This document is an addendum to Request for Proposal (RFP) #2314 issued by the Darien Downtown Development Authority for dock improvements on the Darien River in Darien, Georgia, located in McIntosh County. The addendum provides updates to the proposal due date, material specifications for the fixed dock, floating docks, and gangways, as well as responses to questions received during the pre-proposal meeting. The fixed dock is to have an aluminum frame, Trex or similar composite decking, and aluminum or composite railings. The floating docks will also have an aluminum frame and Trex or similar composite decking. The gangways are to be 30 feet in length with aluminum construction and railings. The new proposal due date is April 19, 2024, at 10:30 AM.

The addendum clarifies that soil boring and wind test results are the responsibility of the contractor, and that neither of the 30-foot gangways are required to be ADA compliant. The addendum also provides guidance on piling placement and spacing, and notes that 3D drawings are intended as visual aids and not construction specifications. The RFP is a design-build project, and the contractor is responsible for providing the structural specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

301 Sea Island Road Suite 10, St. Simons Island, GA 31522

912-638-9681 Office

P a g e 1 | 3

Addendum No. 1

March 29, 2024

Darien Downtown Development Authority

PO Box 452

Darien, GA 31305

Re: Dock Improvements Project

RFP No. 2314

Dated February 29, 2024

A. PROPOSAL DUE DATE EXTENSION - The new Proposal Opening Date is

Friday, April 19th, 2024 at 10:30 AM

B. MATERIAL SPECIFICATION

1. Fixed Dock (leading into the river that the floating docks will attach to)

i. Aluminum Frame

ii. Trex, WearDeck or a similar man-made composite material for the deck boards

iii. Aluminum or man-made composite horizontal railings

1. One middle railing and one top railing

iv. Concrete Pilings AND/OR alternate material to be specified

2. Floating Docks

i. Aluminum Frame

ii. Trex, WearDeck or a similar man-made composite material for the deck boards

3. Gangways

i. Aluminum with aluminum railings

City of Darien RFP #374 - Contract Addendum No. 1

ii. 30 foot in length

iii. ADA compliance is not required

C. QUESTIONS AND RESPONSES - discussed during the Pre-Proposal meeting held Wednesday, March 20, 2024, and received via email up until the deadline for questions on Friday, March 22, 2024.

1. What is the preferred material for the new proposed floating docks and access ramps?

a. Please see Material Specification above

2. Please confirm if Dock 1 is 8’ or 10’ wide.

a. Dock 1 is 10’ wide.

3. Will soil boring and wind test results be provided?

a. Testing for the design of this project is the responsibility of the contractor and is not required unless the information needed is not known. Please note that boring test results (and possibly wind test results) for the proposed bridge project on SR25/US17 over Darien River are public records and may be acquired directly from GDOT.

4. Are there any dock specifications?

a. This is a design-build RFP therefore the structural specifications are the responsibility of the contractor. The material specifications are defined in the section above and in the revised RFP.

5. Please confirm the 80’ gangway is to be ADA compliant.

a. Neither of the gangways are required to be ADA compliant. The length of both of the gangways are 30’.

6. Are there any elevation details on the proposed docks?

a. The permit plans show elevations on sheet 3-5.

7. Given the time constraints and design costs, we can only provide a descriptive plan with this proposal. Is this sufficient for proposal purposes?

a. The due date has been extended. Please provide what is requested in the

RFP.

8. There are presently large shrimp boats moored at the site. What is the largest vessel planned for the new floating dock?

a. The proposed docks’ use is intended as a typical day dock and should be designed with the capacity to withstand what is currently existing or greater

9. Can the due date be extended?

a. Yes, the new opening/due date is Friday, April 19, 2024

10. Are emailed or mail-in bids accepted?

a. No, all proposals must be delivered in person by the due date.

11. What is the standard design for these docks?

City of Darien RFP #374 - Contract Addendum No. 1

a. The standard should be equal to or greater than what is existing

12. Are there any specifics on the handrails?

a. See Material Specifications above.

13. Do we need to submit shop drawings?

a. Shop drawings are considered an allowable submittal. Please see Scope section in the revised RFP for other options.

D. COMMENTS

1. Pilings must be placed within the decking, to avoid interfering with boat docking

2. Pile spacing is shown on the permit plans as 10’ and 20’ as a general guide but the spacing could be closer or further as needed as long as waterflow is not restricted.

3. 3D drawings are intended to be a visual aid and are not to be construction specifications.

E. CHANGES TO THE PROPOSAL SHEET TABLE – See page 19-20 of the attached Revised RFP

Feel free to contact me with any questions or comments.

Sincerely, Jessica Najar

Project Engineer jnajar@robertscivilengineering.com