2024_04_15 FVSU_Troup AHUs Drawings.pdf

PDF 3 MB Posted

Attached to
FVSU-Troup Air Handling Unit Replacement
Solicitation number
PE-53300-RFP-2024-000000020
Issued by
Paulding County, Georgia

About this file

This document is a set of drawings and specifications for the Fort Valley State University Troup Administration Building Air Handling Unit Replacement project in Georgia. The project involves the replacement of air handling units on the first, second, and third floors of the Troup Administration Building. The drawings detail the demolition and new work required, including the installation of three new air handling units with associated ductwork, piping, and electrical work. The project is being bid as a construction project, with a bid set date of April 20, 2024. The contract will be awarded to a qualified contractor, and the project is located in Peach County, Georgia.

The drawings provide detailed information on the air handling unit schedules, HVAC system design, and electrical work required. There are two deductive alternates included, which allow for the omission of the first and second floor air handling units from the contract. Pricing information is not included in the document, but the contract will likely be awarded based on the lowest responsive and responsible bid. Funding for the project is not specified, but it is a state and local government contract opportunity.

View the file

Other files

File Type Posted
FVSUA 042024 TroupAHU ITB.pdf PDF
FVSUA 042024 Troup AHU Project Manual.pdf PDF
FVSU TroupAdminAHU_Submittal 301_2 _ No Excep.pdf PDF
FVSU TroupAUReplacement_Addn_1.pdf PDF
NOIA Troup AHU.pdf PDF
NOA RFP 20.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF

DRAWINGS

PROJECT CONSULTANTS

NBP ENGINEERS, INC.

MACON, GEORGIA316 CORPORATE PARKWAY

NBP

ENGINEERS

CONSULTANTS

478-745-1691 www.nbpengineers.com

SHEET NO. TITLE

M001 ABBREVIATIONS, LEGENDS, & SCHEDULES - HVAC

M002 DETAILS - HVAC

M201

M202

M203

E001

1005 State University Drive; Fort Valley, Georgia 31030

Troup Administration Building - AHU Replacements

Fort Valley State University

FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC

SECOND FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC

THIRD FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC

E201

E202

E203

FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL

SECOND FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL

THIRD FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL

LEGEND, SCHEDULE, & RISER - ELECTRICAL

M003 AH FLOW DIAGRAM - HVAC

Project No.: FVSUA 042024

04.20.24 BID SET

A COMPRESSED AIR

AAV AUTOMATIC AIR VENT

AF AIR FOIL

-AFF ABOVE FINISHED FLOOR

AV ACID VENT

AVD AUTOMATIC VOLUME DAMPER

AW ACID WASTE

-AC ABOVE CEILING

AH- AIR HANDLING UNIT

BBD BOILER BLOW DOWN

BE BOTTOM ELEVATION

BOL BOTTOM OF LINE (UNINSULATED)

BOD BOTTOM OF DUCT

BP- BOOSTER PUMP

BTUH BRITISH THERMAL UNIT PER HOUR

-BF BELOW FLOOR

BFP BACK FLOW PREVENTOR

C CONDUIT

CC COOLING COIL

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSER WATER RETURN

CS CONDENSER WATER SUPPLY

CW DOMESTIC COLD WATER

CAB CABINET FAN

CF CENTRIFICAL FAN

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CHEMICAL FEED TANK

CH CABINET HEATER

CHR CHILLER

CL CENTER LINE

CO CLEANOUT

CP CHILLER PUMP

CPHB CHROME PLATED HOSE BIBB

CT COOLING TOWER

CU COPPER

CV- CONVECTOR

Cv VALVE COEFFICIENT

D DRAIN

DDC DIRECT DIGITAL CONTROL

DHW DOMESTIC HOT WATER

DN DOWN

DP DIFFERENTIAL PRESSURE

DS DOWN SPOUT

DSO DOWN SPOUT OVER FLOW

DX DIRECT EXCHANGE

EAD EXHAUST AIR DAMPER

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EWB ENTERING WET BULB

ESP END SUCTION PUMP

ESP EXTERNAL STATIC PRESSURE

ELL ELBOW

ET EXPANSION TANK

EQT EQUIPMENT TRAP SET

EWT ENTERING WATER TEMPERATURE

EX EXPANSION TANK LINE

EXT EXTERNAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

F&BP FACE & BYPASS

FC FAN COIL UNIT

BPD BYPASS DAMPER

EAL EXHAUST AIR LOUVER

ECH ELECTRIC CABINET HEATER

ABBREVIATIONS

FD FLOOR DRAIN

FF FOULING FACTOR

FF- FLY FAN

FF FINISHED FLOOR

FF FINAL FILTER

FFM FIRE FLOW METER

FLEX FLEXIBLE

FM FIRE MAIN

FMS FLOW METER STATION

FOF FUEL OIL FLOW

FOR FUEL OIL RETURN

FOV FUEL OIL VENT

FOP FUEL OIL PUMP

FP FIRE PUMP

FP- FAN POWERED

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRT FLOW RATE TRANSMITTER

FT FEET

G LOW PRESSURE GAS

GA GAUGE

GPM GALLONS PER MINUTE

GT GREASE TRAP

GTH GRAND TOTAL HEAT

H HEIGHT

HC HEATING COIL

HB HOSE BIBB

HBT HORIZONTAL BLOW THROUGH

HD HUB DRAIN

HDT HORIZONTAL DRAW THROUGH

HP HORSEPOWER/HIGH PRESSURE

HPA HIGH PRESSURE AIR

HPG HIGH PRESSURE GAS

HPS HIGH PRESSURE STEAM

HPWS HEAT PUMP WATER SUPPLY

HPWR HEAT PUMP WATER RETURN

HSC HORIZONTAL SPLIT CASE

HWG HOT WATER GENERATOR

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

ILC IN-LINE CENTRIFICAL

IT INTERVAL TIMER

IN INCHES

INV INVERT

JB JUNCTION BOX

L LENGTH

LR LONG RADIUS

LAT LEAVING AIR TEMPERATURE

LCP LOCAL CONTROL PANEL

LDB LEAVING DRY BULB

LN LIQUID NITROGEN

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM

MAV MANUAL AIR VENT

MVD MANUAL VOLUME DAMPER

MAX MAXIMUM

MBH ONE THOUSAND BTUH PER HOUR

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MH MAN HOLE

MP SUMP (MUD) PUMP

MPS MEDIUM PRESSURE STEAM

MPR MEDIUM PRESSURE RETURN

MTS MEDIUM TEMPERATURE SUPPLY

MTR MEDIUM TEMPERATURE RETURN

MUA MAKE-UP AIR

MUW MAKE-UP WATER

MZ MULTIZONE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTSIDE AIR DAMPER

ODT OUTDOOR TEMPERATURE

PC PUMP CONDENSATE

PD PRESSURE DROP

PRV PRESSURE REDUCING VALVE

PWF PROPELLER WALL FAN

R REFRIGERANT

RA RETURN AIR

RAD RETURN AIR DAMPER

RAS RELIEF AIR SUPPLY

RP RECIRCULATING PUMP

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RD ROOF DRAIN

RV RELIEF VALVE

SR SHORT RADIUS

OAL OUTSIDE AIR LOUVER

SAN SANITARY SEWER

SC SILL COCK

SCD SMOKE DAMPER

SD STORM DRAIN

SD SMOKE DETECTOR

SF SQUARE FEET

SDO STORM DRAIN OVERFLOW

SHC SENSIBLE HEAT CAPACITY

SP STAND PIPE

SP SUMP PUMP

SPS STATIC PRESSURE SENSOR

STA STATION

TR TEMPERED WATER RETURN

UG UNDERGROUND

VAC VACUUM PIPING

VDT VERTICAL DRAW THROUGH

VTR VENT THROUGH ROOF

WB WET BULB

O2 OXYGEN

?F DEGREES FAHRENHEIT

?C DEGREES CENTIGRADE

WM WATER METER

WL WATER LINE

WH WATER HEATER

WG WATER GAUGE

W WIDTH

W WASTE

VT VERTICAL TURBINE

VFD VARIABLE FREQUENCY DRIVE

VB VACUUM BREAKER

VAV VARIABLE AIR VOLUME

V VENT

UC UNDERCUT (DOOR - 3/4")

V- VALVE

TOS TOP OF STRUCTURE

TB THRUST BLOCK

T TEMPERED WATER

STR STRAINER

SP STATIC PRESSURE

SP SPRINKLER PIPE

SG SPECIALTY GAS

EUH ELECTRIC UNIT HEATER

RECIRCULATING

DHR DOMESTIC HOT WATER

TRANSMITTER

DPT DIFFERENTIAL PRESSURE

PER MINUTE

SCIM STANDARD CUBIC INCHES

TEMPERATURE

SST SATURATED SUCTION

(UNINSULATED)

TE TOP ELEVATION

(TOWER) PUMP

TP CONDENSER WATER

FSD FIRE/SMOKE DAMPER

EA EXHAUST AIR

MA MIXED AIR

AE ADJUSTABLE AIR EXTRACTOR

RAO RETURN AIR OPENING

AD AREA DRAIN/ACCESS DOOR

SINGLE LINE DUCT LEGEND

DUCT (SUPPLY, RETURN & EXHAUST)

SUPPLY DUCT UP

SUPPLY DUCT DOWN

RETURN OR EXHAUST DUCT UP

RETURN OR EXHAUST DUCT DOWN

DUCT RISE

DUCT DOWN

VOLUME DAMPER (MANUAL UNLESS INDICATED A.V.D.)

TRANSITION

DUCT TAKE-OFF (SEE SPEC. PERTAINING TO DEFLECTROLS)

TRANSITION (FLAT ON TOP)

TRANSITION (FLAT ON BOTTOM)

TRANSITION (TOP OR BOTTOM ONLY)

SUPPLY CEILING DIFFUSER

RETURN OR EXHAUST CEILING GRILLE

SIDEWALL SUPPLY

SIDEWALL RETURN

FLEXIBLE CONNECTION (DUCT)

RELIEF AIR SUPPLY TO TOILET

DUCT SPLIT WITH SPLITTER DAMPER

FLEX. DUCT WITH SCREW ON COLLAR, TAKE-OFF

DUCT WITH DUCT LINER

SQUARE ELBOW WITH TURNING VANES

RADIUS ELBOW (SEE SPECS. PERTAINING TO TURNING VANES)

AUTOMATIC VOLUME DAMPER

DN

R

12\10 SPLIT

OR

OR

SCD

FOB

T OR B

RAS

AVD

FD/SCD

FD

SMOKE CONTROL DAMPER

COMBINATION FIRE/SMOKE CONTROL DAMPER

FIRE DAMPER (FD)

FIRE DAMPER

SPS

SD

COMBINATION STARTER

STARTER

PIPE SLEEVE

CONCENTRIC REDUCER

PIPE ANCHOR

HVAC LEGEND

BALL VALVE WITH

3/4" HOSE END

BALANCE VALVE

THREADED & FLANGED

GLOBE VALVE

CHECK VALVE

3-WAY MIXING VALVE

BALL VALVE

BUTTERFLY VALVE

SOLENOID VALVE

CONTROL VALVE

PLAN VIEW

2-WAY MOTORIZED VALVE

RELIEF VALVE

FLANGED UNION

BRANCH OUT TOP

STRAINER

BRANCH OUT BOTTOM

ELBOW DOWN

ELBOW UP

TEE OUT TOP

BLIND FLANGE

PIPE CAP

AUTOMATIC AIR VENTAAV

FLEX. PIPE CONN.

BACKFLOW PREVENTER

THERMOMETER

TEE OUT BOTTOM

MANUAL AIR VENT

PIPE TEST PLUG

HEATING WATER FLOW

COLD WATER DOMESTIC

NATURAL GAS

CONDENSER WATER FLOW

DRAIN

HEATING WATER RETURN

HOT WATER DOMESTIC

G

D

DUCT SIZE FIRST DIMENSION

IS SIDE SHOWN

24\12

DOOR GRILLE

REFERS TO DETAIL OR

PLAN ON SHEET M-1.THERMOSTAT

INTERVAL TIMER

T

I.T.

1\M-4

DUCT/PLENUM w/LINER

FIRE DAMPER

ELBOW WITH

TURNING VANES

FLEX. DUCT CONN.

TURNING VANES

ELBOW WITHOUT

ADJUSTABLE AIR

EXTRACTOR

INSULATED FLEX. DUCT

INSULATED FLEX. DUCT

c

ECCENTRIC REDUCER

HWS

HWR

SCHS

SCHR

CONDENSER WATER RETURN

CS

CR

STATIC PRESSURE SENSOR

SMOKE DETECTOR

POINT OF CONNECTION

DUCT SPLIT

THREADED & FLANGED

THREADED & FLANGED

UNION

GAUGE TAPPING

GAUGE WITH TAPPING

THREADED & FLANGED

THREADED & FLANGED

PIPE SOCKET WELL

FLOW INDICATOR BALANCER

M

T G THERMOSTAT w/GROUND

ANNULAR ELEMENT FLOW STATION

M

DAMPER - BLADE VIEW DAMPER - END VIEW

xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)

DOUBLE WALL INSULATED

ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}

CHILLED WATER FLOW

CHILLED WATER RETURN

CHS

CHR

WATER SUPPLY

SECONDARY CHILLED

WATER RETURN

SECONDARY CHILLED

CV

CVA

CONSTANT VOLUME

ADJUSTABLE

CONSTANT VOLUME

CFM

PRESSURE SENSOR

SUMMER WINTER

DESIGN CONDITIONS

OUTSIDE

INSIDE

95 F DB / 76 F WB 20 F DB

75 F DB / 55% RH 72 F DB

MARK

ASSUMED

TYPE

TOTAL FAN

TYPE

AIRFLOW

TSP (IN.) HP

NOTES:

AH-1

(IN.)

E.S.P.

EWT

F

LWT

F

TOTAL SENSIBLE GPM

COOLING COIL

CFM

COIL EADB EAWB LADB LAWB

(IN.) H2OCFM CFM

MBH MBH( F) ( F) ( F) ( F) (FT)

AIR HANDLING UNIT SCHEDULE

AH-2

AH-3

M001

SCHEDULES - HVAC

LEGENDS, &

ABBREVIATIONS,

A.P.D. REMARKS

VAV

VAV

VAV

1 1,600

12,200

10,000

1.25

1.25

1.25

2.8

3.1

2.5

DWDI

DWDI

DWDI 79.5 66.1

54.8

53.7

54.9

54.3

53.5

54.4

79.5 66.1

79.5 66.11 1,600

12,200

10,000

MIN. OA MOTOR

0.85

1.1

0.71 45 56

45 56

45 56

W.P.D.

10.5

10.6

6.0

ALL THREE AIR HANDLERS ARE OWNER FURNISHED; CONTRACTOR INSTALLED.

3 DEDUCTIVE ALTERNATE 2: OMIT SECOND FLOOR AH-2 FROM THE CONTRACT.

DEDUCTIVE ALTERNATE 1: OMIT FIRST FLOOR AH-1 FROM THE CONTRACT.

P:\24011\24011m001.dgn

DATE PLOTTED

DGN FILE

16-APR-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24011\24011m001.dgn

AS SHOWN

WSH

LTF

WSH

04.20.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

24011

F o rt V a ll e y

S ta te

U n iv e rs it y

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T ro u p

A d m in is tr a ti o n

B u il d in g

A

H U

R e p la c e m e n ts

P ro je c t

N o

F

V S

B

ID

S E

T

M002

DETAILS - HVAC

WALL

AS SYSTEM PIPE.

MANUAL AIR VENT

TERMINATE DRAIN WITH HOSE END

CONNECTION 18" ABOVE FLOOR.

WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE

CEILING. LOCATE VALVE AND TERMINATE DRAIN

HERE, UNLESS NOTED OTHERWISE AND POSITION

VALVE FOR VERTICAL DOWN DISCHARGE.

•" PIPE SAME MATERIAL

2•"

VERTICAL

PIPE

SUPPORT

WELDED PIPETHREADED / BRAISED

PIPING

BALL VALVE (EXPOSED) OR

GATE VALVE (CONCEALED)

ARRANGEMENT FOR LOCATIONS

WITH LIMITED CLEARANCE

6"MAX.

NOT TO SCALE

AH-1

COIL

AIR FLOW

AIR HANDLER COOLING COIL

UNION

W\HOSE ADAPTOR

•" GATE VALVE

TEST

PLUGS

BALANCE

VALVE

N.C.

N.O.

(PROVIDE CONNECTIONS FOR NUMBER OF

STACKED COILS PROVIDED WITH UNIT)

(PROVIDE M.A.V. IF COIL IS NOT SELF VENTING)

C.

SUPP

LY

RETURN

NOT TO SCALE

VALVE COEFFICIENTS

SYSTEM Cv RUNOUT SIZE

TYPICAL DRAIN VALVE CONNECTION

ELEVATION

THREADED PIPING

ELEVATION

WELDED PIPING

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

ƒ" GATE VALVE

ADAPTER TO ƒ" HOSE THREAD

PROVIDE HOSE CAP NUT

NOTES:

DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.

2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS

AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.

NOT TO SCALE

BUTTERFLY VALVE

CONTROL VALVE

A

B

DRAIN LINE SHALL BE

AT LEAST THE SAME

SIZE AS THE NIPPLE

ON THE DRAIN PAN

DRAIN

PAN

1"

UNIT TYPE

WHERE X = STATIC PRESSURE IN PAN IN INCHES - H2O

A B

ADAPTER

NOT TO SCALE

DRAW THRU 2" PLUS X X

AIR HANDLING UNIT DRAIN TRAP

CLEAN OUT

SEDIMENT BUCKET

LOOSE CAP

GRATE

REMOVABLE

FITTING

LOOSE

THIS SIDE

FLOOR DRAIN (REFER TO DIVISION 220000)

FLOOR

PER FOOT SLOPE

MINIMUM 1/8 INCH

SLOPE TO DRAIN AT

1" (MIN)

DRAIN PIPE AS SPECIFIED

2" MAX.

REQUIRED BY CONDITIONS

DRAIN TERMINATION AS

BLOW THRU 1" MIN. 1.5"X

HANGER ROD - SEE SPECIFICATIONS

SECTION OF RIGID INSULATION

SPECIFIED INSULATION

PIPE

• ROUND BEARING PLATE

PLATE WASHER

CUT ROD ABOVE ANGLE LEG

1" MIN.

TRAPEZE HANGER

LONG LEG VERTICAL

SEE SPECIFICATIONS

DOUBLE HEX NUTS

TRAPEZE PIPE HANGER

NOT TO SCALE

P:\24011\24011m002.dgn

DATE PLOTTED

DGN FILE

16-APR-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24011\24011m002.dgn

AS SHOWN

WSH

LTF

WSH

04.20.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

24011

F o rt V a ll e y

S ta te

U n iv e rs it y

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T ro m in is tr a ti o n

B u il d in g

A p la c e m e n ts

P ro je c t

N o

F

V S

M003

S.A.

FAR

1 WALL

EXTERIOR

SAF

VFD

VFD R FAR

VLV

TT

LL

TT

OA

OA

AFMS

RA

R.A. AVD

FIL

T

TUC

H W

R

H W

S

ZONE

COND.

T-X

T

TUC

H W

R

H W

S

ZONE

COND.

T-X

TU-X

SAT

TU-X

SAT

SPS

Y

S T

M

G

A P

IC

D

IS

P L

A Y

S T

A R

T

S T

O P

E N

A B

L E

D

IS

A B

L E

O P

E N

C L

O S

E

S T

A R

T

S T

O P

K E

U P

S E

T P

O

IN

J

U S

T

D

C

N T

R O

L

D

IF

F E

R E

N T

IA

L

P

R E S

S U

R E

P R

E S

S U

R E

S

W

IT

C H

A U

X

IL

IA

Y

N T

A C

T

A L

A

N T

A C

T

T E

M P

E R

A T

U R

E

R E

L A

T

IV

M

ID

IT

Y

P R

E S

S U

R E

H

IG

H

L

W

L

IM

IT

R

N

T A

L

IZ

A T

IO

N

P R

O P

O R

T

IO

N A

L

P R

O P

IN

T E

G R

A L

T

IM

E

S

C H

E D

U L

E

S

S

O P

T

IM

A R

T

S T

O P

D A

Y

N

IG

T B

A C

K

D E

M A

IT

C Y

C L

E

R E S

T

IM

IZ

A T

IO

N

E C

O N

O M

IZ

E R

F A

IL

U

D E (S

T E S

A

N D

N O

T E S

OUTPUTS INPUTS SOFTWARE

DDC PANELS

INPUT/OUTPUT

SUMMARIES

DIGITAL ANALOG ANALOG ALARM DDC ENERGY MGMT.DIGITAL

C U

R R

E

L A

Y

D R

IV

E

S

T A

T U

S

S P

E E

D

IN

D

IC

A T

IO

N

S P

E

N T

R O

L

E

W

IT

C H

C O

IR

O W

PRIMARY AIR FLOW

AIR TERMINAL UNITS (TU/FP)

HC VALVE

C

O

C

NOTES:

1. FAILURE MODES:

2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF

ELECTRIC POWER TO THE DDC PANEL.

L - LAST COMMAND

L

C A

L C

U L

A T

IN

T

C

O - OPEN OR ON

C - CLOSE OR OFF

PERCENTAGE DESIGN FLOW-HEATING

PERCENTAGE DESIGN FLOW-COOLING

TAG

OA 1

OA 2

AFMS 1

FAR

TT 1

TT 2

TT 3

SPS H

SPS 1

TUC-XX

TUC-XX

TUC-XX

ZONE-SPACE TEMP.

SAT

LL

HT

CC-L.A.T.

L.L.-TEMP.

RA 1

T-XX

F.A. RELAY

P O

S

IT

IO

N

IN

D

IC

A T

IO

N

O P

E N

C L

O S

S

IT

IO

N

CC CONTROL VALVE

TT 4

ACP

C

VLV 2

HIGH LIMIT SPS

L

BUILDING PRESSUREDP 1

CHS

CHR

AID0 A0 D1

S T

A T

U S

T R

E

G

LOGS

VFD 1

AH-x

SA-TEMP.

RA TEMP.

MA TEMP.

RA-RH

RA DAMPER

MIN. OA DAMPER

MAX. OA DAMPER

MIN. OA AFMS

SA-SPS

SS FAN ARRAY-VFD

SA DAMPER ACTUATOR

SA TEMP. TO ZONE

MAX. OA AVD

MIN. OA AVD

OA

OA

NOT TO SCALE

AH FLOW DIAGRAM - HVAC

HVAC

AH FLOW DIAGRAM -

AH VAV SYSTEM

FOR REFERENCE ONLY.

AIR TERMINAL UNITS (TU/FP)

SHOWN FOR REFERENCE ONLY

EXISTING TERMINAL UNITS

LOCATE ƒ DOWN MEDIUM PRESSURE DUCT.

PROVIDE NEW STATIC PRESSURE SENSOR.

SMOKE DETECTOR

RE CONNECT TO EXISTING

AH SA FAN

DP

SPS

AI

TU-X

TU-X

TT

1AVD

RA

AH AH

CC

RA

HT

EXISTINGNEW WORK

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

SD

P:\24011\24011m003.dgn

DATE PLOTTED

DGN FILE

16-APR-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24011\24011m003.dgn

AS SHOWN

WSH

LTF

WSH

04.20.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

24011

F o rt V a ll e y

S ta te

U n iv e rs it y

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T ro m in is tr a ti o n

B u il d in g

A p la c e m e n ts

P ro je c t

N o

F

V S

M201

FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - HVAC

SCALE:

= 1'-0

4 0 2 4 8

NEW WORK - HVAC

DEMOLITION &

MECHANICAL ROOM -

FIRST FLOOR PLAN -

RF-1

CP-1

UH-2UH-1

10/6

12/10 UP w/FD

10/10

BLR-1

AHU-1

50/30

60/24

SCALE:

= 1'-0

4 0 2 4 8

FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK - HVAC

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

SD

EXISTING

EXISTING

EXISTING

EXISTING

TO CHILLER

4" BELOW GRADE

TO CHILLER

4" BELOW GRADE

2•"

EXPANSION TANK

EXISTING

CHEMICAL FEEDER

EXISTING HW BYPASS

HP-1

EXISTING

BOILER FLUE UP

EXISTING 10"{EXISTING WH

1•"

2•"

& REFRIGERATED DRYER

AIR COMPRESSOR

EXISTING CONTROL

FM

PUMP GAUGE

MOUNTED

EXISTING WALL

CHEMICAL FEEDER

EXISTING CH BYPASS

EXISTING 50/22 SA

4"1 "

ROOM CONTROL PANEL

EXISTING BOILER

1•"

T

FACP

LDP LA

HA

MSG

50/24

CHS

HWS

RISERS UP

2•" HWR/S

3" CHR/S UP

AFMS

EXISTING

REMOVE

EXISTING

REMOVE

EXISTING 24/60 RA

REMOVE

TO REMAIN

EXISTING CONCRETE PAD

REMOVE EXISTING AFMS

2•"

MIXING BOX

FILTER

COOLING COIL

FANAH-1

36/30 12/6

SCALE:

= 1'-0

4 0 2 4 8

AHU-1

F

IL

T E

R

50/22

MAX OA AVD

MIN OA AVD

60"x72" PLENUM

AFMS

C O

O L

IN

G

IL

24/64

FAN

30/50

EXISTING CONCRETE PAD

PORTION OF LOUVER NOT USED

BLANK-OFF PANEL OVER

PROVIDE INSULATED METAL

B O

X

M

IX

IN

G

EXISTING LOUVER 30/36

AFMS

6/12

MAX OA AVD

22/50 SA

30/60 RA

DN

VFD

ACP

RA FAN

SA STR

AHU

AH-1

VF

D

AP

AP

AVD

RA

AP

SECTION AHU - NEW WORK - HVAC

PROTECT EXISTING DATA RACK AND EQUIPMENT.

INSTALL EXISTING BIOPOLAR IONIZATION UNIT IN NEW SA DUCTWORK.

AIR HANDLER.

REMOVE EXISTING OA INTAKE LOUVER TO ALLOW REMOVAL OF EXISTING

IN NEW DUCTWORK.

REMOVE EXISTING BIPOLAR IONIZATION UNIT. SAVE FOR INSTALLATION

IS PLACED INSIDE MECHANICAL ROOM.

REINSTALL EXISTING OA INTAKE LOUVER AFTER NEW AIR HANDLER

REMOVE EXISTING COMBINATION STARTER/DISCONNECT.

REMOVE EXISTING VFD; TURN OVER TO FVSU.

NOTES:(THIS SHEET ONLY)

OF LOUVER NOT USED.

PROVIDE INSULATED METAL BLANK-OFF PANEL OVER PORTION

P:\24011\24011m201.dgn

DATE PLOTTED

DGN FILE

16-APR-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24011\24011m201.dgn

AS SHOWN

WSH

LTF

WSH

04.20.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

24011

F o rt V a ll e y

S ta te

U n iv e rs it y

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T ro m in is tr a ti o n

B u il d in g

A p la c e m e n ts

P ro je c t

N o

F

V S

T

CP-1

UH-2UH-1

10/6

12/10 UP w/FD

10/10

BLR-1

50/30

SD

EXISTING

EXISTING

EXISTING

EXISTING

TO CHILLER

4" BELOW GRADE

TO CHILLER

4" BELOW GRADE

EXPANSION TANK

EXISTING

CHEMICAL FEEDER

EXISTING HW BYPASS

HP-1

EXISTING

BOILER FLUE UP

EXISTING 10"{EXISTING WH

1•"

2•"

& REFRIGERATED DRYER

AIR COMPRESSOR

EXISTING CONTROL

FM

PUMP GAUGE

MOUNTED

EXISTING WALL

CHEMICAL FEEDER

EXISTING CH BYPASS

EXISTING 50/22 SA

4"1 "

ROOM CONTROL PANEL

EXISTING BOILER

1•"

T

FACP

LDP LA

HA

MSG

CHS

HWS

RISERS UP

2•" HWR/S

3" CHR/S UP

AFMS

TO REMAIN

EXISTING CONCRETE PAD

ACP

M202

SCALE:

= 1'-0

4 0 2 4 8

RF-2

10/610/12

AHU-2

50/30

60/24

SCALE:

= 1'-0

4 0 2 4 8

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

NEW WORK - HVAC

DEMOLITION &

MECHANICAL ROOM -

SECOND FLOOR PLAN -

SECOND FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - HVAC

SECOND FLOOR PLAN - MECHANICAL ROOM - NEW WORK - HVAC

12/10 UPFD

SD

EXISTING 50/22 SA

AFMS

50/24

2•" CHR/S UP

HB

LB

2•"

ACP

EXISTING 24/60 RA

REMOVE

EXISTING

REMOVE

EXISTING

REMOVE

TO REMAIN

EXISTING CONCRETE PAD

REMOVE EXISTING AFMS

2•"2•"

MIXING BOX

COOLING COIL

FANAH-2

36/30 12/6

60/22

MAX OA AVD

MIN OA AVD

60"x72" PLENUM

AFMS

FILTER

COOLING COIL

DN

VFD

RA FAN

SA FAN

AHU

AH-2

VF

D

PROTECT EXISTING DATA RACK AND EQUIPMENT.

INSTALL EXISTING BIOPOLAR IONIZATION UNIT IN NEW SA DUCTWORK.

AIR HANDLER.

REMOVE EXISTING OA INTAKE LOUVER TO ALLOW REMOVAL OF EXISTING

IN NEW DUCTWORK.

REMOVE EXISTING BIPOLAR IONIZATION UNIT. SAVE FOR INSTALLATION

IS PLACED INSIDE MECHANICAL ROOM.

REINSTALL EXISTING OA INTAKE LOUVER AFTER NEW AIR HANDLER

REMOVE EXISTING COMBINATION STARTER/DISCONNECT.

REMOVE EXISTING VFD; TURN OVER TO FVSU.

NOTES:(THIS SHEET ONLY)

OF LOUVER NOT USED.

PROVIDE INSULATED METAL BLANK-OFF PANEL OVER PORTION

P:\24011\24011m202.dgn

DATE PLOTTED

DGN FILE

16-APR-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24011\24011m202.dgn

AS SHOWN

WSH

LTF

WSH

04.20.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

24011

F o rt V a ll e y

S ta te

U n iv e rs it y

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T ro m in is tr a ti o n

B u il d in g

A p la c e m e n ts

P ro je c t

N o

F

V S

T

10/610/12

50/30

12/10 UPFD

SD

EXISTING 50/22 SA

AFMS

2•" CHR/S UP

HB

LB

ACP

TO REMAIN

M203

SCALE:

= 1'-0

4 0 2 4 8

RF-3

AHU-3

50/24

60/24

SCALE:

= 1'-0

4 0 2 4 8

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

THIRD FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - HVAC

NEW WORK - HVAC

DEMOLITION &

MECHANICAL ROOM -

THIRD FLOOR PLAN -

THIRD FLOOR PLAN - MECHANICAL ROOM - NEW WORK - HVAC

2•"

2•" CHR/S UP

SD

ACPAFMS

50/24

TO REMAIN

EXISTING CONCRETE PAD

EXISTING 24/60 RA

REMOVE

REMOVE EXISTING AFMS

EXISTING

REMOVE

EXISTING

REMOVE

2•"

MIXING BOX

FAN

36/30 12/6

MAX OA AVD

MIN OA AVD

60"x72" PLENUM

AFMS

FILTER

COOLING COIL

FANAH-3

DN

SA FAN

AHU

RA FAN

VFD

PROTECT EXISTING DATA RACK AND EQUIPMENT.

INSTALL EXISTING BIOPOLAR IONIZATION UNIT IN NEW SA DUCTWORK.

AIR HANDLER.

REMOVE EXISTING OA INTAKE LOUVER TO ALLOW REMOVAL OF EXISTING

IN NEW DUCTWORK.

REMOVE EXISTING BIPOLAR IONIZATION UNIT. SAVE FOR INSTALLATION

IS PLACED INSIDE MECHANICAL ROOM.

REINSTALL EXISTING OA INTAKE LOUVER AFTER NEW AIR HANDLER

REMOVE EXISTING COMBINATION STARTER/DISCONNECT.

REMOVE EXISTING VFD; TURN OVER TO FVSU.

NOTES:(THIS SHEET ONLY)

66/22

AH-3

VF

D

9 TRANSITION TO SIZE OF EXISTING DUCT AT WALL.

OF LOUVER NOT USED.

PROVIDE INSULATED METAL BLANK-OFF PANEL OVER PORTION

P:\24011\24011m203.dgn

DATE PLOTTED

DGN FILE

16-APR-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24011\24011m203.dgn

AS SHOWN

WSH

LTF

WSH

04.20.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

24011

F o rt V a ll e y

S ta te

U n iv e rs it y

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T ro m in is tr a ti o n

B u il d in g

A p la c e m e n ts

P ro je c t

N o

F

V S

T

50/24

2•" CHR/S UP

SD

ACPAFMS

E001

ELECTRICAL

& RISER -

LEGEND, SCHEDULE,

PE

EWC

WP

F

T

M

JJ J

UI

CEILING MOUNTED FIXTURE

WALL MOUNTED FIXTURE

EXIT LIGHT (ARROWS AS SHOWN)

ELECTRICAL LEGEND

LIGHTING CONTROL

CEILING MOUNTED COMBINATION INFRARED/

EXTERIOR TYPE PHOTO ELECTRIC SWITCH

INFRARED OCCUPANCY SENSOR

WALL MOUNTED SWITCH

DIMMER SWITCH

THREE WAY SWITCH

SINGLE POLE SWITCH

RECEPTACLES

DUPLEX - NORMAL

GFI DUPLEX - NORMAL

FLOOR OUTLET DUPLEX - NORMAL

CEILING OUTLET DUPLEX - NORMAL

SPECIAL - TYPE NOTED OR SHOWN

CIRCUITS

HOMERUN- ONE ARROW PER CIRCUIT

CONNECTION TO EQUIPMENT

CAP

CONDUIT DOWN

CONDUIT UP

GENERAL EQUIPMENT

TRANSFORMER

DISCONNECT SWITCH: "F" IF FUSED

FRAME AMPS/POLES/NEMA TYPE

FUSE PER MANUFACTURERS RECOMMENDATIONS

ENCLOSED CIRCUIT BREAKER

MANUAL STARTER AND MOTOR RATED SWITCH

JUNCTION BOX - WALL/CEILING/FLOOR

SURGE SUPPRESSOR

BACKBOARD

FIRE PROTECTION EQUIPMENT

COMMUNICATIONS

F

VISUAL ALARM: CEILING/WALL

MANUAL PULL STATION

FIRE ALARM ANNUNCIATOR

FIRE ALARM PANEL

DUCT MOUNTED SMOKE DETECTOR

SMOKE DETECTOR: CEILING / WALL

HEAT DETECTOR: CEILING / WALL

WATER FLOW SWITCH

WATER TAMPER SWITCH

L

D

I

LOW VOLTAGE SWITCH

CEILING SPECIAL - TYPE NOTED OR SHOWN

WEATHER PROOF OUTLET (GFCI)

ELECTRIC WATER COOLER OUTLET (GFCI)

FACP

FAA

C

WF

VS

LED ON "NORMAL" POWER

WALL/CEILING RACEWAY

AUTO SHUT OFF

ULTRASONIC OCCUPANCY SENSOR AND RELAY - VACANCY

H HORIZONTALLY MOUNTED DUPLEX RECEPTACLE

K KEYED SWITCH

USB

TV TV DUPLEX

J-HOOK

R RELAY

S

TV

S

B

VOICE OUTLET, QUANTITY OF JACKS AS NOTED

DATA OUTLET, QUANTITY OF JACKS AS NOTED

FLOOR VOICE OUTLET, QUANTITY OF JACKS

AS NOTED

FLOOR DATA OUTLET, QUANTITY OF JACKS

AS NOTED

FLOOR COMBINATION VOICE/DATA OUTLET,

QUANTITY OF JACKS AS NOTED

BOX, STUB-UP, AND MODULAR PLATE W/ BLANKS

TELEVISION OUTLET

SPEAKER: CEILING/WALL

FIBER OUTLET

COMBINATION VOICE/DATA OUTLET, QUANTITY

OF VOICE/DATA JACKS AS NOTED

THREE WAY DIMMER SWITCH

FOUR WAY DIMMER SWITCH

DUPLEX WITH INTEGRAL USB

D4

D3

C

CEILING/WALL MOUNTED CAMERA LOCATION

AC ABOVE COUNTER COORDINATE WITH ARCHITECT

C

AUDIO/VISUAL ALARM: CEILING/WALL

SPEAKER/STROBE ALARM: CEILING/WALL

QUADRUPLEX - NORMAL

GFI QUADRUPLEX - NORMAL

FLOOR OUTLET QUADRUPLEX - NORMAL

DP INTERIOR DIMMING PHOTOCELL

LIGHTING FIXTURES (SYMBOLS VARY BASED ON FIXTURES TYPE)

CONDUIT CONCEALED IN CEILING OR WALL

CONDUIT IN GROUND, SLAB, OR UNDER FLOOR

CONDUIT EXPOSED

FLEXIBLE CONDUIT

SURFACE MOUNTED PANELBOARD

RECESSED PANELBOARD

L4 FOUR WAY LOW VOLTAGE SWITCH L2 TWO WAY LOW VOLTAGE SWITCH

EXISTING POWER RISER - ELECTRICAL

NOT TO SCALE

LCC HCC

THIRD FLOOR

LC HC

LBB HBB

SECOND FLOOR

LB HB

LAA HAA

FIRST FLOOR

LA HALDP

T

T

500KVA

TRANSFORMER

PAD MOUNTED

3PH, 4W

480Y/277 VOLT

TO

12470 VOLT DELTA

150KVA

3PH, 4W

208Y/120V

480V TO

LDP-2

LDP-2

MSG-3 MSG-4

MSG-6

REUSE EXISTING 30A/2P BREAKER ABANDONDED DURING DEMOLITION TO SERVE THIS NEW EQUIPMENT.

NOTES:(THIS SHEET ONLY)

30A/3P

REMOVE EXISTING 3P BREAKER AND PROVIDE A NEW ONE PER NOTE 3/E202.2

3 REMOVE EXISTING 3P BREAKER AND PROVIDE A NEW ONE PER NOTE 3/E203.

LIGHTING FIXTURE SCHEDULE

MARK LAMPS FIXTURE TYPE-SEE SPECIFICATIONS MOUNTING REMARKSVOLT.

A

METALUX 4SNLED

ACUITY CLX

COLUMBIA MPS STRIP

4' LINEAR LED STRIP

A.F.F.

@ 8'-0"

OR CHAIN

SURFACE

3500K

32 WATTS

5000 LUMENS

LED

BY:

EQUALS

UNIV.

P:\24011\24011e001.dgn

DATE PLOTTED

DGN FILE

16-APR-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24011\24011e001.dgn

AS SHOWN

04.20.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

TWT

TWT

24011

LTF

F o rt V a ll e y

S ta te

U n iv e rs it y

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T ro m in is tr a ti o n

B u il d in g

A p la c e m e n ts

P ro je c t

N o

F

V S

E201

FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - ELEC

SCALE:

= 1'-0

4 0 2 4 8

NEW WORK - ELEC

DEMOLITION &

MECHANICAL ROOM -

FIRST FLOOR PLAN -

RF-1

CP-1

UH-2UH-1

BLR-1

AHU-1

SCALE:

= 1'-0

4 0 2 4 8

FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK - ELEC

EXISTING

EXISTING

EXISTING

EXISTING

EXPANSION TANK

EXISTING

CHEMICAL FEEDER

EXISTING HW BYPASS

HP-1

EXISTING

EXISTING WH

& REFRIGERATED DRYER

AIR COMPRESSOR

EXISTING CONTROL

PUMP GAUGE

MOUNTED

EXISTING WALL

CHEMICAL FEEDER

EXISTING CH BYPASS

ACP DDC

ROOM CONTROL PANEL

EXISTING BOILER

T

FACP

LDP

LA

HA

MSG

EXISTING

REMOVE

EXISTING

REMOVE

TO REMAIN

EXISTING CONCRETE PAD

LAA-17,19

LAA-21

HAA-12

LAA-23

HAA-11

LA-29

LA-31

HA-9

VFD

SA STR

AHU

RA FAN

GENERAL NOTES:(THIS SHEET ONLY)

CONDITIONS AT THE SITE MAY VARY.

NEITHER THE OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT" DOCUMENTS AND ACTUAL

DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING "AS-DESIGN" DOCUMENTS.

DEMOLITION/NEW WORK.

WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED TO COMPLETE THE

THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION/NEW WORK AND IN NO

COORDINATE DEMOLITION WORK WITH NEW WORK.

OR NEAR AREA REQUIRING WORK.

PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS, COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO

SURROUNDINGS.

BOXES. WHERE CONDUIT IN SLAB IS ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH EXISTING

TERMINATION. THERE SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK COVER FOR ANY ABANDONED

REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO LONGER BE IN USE TO THE POINT OF LAST

CIRCUITS ARE BEING REPLACED.

REUSE HOMERUN CONDUITS WHEREVER POSSIBLE. REPLACE BRANCH CIRCUIT CONDUCTORS WHERE ENTIRE

A

B

C

D

E

F

FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - ELEC

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK LIGHTING - ELEC

A A

A

A

A

HA-10

HA-

NOTES:(THIS SHEET ONLY)

TURN EXISTING VFD OVER TO OWNER.

LABEL ABANDONED BREAKER AS "SPARE". PROVIDE UPDATED TYPE WRITTEN PANEL SCHEDULE.

DEMOLISH/REMOVE EXISTING STARTER/VFD, & CONDUCTORS BACK TO SERVING BREAKER.

2 REUSE EXISTING LIGHTING HOMERUN FOR NEW WORK.

ROUTE CIRCUIT THRU VFD. ELECTRICIAN TO MAKE ALL FINAL CONNECTIONS.

REUSE EXISTING 30A/3P BREAKER IN PANEL HA ABANDONED BY DEMOLITION FOR NEW AH-1.

MAKE ALL FINAL CONNECTIONS.

ROUTE 3#12 IN •"C TO A SPARE 20/1P BREAKER IN PANEL LA FOR UV LIGHTING IN AH-1.

LA-

A

WALLMOUNT

WALLMOUNT

WALLMOUNT

POSITION. PROVIDE AN UNSWITCHED HOT FOR SENSING POWER LOSS.

SUCH THAT UPON LOSS OF POWER THIS FIXTURE SHALL ILLUMINATE REGARDLESS OF SWITCH

FIXTURE SHALL BE PROVIDED WITH INTEGRAL BATTERY BACKUP OR WITH A MICROINVERTER

NEW SWITCH IN EXISTING LOCATION

LINE LEGEND

NEW WORK

DEMOLITION

EXISTING TO REMAIN

M

UV LTS

P:\24011\24011e201.dgn

DATE PLOTTED

DGN FILE

16-APR-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24011\24011e201.dgn

AS SHOWN

04.20.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

TWT

TWT

24011

LTF

F o rt V a ll e y

S ta te

U n iv e rs it y

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T ro m in is tr a ti o n

B u il d in g

A p la c e m e n ts

P ro je c t

N o

F

V S

T

CP-1

UH-2UH-1

BLR-1

EXISTING

EXISTING

EXISTING

EXISTING

EXPANSION TANK

EXISTING

CHEMICAL FEEDER

EXISTING HW BYPASS

HP-1

EXISTING

EXISTING WH

& REFRIGERATED DRYER

AIR COMPRESSOR

EXISTING CONTROL

PUMP GAUGE

MOUNTED

EXISTING WALL

CHEMICAL FEEDER

EXISTING CH BYPASS

ACP DDC

ROOM CONTROL PANEL

EXISTING BOILER

T

FACP

LDP

LA

HA

MSG

TO REMAIN

EXISTING CONCRETE PAD

LAA-17,19

LAA-21

HAA-12

LAA-23

HAA-11

LA-29

LA-31

AH-1

AH-1

VF

E202

SCALE:

= 1'-0

4 0 2 4 8

RF-2

AHU-2

SCALE:

= 1'-0

4 0 2 4 8

SECOND FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - ELEC

SECOND FLOOR PLAN - MECHANICAL ROOM - NEW WORK - ELEC

HB

LB

DDCACP

EXISTING

REMOVE

EXISTING

REMOVE

TO REMAIN

EXISTING CONCRETE PAD

NEW WORK - ELEC

DEMOLITION &

MECHANICAL ROOM -

SECOND FLOOR PLAN -

HB-13

HB-16

LINE LEGEND

NEW WORK

DEMOLITION

EXISTING TO REMAIN

GENERAL NOTES:(THIS SHEET ONLY)

CONDITIONS AT THE SITE MAY VARY.

NEITHER THE OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT" DOCUMENTS AND ACTUAL

DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING "AS-DESIGN" DOCUMENTS.

DEMOLITION/NEW WORK.

WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED TO COMPLETE THE

THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION/NEW WORK AND IN NO

COORDINATE DEMOLITION WORK WITH NEW WORK.

OR NEAR AREA REQUIRING WORK.

PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS, COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO

SURROUNDINGS.

BOXES. WHERE CONDUIT IN SLAB IS ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH EXISTING

TERMINATION. THERE SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK COVER FOR ANY ABANDONED

REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO LONGER BE IN USE TO THE POINT OF LAST

CIRCUITS ARE BEING REPLACED.

REUSE HOMERUN CONDUITS WHEREVER POSSIBLE. REPLACE BRANCH CIRCUIT CONDUCTORS WHERE ENTIRE

A

B

C

D

E

F

NOTES:(THIS SHEET ONLY)

TURN EXISTING VFD OVER TO OWNER.

LABEL ABANDONED BREAKER AS "SPARE". PROVIDE UPDATED TYPE WRITTEN PANEL SCHEDULE.

DEMOLISH/REMOVE EXISTING STARTER/VFD, & CONDUCTORS BACK TO SERVING BREAKER.

2 REUSE EXISTING LIGHTING HOMERUN FOR NEW WORK.

MAKE ALL FINAL CONNECTIONS.

ROUTE 3#12 IN •"C TO A SPARE 20/1P BREAKER IN PANEL LB FOR UV LIGHTING IN AH-2.

POSITION. PROVIDE AN UNSWITCHED HOT FOR SENSING POWER LOSS.

SUCH THAT UPON LOSS OF POWER THIS FIXTURE SHALL ILLUMINATE REGARDLESS OF SWITCH

FIXTURE SHALL BE PROVIDED WITH INTEGRAL BATTERY BACKUP OR WITH A MICROINVERTER

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

SECOND FLOOR PLAN - MECHANICAL ROOM - NEW WORK LIGHTING - ELEC

SECOND FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - ELEC

KAIC RATING. ROUTE CIRCUIT THRU NEW VFD. ELECTRICIAN TO MAKE ALL FINAL CONNECTIONS.

WITH A NEW 45A/3P BREAKER FOR NEW AH-2. NEW BREAKER SHALL MATCH EXISTING PANEL

REMOVE EXISTING 20A/3P BREAKER IN PANEL HB ABANDONED BY DEMOLITION AND REPLACE

HB-

4#6, 1#10G, 1"C

4#6, 1#10G, 1"C

M

UV LTS LB-

A

A

A

A

A

NEW SWITCH IN EXISTING LOCATION

P:\24011\24011e202.dgn

DATE PLOTTED

DGN FILE

16-APR-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24011\24011e202.dgn

AS SHOWN

04.20.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

TWT

TWT

24011

LTF

F o rt V a ll e y

S ta te

U n iv e rs it y

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T ro m in is tr a ti o n

B u il d in g

A p la c e m e n ts

P ro je c t

N o

F

V S

T

HB

LB

DDCACP

TO REMAIN

EXISTING CONCRETE PAD

AH-2

AH-2

VF

E203

SCALE:

= 1'-0

4 0 2 4 8

RF-3

AHU-3

SCALE:

= 1'-0

4 0 2 4 8

THIRD FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - ELEC

NEW WORK - ELEC

DEMOLITION &

MECHANICAL ROOM -

THIRD FLOOR PLAN -

THIRD FLOOR PLAN - MECHANICAL ROOM - NEW WORK - ELEC

HC

LC

DDCACP TO REMAIN

EXISTING CONCRETE PAD

EXISTING

REMOVE

EXISTING

REMOVE

HC-13

HC-8

LINE LEGEND

NEW WORK

DEMOLITION

EXISTING TO REMAIN

4 0 2 4 8

FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK LIGHTING - ELEC

SCALE:

= 1'-0

SCALE:

= 1'-0

4 0 2 4 8

GENERAL NOTES:(THIS SHEET ONLY)

CONDITIONS AT THE SITE MAY VARY.

NEITHER THE OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT" DOCUMENTS AND ACTUAL

DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING "AS-DESIGN" DOCUMENTS.

DEMOLITION/NEW WORK.

WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED TO COMPLETE THE

THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION/NEW WORK AND IN NO

COORDINATE DEMOLITION WORK WITH NEW WORK.

OR NEAR AREA REQUIRING WORK.

PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS, COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO

SURROUNDINGS.

BOXES. WHERE CONDUIT IN SLAB IS ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH EXISTING

TERMINATION. THERE SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK COVER FOR ANY ABANDONED

REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO LONGER BE IN USE TO THE POINT OF LAST

CIRCUITS ARE BEING REPLACED.

REUSE HOMERUN CONDUITS WHEREVER POSSIBLE. REPLACE BRANCH CIRCUIT CONDUCTORS WHERE ENTIRE

A

B

C

D

E

F

NOTES:(THIS SHEET ONLY)

TURN EXISTING VFD OVER TO OWNER.

LABEL ABANDONED BREAKER AS "SPARE". PROVIDE UPDATED TYPE WRITTEN PANEL SCHEDULE.

DEMOLISH/REMOVE EXISTING STARTER/VFD, & CONDUCTORS BACK TO SERVING BREAKER.

2 REUSE EXISTING LIGHTING HOMERUN FOR NEW WORK.

MAKE ALL FINAL CONNECTIONS.

ROUTE 3#12 IN •"C TO A SPARE 20/1P BREAKER IN PANEL LA FOR UV LIGHTING IN AH-3.

POSITION. PROVIDE AN UNSWITCHED HOT FOR SENSING POWER LOSS.

SUCH THAT UPON LOSS OF POWER THIS FIXTURE SHALL ILLUMINATE REGARDLESS OF SWITCH

FIXTURE SHALL BE PROVIDED WITH INTEGRAL BATTERY BACKUP OR WITH A MICROINVERTER

THIRD FLOOR PLAN - MECHANICAL ROOM - DEMOLITION LIGHTING - ELEC

SA FAN

AHU

RA FAN

VFD

HC-

LC-

M

UV LTS

A

A

A

NEW SWITCH IN EXISTING LOCATION

KAIC RATING. ROUTE CIRCUIT THRU NEW VFD. ELECTRICIAN TO MAKE ALL FINAL CONNECTIONS.

WITH A NEW 45A/3P BREAKER FOR NEW AH-3. NEW BREAKER SHALL MATCH EXISTING PANEL

REMOVE EXISTING 20A/3P BREAKER IN PANEL HB ABANDONED BY DEMOLITION AND REPLACE

4#6, 1#10G, 1"C

4#6, 1#10G, 1"C

P:\24011\24011e203.dgn

DATE PLOTTED

DGN FILE

16-APR-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24011\24011e203.dgn

AS SHOWN

04.20.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

TWT

TWT

24011

LTF

F o rt V a ll e y

S ta te

U n iv e rs it y

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T ro m in is tr a ti o n

B u il d in g

A p la c e m e n ts

P ro je c t

N o

F

V S

T

HC

LC

AH-3

AH-3

VF

D

50/24

2•" CHR/S UP

SD

ACPAFMS

24011aCov
24011m001
References
tb, 24011tb.dgn
24011m002
References
tb, 24011tb.dgn
24011m003
References
tb, 24011tb.dgn
24011m201
References
tb, 24011tb.dgn
axfp1, 24011aX1.dgn
axfp2, 24011aX1.dgn
existing, 24011m201.dgn
24011m202
References
tb, 24011tb.dgn
axfp1, 24011aX2.dgn
axfp2, 24011aX2.dgn
existing, 24011m202.dgn
24011m203
References
tb, 24011tb.dgn
axfp1, 24011aX3.dgn
axfp2, 24011aX3.dgn
existing, 24011m203.dgn
Ref, 24011m202.dgn
24011e001
References
tb, 24011tb.dgn
24011e201
References
tb, 24011tb.dgn
axfp1, 24011aX1.dgn
axfp2, 24011aX1.dgn
existingD2, 24011e201.dgn
ExistingD4, 24011e201.dgn
24011m201.dgn
axfp1-1, 24011aX1.dgn
axfp2-1, 24011aX1.dgn
ElectricalNotesV.dgn
24011e202
References
tb, 24011tb.dgn
axfp1, 24011aX2.dgn
axfp2, 24011aX2.dgn
existing, 24011e202.dgn
axfp1-1, 24011aX2.dgn
axfp2-1, 24011aX2.dgn
NEWhvac, 24011m202.dgn
24011e203
References
tb, 24011tb.dgn
axfp1, 24011aX3.dgn
axfp2, 24011aX3.dgn
EXIST, 24011e203.dgn
HVAC, 24011m203.dgn
axfp1-1, 24011aX3.dgn
axfp2-1, 24011aX3.dgn
existing-1, 24011e203.dgn
Ref1, 24011e202.dgn