOTES &

ROOF PLAN NOTES

PROJECT

LOCATION

AE-201

AE-301

AE-310

N

600 EAST 7TH STREET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

A

B

C

D on e e ig ht h in ch o ne fo ot on e q ua rt er i nc h th re e e ig ht hs o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e a nd on e h al f in ch es o ne f oo t th re e in es ne f oo t

1 2 3 4 5 6

A

B

C

D

1 2 3 4 5 6

VA FORM 08-6231

Office of Construction and Facilities Management

Department of Veterans AffairsDwg.

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

CONSULTANTS: ARCHITECT OF RECORD:

12700 WEST DODGE ROAD

OMAHA, NEBRASKA 68154

402.330.5900

2550 UNIVERSITY AVE. W., SUITE 423-S

ST. PAUL, MINNESOTA 55114

651.251.7570

330 N MEAD ST, SUITE 100

WICHITA, KANSAS 67202

316.262.2500

GI001

TITLE SHEET

RENOVATE & EXPAND

UROLOGY CLINIC

800 HOSPITAL DRIVE COLUMBIA, MO 65201

03-22-2024

589A4-23-050

RENOVATE & EXPAND UROLOGY CLINIC

HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL

DEPT OF VETERANS AFFAIRS

800 HOSPITAL DRIVE COLUMBIA, MO 65201

FINAL BID DOCUMENTS

FINAL BID DOCUMENTS

589A4-23-050

JSJIEP

SHEET INDEX

SHEET # SHEET NAME R.1

GENERAL

GI001 TITLE SHEET X

GI002 ABAAS SHEET

GI003 ABAAS SHEET

GI104 LIFE SAFETY PLAN - 1ST FLOOR

GI110 PHASING PLANS - 1ST FLOOR

GENERAL: 5

STRUCTURAL

S-100 FLOOR PLAN - 1ST FLOOR

STRUCTURAL: 1

ARCHITECTURAL

AD100 DEMOLITION RCP - BASEMENT - ABOVE CEILING

AD101 DEMOLITION PLAN - 1ST FLOOR

AD110 DEMOLITION RCP - 1ST FLOOR

AE101 FLOOR PLAN - 1ST FLOOR

AE102 FLOOR PLAN - DIMENSIONS - 1ST FLOOR

AE120 REFLECTED CEILING PLAN - 1ST FLOOR

AE401 ENLARGED PLANS

AE501 DETAILS

AE601 SCHEDULES

ARCHITECTURAL: 9

ARCHITECTURAL INTERIORS

AI101 FINISH PLAN & SCHEDULE - 1ST FLOOR

AI201 EQUIPMENT PLAN & SCHEDULE - 1ST FLOOR

AI301 WALL PROTECTION PLAN - 1ST FLOOR

AI401 INTERIOR ELEVATIONS

AI402 INTERIOR ELEVATIONS

AI403 INTERIOR ELEVATIONS

AI501 MILLWORK SECTION DETAILS

AI601 SIGNAGE PLAN & SCHEDULE - 1ST FLOOR

ARCHITECTURAL INTERIORS: 8

FIRE SUPPRESSION AND ALARM

FG101 FIRE SUPPRESSION SYMBOLS LEGEND, GENERAL NOTES, AND DETAILS

FD101 FIRE SUPPRESSION DEMOLITION PLAN - 1ST FLOOR

FX100 FIRE SUPPRESSION ZONING PLAN - 1ST FLOOR

FX101 FIRE SUPPRESSION PLAN - 1ST FLOOR

FA101 FIRE ALARM PLAN - 1ST FLOOR

FIRE SUPPRESSION AND ALARM: 5

MECHANICAL

MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES

MD101 MECHANICAL DEMOLITION PLAN - 1ST FLOOR

MH101 HVAC PLAN - 1ST FLOOR

MP101 MECHANICAL PIPING PLAN - 1ST FLOOR

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-701 MECHANICAL SCHEDULES

MECHANICAL: 7

PLUMBING

PD101 PLUMBING DEMOLITION PLAN - 1ST FLOOR X

PL100 PLUMBING PLAN - BASEMENT

PL101 PLUMBING PLAN - 1ST FLOOR X

PM101 MEDICAL GASES PLAN - 1ST FLOOR

P-501 PLUMBING DETAILS

P-701 PLUMBING SCHEDULES

PLUMBING: 6

ELECTRICAL

EG101 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES

ED101 ELECTRICAL DEMOLITION PLAN - 1ST FLOOR

EL101 LIGHTING PLAN - 1ST FLOOR

EP101 POWER & SPECIAL SYSTEMS PLAN - 1ST FLOOR

E-501 ELECTRICAL DETAILS

ELECTRICAL: 5

TOTAL SHEETS: 46

# Revision Date

1 AMENDMENT #2 08/01/2024

T T

T

FIRST FLOOR KEY PLAN

N

JKLMMa LaPQ Nb

V (E)

SAN (E)

SAN (E)

V (E)

V (E)

SAN (E)

SAN (E)

DCW (E)

DHW (E)

RHW (E)

DHW (E)

DCW (E)

C1C9

C184

D100A

D151

C1C1

C1D9

C102

C103

G163

C189

C188

C185

C187

C186

C193

C180

C182

C181

C105

D194

C1C19

C179

C178

D151C

C101C

C101B

D151B

D150

C101E

C1C2

C101A

C101D

C101

C1C20

#6

C1D5

C186B

1. ANY WORK TO BE DONE THAT AFFECTS AREAS OUTSIDE OF THE SCOPE OF THIS

PROJECT SHALL BE PERFORMED AT NIGHT.

2. PLANS REFLECT THE RATED WALL LOCATIONS. RATED WALLS ARE IDENTIFIED

BY THE COLORED BOLD LINES. SEE BUILDING & LIFE SAFETY REQUIREMENTS

LEGEND FOR WALL RATING DESIGNATIONS.

3. EXISTING SPRINKLER MAIN SIZES TAKEN FROM EXISTING SHOP DRAWINGS.

CONTRACTOR SHALL FIELD VERIFY PRIOR TO CREATION OF SHOP DRAWINGS.

4. ALL SPRINKLER DESIGN LOCATED WITHIN PROJECT AREA SHALL BE SERVED

FROM SPRINKLER MAIN LOCATED WITHIN THE SAME SMOKE ZONE AS THE

PROJECT AREA. DO NOT CROSS SMOKE BARRIER WITH SPRINKLER PIPING.

GENERAL NOTES:

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:232047

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t

CONSULTANTS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

Department of Veterans Affairs

600 EAST 7TH STREET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

ARCHITECT OF RECORD:

12700 WEST DODGE ROAD

OMAHA, NEBRASKA 68154

402.330.5900

2550 UNIVERSITY AVE. W., SUITE 423-S

ST. PAUL, MINNESOTA 55114

651.251.7570

330 N MEAD ST, SUITE 100

WICHITA, KANSAS 67202

316.262.2500

03/22/2024

PD101

PLUMBING DEMOLITION PLAN - 1ST

FLOOR

RENOVATE & EXPAND

UROLOGY CLINIC

800 HOSPITAL DRIVE COLUMBIA, MO 65201

03-22-2024

589A4-23-050

FINAL BID DOCUMENTS

MKMDOV

0' 2'-0" 4'-0" 8'-0"

N

KEYNOTES

1 REMOVE EXISTING PLUMBING FIXTURE. REMOVE WATER/WASTE/VENT PIPING BACK TO MAIN AND

CAP. PATCH HOLES IN EXISTING STRUCTURE AS REQUIRED.

2 REMOVE EXISTING HOT WATER HEATER. REMOVE ASSOCIATED EXPANSION TANK, MIXING VALVE, AND BACKFLOW PREVENTER. REMOVE ALL HOT WATER PIPING ASSOCIATED WITH WATER HEATER.

REMOVE COLD WATER PIPING BACK TO MAIN AND CAP. REMOVE ASSOCIATED FLOOR DRAIN.

REMOVE WASTE PIPING BACK TO MAIN AND CAP. PATCH HOLES IN FLOOR.

3 THIS OUTLINE SHOWS THE APPROXIMATE AREA OF WORK ASSOCIATED WITH PHASE 1, UNLESS

NOTED OTHERWISE. THE WORK OUTSIDE OF THIS AREA WILL BE PERFORMED UNDER PHASE 2.

4 EXISTING PIPING UP AND DOWN IN CHASE TO REMAIN. FIELD VERIFY EXACT LOCATION OF PIPING

WITHIN CHASE.

5 REMOVE PORTION OF VENT PIPE SERVING SINK. EXISTING VENT PIPING ABOVE CEILING TO REMAIN

FOR RECONNECTION.

6 RELOCATE EXISTING WATER PIPING DOWN IN CHASE, TO ROUTE DOWN IN NEW WALL.

7 RELOCATE EXISTING SEWER PIPING DOWN IN CHASE, TO ROUTE DOWN IN NEW WALL.

8 REMOVE EXISTING PLUMBING FIXTURE. CAP PIPING TEMPORARILY, TO BE REUSED FOR NEW SINK.

REFER TO NEW WORK PLANS.

9 REMOVE VENT PIPE UP TO PLENUM AND CAP TEMPORARILY, TO BE REUSED FOR NEW SINK. REFER

TO NEW WORK PLANS.

10 EXISTING MED GAS OUTLETS TO REMAIN.

11 EXISTING PIPING TO REMAIN, AND EXTENDED DURING PHASE 1 WORK.

SCALE: 1/4" = 1'-0"

1 PLUMBING DEMOLITION PLAN - 1ST FLOOR

# Revision Date

1 AMENDMENT #2 08/01/2024

JT

JT

JT

JT

JT

JT

FEC

JT

JT

JT

JT

JT

FEC

T T

T

JKLMMa LaPQ Nb

EXAM #7

C101G

EXAM #5

C101E

TLT.

C181

NURSE

ALCOVE

TLT.

C182

TLT.

C180

URO

PROCEDURE

C184

URO

PROCEDURE

C186

TLT.

C189

TLT.

C177A

TLT.

D150A

WAITING

C177

CORR.

C1C19

HALL

C101

MSA

C178

SOILED

C188

SUPPLIES

ALCOVE

NAVIGATOR

C183

PROVIDER

SWAMP

C187

STOR.

C185

EXAM #6

C101F

EXAM #4

C101D

EXAM #2

C101B

EXAM #3

C101C

EXAM #1

C101A

CLEAN

UTILITY

C179

ELEC

D194

CORR.

C1C18

EQUIP.

CORR.

C1D5

NAVIGATOR

SWAMP

D150

(TYP)

(TYP)2

23 (TYP)2 (TYP)2

P-600

P-600

P-528

P-101

P-528

P-528 P-528

P-408

P-408

P-101

P-101

P-408

P-528

P-528

P-528

VB-1

3/4" DCW

3/4" DHW

3/4" RHW

2" V

1 1/4" DCW

3/4" DHW

3/4" RHW

1 1/4" DCW

3/4" DHW

2" V

3/4" RHW

3/4" DHW

1 1/2" DCW

3/4" RHW

3/4" DHW

2" DCW

3/4" DHW

3/4" DCW

(TYP)10 (TYP)11

(TYP)

FIRST FLOOR KEY PLAN

N

1. ANY WORK TO BE DONE THAT AFFECTS AREAS OUTSIDE OF THE SCOPE OF THIS

PROJECT SHALL BE PERFORMED AT NIGHT.

2. PLANS REFLECT THE RATED WALL LOCATIONS. RATED WALLS ARE IDENTIFIED

BY THE COLORED BOLD LINES. SEE BUILDING & LIFE SAFETY REQUIREMENTS

LEGEND FOR WALL RATING DESIGNATIONS.

3. PROVIDE WATER HAMMER ARRESTORS ON

ALL RUNS WITH QUICK-CLOSING VALVES. PROVIDE ACCESS PANELS FOR ALL

INACCESSIBLE VALVES AND WATER HAMMER ARRESTORS.

4. PROVIDE ISOLATION VALVES FOR ALL

DOMESTIC WATER BRANCH PIPING.

GENERAL NOTES:

OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY

FARRIS ENGINEERING

farris-usa.com

FE#:232047

A

2 3 4 5 6

B

C

D

1 2 3 4 5 6

A

B

C

D

VA FORM 08-6231

on e e ig ht h on e q ua rt er i nc h th re e e ig o ne f oo t on e h al f ne f oo t th re e q ua rt er s on e in ch on e h al f in ch es o ne f oo t th re e in ne f oo t

CONSULTANTS:

Drawing Title

Office of Construction and Facilities ManagementApproved: Project Director

Project Title

Location

Date Checked Drawn

Dwg.

Drawing Number

Building Number

Project Number

Department of Veterans Affairs

600 EAST 7TH STREET

SIOUX FALLS, SOUTH DAKOTA 57103

605.274.2893

ARCHITECT OF RECORD:

12700 WEST DODGE ROAD

OMAHA, NEBRASKA 68154

402.330.5900

2550 UNIVERSITY AVE. W., SUITE 423-S

ST. PAUL, MINNESOTA 55114

651.251.7570

330 N MEAD ST, SUITE 100

WICHITA, KANSAS 67202

316.262.2500

03/22/2024

PL101

PLUMBING PLAN - 1ST FLOOR

RENOVATE & EXPAND

UROLOGY CLINIC

800 HOSPITAL DRIVE COLUMBIA, MO 65201

03-22-2024

589A4-23-050

FINAL BID DOCUMENTS

MKMDOV

0' 2'-0" 4'-0" 8'-0"

N

SCALE: 1/4" = 1'-0"

1 PLUMBING PLAN - 1ST FLOOR

KEYNOTES

1 PROVIDE NEW AUTOMATIC FLOW CONTROL VALVE. BALANCE TO 0.5 GPM.

2 ROUTE PIPING DOWN IN CHASE / WALL AND OVER TO CORRESPONDING FIXTURE(S).

3 CONNECT NEW VENT PIPING TO EXISTING VENT RISER.

4 CONNECT NEW VENT PIPING TO EXISTING VENT MAIN.

5 THIS OUTLINE SHOWS THE APPROXIMATE AREA OF WORK ASSOCIATED WITH PHASE 1, UNLESS

NOTED OTHERWISE. THE WORK OUTSIDE OF THIS AREA WILL BE PERFORMED UNDER PHASE 2.

6 LOCATE VALVE BOX ABOVE COUNTERTOP.

7 CONNECT NEW VENT PIPING TO EXISTING VENT PIPING PREVIOUSLY SERVING DEMOLISHED SINK.

FIELD VERIFY EXACT ROUTING OF EXISTING VENT PIPING.

8 RECONNECT TO EXISTING WASTE / VENT / WATER THAT SERVED DEMOLISHED SINK.

9 REROUTE EXISTING WASTE / WATER PIPING RISERS IN NEW WALL.

10 PROVIDE NEW SHUT-OFF VALVES DURING PHASE 1, FOR CONNECTION TO NEW WATER MAINS TO BE

INSTALLED IN PHASE 2.

11 PROVIDE NEW SHUT-OFF VALVES.

12 EXTEND PIPING DURING PHASE 1, REMOVE PIPING UP TO SHUT OFF VALVES DURING PHASE 2, AFTER NEW PHASE 2 MAINS ARE IN PLACE.

# Revision Date

1 AMENDMENT #2 08/01/2024

Sheets
GI001 - TITLE SHEET