2024_04_15 FVSU_Troup AHUs Drawings.pdf
PDF 3 MB Posted
- Attached to
- FVSU-Troup Air Handling Unit Replacement
- Solicitation number
- PE-53300-RFP-2024-000000020
- Issued by
- Paulding County, Georgia
About this file
This document is a set of drawings and specifications for the Fort Valley State University Troup Administration Building Air Handling Unit Replacement project in Georgia. The project involves the replacement of air handling units on the first, second, and third floors of the Troup Administration Building. The drawings detail the demolition and new work required, including the installation of three new air handling units with associated ductwork, piping, and electrical work. The project is being bid as a construction project, with a bid set date of April 20, 2024. The contract will be awarded to a qualified contractor, and the project is located in Peach County, Georgia.
The drawings provide detailed information on the air handling unit schedules, HVAC system design, and electrical work required. There are two deductive alternates included, which allow for the omission of the first and second floor air handling units from the contract. Pricing information is not included in the document, but the contract will likely be awarded based on the lowest responsive and responsible bid. Funding for the project is not specified, but it is a state and local government contract opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
SHEET NO. TITLE
M001 ABBREVIATIONS, LEGENDS, & SCHEDULES - HVAC
M002 DETAILS - HVAC
M201
M202
M203
E001
1005 State University Drive; Fort Valley, Georgia 31030
Troup Administration Building - AHU Replacements
Fort Valley State University
FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC
SECOND FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC
THIRD FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC
E201
E202
E203
FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL
SECOND FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL
THIRD FLOOR PLAN - MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL
LEGEND, SCHEDULE, & RISER - ELECTRICAL
M003 AH FLOW DIAGRAM - HVAC
Project No.: FVSUA 042024
04.20.24 BID SET
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
?F DEGREES FAHRENHEIT
?C DEGREES CENTIGRADE
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
SINGLE LINE DUCT LEGEND
DUCT (SUPPLY, RETURN & EXHAUST)
SUPPLY DUCT UP
SUPPLY DUCT DOWN
RETURN OR EXHAUST DUCT UP
RETURN OR EXHAUST DUCT DOWN
DUCT RISE
DUCT DOWN
VOLUME DAMPER (MANUAL UNLESS INDICATED A.V.D.)
TRANSITION
DUCT TAKE-OFF (SEE SPEC. PERTAINING TO DEFLECTROLS)
TRANSITION (FLAT ON TOP)
TRANSITION (FLAT ON BOTTOM)
TRANSITION (TOP OR BOTTOM ONLY)
SUPPLY CEILING DIFFUSER
RETURN OR EXHAUST CEILING GRILLE
SIDEWALL SUPPLY
SIDEWALL RETURN
FLEXIBLE CONNECTION (DUCT)
RELIEF AIR SUPPLY TO TOILET
DUCT SPLIT WITH SPLITTER DAMPER
FLEX. DUCT WITH SCREW ON COLLAR, TAKE-OFF
DUCT WITH DUCT LINER
SQUARE ELBOW WITH TURNING VANES
RADIUS ELBOW (SEE SPECS. PERTAINING TO TURNING VANES)
AUTOMATIC VOLUME DAMPER
DN
R
12\10 SPLIT
OR
OR
SCD
FOB
T OR B
RAS
AVD
FD/SCD
FD
SMOKE CONTROL DAMPER
COMBINATION FIRE/SMOKE CONTROL DAMPER
FIRE DAMPER (FD)
FIRE DAMPER
SPS
SD
COMBINATION STARTER
STARTER
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALL VALVE WITH
3/4" HOSE END
BALANCE VALVE
THREADED & FLANGED
GLOBE VALVE
CHECK VALVE
3-WAY MIXING VALVE
BALL VALVE
BUTTERFLY VALVE
SOLENOID VALVE
CONTROL VALVE
PLAN VIEW
2-WAY MOTORIZED VALVE
RELIEF VALVE
FLANGED UNION
BRANCH OUT TOP
STRAINER
BRANCH OUT BOTTOM
ELBOW DOWN
ELBOW UP
TEE OUT TOP
BLIND FLANGE
PIPE CAP
AUTOMATIC AIR VENTAAV
FLEX. PIPE CONN.
BACKFLOW PREVENTER
THERMOMETER
TEE OUT BOTTOM
MANUAL AIR VENT
PIPE TEST PLUG
HEATING WATER FLOW
COLD WATER DOMESTIC
NATURAL GAS
CONDENSER WATER FLOW
DRAIN
HEATING WATER RETURN
HOT WATER DOMESTIC
G
D
DUCT SIZE FIRST DIMENSION
IS SIDE SHOWN
24\12
DOOR GRILLE
REFERS TO DETAIL OR
PLAN ON SHEET M-1.THERMOSTAT
INTERVAL TIMER
T
I.T.
1\M-4
DUCT/PLENUM w/LINER
FIRE DAMPER
ELBOW WITH
TURNING VANES
FLEX. DUCT CONN.
TURNING VANES
ELBOW WITHOUT
ADJUSTABLE AIR
EXTRACTOR
INSULATED FLEX. DUCT
INSULATED FLEX. DUCT
c
ECCENTRIC REDUCER
HWS
HWR
SCHS
SCHR
CONDENSER WATER RETURN
CS
CR
STATIC PRESSURE SENSOR
SMOKE DETECTOR
POINT OF CONNECTION
DUCT SPLIT
THREADED & FLANGED
THREADED & FLANGED
UNION
GAUGE TAPPING
GAUGE WITH TAPPING
THREADED & FLANGED
THREADED & FLANGED
PIPE SOCKET WELL
FLOW INDICATOR BALANCER
M
T G THERMOSTAT w/GROUND
ANNULAR ELEMENT FLOW STATION
M
DAMPER - BLADE VIEW DAMPER - END VIEW
xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)
DOUBLE WALL INSULATED
ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}
CHILLED WATER FLOW
CHILLED WATER RETURN
CHS
CHR
WATER SUPPLY
SECONDARY CHILLED
WATER RETURN
SECONDARY CHILLED
CV
CVA
CONSTANT VOLUME
ADJUSTABLE
CONSTANT VOLUME
CFM
PRESSURE SENSOR
SUMMER WINTER
DESIGN CONDITIONS
OUTSIDE
INSIDE
95 F DB / 76 F WB 20 F DB
75 F DB / 55% RH 72 F DB
MARK
ASSUMED
TYPE
TOTAL FAN
TYPE
AIRFLOW
TSP (IN.) HP
NOTES:
AH-1
(IN.)
E.S.P.
EWT
F
LWT
F
TOTAL SENSIBLE GPM
COOLING COIL
CFM
COIL EADB EAWB LADB LAWB
(IN.) H2OCFM CFM
MBH MBH( F) ( F) ( F) ( F) (FT)
AIR HANDLING UNIT SCHEDULE
AH-2
AH-3
M001
SCHEDULES - HVAC
LEGENDS, &
ABBREVIATIONS,
A.P.D. REMARKS
VAV
VAV
VAV
1 1,600
12,200
10,000
1.25
1.25
1.25
2.8
3.1
2.5
DWDI
DWDI
DWDI 79.5 66.1
54.8
53.7
54.9
54.3
53.5
54.4
79.5 66.1
79.5 66.11 1,600
12,200
10,000
MIN. OA MOTOR
0.85
1.1
0.71 45 56
45 56
45 56
W.P.D.
10.5
10.6
6.0
ALL THREE AIR HANDLERS ARE OWNER FURNISHED; CONTRACTOR INSTALLED.
3 DEDUCTIVE ALTERNATE 2: OMIT SECOND FLOOR AH-2 FROM THE CONTRACT.
DEDUCTIVE ALTERNATE 1: OMIT FIRST FLOOR AH-1 FROM THE CONTRACT.
P:\24011\24011m001.dgn
DATE PLOTTED
DGN FILE
16-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24011\24011m001.dgn
AS SHOWN
WSH
LTF
WSH
04.20.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
24011
F o rt V a ll e y
S ta te
U n iv e rs it y
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T ro u p
A d m in is tr a ti o n
B u il d in g
A
H U
R e p la c e m e n ts
P ro je c t
N o
F
V S
B
ID
S E
T
M002
DETAILS - HVAC
WALL
AS SYSTEM PIPE.
MANUAL AIR VENT
TERMINATE DRAIN WITH HOSE END
CONNECTION 18" ABOVE FLOOR.
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
CEILING. LOCATE VALVE AND TERMINATE DRAIN
HERE, UNLESS NOTED OTHERWISE AND POSITION
VALVE FOR VERTICAL DOWN DISCHARGE.
•" PIPE SAME MATERIAL
2•"
VERTICAL
PIPE
SUPPORT
WELDED PIPETHREADED / BRAISED
PIPING
BALL VALVE (EXPOSED) OR
GATE VALVE (CONCEALED)
ARRANGEMENT FOR LOCATIONS
WITH LIMITED CLEARANCE
6"MAX.
NOT TO SCALE
AH-1
COIL
AIR FLOW
AIR HANDLER COOLING COIL
UNION
W\HOSE ADAPTOR
•" GATE VALVE
TEST
PLUGS
BALANCE
VALVE
N.C.
N.O.
(PROVIDE CONNECTIONS FOR NUMBER OF
STACKED COILS PROVIDED WITH UNIT)
(PROVIDE M.A.V. IF COIL IS NOT SELF VENTING)
C.
SUPP
LY
RETURN
NOT TO SCALE
VALVE COEFFICIENTS
SYSTEM Cv RUNOUT SIZE
TYPICAL DRAIN VALVE CONNECTION
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
ƒ" GATE VALVE
ADAPTER TO ƒ" HOSE THREAD
PROVIDE HOSE CAP NUT
NOTES:
DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.
2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
NOT TO SCALE
BUTTERFLY VALVE
CONTROL VALVE
A
B
DRAIN LINE SHALL BE
AT LEAST THE SAME
SIZE AS THE NIPPLE
ON THE DRAIN PAN
DRAIN
PAN
1"
UNIT TYPE
WHERE X = STATIC PRESSURE IN PAN IN INCHES - H2O
A B
ADAPTER
NOT TO SCALE
DRAW THRU 2" PLUS X X
AIR HANDLING UNIT DRAIN TRAP
CLEAN OUT
SEDIMENT BUCKET
LOOSE CAP
GRATE
REMOVABLE
FITTING
LOOSE
THIS SIDE
FLOOR DRAIN (REFER TO DIVISION 220000)
FLOOR
PER FOOT SLOPE
MINIMUM 1/8 INCH
SLOPE TO DRAIN AT
1" (MIN)
DRAIN PIPE AS SPECIFIED
2" MAX.
REQUIRED BY CONDITIONS
DRAIN TERMINATION AS
BLOW THRU 1" MIN. 1.5"X
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
• ROUND BEARING PLATE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
TRAPEZE HANGER
LONG LEG VERTICAL
SEE SPECIFICATIONS
DOUBLE HEX NUTS
TRAPEZE PIPE HANGER
NOT TO SCALE
P:\24011\24011m002.dgn
DATE PLOTTED
DGN FILE
16-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24011\24011m002.dgn
AS SHOWN
WSH
LTF
WSH
04.20.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
24011
F o rt V a ll e y
S ta te
U n iv e rs it y
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T ro m in is tr a ti o n
B u il d in g
A p la c e m e n ts
P ro je c t
N o
F
V S
M003
S.A.
FAR
1 WALL
EXTERIOR
SAF
VFD
VFD R FAR
VLV
TT
LL
TT
OA
OA
AFMS
RA
R.A. AVD
FIL
T
TUC
H W
R
H W
S
ZONE
COND.
T-X
T
TUC
H W
R
H W
S
ZONE
COND.
T-X
TU-X
SAT
TU-X
SAT
SPS
Y
S T
M
G
A P
IC
D
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
O P
K E
U P
S E
T P
O
IN
J
U S
T
D
C
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
R E
L A
T
IV
M
ID
IT
Y
P R
E S
S U
R E
H
IG
H
L
W
L
IM
IT
R
N
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
A R
T
S T
O P
D A
Y
N
IG
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
F A
IL
U
D E (S
T E S
A
N D
N O
T E S
OUTPUTS INPUTS SOFTWARE
DDC PANELS
INPUT/OUTPUT
SUMMARIES
DIGITAL ANALOG ANALOG ALARM DDC ENERGY MGMT.DIGITAL
C U
R R
E
L A
Y
D R
IV
E
S
T A
T U
S
S P
E E
D
IN
D
IC
A T
IO
N
S P
E
N T
R O
L
E
W
IT
C H
C O
IR
O W
PRIMARY AIR FLOW
AIR TERMINAL UNITS (TU/FP)
HC VALVE
C
O
C
NOTES:
1. FAILURE MODES:
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
ELECTRIC POWER TO THE DDC PANEL.
L - LAST COMMAND
L
C A
L C
U L
A T
IN
T
C
O - OPEN OR ON
C - CLOSE OR OFF
PERCENTAGE DESIGN FLOW-HEATING
PERCENTAGE DESIGN FLOW-COOLING
TAG
OA 1
OA 2
AFMS 1
FAR
TT 1
TT 2
TT 3
SPS H
SPS 1
TUC-XX
TUC-XX
TUC-XX
ZONE-SPACE TEMP.
SAT
LL
HT
CC-L.A.T.
L.L.-TEMP.
RA 1
T-XX
F.A. RELAY
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
O P
E N
C L
O S
S
IT
IO
N
CC CONTROL VALVE
TT 4
ACP
C
VLV 2
HIGH LIMIT SPS
L
BUILDING PRESSUREDP 1
CHS
CHR
AID0 A0 D1
S T
A T
U S
T R
E
G
LOGS
VFD 1
AH-x
SA-TEMP.
RA TEMP.
MA TEMP.
RA-RH
RA DAMPER
MIN. OA DAMPER
MAX. OA DAMPER
MIN. OA AFMS
SA-SPS
SS FAN ARRAY-VFD
SA DAMPER ACTUATOR
SA TEMP. TO ZONE
MAX. OA AVD
MIN. OA AVD
OA
OA
NOT TO SCALE
AH FLOW DIAGRAM - HVAC
HVAC
AH FLOW DIAGRAM -
AH VAV SYSTEM
FOR REFERENCE ONLY.
AIR TERMINAL UNITS (TU/FP)
SHOWN FOR REFERENCE ONLY
EXISTING TERMINAL UNITS
LOCATE ƒ DOWN MEDIUM PRESSURE DUCT.
PROVIDE NEW STATIC PRESSURE SENSOR.
SMOKE DETECTOR
RE CONNECT TO EXISTING
AH SA FAN
DP
SPS
AI
TU-X
TU-X
TT
1AVD
RA
AH AH
CC
RA
HT
EXISTINGNEW WORK
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
SD
P:\24011\24011m003.dgn
DATE PLOTTED
DGN FILE
16-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24011\24011m003.dgn
AS SHOWN
WSH
LTF
WSH
04.20.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
24011
F o rt V a ll e y
S ta te
U n iv e rs it y
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T ro m in is tr a ti o n
B u il d in g
A p la c e m e n ts
P ro je c t
N o
F
V S
M201
FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - HVAC
SCALE:
= 1'-0
4 0 2 4 8
NEW WORK - HVAC
DEMOLITION &
MECHANICAL ROOM -
FIRST FLOOR PLAN -
RF-1
CP-1
UH-2UH-1
10/6
12/10 UP w/FD
10/10
BLR-1
AHU-1
50/30
60/24
SCALE:
= 1'-0
4 0 2 4 8
FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK - HVAC
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
SD
EXISTING
EXISTING
EXISTING
EXISTING
TO CHILLER
4" BELOW GRADE
TO CHILLER
4" BELOW GRADE
2•"
EXPANSION TANK
EXISTING
CHEMICAL FEEDER
EXISTING HW BYPASS
HP-1
EXISTING
BOILER FLUE UP
EXISTING 10"{EXISTING WH
1•"
2•"
& REFRIGERATED DRYER
AIR COMPRESSOR
EXISTING CONTROL
FM
PUMP GAUGE
MOUNTED
EXISTING WALL
CHEMICAL FEEDER
EXISTING CH BYPASS
EXISTING 50/22 SA
4"1 "
ROOM CONTROL PANEL
EXISTING BOILER
1•"
T
FACP
LDP LA
HA
MSG
50/24
CHS
HWS
RISERS UP
2•" HWR/S
3" CHR/S UP
AFMS
EXISTING
REMOVE
EXISTING
REMOVE
EXISTING 24/60 RA
REMOVE
TO REMAIN
EXISTING CONCRETE PAD
REMOVE EXISTING AFMS
2•"
MIXING BOX
FILTER
COOLING COIL
FANAH-1
36/30 12/6
SCALE:
= 1'-0
4 0 2 4 8
AHU-1
F
IL
T E
R
50/22
MAX OA AVD
MIN OA AVD
60"x72" PLENUM
AFMS
C O
O L
IN
G
IL
24/64
FAN
30/50
EXISTING CONCRETE PAD
PORTION OF LOUVER NOT USED
BLANK-OFF PANEL OVER
PROVIDE INSULATED METAL
B O
X
M
IX
IN
G
EXISTING LOUVER 30/36
AFMS
6/12
MAX OA AVD
22/50 SA
30/60 RA
DN
VFD
ACP
RA FAN
SA STR
AHU
AH-1
VF
D
AP
AP
AVD
RA
AP
SECTION AHU - NEW WORK - HVAC
PROTECT EXISTING DATA RACK AND EQUIPMENT.
INSTALL EXISTING BIOPOLAR IONIZATION UNIT IN NEW SA DUCTWORK.
AIR HANDLER.
REMOVE EXISTING OA INTAKE LOUVER TO ALLOW REMOVAL OF EXISTING
IN NEW DUCTWORK.
REMOVE EXISTING BIPOLAR IONIZATION UNIT. SAVE FOR INSTALLATION
IS PLACED INSIDE MECHANICAL ROOM.
REINSTALL EXISTING OA INTAKE LOUVER AFTER NEW AIR HANDLER
REMOVE EXISTING COMBINATION STARTER/DISCONNECT.
REMOVE EXISTING VFD; TURN OVER TO FVSU.
NOTES:(THIS SHEET ONLY)
OF LOUVER NOT USED.
PROVIDE INSULATED METAL BLANK-OFF PANEL OVER PORTION
P:\24011\24011m201.dgn
DATE PLOTTED
DGN FILE
16-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24011\24011m201.dgn
AS SHOWN
WSH
LTF
WSH
04.20.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
24011
F o rt V a ll e y
S ta te
U n iv e rs it y
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T ro m in is tr a ti o n
B u il d in g
A p la c e m e n ts
P ro je c t
N o
F
V S
T
CP-1
UH-2UH-1
10/6
12/10 UP w/FD
10/10
BLR-1
50/30
SD
EXISTING
EXISTING
EXISTING
EXISTING
TO CHILLER
4" BELOW GRADE
TO CHILLER
4" BELOW GRADE
EXPANSION TANK
EXISTING
CHEMICAL FEEDER
EXISTING HW BYPASS
HP-1
EXISTING
BOILER FLUE UP
EXISTING 10"{EXISTING WH
1•"
2•"
& REFRIGERATED DRYER
AIR COMPRESSOR
EXISTING CONTROL
FM
PUMP GAUGE
MOUNTED
EXISTING WALL
CHEMICAL FEEDER
EXISTING CH BYPASS
EXISTING 50/22 SA
4"1 "
ROOM CONTROL PANEL
EXISTING BOILER
1•"
T
FACP
LDP LA
HA
MSG
CHS
HWS
RISERS UP
2•" HWR/S
3" CHR/S UP
AFMS
TO REMAIN
EXISTING CONCRETE PAD
ACP
M202
SCALE:
= 1'-0
4 0 2 4 8
RF-2
10/610/12
AHU-2
50/30
60/24
SCALE:
= 1'-0
4 0 2 4 8
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
NEW WORK - HVAC
DEMOLITION &
MECHANICAL ROOM -
SECOND FLOOR PLAN -
SECOND FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - HVAC
SECOND FLOOR PLAN - MECHANICAL ROOM - NEW WORK - HVAC
12/10 UPFD
SD
EXISTING 50/22 SA
AFMS
50/24
2•" CHR/S UP
HB
LB
2•"
ACP
EXISTING 24/60 RA
REMOVE
EXISTING
REMOVE
EXISTING
REMOVE
TO REMAIN
EXISTING CONCRETE PAD
REMOVE EXISTING AFMS
2•"2•"
MIXING BOX
COOLING COIL
FANAH-2
36/30 12/6
60/22
MAX OA AVD
MIN OA AVD
60"x72" PLENUM
AFMS
FILTER
COOLING COIL
DN
VFD
RA FAN
SA FAN
AHU
AH-2
VF
D
PROTECT EXISTING DATA RACK AND EQUIPMENT.
INSTALL EXISTING BIOPOLAR IONIZATION UNIT IN NEW SA DUCTWORK.
AIR HANDLER.
REMOVE EXISTING OA INTAKE LOUVER TO ALLOW REMOVAL OF EXISTING
IN NEW DUCTWORK.
REMOVE EXISTING BIPOLAR IONIZATION UNIT. SAVE FOR INSTALLATION
IS PLACED INSIDE MECHANICAL ROOM.
REINSTALL EXISTING OA INTAKE LOUVER AFTER NEW AIR HANDLER
REMOVE EXISTING COMBINATION STARTER/DISCONNECT.
REMOVE EXISTING VFD; TURN OVER TO FVSU.
NOTES:(THIS SHEET ONLY)
OF LOUVER NOT USED.
PROVIDE INSULATED METAL BLANK-OFF PANEL OVER PORTION
P:\24011\24011m202.dgn
DATE PLOTTED
DGN FILE
16-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24011\24011m202.dgn
AS SHOWN
WSH
LTF
WSH
04.20.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
24011
F o rt V a ll e y
S ta te
U n iv e rs it y
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T ro m in is tr a ti o n
B u il d in g
A p la c e m e n ts
P ro je c t
N o
F
V S
T
10/610/12
50/30
12/10 UPFD
SD
EXISTING 50/22 SA
AFMS
2•" CHR/S UP
HB
LB
ACP
TO REMAIN
M203
SCALE:
= 1'-0
4 0 2 4 8
RF-3
AHU-3
50/24
60/24
SCALE:
= 1'-0
4 0 2 4 8
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
THIRD FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - HVAC
NEW WORK - HVAC
DEMOLITION &
MECHANICAL ROOM -
THIRD FLOOR PLAN -
THIRD FLOOR PLAN - MECHANICAL ROOM - NEW WORK - HVAC
2•"
2•" CHR/S UP
SD
ACPAFMS
50/24
TO REMAIN
EXISTING CONCRETE PAD
EXISTING 24/60 RA
REMOVE
REMOVE EXISTING AFMS
EXISTING
REMOVE
EXISTING
REMOVE
2•"
MIXING BOX
FAN
36/30 12/6
MAX OA AVD
MIN OA AVD
60"x72" PLENUM
AFMS
FILTER
COOLING COIL
FANAH-3
DN
SA FAN
AHU
RA FAN
VFD
PROTECT EXISTING DATA RACK AND EQUIPMENT.
INSTALL EXISTING BIOPOLAR IONIZATION UNIT IN NEW SA DUCTWORK.
AIR HANDLER.
REMOVE EXISTING OA INTAKE LOUVER TO ALLOW REMOVAL OF EXISTING
IN NEW DUCTWORK.
REMOVE EXISTING BIPOLAR IONIZATION UNIT. SAVE FOR INSTALLATION
IS PLACED INSIDE MECHANICAL ROOM.
REINSTALL EXISTING OA INTAKE LOUVER AFTER NEW AIR HANDLER
REMOVE EXISTING COMBINATION STARTER/DISCONNECT.
REMOVE EXISTING VFD; TURN OVER TO FVSU.
NOTES:(THIS SHEET ONLY)
66/22
AH-3
VF
D
9 TRANSITION TO SIZE OF EXISTING DUCT AT WALL.
OF LOUVER NOT USED.
PROVIDE INSULATED METAL BLANK-OFF PANEL OVER PORTION
P:\24011\24011m203.dgn
DATE PLOTTED
DGN FILE
16-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24011\24011m203.dgn
AS SHOWN
WSH
LTF
WSH
04.20.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
24011
F o rt V a ll e y
S ta te
U n iv e rs it y
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T ro m in is tr a ti o n
B u il d in g
A p la c e m e n ts
P ro je c t
N o
F
V S
T
50/24
2•" CHR/S UP
SD
ACPAFMS
E001
ELECTRICAL
& RISER -
LEGEND, SCHEDULE,
PE
EWC
WP
F
T
M
JJ J
UI
CEILING MOUNTED FIXTURE
WALL MOUNTED FIXTURE
EXIT LIGHT (ARROWS AS SHOWN)
ELECTRICAL LEGEND
LIGHTING CONTROL
CEILING MOUNTED COMBINATION INFRARED/
EXTERIOR TYPE PHOTO ELECTRIC SWITCH
INFRARED OCCUPANCY SENSOR
WALL MOUNTED SWITCH
DIMMER SWITCH
THREE WAY SWITCH
SINGLE POLE SWITCH
RECEPTACLES
DUPLEX - NORMAL
GFI DUPLEX - NORMAL
FLOOR OUTLET DUPLEX - NORMAL
CEILING OUTLET DUPLEX - NORMAL
SPECIAL - TYPE NOTED OR SHOWN
CIRCUITS
HOMERUN- ONE ARROW PER CIRCUIT
CONNECTION TO EQUIPMENT
CAP
CONDUIT DOWN
CONDUIT UP
GENERAL EQUIPMENT
TRANSFORMER
DISCONNECT SWITCH: "F" IF FUSED
FRAME AMPS/POLES/NEMA TYPE
FUSE PER MANUFACTURERS RECOMMENDATIONS
ENCLOSED CIRCUIT BREAKER
MANUAL STARTER AND MOTOR RATED SWITCH
JUNCTION BOX - WALL/CEILING/FLOOR
SURGE SUPPRESSOR
BACKBOARD
FIRE PROTECTION EQUIPMENT
COMMUNICATIONS
F
VISUAL ALARM: CEILING/WALL
MANUAL PULL STATION
FIRE ALARM ANNUNCIATOR
FIRE ALARM PANEL
DUCT MOUNTED SMOKE DETECTOR
SMOKE DETECTOR: CEILING / WALL
HEAT DETECTOR: CEILING / WALL
WATER FLOW SWITCH
WATER TAMPER SWITCH
L
D
I
LOW VOLTAGE SWITCH
CEILING SPECIAL - TYPE NOTED OR SHOWN
WEATHER PROOF OUTLET (GFCI)
ELECTRIC WATER COOLER OUTLET (GFCI)
FACP
FAA
C
WF
VS
LED ON "NORMAL" POWER
WALL/CEILING RACEWAY
AUTO SHUT OFF
ULTRASONIC OCCUPANCY SENSOR AND RELAY - VACANCY
H HORIZONTALLY MOUNTED DUPLEX RECEPTACLE
K KEYED SWITCH
USB
TV TV DUPLEX
J-HOOK
R RELAY
S
TV
S
B
VOICE OUTLET, QUANTITY OF JACKS AS NOTED
DATA OUTLET, QUANTITY OF JACKS AS NOTED
FLOOR VOICE OUTLET, QUANTITY OF JACKS
AS NOTED
FLOOR DATA OUTLET, QUANTITY OF JACKS
AS NOTED
FLOOR COMBINATION VOICE/DATA OUTLET,
QUANTITY OF JACKS AS NOTED
BOX, STUB-UP, AND MODULAR PLATE W/ BLANKS
TELEVISION OUTLET
SPEAKER: CEILING/WALL
FIBER OUTLET
COMBINATION VOICE/DATA OUTLET, QUANTITY
OF VOICE/DATA JACKS AS NOTED
THREE WAY DIMMER SWITCH
FOUR WAY DIMMER SWITCH
DUPLEX WITH INTEGRAL USB
D4
D3
C
CEILING/WALL MOUNTED CAMERA LOCATION
AC ABOVE COUNTER COORDINATE WITH ARCHITECT
C
AUDIO/VISUAL ALARM: CEILING/WALL
SPEAKER/STROBE ALARM: CEILING/WALL
QUADRUPLEX - NORMAL
GFI QUADRUPLEX - NORMAL
FLOOR OUTLET QUADRUPLEX - NORMAL
DP INTERIOR DIMMING PHOTOCELL
LIGHTING FIXTURES (SYMBOLS VARY BASED ON FIXTURES TYPE)
CONDUIT CONCEALED IN CEILING OR WALL
CONDUIT IN GROUND, SLAB, OR UNDER FLOOR
CONDUIT EXPOSED
FLEXIBLE CONDUIT
SURFACE MOUNTED PANELBOARD
RECESSED PANELBOARD
L4 FOUR WAY LOW VOLTAGE SWITCH L2 TWO WAY LOW VOLTAGE SWITCH
EXISTING POWER RISER - ELECTRICAL
NOT TO SCALE
LCC HCC
THIRD FLOOR
LC HC
LBB HBB
SECOND FLOOR
LB HB
LAA HAA
FIRST FLOOR
LA HALDP
T
T
500KVA
TRANSFORMER
PAD MOUNTED
3PH, 4W
480Y/277 VOLT
TO
12470 VOLT DELTA
150KVA
3PH, 4W
208Y/120V
480V TO
LDP-2
LDP-2
MSG-3 MSG-4
MSG-6
REUSE EXISTING 30A/2P BREAKER ABANDONDED DURING DEMOLITION TO SERVE THIS NEW EQUIPMENT.
NOTES:(THIS SHEET ONLY)
30A/3P
REMOVE EXISTING 3P BREAKER AND PROVIDE A NEW ONE PER NOTE 3/E202.2
3 REMOVE EXISTING 3P BREAKER AND PROVIDE A NEW ONE PER NOTE 3/E203.
LIGHTING FIXTURE SCHEDULE
MARK LAMPS FIXTURE TYPE-SEE SPECIFICATIONS MOUNTING REMARKSVOLT.
A
METALUX 4SNLED
ACUITY CLX
COLUMBIA MPS STRIP
4' LINEAR LED STRIP
A.F.F.
@ 8'-0"
OR CHAIN
SURFACE
3500K
32 WATTS
5000 LUMENS
LED
BY:
EQUALS
UNIV.
P:\24011\24011e001.dgn
DATE PLOTTED
DGN FILE
16-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24011\24011e001.dgn
AS SHOWN
04.20.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
TWT
TWT
24011
LTF
F o rt V a ll e y
S ta te
U n iv e rs it y
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T ro m in is tr a ti o n
B u il d in g
A p la c e m e n ts
P ro je c t
N o
F
V S
E201
FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - ELEC
SCALE:
= 1'-0
4 0 2 4 8
NEW WORK - ELEC
DEMOLITION &
MECHANICAL ROOM -
FIRST FLOOR PLAN -
RF-1
CP-1
UH-2UH-1
BLR-1
AHU-1
SCALE:
= 1'-0
4 0 2 4 8
FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK - ELEC
EXISTING
EXISTING
EXISTING
EXISTING
EXPANSION TANK
EXISTING
CHEMICAL FEEDER
EXISTING HW BYPASS
HP-1
EXISTING
EXISTING WH
& REFRIGERATED DRYER
AIR COMPRESSOR
EXISTING CONTROL
PUMP GAUGE
MOUNTED
EXISTING WALL
CHEMICAL FEEDER
EXISTING CH BYPASS
ACP DDC
ROOM CONTROL PANEL
EXISTING BOILER
T
FACP
LDP
LA
HA
MSG
EXISTING
REMOVE
EXISTING
REMOVE
TO REMAIN
EXISTING CONCRETE PAD
LAA-17,19
LAA-21
HAA-12
LAA-23
HAA-11
LA-29
LA-31
HA-9
VFD
SA STR
AHU
RA FAN
GENERAL NOTES:(THIS SHEET ONLY)
CONDITIONS AT THE SITE MAY VARY.
NEITHER THE OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT" DOCUMENTS AND ACTUAL
DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING "AS-DESIGN" DOCUMENTS.
DEMOLITION/NEW WORK.
WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED TO COMPLETE THE
THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION/NEW WORK AND IN NO
COORDINATE DEMOLITION WORK WITH NEW WORK.
OR NEAR AREA REQUIRING WORK.
PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS, COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO
SURROUNDINGS.
BOXES. WHERE CONDUIT IN SLAB IS ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH EXISTING
TERMINATION. THERE SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK COVER FOR ANY ABANDONED
REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO LONGER BE IN USE TO THE POINT OF LAST
CIRCUITS ARE BEING REPLACED.
REUSE HOMERUN CONDUITS WHEREVER POSSIBLE. REPLACE BRANCH CIRCUIT CONDUCTORS WHERE ENTIRE
A
B
C
D
E
F
FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - ELEC
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK LIGHTING - ELEC
A A
A
A
A
HA-10
HA-
NOTES:(THIS SHEET ONLY)
TURN EXISTING VFD OVER TO OWNER.
LABEL ABANDONED BREAKER AS "SPARE". PROVIDE UPDATED TYPE WRITTEN PANEL SCHEDULE.
DEMOLISH/REMOVE EXISTING STARTER/VFD, & CONDUCTORS BACK TO SERVING BREAKER.
2 REUSE EXISTING LIGHTING HOMERUN FOR NEW WORK.
ROUTE CIRCUIT THRU VFD. ELECTRICIAN TO MAKE ALL FINAL CONNECTIONS.
REUSE EXISTING 30A/3P BREAKER IN PANEL HA ABANDONED BY DEMOLITION FOR NEW AH-1.
MAKE ALL FINAL CONNECTIONS.
ROUTE 3#12 IN •"C TO A SPARE 20/1P BREAKER IN PANEL LA FOR UV LIGHTING IN AH-1.
LA-
A
WALLMOUNT
WALLMOUNT
WALLMOUNT
POSITION. PROVIDE AN UNSWITCHED HOT FOR SENSING POWER LOSS.
SUCH THAT UPON LOSS OF POWER THIS FIXTURE SHALL ILLUMINATE REGARDLESS OF SWITCH
FIXTURE SHALL BE PROVIDED WITH INTEGRAL BATTERY BACKUP OR WITH A MICROINVERTER
NEW SWITCH IN EXISTING LOCATION
LINE LEGEND
NEW WORK
DEMOLITION
EXISTING TO REMAIN
M
UV LTS
P:\24011\24011e201.dgn
DATE PLOTTED
DGN FILE
16-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24011\24011e201.dgn
AS SHOWN
04.20.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
TWT
TWT
24011
LTF
F o rt V a ll e y
S ta te
U n iv e rs it y
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T ro m in is tr a ti o n
B u il d in g
A p la c e m e n ts
P ro je c t
N o
F
V S
T
CP-1
UH-2UH-1
BLR-1
EXISTING
EXISTING
EXISTING
EXISTING
EXPANSION TANK
EXISTING
CHEMICAL FEEDER
EXISTING HW BYPASS
HP-1
EXISTING
EXISTING WH
& REFRIGERATED DRYER
AIR COMPRESSOR
EXISTING CONTROL
PUMP GAUGE
MOUNTED
EXISTING WALL
CHEMICAL FEEDER
EXISTING CH BYPASS
ACP DDC
ROOM CONTROL PANEL
EXISTING BOILER
T
FACP
LDP
LA
HA
MSG
TO REMAIN
EXISTING CONCRETE PAD
LAA-17,19
LAA-21
HAA-12
LAA-23
HAA-11
LA-29
LA-31
AH-1
AH-1
VF
E202
SCALE:
= 1'-0
4 0 2 4 8
RF-2
AHU-2
SCALE:
= 1'-0
4 0 2 4 8
SECOND FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - ELEC
SECOND FLOOR PLAN - MECHANICAL ROOM - NEW WORK - ELEC
HB
LB
DDCACP
EXISTING
REMOVE
EXISTING
REMOVE
TO REMAIN
EXISTING CONCRETE PAD
NEW WORK - ELEC
DEMOLITION &
MECHANICAL ROOM -
SECOND FLOOR PLAN -
HB-13
HB-16
LINE LEGEND
NEW WORK
DEMOLITION
EXISTING TO REMAIN
GENERAL NOTES:(THIS SHEET ONLY)
CONDITIONS AT THE SITE MAY VARY.
NEITHER THE OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT" DOCUMENTS AND ACTUAL
DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING "AS-DESIGN" DOCUMENTS.
DEMOLITION/NEW WORK.
WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED TO COMPLETE THE
THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION/NEW WORK AND IN NO
COORDINATE DEMOLITION WORK WITH NEW WORK.
OR NEAR AREA REQUIRING WORK.
PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS, COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO
SURROUNDINGS.
BOXES. WHERE CONDUIT IN SLAB IS ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH EXISTING
TERMINATION. THERE SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK COVER FOR ANY ABANDONED
REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO LONGER BE IN USE TO THE POINT OF LAST
CIRCUITS ARE BEING REPLACED.
REUSE HOMERUN CONDUITS WHEREVER POSSIBLE. REPLACE BRANCH CIRCUIT CONDUCTORS WHERE ENTIRE
A
B
C
D
E
F
NOTES:(THIS SHEET ONLY)
TURN EXISTING VFD OVER TO OWNER.
LABEL ABANDONED BREAKER AS "SPARE". PROVIDE UPDATED TYPE WRITTEN PANEL SCHEDULE.
DEMOLISH/REMOVE EXISTING STARTER/VFD, & CONDUCTORS BACK TO SERVING BREAKER.
2 REUSE EXISTING LIGHTING HOMERUN FOR NEW WORK.
MAKE ALL FINAL CONNECTIONS.
ROUTE 3#12 IN •"C TO A SPARE 20/1P BREAKER IN PANEL LB FOR UV LIGHTING IN AH-2.
POSITION. PROVIDE AN UNSWITCHED HOT FOR SENSING POWER LOSS.
SUCH THAT UPON LOSS OF POWER THIS FIXTURE SHALL ILLUMINATE REGARDLESS OF SWITCH
FIXTURE SHALL BE PROVIDED WITH INTEGRAL BATTERY BACKUP OR WITH A MICROINVERTER
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
SECOND FLOOR PLAN - MECHANICAL ROOM - NEW WORK LIGHTING - ELEC
SECOND FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - ELEC
KAIC RATING. ROUTE CIRCUIT THRU NEW VFD. ELECTRICIAN TO MAKE ALL FINAL CONNECTIONS.
WITH A NEW 45A/3P BREAKER FOR NEW AH-2. NEW BREAKER SHALL MATCH EXISTING PANEL
REMOVE EXISTING 20A/3P BREAKER IN PANEL HB ABANDONED BY DEMOLITION AND REPLACE
HB-
4#6, 1#10G, 1"C
4#6, 1#10G, 1"C
M
UV LTS LB-
A
A
A
A
A
NEW SWITCH IN EXISTING LOCATION
P:\24011\24011e202.dgn
DATE PLOTTED
DGN FILE
16-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24011\24011e202.dgn
AS SHOWN
04.20.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
TWT
TWT
24011
LTF
F o rt V a ll e y
S ta te
U n iv e rs it y
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T ro m in is tr a ti o n
B u il d in g
A p la c e m e n ts
P ro je c t
N o
F
V S
T
HB
LB
DDCACP
TO REMAIN
EXISTING CONCRETE PAD
AH-2
AH-2
VF
E203
SCALE:
= 1'-0
4 0 2 4 8
RF-3
AHU-3
SCALE:
= 1'-0
4 0 2 4 8
THIRD FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - ELEC
NEW WORK - ELEC
DEMOLITION &
MECHANICAL ROOM -
THIRD FLOOR PLAN -
THIRD FLOOR PLAN - MECHANICAL ROOM - NEW WORK - ELEC
HC
LC
DDCACP TO REMAIN
EXISTING CONCRETE PAD
EXISTING
REMOVE
EXISTING
REMOVE
HC-13
HC-8
LINE LEGEND
NEW WORK
DEMOLITION
EXISTING TO REMAIN
4 0 2 4 8
FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK LIGHTING - ELEC
SCALE:
= 1'-0
SCALE:
= 1'-0
4 0 2 4 8
GENERAL NOTES:(THIS SHEET ONLY)
CONDITIONS AT THE SITE MAY VARY.
NEITHER THE OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT" DOCUMENTS AND ACTUAL
DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING "AS-DESIGN" DOCUMENTS.
DEMOLITION/NEW WORK.
WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED TO COMPLETE THE
THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION/NEW WORK AND IN NO
COORDINATE DEMOLITION WORK WITH NEW WORK.
OR NEAR AREA REQUIRING WORK.
PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS, COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO
SURROUNDINGS.
BOXES. WHERE CONDUIT IN SLAB IS ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH EXISTING
TERMINATION. THERE SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK COVER FOR ANY ABANDONED
REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO LONGER BE IN USE TO THE POINT OF LAST
CIRCUITS ARE BEING REPLACED.
REUSE HOMERUN CONDUITS WHEREVER POSSIBLE. REPLACE BRANCH CIRCUIT CONDUCTORS WHERE ENTIRE
A
B
C
D
E
F
NOTES:(THIS SHEET ONLY)
TURN EXISTING VFD OVER TO OWNER.
LABEL ABANDONED BREAKER AS "SPARE". PROVIDE UPDATED TYPE WRITTEN PANEL SCHEDULE.
DEMOLISH/REMOVE EXISTING STARTER/VFD, & CONDUCTORS BACK TO SERVING BREAKER.
2 REUSE EXISTING LIGHTING HOMERUN FOR NEW WORK.
MAKE ALL FINAL CONNECTIONS.
ROUTE 3#12 IN •"C TO A SPARE 20/1P BREAKER IN PANEL LA FOR UV LIGHTING IN AH-3.
POSITION. PROVIDE AN UNSWITCHED HOT FOR SENSING POWER LOSS.
SUCH THAT UPON LOSS OF POWER THIS FIXTURE SHALL ILLUMINATE REGARDLESS OF SWITCH
FIXTURE SHALL BE PROVIDED WITH INTEGRAL BATTERY BACKUP OR WITH A MICROINVERTER
THIRD FLOOR PLAN - MECHANICAL ROOM - DEMOLITION LIGHTING - ELEC
SA FAN
AHU
RA FAN
VFD
HC-
LC-
M
UV LTS
A
A
A
NEW SWITCH IN EXISTING LOCATION
KAIC RATING. ROUTE CIRCUIT THRU NEW VFD. ELECTRICIAN TO MAKE ALL FINAL CONNECTIONS.
WITH A NEW 45A/3P BREAKER FOR NEW AH-3. NEW BREAKER SHALL MATCH EXISTING PANEL
REMOVE EXISTING 20A/3P BREAKER IN PANEL HB ABANDONED BY DEMOLITION AND REPLACE
4#6, 1#10G, 1"C
4#6, 1#10G, 1"C
P:\24011\24011e203.dgn
DATE PLOTTED
DGN FILE
16-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24011\24011e203.dgn
AS SHOWN
04.20.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
TWT
TWT
24011
LTF
F o rt V a ll e y
S ta te
U n iv e rs it y
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T ro m in is tr a ti o n
B u il d in g
A p la c e m e n ts
P ro je c t
N o
F
V S
T
HC
LC
AH-3
AH-3
VF
D
50/24
2•" CHR/S UP
SD
ACPAFMS
| 24011aCov |
| 24011m001 |
| References |
| tb, 24011tb.dgn |
| 24011m002 |
| References |
| tb, 24011tb.dgn |
| 24011m003 |
| References |
| tb, 24011tb.dgn |
| 24011m201 |
| References |
| tb, 24011tb.dgn |
| axfp1, 24011aX1.dgn |
| axfp2, 24011aX1.dgn |
| existing, 24011m201.dgn |
| 24011m202 |
| References |
| tb, 24011tb.dgn |
| axfp1, 24011aX2.dgn |
| axfp2, 24011aX2.dgn |
| existing, 24011m202.dgn |
| 24011m203 |
| References |
| tb, 24011tb.dgn |
| axfp1, 24011aX3.dgn |
| axfp2, 24011aX3.dgn |
| existing, 24011m203.dgn |
| Ref, 24011m202.dgn |
| 24011e001 |
| References |
| tb, 24011tb.dgn |
| 24011e201 |
| References |
| tb, 24011tb.dgn |
| axfp1, 24011aX1.dgn |
| axfp2, 24011aX1.dgn |
| existingD2, 24011e201.dgn |
| ExistingD4, 24011e201.dgn |
| 24011m201.dgn |
| axfp1-1, 24011aX1.dgn |
| axfp2-1, 24011aX1.dgn |
| ElectricalNotesV.dgn |
| 24011e202 |
| References |
| tb, 24011tb.dgn |
| axfp1, 24011aX2.dgn |
| axfp2, 24011aX2.dgn |
| existing, 24011e202.dgn |
| axfp1-1, 24011aX2.dgn |
| axfp2-1, 24011aX2.dgn |
| NEWhvac, 24011m202.dgn |
| 24011e203 |
| References |
| tb, 24011tb.dgn |
| axfp1, 24011aX3.dgn |
| axfp2, 24011aX3.dgn |
| EXIST, 24011e203.dgn |
| HVAC, 24011m203.dgn |
| axfp1-1, 24011aX3.dgn |
| axfp2-1, 24011aX3.dgn |
| existing-1, 24011e203.dgn |
| Ref1, 24011e202.dgn |