2024-031316 ADD 1 ATT 2 SEC. 28-1300 Access Control System Specs.pdf

PDF 332 KB Posted

Attached to
Midwestern Gov Center - Clerk of Court Renovation
Solicitation number
IFB 410 2024-031316 3
Issued by
Palm Beach County, Florida

About this file

This is Section 28-1300, an Access Control System specification document issued by Palm Beach County, Florida for the Facilities, Development, and Operations and Electronic Services and Security Division. The specification establishes comprehensive requirements for the installation, configuration, and integration of access control systems across County facilities, with two approved platforms: Lenel OnGuard for Criminal Justice Facilities (courthouses, correctional centers, juvenile justice, and law enforcement facilities) and Honeywell ProWatch for General Government Facilities. The specification requires card reader access control on selected areas including cash-out rooms, electrical rooms, exterior doors, mechanical rooms, restricted areas, server rooms, and vaults, with all card reader controlled doors requiring door position switches and request-to-exit devices. The document details specific hardware components, primarily HID Signo multi-technology readers for both interior and exterior applications, Mercury-based control panel architecture, and supporting infrastructure including UPS units sized for 48-hour backup, conduit systems, and wire specifications. Installation requirements include factory-trained and certified technicians from authorized representatives with minimum three years of documented experience and service facilities within 200 miles of the project site. The specification mandates comprehensive training across three levels: user training for security personnel (four sessions), administrative training for access control staff (24 hours across four six-hour sessions), and factory-certified maintenance training for operations technicians (minimum 18 hours), all to be conducted at Palm Beach County facilities with video recording of select sessions.

The specification requires a one-year warranty covering all components, parts, and infrastructure against defects in materials and workmanship, with repair and replacement provided at no cost to the County. Project closeout activities must be completed within 30 days following the closeout inspection, with the County reserving the right to hire outside vendors and back-charge costs for incomplete work. Contractors must submit detailed shop drawings in AutoCAD 2013 or later format, product data sheets, floor plans, point-to-point wiring diagrams, panel schedules, and overall system diagrams for ESS review and approval. The specification mandates pre-construction meetings, pre-drywall inspections, above-ceiling inspections, and final acceptance testing conducted by ESS representatives; failure to meet inspection standards may result in re-testing charges assessed to the contractor. All programming, licensing, and database migration are to be included in project scope, as is the delivery of electronic keys, software licenses, and passwords to the County. No pricing information, funding sources, or contract award dates are specified in this technical specification document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 28 1300 Specification Date: 03/20/2025 Page 1 of 23

SECTION 28 1300

PALM BEACH COUNTY

FD&O/ESS DIVISION

ACCESS CONTROL SYSTEM

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Security access devices.

B. Access control panel.

1.02 RELATED REQUIREMENTS

A. Section 08 7100 - Door Hardware.

B. Section 26 0519 - Low-Voltage Electrical Power Conductors and Cables (600 V and Less).

C. Section 26 0526 - Grounding and Bonding.

D. Section 28 2300 - Video Surveillance.

E. Section 28 1600 - Intrusion Detection.

1.03 ABBREVIATIONS AND ACRONYMS

A. The following abbreviations may be used in this document.

ACS Access Control System ANSI American National Standards Institute AWG American Wire Gauge DPS Door Position Switch ESS Electronic Services and Security GUI Graphical User Interface ID Identification IDF Intermediate Distribution Frame IEEE Institute of Electrical and Electronics Engineers I/O Input /Output IP Internet Protocol ISS Information System Services LAN Local Area Network MDF Main Distribution Frame NEC National Electrical Code NEMA National Electrical Manufacturers Association NFPA National Fire Protection Association ODBC Open Database Connectivity O&M Operation & Maintenance PBC Palm Beach County PBSO Palm Beach County Sheriff Office POE Power over Ethernet REX Request to Exit RFI Request for Information SPDT Single Pole Double Throw SOW Scope of Work UL Underwriters Laboratories, Inc.

UPS Uninterrupted Power Supply

V-DDelrioCabrera Text Box

ATTACHMENT #2

Specification Date: 03/20/2025 Page 2 of 23

USB Universal Serial Bus UTP Unshielded Twisted Pair WAN Wide Area Network

1.04 REFERENCED STANDARDS

A. NFPA 70 - National Electrical Code; National Fire Protection Association; most recent edition.

B. NFPA 71 - National Fire Alarm and Signaling Code; National Fire Protection Association; most recent edition.

C. NFPA 101 – Life Safety Code; Current edition for all standards and codes (new construction).

Design professional shall verify applicable codes (renovations), based on scope of work.

D. Palm Beach County Fire Code Ordinance; Current edition for all standards and codes (new construction). Design professional shall verify applicable codes (renovations), based on scope of work.

E. American Disability Act (ADA) Current edition for all standards and codes (new construction). Design professional shall verify applicable codes (renovations), based on scope.

F. Palm Beach County ESS Typical Card Access Installation Diagram (Appendix A)

G. Palm Beach County ESS Pre-Drywall Inspection Checklist (Appendix B)

H. Palm Beach County ESS Above Celling Inspection Checklist (Appendix C)

I. Palm Beach County ESS Final Acceptance Checklist (Appendix D)

J. Palm Beach County ESS Warranty Sign-Off (Appendix E)

K. Palm Beach County ESS Project Close-out Requirement Submittal Form (Appendix F)

L. Palm Beach County ESS Master Door Details (Appendix G)

1.05 GENERAL REQUIREMENTS

A. Palm Beach County utilizes (2) approved security systems for Access Control.

1. The Lenel OnGuard access control system shall be used on all new construction, renovation and replacement in Criminal Justice Facilities. These sites include but are not limited to:

a. Courthouses, correctional centers, juvenile justice and law enforcement facilities.

2. The Honeywell ProWatch access control system shall be used on all new construction, renovation and replacement in General Government Facilities.

3. Confirm system requirements for all Palm Beach County facilities with ESS.

B. At a minimum the following areas are required to receive card reader access control on new system deployments and system replacement projects.

1. Selected Areas:

a. Cash-Out Rooms (keypad with pin required)

b. CJI Spaces

c. Electrical Rooms

Specification Date: 03/20/2025 Page 3 of 23

d. ESS Equipment Rooms

e. Exterior Doors (Card reader with Keypad)

f. ISS MDF/ IDF Communication Rooms (Card Reader with Keypad)

g. Mechanical Rooms

h. Restricted areas

i. Server Rooms

j. Vaults (Card Reader with Keypad)

2. All card reader controlled doors shall have a DPS for door status monitoring and a Request to exit built in the locking hardware or PIR.

3. All exterior card readers must include an integrated keypad.

4. On monitored Facilities: Duress buttons shall be monitored through the access control system.

5. The system shall maintain network communication with remote server.

6. Facilities with multiple compatible systems installed, such as video surveillance, networked intercom and access control, shall be integrated and programmed to work together and share information, such as automatically linking the alarm event and call-up of cameras without any required intervention by a user. The integrator shall provide all necessary licenses and optional software modules to accommodate this system integration requirement. Submit an RFI to Palm Beach County ESS (Electronic Services and Security) to confirm requirements.

7. Access control systems installed independently from other systems, integration is not required.

Submit an RFI to Palm Beach County ESS (Electronic Services and Security) to confirm requirements.

8. All programming shall include access levels also database migration; including access levels, cardholders import and conversion to the new card access system.

9. Licensing and Programming:

a. Shall be included with project.

b. Product: Honeywell Pro-Watch

c. Product: Lenel On-Guard

d. Product: HID, Signo multi technology Card Reader (includes flashing card readers to work with other type of formats even if needs to be done temporarily).

e. Product: Door Licenses

10. Provide a revised set of the building’s Access Control System AutoCAD DWG drawings, release

2013 or later, with all references as a whole, date all pages including all supporting pages to include new riser diagram.

1.06 RENOVATION

A. Modifications, additions, changes, alterations or programming changes that are required to an existing access control system, the contractor is required to:

1. Meet all of the guidelines listed in this specification regarding types, installation instructions, wiring, submittals, methods, devices, manufacturers and meet all NFPA 70 & NFPA 72 requirements including testing and documentation.

2. Contractor, Owner will perform onsite function test of the system prior to any new work commencing.

Specification Date: 03/20/2025 Page 4 of 23

3. All system modifications, additions, changes and alterations do not require Section 3.07 training.

4. The scope of the project may include the removal of the old access control devices and infrastructure. All system components, devices and panels will be returned to Palm Beach County ESS (Electronic Services and Security).

5. All programming shall include access levels and database migration; including access levels, cardholders import and conversion to the new card access system.

6. All wiring shall be labeled with machine printed labels at both ends, indicating system, device ID, and termination location. As-built documentation shall identify all wire terminations to match field labeling. Each enclosure shall be provided with a cable schedule identifying the device information.

7. Contractor is responsible to remove all card access components that are "Not in Service."

8. If a site condition conflicts with the standard, a request for information (RFI) is formalized by the contractor to Palm Beach County ESS (Electronic Services and Security) for direction or deviation from the standard.

9. Provide a revised set of the building’s Access Control System AutoCAD DWG drawings, release 2013 or later, with all references as a whole, date all pages including all supporting pages to include new riser diagram.

10. Provide data sheet submittals in electronic format on devices that are different than currently installed.

11. Licensing and Programming:

a. Shall be included with project.

c. Product: Lenel On-Guard

d. Product: HID Card Reader (includes flashing card readers to work with other type of formats even if needs to be done temporarily).

e. Product: Door Licenses

12. Provide PBC/ESS Inspection and testing reports.

13. Provide PBC/ESS Warranty Sign off.

B. All full system replacements of the access control system shall be installed alongside the existing operational access control system in occupied buildings. The existing access control system shall not be de-commissioned or altered until the new access control system has been programmed and proved functional and accepted. However, the consultant can request an exception to running a parallel system if the infrastructure meets our current requirements and code requirements.

C. All full replacement projects shall follow the same specifications and requirements listed in this standard as a new access control system installation.

D. All wiring must be replaced and meet the specification standard based on type, location, and circuit type. All wiring shall be labeled with machine printed labels at both ends, indicating system, device ID, and termination location. As-built documentation shall identify all wire terminations to match field labeling. Each enclosure shall be provided with a cable schedule identifying the device information.

Specification Date: 03/20/2025 Page 5 of 23

E. Full system changes may be required to comply with level one administrative training as defined in Part 3. Submit an RFI to Palm Beach County ESS (Electronic Services and Security) to confirm requirements.

1.07 SUBMITTALS

A. Shop Drawings: Submit system wiring diagrams for review and approval by ESS, showing each device and all required wiring connections. Shop drawings shall be submitted in electronic media format on USB memory stick in AutoCAD 2013 or later and PDF file format. Full size drawings shall be provided upon request.

B. Product Data: Provide product data sheets indicating all electrical characteristics and connection specifications for each product.

1. Include data sheets and examples of all labeling materials and equipment to be used in the project.

2. Include data sheets for all wire and cable to be used as part of this system shall designate intended use of each wire/cable. A paragraph shall be added before each data sheet indicating the intended use of each cable. (i.e. connection for what devices)

3. Include floor plan drawings indicating all devices being provided and all cable runs to all devices along with junction box, equipment enclosures and power supply locations. Access controlled doors shall have the door name/number. All other devices shall have a unique identifier, as they shall be programmed in the system.

4. Include point-to-point wiring diagrams indicating all termination points for each conductor and for each device, cable types and color coding of each termination. These diagrams shall be submitted for each door type and for each type of device in the system.

5. Include panel schedules in a table format, indicating all ports being used and what device is connected to each port. Panel schedules shall be submitted for all access control panels, intrusion alarm panels, fiber optics distribution frames, Ethernet switches, patch panels, termination blocks, etc.

6. Include overall system diagrams indicating all head end components, their room location, and all configuration characteristics like IP addresses, serial ports used, etc.

7. Include termination details for multi-conductor connectors and other details not included under line item 4.

8. Include outline of the testing process.

1.08 QUALITY ASSURANCE

A. Installer Qualifications: The contractor selected for this project must be a direct manufacturer authorized representative of the product they propose to provide. All technicians assigned to install and configure this system shall be factory/ manufacturer trained and certified for the proper installation of this equipment. The contractor must have a minimum of (3) qualified and factory trained technicians to support this system. This company must be of established reputation and experience, regularly engaged in the supply and support of such systems for a period of at least (3) years documented experience. This company shall have a fully staffed office of sales and technical support representatives and with a service facility within 200 miles of Project, except for federally funded projects.

B. Products: Furnished products must be new, listed and classified by Underwriters Laboratories Inc. as suitable for purpose specified and indicated.

Specification Date: 03/20/2025 Page 6 of 23

C. Conform to requirements of NFPA 70, most recent edition.

D. The security installer, as a minimum, must carry a current state issued limited energy (low voltage) license; a copy of this document shall be included with the shop drawing submittals.

E. A copy of these documents shall be included with the shop drawing submittals.

1.09 WARRANTY

A. Furnish warranty service of access control system for one year from Date of Substantial Completion.

Must include all components, parts and supporting infrastructure and guarantee against defects in materials and workmanship. Provide repair/replacement at no cost to Palm Beach County. Failure to respond may result in disqualification for future projects.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Honeywell Prowatch, www.honeywell.com

B. Lenel OnGuard, www.lenel.com

C. The Honeywell & Lenel system shall utilize Mercury control panel hardware.

D. Manufacturers with components supporting Honeywell & Lenel.

1. HID Global; Products: Multi-Class or Multi Technologies; Signo, www.hidglobal.com

2. United Technologies; Product: (Door Contact) Interlogix; www.interlogix.com

3. Tripp Lite; Product: Omni: (UPS) www.tripplite.com

4. Seco Alarm: (Door Release Switch) www.Seco-larm.com

5. Amseco; Product: (Panic Button Switch) www.amseco.com

6. Dell; Product: Client (Desktop Workstation) www.dell.com

7. Cisco; POE Switches *Provided by PBC ISS

2.02 COMPONENTS

Manufacturer References:

A. Lenel Security Access Control System Components: (Mercury based)

1. Intelligent System Controllers (ISC) - LNL-M3300

2. Input Control Module (ICM) - LNL-1100-S3

3. Output Control Module (OCM) - LNL-1200-S3

4. Single Reader Interface Module (SRI) - LNL-1300-S3

5. Dual Reader Interface Module (DRI) - LNL-1320-S3 http://www.honeywell.com/ http://www.hidglobal.com/ http://www.seco/ http://www.dell.com/

Specification Date: 03/20/2025 Page 7 of 23

6. Access Control Network Door Controllers or Network Controller/Readers

7. Power over Ethernet (PoE) Enabled Door Controller: LNL-M2210

8. Power supplies and enclosures

9. UL listed power supplies and enclosures

10. Enclosure Lenel LNL-AL600ULX-4CB6

11. Door Licenses

B. Honeywell Security Access Control System Components:

1. Mercury based Intelligent System Controller PW7K1IC

2. Dual Reader Board PW7K1R2

3. 16 Input Board PW7K1IN

4. 16 Output Board PW7K1OUT

5. Single Reader Board PW7K1R1

6. Enclosure Pro-Watch PW5K2ENC1

7. Door Licenses

The following components listed apply to both system types.

C. Security Access Control Panel: distributed intelligence architecture, capable of downloading user data for up to 300,000 Cardholders and grant access independently of host computer communication.

1. Sequence of Operation:

a. Presentation of valid encoded card to an encoded card reader shall provide access to the corresponding door.

b. Forced opening of a door without presentation of a valid encoded card to the encoded card reader shall send a signal to an input resulting in a forced entry notification.

c. Doors held open for a pre-defined amount of time (normally 5 seconds) shall send a signal to an input resulting in a door held open notification.

d. Depressing a Door Release Button shall send a signal to an input resulting with the corresponding door unlocking.

e. Depressing a Panic Button shall send a signal to an input resulting with a notification to the corresponding monitoring client.

f. Request-to-Exit (REX) sensor shall prevent a forced door notification, but shall not send a signal to an input to unlock the door unless requested.

2. Capable of download from an offsite location.

3. Battery backup required to provide data integrity for up to 48 hours.

4. Transaction records: capable of buffering up to 50,000 records without connection to host.

Specification Date: 03/20/2025 Page 8 of 23

5. Report Requirements: capable of supervised signal reporting for secure, active, cut and short states.

6. Capacity: provide minimum of 1 dual, encoded card reader controller board.

7. Card Readers: multiCLASS or Multi Technologies devices immune to metal distortion and ability to process 26-33 (twenty-six to thirty-three) bit standardized or non-proprietary code. The optional proximity antenna must be activated in all HID readers for compatibility and use with current proximity access cards. All exterior readers must include integrated keypad.

a. Dimension: 3.3”H x 4.8” W x 1.1” D.

b. Local notification: Must have LED and audible alert indicating card acceptance or rejection.

c. Range: Capable of operation when installed up to 500’ away from access control panel.

8. Product: HID Signo Multi Technology Readers 40 (Interior)

9. Product: HID Signo Multi Technology Readers 40K (Exterior/Interior with Keypad)

10. Product: HID Signo Multi Technology Reader 20 mullion (Narrow Door Frame Interior/Exterior)

11. Product: HID Signo Multi Technology Reader 20K mullion (Narrow Door Frame Interior/Exterior)

12. Product: HID Signo PIV Readers

13. Product: HID pivCLASS Reader RKCLB40 (Biometric)

14. Product: HID pivCLASS FIPS 201 (PAM Biometric Authentication Module)

15. Licensing:

a. Coordinate licensing procurement for each door with PBC/ESS

c. Product: Lenel On-Guard

16. Door Position Switch: for steel frame doors.

a. Size: ¾” or 1”

b. Product: UTC, GE Interlogix 1078

17. Request-to-Exit Sensor:

a. The request to exit switch, as a component or module in the door hardware/lock assembly, is the preferred method to be used with all new lock types.

b. Product: Honeywell IS310WH (for applications requiring non-integrated REX device)

c. Product: Seco Alarm SD-7202GC-PE (for applications requiring REX push button:

momentary single pole switch)

18. Uninterruptable Power Supply (UPS): sized to provide 48-hours backup.

a. Size: 1.5 KVA minimum (Wall Mount: 2POSTRMKITWM)

b. Product: Tripp-Lite SMART1500RMXL2UA

19. Panic Button: latching resettable switch.

a. Product: Amseco HUSK-20 S.P.D.T.

Specification Date: 03/20/2025 Page 9 of 23

2.03 SUPPORTING INFRASTRUCTURE

A. Wire: UL listed: All wiring shall meet or exceed manufacturers’ recommendations and must be plenum rated when not in conduit.

1. Reader: West Penn 3021

2. Power: West Penn 224

3. Lock power: West Penn 224

4. Request to exit: West Penn 241

5. Door contact: West Penn 221

6. Accessory cable: West Penn 244

7. West Penn Plenum-Rated AC251822B Access Control Cable

B. Above Ceiling: Use existing cable tray above ceiling and if that’s not an option j-hooks shall be specified, the maximum distance between j-hooks shall not exceed 5’-0” on center. All cabling in detention areas must be installed in conduit.

C. Conduit size: 1” minimum with all necessary fittings, fill ratio not to exceed 60%. Provide (1) spare pull string in each new conduit run.

D. Remove abandoned cabling.

E. Any deviations to this in the SOW (scope of work) prepared by ESS will be discussed with the FMD Regional Manager and captured in writing.

F. Junction Boxes: color coded to differentiate for Access Control components.

1. Color Scheme: White

G. Security Electronics Room:

1. Plywood backboard with black fire-resistant coating.

2. Un-switched, emergency power; 120v double-gang outlet.

3. Mount UPS on new shelf or wall mount UPS.

H. Communication Links:

1. Provide 2 data drops installed in single-duplex box.

2. Coordinate with Palm Beach County ISS (Information System Services) through County Project Manager for static IP address.

PART 3 EXECUTION

3.01 PRE CONSTRUCTION MEETING

A. Requirements for pre-construction meeting shall be defined as required for each project.

Specification Date: 03/20/2025 Page 10 of 23

3.02 INSTALLERS

A. Upon project commencement, the installer shall provide qualified technical personnel on-site.

Personnel shall be present on each consecutive working day until the system is fully functional and ready to begin the testing phase of this project.

B. During the installation process the installer shall maintain an up-to-date set of shop drawings which shall always be available for review. This set of documents should be clearly annotated with as-built data as the work is performed. These documents will be reviewed as part of the approval process when evaluating payment request applications. At a minimum, the drawings should contain the following information:

1. Quantity and location of all equipment installed.

2. Cable and wire runs along with the designations tags assigned to each.

3. Wiring diagrams that indicate terminal strip layout, identification, and terminations.

C. The contractors’ Project Manager shall maintain continuous coordination with the consulting engineers.

The engineers shall be kept informed of the progress and all conflicts that arise during the course of this project. Prior to the start of construction, the contractor shall submit a complete plan and schedule for proposed operations. This schedule should include information relevant to number of employees assigned to the project, work hours, etc.

D. The contractor shall be responsible for the cleanup, removal, and disposal of all materials resulting by this project. This scope of work shall include all necessary repair, paint, or refinishing needed to restore modified areas to match the existing surfaces.

3.03 INSTALLATION

A. Install components in accordance with manufacturer's instructions and conform to all referenced standards under paragraph 1.04. HEIGHT OF CARD READERS SHALL BE IN ACCORDANCE

WITH APPLICABLE CODES AND STANDARDS.

B. Make conduit and wiring connections to door hardware devices furnished and installed under

Specification Section 08 7100.

C. Hardware programming of static IP address and initial hardware configuration shall be completed by the access control system installer at installation site.

D. Complete system configuration programming of Site Access Control Hardware shall be completed by access system installer under supervision of ESS staff at 2633 Vista Parkway, West Palm Beach, FL.

33411.

E. County Staff access card programming including access groups and card holder database is the responsibility of Palm Beach County ESS Division.

F. System installed as per manufacturer specifications.

G. Above Ceiling: Use existing cable tray. If that is not an option J-Hooks shall be provided. All cabling shall be installed in conduit in detention areas.

H. Walls: Conduit down wall in all locations

I. Conduit Size: 1" minimum with fill ratio not to exceed 60%.

Specification Date: 03/20/2025 Page 11 of 23

J. Remove abandoned cabling.

K. Any deviations to this in the SOW prepared by ESS will be discussed with FMD Regional Manager and captured in writing.

L. Wiring:

1. All wire and cable shall meet or exceed the recommendations established by the equipment manufacturers, and shall comply with all state and local codes.

2. Visually inspect all wire and cable for faulty insulation prior to installation. Protect cable ends at all times with acceptable end caps.

3. Provide grommets and strain relief materials where necessary to avoid abrasion and excess tension on wire and cable.

4. All termination blocks for cables with gauges larger or equal to AWG-18 and all types of stranded conductors shall be of the captive screw type and shall be selected for the appropriate cable gauge and number of conductors. Termination blocks shall be provided with all accessories like end clamps, jumpers, end barriers, etc., and shall always be mount inside a security enclosure.

Up to 2 conductors can be terminated in the same point in a termination block as long as the combined diameter of the conductors does not exceed the maximum cable diameter allowed by the termination block. No more than 2 conductors shall be terminated in the same point at a termination block regardless of the cable gauges. The use of wire nuts or manually twisting cables and protecting them with electrical tape are not acceptable means of termination.

5. When equipment supplied has wire leads instead of termination end points for connections, the only acceptable methods of connection to field wiring are insulated butt splices, quick release connectors (both ends provided) or quick lock self-stripping pig tail connectors. All connectors or splices shall be selected according to the gauge of the cable to be terminated.

6. All penetrations through fire rated barriers shall be provided, shall be sealed, with appropriate fire stopping materials in accordance with NFPA requirements and local fire authority having jurisdiction.

7. All cable runs shall be continuous from the device to the equipment. Cable splices shall not be allowed inside conduits, or cable trays.

8. Cables of similar signal level shall be bundled together and kept physically separate from power cords, plug strips or other circuits with different potential. Exposed wire bundles or individual cables shall be neatly secured with self-clinching nylon "TY-Raps" (Thomas & Betts or equal).

9. Circuits considered Class 1 circuits as defined by the NEC article 725. As mandated by NEC, these circuits cannot share the same conduit or raceway with Class 2 circuits, or communication circuits. Separate raceways shall be provided for Class 2 or communications circuits (door position switches, readers, push buttons, etc.) or the installer shall use NEC approved Class 1 wiring methods for all Class 2 or communication circuits.

10. Components of the wiring distribution system shall be installed in a neat, workmanlike manner consistent with all best practices. All wiring shall be labeled with machine printed labels at both ends, indicating system, device ID, and termination location. As-built documentation shall identify all wire terminations to match field labeling. Each enclosure shall be provided with a cable schedule identifying the device information. THE DESIGN PROFESSIONAL SHALL VERIFY

REQUIREMENTS BASED ON PROJECT CONDITIONS.

Specification Date: 03/20/2025 Page 12 of 23

11. Wiring color codes shall be strictly observed and terminations shall be uniform throughout the building.

12. Finger duct wire managers shall be used inside all equipment panels to properly dress cables.

M. Grounding:

1. Comply with IEEE 1100, "Power and Grounding Sensitive Electronic Equipment."

2. Ground cable shields, drain conductors, and equipment to eliminate shock hazard and to minimize ground loops, common-mode returns, noise pickup, cross talk, and other impairments.

3. Bond shields and drain conductors to ground at only one point in each circuit.

4. Signal Ground:

a. Terminal: Locate in each equipment room and wiring closet; isolate from power system and equipment grounding.

b. Bus: Mount on wall of main equipment room with standoff insulators.

c. Backbone Cable: Extend from signal ground bus to signal ground terminal in each equipment room and wiring closet.

d. Install end-of-line resistors at the field device location as required or recommended by the manufacturer.

N. Identification:

1. Use alphanumeric designation for each cable, as directed by Palm Beach County ESS, and label all cables at both ends. All cables, terminal strips and equipment enclosures shall be labeled with preprinted tags. Hand written tags and notations will not be acceptable.

2. Label each terminal strip and screw terminal in each cabinet, rack, or panel.

a. All wiring conductors connected to terminal strips shall be individually numbered, and each cable or wiring group being extended from a panel or cabinet to a building-mounted device shall be identified with the name and number of the particular device as shown.

O. Integration with other systems:

1. Do not integrate with Intrusion Alarm System; if Intrusion System is part of project, provide separate Addressable Door Position Switches required for Intrusion systems.

a. Existing or new intercom products shall be tied into the Access Control System. Current

County standard for intercoms is TOA, Bogen, 2N and Aiphone.

b. CCTV – Integration of CCTV with Access Control System shall be determined by the

PBC/ESS for each project as required.

c. Panic Alarms – Integration of Panic Alarms with the Access Control System shall be determined by PBC/ESS for each project as required.

d. Elevator Control – Integration of Elevator Control shall be determined by PBC/ESS for each project as required.

e. Elevator Override – Integration of Elevator Override shall be determined by PBC/ESS for each project as required.

f. PLC – Integration of PLC shall be determined by PBC/ESS for each project as required.

3.04 RESTORATION

A. Requirements for restoration shall be defined as required for each project.

Specification Date: 03/20/2025 Page 13 of 23

3.05 FIELD QUALITY CONTROL

A. Verify all hardware is compatible with access control system.

B. Coordinate pre-construction meeting between ESS, Contractor and low-voltage subcontractors.

C. Coordinate pre-drywall inspection between ESS and Contractor.

D. Coordinate above ceiling inspection between ESS and Contractor.

E. Furnish services of manufacturer-certified technician to supervise installation, adjustments, final connections, system testing, and to train Palm Beach County ESS (Electronic Services and Security) personnel.

F. Secure components with positive anchorage devices sized to withstand stress, vibration and physical distortion.

G. Clean the inside of terminal enclosure cabinets.

H. 100% Acceptance Test. If retest is needed ESS reserves the right to charge for failed inspection.

3.06 CLOSEOUT ACTIVITIES AND INSPECTIONS

A. Termination details for multi-conductor connectors and other details not included in item 4 of the shop drawing submittal.

B. Test Reports: Indicate satisfactory completion of required tests and inspections.

C. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of product.

D. Project Record Documents: Record actual locations of access authorization equipment.

E. Operation Data: Operating instructions.

F. Maintenance Data: Maintenance and repair procedures.

G. Maintenance Materials: Furnish the following for PBC/ESS use in maintenance of project.

1. Deliver keys/cards not used in initial installation to PBC/ESS as directed.

H. Training lesson plan: Provide a detailed training plan to the Owner for each type training required.

1. Level one: User training

2. Level two: Administrative training

3. Level three: Factory certified training

3.07 TRAINING

A. Administrative: One session covering issues necessary for non-technical administrative staff (building coordinators); classroom. Training must include access control overview and specific programming steps to include access groups, time zones, door groups, etc.

Specification Date: 03/20/2025 Page 14 of 23

1. Three (3) levels of training shall be provided for this contract as summarized below.

B. Level One: User training shall provide security personnel the ability to monitor and respond to security events.

1. User training shall be provided for security personnel interacting with the security system in areas different from the security monitoring rooms. The purpose of this training is to explain clearly how the field devices operate and what the different status indicators mean.

2. This training shall cover operation of devices and doors like:

a. Operation and indication of all types of readers in the project

b. Operation of all roll-up doors.

c. Operation of all vehicular gates.

d. Resetting door alarms (local) for all door types.

e. Resetting of duress alarm buttons.

f. Operation of cell door controllers.

g. Operation of door interlocks.

h. Operation of the duress alarm notification system.

3. This training shall be provided by personnel working directly for the manufacturer or designated trainer.

4. At least four (4) separate sessions shall be provided. At least one (1) session shall be video recorded.

5. Each session could have up to 20 trainees.

6. All training shall take place at Palm Beach County facilities on dates scheduled by Palm Beach

County.

7. The approved O&M manuals shall be available at the time of the training. Training material provided shall be provided in electronic format as well.

C. Level Two: Administrator Training shall include user training and additional training that provides security and card access personnel a complete understanding of how the system operates, database management and basic trouble shooting of the system. Administrator training shall detail how to add, remove, and modify permission levels of cardholders and security staff.

1. Administrator training shall be provided for security and card access personnel interacting with the security system in all security monitoring rooms. The purpose of this training is to explain clearly how the complete system operates and what the different status indicators mean.

2. This training shall cover at least the following topics:

a. All content provided during the user training

b. Operation of the access control software (all aspects).

c. Operation of all devices inside the security monitoring room.

d. Alarm response and alarm reset in the security monitoring room.

e. Data backup/restore and achieving.

f. File import/export.

g. Badging system operation

h. Creating reports and print outs.

i. Basic system troubleshooting.

j. Creating users and password reset.

Specification Date: 03/20/2025 Page 15 of 23

3. This training shall be provided by personnel working directly for the manufacturer or a factory certified trainer.

4. One session of this type of training shall be provided and video-taped. This training shall consist of four (4) six (6) hour sessions, totaling 24 hours of training.

5. Each session could have up to 15 trainees.

6. All training shall take place at Palm Beach County facilities.

7. O&M manuals shall be available at the time of the training. Training material provided shall be provided in electronic format as well.

D. Level Three: Maintenance training shall include user and administrator training as well as a focus on troubleshooting, maintenance, replacement, installation and configuration of all field equipment.

Maintenance training shall contain a detailed explanation of the source code for all devices that use custom programming.

1. Maintenance training shall be provided for ESS Operations Technicians and card access administrator. The purpose of this training is to explain how to troubleshoot and replace all field devices and hardware. By the end of training attendees shall be factory certified and able to support the system independent from vendor or manufacturer.

2. This training shall cover at least the following topics:

a. Troubleshooting and replacement of all field devices.

b. Installation of all field panels and settings (jumpers, dip switches, etc.)

c. Wire labeling system.

d. Software system installation and recover from system crashes.

e. Detail explanation on all physical keys used in security devices.

f. Routine preventive maintenance procedures recommended by equipment manufacturers for all components of the system.

g. Detail explanation of source code programming for all devices that have software code specifically compiled for this project.

3. This training shall be provided by personnel working directly for the manufacturer or a factory certified trainer.

4. One (1) session of this type of training shall be provided and video-taped. This session shall last no less than 18 hours, broken down into day sessions no longer than 6 hours each.

5. Each session could have up to 15 trainees.

6. All training shall take place at Palm Beach County facilities.

7. All training level for each session shall be recorded for reference by Palm Beach County staff.

E. Note: All training must be complete prior to project closeout.

3.08 PROJECT CLOSEOUT

A. Project closeout items must be completed no later than 30 days after closeout inspection. For work outstanding after 30 days Palm Beach County reserves the right to hire an outside vendor to complete unresolved deficiencies and back charge for the expense incurred.

B. Conduct 100% device by device test under ESS supervision.

Specification Date: 03/20/2025 Page 16 of 23

C. Develop punch list items and correct deficiencies; final acceptance by ESS.

D. Provide 2 copies of as-built diagrams that include device locations and signaling details. Provide in Electronic media format USB memory stick in PDF and AutoCAD DWG format release 2013 or later.

Include all graphic files developed for the graphical maps. Detail list of drawings required. (Include Graphical Maps)

1. Site Plan drawing.

2. Floor Plan drawings showing all device locations, all types of devices, power supply, cable pathways and riser diagrams.

3. Point-to-Point wiring diagrams with information related to pathways used for cable routing and information associated with cable type, size and quantity.

4. Wiring Diagrams for security devices and control panels.

5. Elevation details.

6. Door details.

E. Issue electronic license and software keys to Palm Beach County for all Honeywell ProWatch or Lenel OnGuard software additions, upgrades or expansion modules including any required integration components.

F. If all items listed are not delivered within 30 days set from CO, Palm Beach County reserves the right to hire an outside vendor to secure all missing or incomplete item deficiencies, and to back charge the costs for all expenses occurred.

G. Demonstrate normal and abnormal modes of operation, and required response to each.

H. Test Reports: Indicate satisfactory completion of required tests and inspections.

I. Project Record Documents: Record actual locations of access authorization equipment.

J. Operation Data: Operating instructions.

K. Maintenance Data: Maintenance and repair procedures.

L. Spare Parts – Typically none required, unless requested in project proposal.

M. Add any required electronic keys, software, passwords etc.

N. Add system manuals and warranties.

Specification Date: 03/20/2025 Page 17 of 23

APPENDIX A – Palm Beach County ESS Typical Card Access Installation Diagram

PIR not needed if REX is integrated with door lock hardware.

Specification Date: 03/20/2025 Page 18 of 23

APPENDIX B – Palm Beach County ESS Pre-Drywall Inspection Checklist

Project Name:

Project Number:

Inspection Date:

ESS Representative:

� Complete internal review of project specification manual and plans with Planner prior to inspection.

Notes:

� Walk site with Architectural Field Representative and Contractor to verify device count and location.

� Verify conduit, enclosure and reader installation heights and color coding scheme.

� Verify wire installation.

� Inspect security electronics room and verify plywood backboard and access control panel enclosure size and mounting.

Specification Date: 03/20/2025 Page 19 of 23

APPENDIX C – Palm Beach County ESS Above Ceiling Inspection Checklist

Project Name: _

Project Number:

Date: Inspector(s) Name(s): _

Shop drawing and historical comments review with Planner pre-site visit. _

Device type installed; review and placement per shop drawings. _

Conduit and electrical box above ceiling inspection. Color coded. _

Wire inspection. Type, wire method, and installation. _

Review of punch list items from pre-dry wall inspection. _

Specification Date: 03/20/2025 Page 20 of 23

APPENDIX D – Palm Beach County ESS Final Acceptance Checklist

Project Number:

Inspection Date:

ESS Representative:

� Inspect shop drawings and verify that each device is installed in the correct location.

� Verify server connectivity to each panel.

� Inspect conduit, wiring and power supplies.

� Inspect panels and verify that batteries and UPS are sized correctly. UPS must be rack or wall mounted.

� Inspect card reader height at every location and verify ADA compliance (48” AFF).

� Inspect all logical devices and verify functionality:

1. Doors

2. Locks

3. Request-to-Exit Sensors

4. Door Position Switches

5. Door Release Buttons

6. Panic Buttons

� Complete system operations test and documentation.

This testing and documentation exercise will require two people. One person will monitor the client software and document the outcome of each action taken by the on-site technician. Prior to testing, verify that the appropriate access control rights have been programmed and verify that no time zones have been set. Test all devices one floor at a time and record the results of each action performed.

Sample documentation sheet follows:

1. Card Reader

Device Location Action Event Monitor Initials Reader Present card Access Granted Hold door open Door Held Open Close door Door Secure Open door with key Door Forced Open Close door Door Secure Open door secure side Door Open Verify all wiring in card access enclosure and at doors are labeled with office\door number

2. Door Positions Switches (Monitored Doors – No Card Reader)

Open door with key Door Forced Open Close Door Door Secure

3. Panic Buttons

Depress button Panic Alarm Reset button Panic Clear

Specification Date: 03/20/2025 Page 21 of 23

APPENDIX E– Palm Beach County ESS Access Control Warranty Sign-Off Sheet

Project Number:

Date:

ESS Representative:

System Warranty: All components, parts, assemblies and software shall be guaranteed against defects in materials, workmanship for a period of at least (12) twelve months, beginning on the date of Substantial Completion if ESS has accepted the system and received all closeout items and documents. If not received and accepted, the 12 months will begin when items received and accepted by ESS.

Warranty service shall be provided by a manufacturer’s authorized representative who has issued the certificate of completion regardless of status as a sub-contractor to the main contractor and provide this service

(24) twenty-four hours per day, (7) seven days per week.

The representative shall be based in a fully staffed branch office located within one (1) hour travel time of the installation site and respond within this time. All repairs performed during the warranty period must be non-chargeable for labor, material, and travel time. All repairs performed during the warranty period shall be completed within the time limitations imposed by NFPA rules.

The initial service call may be handled by ESS who will assess the problem, and notify the vendor who issued the certificate of completion of corrective action required. Failure of the vendor to respond and perform accordingly will result in disqualification of future bids on similar projects for the COUNTY.

ESS Sign Off: ______________________________________________

Warranty Provider Sign Off: ______________________________________________

Warranty General Contractor Sign Off: ______________________________________________

Warranty Start Date: _________________

Warranty End Date: _________________

Warranty Provider Company Name: _____________________________________

Warranty Provider Company Dispatch #: ________________________________ (24 hours/7 days Tel #)

General Contractor Name: __________________________________

General Contractor Tel. #: __________________________________

General Contractor Contact: _________________________________

Specification Date: 03/20/2025 Page 22 of 23

APPENDIX F – Palm Beach County ESS Project Close-out Requirement Submittal Form

Project Number:

1. Final graphic floor plans: Two Copies of 11” x 17” showing all devices installed.

2. Final as-built drawings: Two full sized. Complete set and supporting pages. One copy of electronic drawing files in open or workable CAD DWG drawings with all references stored on a memory stick.

3. Final device cut sheets: One electronic copy.

4. Final UPS sizing calculations.

5. Final installed software programs: Electronic on memory stick issued to ESS.

6. Final program hardcopy: Two copies of all programming, macros and device settings that are deviations from the factory supplied products. One electronics copy.

7. Turn over all electronic keys, software, passwords and licenses to ESS.

8. Systems manuals: Electronic media copy of each type; installation, programming and troubleshooting/training.

9. Training: Factory and programming training not required unless requested in project proposal.

10. Warranties: Contractor and manufacturer’s published product warranties. One hard copy.

11. Warranties: PBC document with all signatures and dates.

• If all items listed are not met in the 30-day period set from CO. Owner reserves the right to hire an outside vendor to secure any missing or incomplete item deficiencies, and to back charge the costs for all expenses occurred.

Submitted by: _____________________________________ (Contractor)

Signed: Date:

Specification Date: 03/20/2025 Page 23 of 23

APPENDIX G – Palm Beach County ESS Master Door Details

PBC/ESS SHALL INSERT APPLICABLE DOOR DETAILS PER PROJECT REQUIREMENTS

END OF SECTION

1. Intelligent System Controllers (ISC) - LNL-M3300
2. Input Control Module (ICM) - LNL-1100-S3
3. Output Control Module (OCM) - LNL-1200-S3
4. Single Reader Interface Module (SRI) - LNL-1300-S3
5. Dual Reader Interface Module (DRI) - LNL-1320-S3
6. Access Control Network Door Controllers or Network Controller/Readers
7. Power over Ethernet (PoE) Enabled Door Controller: LNL-M2210
8. Power supplies and enclosures
9. UL listed power supplies and enclosures
10. Enclosure Lenel LNL-AL600ULX-4CB6
11. Door Licenses
5. Single Reader Board PW7K1R1
6. Enclosure Pro-Watch PW5K2ENC1
7. Door Licenses

File details come from the government source that posted it. Updated .