2024_0509_Colorado Mesa University_PW Package.pdf
PDF 3 MB Posted
- Attached to
- CMU 2846 Athletic Complex
- Solicitation number
- CMU 2846
- Issued by
- Mesa County, Colorado
About this file
The documents are architectural design and planning files for a Colorado Mesa University Football Stadium Renovation project by Perkins&Will, dated May 09, 2024. The proposed project includes a two-level facility featuring a modern glass and metal structure adjacent to a red running track. Level 01 encompasses comprehensive athletic facilities including a home team locker room with 126 lockers, sports medicine area, multiple breakout/meeting rooms, officials' locker rooms, hallways, and support spaces. Level 02 includes a meeting club, public kitchen, public restrooms, and a pre-function lobby area.
The architectural renderings showcase a contemporary, multi-functional sports facility with extensive glass facades, allowing natural light and providing views of the surrounding landscape. The building design integrates seamlessly with the outdoor running track, featuring curved architectural elements and metallic paneling. The facility appears designed to provide state-of-the-art athletic infrastructure, supporting both training and administrative functions for the university's football program. Rendered images depict runners on the track and suggest the building will serve multiple purposes beyond athletic training, including potential event and meeting spaces.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Colorado Mesa University
May 09, 2024
GV
GV
GV
GV
GV
GVGV
GV
SS
SS
MH
B
BBBB
EB
ST
ST
S
S
S
SS
SS
EB
TB
EB
EB
EB
0.5' DIAMETER
DECIDUOUS
2.8' DIAMETER
DECIDUOUS
0.5' DIAMETER
DECIDUOUS
1.9' DIAMETER
DECIDUOUS
0.7' DIAMETER
DECIDUOUS
0.7' DIAMETER
CONIFEROUS
1.6' DIAMETER
DECIDUOUS
1.0' DIAMETER
DECIDUOUS
2.5' DIAMETER
DECIDUOUS
1.6' DIAMETER
DECIDUOUS
1.9' DIAMETER
DECIDUOUS
46164616
BUILDING
FOOTPRINT
SIDEWALK
DRIVEWAY
EXISTING
BUILDING
FOOTPRINT
SITE PLAN
COLORADO MESA FOOTBALL STATIUM
RENOVATION
05/08/24
PROPOSED
A G
C E
HOME TEAM
LOCKER RM
SPORTS MED
(126 LOCKERS)
B FD
C.1 D.1
BREAKOUT
ROOM
MEETING 4
HOME TEAM
RR &
SHOWERS
VEST. VEST.VEST.
BREAKOUT
ROOM
MEETING 1
OFFICIALS
LR
HALLWAY
IT
VEST.
OFFICE
PLAYER
HALLWAY
LOBBY
BREAKOUT
ROOM
MEETING 2
BREAKOUT
ROOM
MEETING 3
JAN.
JAN/STOR.
EXAM ROOM
JAN.
HEAD COACH
LR
RRRR
1" = 20'-0"1 LEVEL 01
Level 01 Plan
COLORADO MESA FOOTBALL STATIUM
RENOVATION
A G
C E
B FD
C.1 D.1
MEETING
CLUB
KITCHENPUBLIC
RESTROOM
PUBLIC
LOBBY
PREFUNCTION
HA
LL
WA
Y
MECH. ROOF MECH. ROOF
7700 SF
Level 02 Plan
COLORADO MESA FOOTBALL STATIUM
RENOVATION
1" = 20'-0"1 LEVEL 02
File details come from the government source that posted it. Updated .