This document is an Invitation to Bid for the 900 Dallis Street Re-Roof Project issued by the Troup County Board of Commissioners in Georgia. The project involves a re-roofing effort at the 900 Dallis Street facility located within Troup County. Sealed bid proposals are being solicited for the construction work described in the attached construction documents. Bids are due by a specified date and time, and a mandatory site visit is scheduled prior to the bid submission deadline. The contract will be awarded to the lowest responsive and responsible bidder.
The bid documents do not provide specific pricing terms or set-aside requirements. No information is given regarding any incumbent contractor or the current funding source and amount for the project. The bid documents state that the work must be completed within a certain number of calendar days from the notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 900 Dallis Street Re_Roof _ Addenda 1.docx | DOCX document | |
| 900 DALLIS STREET RE_ROOF BID NOTICE.docx | DOCX document | |
| TROUP COUNTY GA 900 DALLIS STREET REROOF SPEC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
NEW CONSTRUCTION
1. ALL WOOD IN CONTACT WITH MASONRY OR CONCRETE SHALL BE PRESSURE TREATED WITH AN
APPROVED PRESERVATIVE.
2. ALL INSULATIONS NOTED ON PLANS SHALL BE NONCOMBUSTIBLE AND MAINTAIN THERMAL AND MOISTURE
PROTECTION AS NOTED IN THE SPECIFICATIONS.
3. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THE VARIOUS TRADE ITEMS WITHIN THE SPACE ABOVE ALL CEILINGS (INCLUDING, BUT NOT LIMITED TO: STRUCTURAL MEMBERS, MECHANICAL DUCTS AND INSULATION, CONDUITS, RACEWAYS, SPRINKLER SYSTEM, LIGHT FIXTURES, CEILING SYSTEMS, AND ANY SPECIAL STRUCTURAL SUPPORTS REQUIRED) AND SHALL BE RESPONSIBLE FOR MAINTAINING THE FINISH CEILING HEIGHT ABOVE THE FINISH FLOOR INDICATED IN THE DRAWINGS AND THE FINISH SCHEDULE. (CEILING HEIGHT DIMENSIONS ARE TO THE FINISH SURFACE OF CEILING.) CONTRACTOR SHALL NOTIFY ARCHITECT IN WRITING OF ANY CONFLICTS PRIOR TO PROCEEDING WITH THE WORK.
4. ACCESS PANELS SHALL BE PROVIDED AND INSTALLED WHEREVER REQUIRED BY BUILDING CODE OR FOR THE PROPER OPERATION OR MAINTENANCE OF MECHANICAL OR ELECTRICAL EQUIPMENT, WHETHER OR NOT INDICATED ON THE DRAWINGS. CONTRACTOR SHALL COORDINATE SIZE, LOCATION, AND TYPE OF
ACCESS PANEL WITH OTHER CONTRACTORS' WORK AND RECEIVE APPROVAL OF THE ARCHITECT.
ACCESS PANEL SHALL BE AS SPECIFIED. NO ACCESS PANEL SHALL BE LOCATED, FRAMED OR INSTALLED
WITHOUT THE EXPRESSED APPROVAL OF THE ARCHITECT.
5. ALL DUCT PENETRATIONS THROUGH PARTITIONS AND CEILINGS SHALL BE PROVIDED WITH NECESSARY FRAMES AND BRACING AROUND THE OPENING AND SHALL BE PROVIDED WITH AUTOMATIC FIRE DAMPERS
AS REQUIRED BY THE BUILDING DEPARTMENT FOR FIRE-RATED PENETRATIONS.
6. HORIZONTAL JOINT REINFORCEMENT IS GENERALLY NOT SHOWN FOR REASONS OF CLARITY. TIES AND ANCHORS SPECIFICALLY NOTED ON DETAILS ARE IN ADDITION TO HORIZONTAL JOINT REINFORCEMENT
UNLESS SPECIFICALLY NOTED OTHERWISE.
7. SIZE OF MECHANICAL AND ELECTRICAL EQUIPMENT PADS AND BASES ARE APPROXIMATE ONLY.
CONTRACTOR SHALL VERIFY DIMENSIONS WITH RESPECTIVE EQUIPMENT MANUFACTURER.
8. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BACK-UP PLATES, BLOCKING, AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK, TOILET
ACCESSORIES AND ALL FLOOR-MOUNTED OR SUSPENDED MECHANICAL AND ELECTRICAL EQUIPMENT.
9. ALL DISSIMILAR METALLIC MATERIALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO PREVENT
GALVANIC ACTION.
10. FILLED CMU CELLS ON ARCHITECTURAL DRAWINGS ARE IN ADDITION TO THOSE SHOWN ON STRUCTURAL
DRAWINGS AND SHALL BE REINFORCED AS INDICATED THEREIN.
DEMOLITION AND DECONSTRUCTION
1. ALL DEMOLITION WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE 2013 EDITION OF NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS.
2. THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN ALL TEMPORARY BARRIER AND GUARDS, AND
ALL TEMPORARY SHORING AND BRACING AS REQUIRED BY ALL APPLICABLE CODES.
3. CONTRACTOR SHALL PERFORM ALL OPERATIONS OF DEMOLITION AND REMOVAL INDICATED ON THE DRAWINGS AND AS MAY BE REQUIRED BY THE WORK. ALL WORK SHALL BE DONE CAREFULLY AND
NEATLY, IN A SYSTEMATIC MANNER.
4. CONTRACTOR SHALL COORDINATE SEQUENCE OF DEMOLITION WITH PHASES OF CONSTRUCTION AGREED TO WITH OWNER AND ARCHITECT. COORDINATE ALL DEMOLITION WITH NEW CONSTRUCTION
DRAWINGS.
5. CONTRACTOR SHALL COORDINATE EXTENT OF DEMOLITION WITH OTHER DRAWINGS IN THIS SET.
NOTIFY ARCHITECT PRIOR TO PROCEEDING WITH DEMOLITION IN CASE OF A CONFLICT.
6. DRAWINGS OF EXISTING CONDITIONS HAVE BEEN DERIVED FROM VISUAL INVESTIGATION AND EXISTING DRAWINGS PROVIDED BY THE OWNER. THE ARCHITECT MAKES NO WARRANTY, EITHER EXPRESSED OR
IMPLIED, FOR THE ACCURACY OR COMPLETENESS OF THE EXISTING INFORMATION RECORDED.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. NOTIFY THE ARCHITECT IN WRITING OF
ANY DISCREPANCIES FOR CLARIFICATION PRIOR TO PROCEEDING WITH WORK.
7. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD PRIOR TO DEMOLITION. DIMENSIONS
INDICATED ON DEMOLITION PLAN ARE FOR REFERENCE ONLY.
8. IF DURING THE COURSE OF CONSTRUCTION THE CONTRACTOR ENCOUNTERS MATERIALS THAT ARE SHOWN AS 'EXISTING TO REMAIN,' WHICH HAVE ROT, TERMITE DAMAGE OR OTHER HIDDEN PROPERTIES WHICH REQUIRE ATTENTION, THE ARCHITECT SHALL IMMEDIATELY BE NOTIFIED PRIOR TO PROCEEDING
WITH THE WORK IN THE AREA OF DISCOVERY.
9. ALL ADJOINING PROPERTY AFFECTED BY ANY OPERATIONS OF DEMOLITION SHALL BE PROTECTED PER
ALL APPLICABLE CODES.
10. CONTACT ARCHITECT IMMEDIATELY, IF DURING THE COURSE OF DEMOLITION, CIRCUMSTANCES ARE ENCOUNTERED IN WHICH THE EXTENT OR INTENT OF DEMOLITION INDICATED IN THE CONTRACT DOCUMENTS IS UNCLEAR. DO NOT PROCEED WITH DEMOLITION IN THESE AREAS IN QUESTION UNTIL
CLARIFICATION IS GIVEN BY ARCHITECT.
11. ALL EXISTING SURFACES AND EQUIPMENT TO REMAIN SHALL BE FULLY PROTECTED FROM DAMAGE. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR DAMAGE AND SHALL MAKE REPAIRS REQUIRED
WITHOUT ADDITIONAL COST TO THE OWNER.
12. NO DEBRIS SHALL BE ALLOWED TO ACCUMULATE ON THE SITE. DEBRIS SHALL BE REMOVED BY THE CONTRACTOR AS THE JOB PROCEEDS. THE SITE SHALL BE LEFT BROOM CLEAN AT THE COMPLETION OF
THE DEMOLITION.
13. REFER TO MECHANICAL, PLUMBING, ELECTRICAL, CIVIL, AND STRUCTURAL SHEETS FOR DEMOLITION OF ITEMS RELATED TO EACH DISCIPLINE. ALL EXISTING PENETRATIONS FOR BUILDING SYSTEMS NOT BEING
RE-USED SHALL BE DEMOLISHED AND HOLES INFILLED TO MATCH ADJACENT CONSTRUCTION.
14. WHERE EXISTING WALLS ARE PARTIALLY DEMOLISHED, FINISH ENDS OF REMAINING WALLS TO MATCH ADJACENT CONSTRUCTION AND PROVIDE SMOOTH, EVEN SURFACES AT JAMBS OF NEW OPENINGS.
15. THE INTENT OF THESE DRAWINGS IS NOT TO DISTURB ANY EXISTING STRUCTURAL FRAMING OR SUPPORT IN OR ON ANY EXISTING STRUCTURE TO REMAIN UNLESS SPECIFICALLY NOTED OTHERWISE.
16. WHERE EXISTING MATERIALS/FINISHES ARE DISTURBED BY WORK OF THIS PROJECT, CUT, PATCH, AND REPAIR THOSE AREAS AS REQUIRED TO MATCH THE ADJACENT EXISTING MATERIALS/FINISHES IN CONFIGURATION, TEXTURE, COLOR, ETC., WITH SMOOTH AND LEVEL TRANSITION UNLESS OTHERWISE
NOTED.
17. WHERE NEW MATERIALS/FINISHES ARE INSTALLED WITHIN EXISTING DOOR, WINDOW OR OTHER OPENINGS, WITHIN NEW OPENINGS IN EXISTING CONSTRUCTION OR SUCH THAT THEY ABUT EXISTING CONSTRUCTION TO REMAIN, THOSE NEW MATERIALS/FINISHES SHALL MATCH THE ADJACENT EXISTING
MATERIALS/FINISHES IN CONFIGURATION, TEXTURE, COLOR, ETC. WITH SMOOTH AND LEVEL
TRANSITION.
18. CUTTING AND PATCHING WILL BE REQUIRED AS NECESSARY FOR BOTH THE INSTALLATION OF NEW ITEMS AND DUE TO THE REMOVAL OF EXISTING ITEMS. CONTRACTOR SHALL COORDINATE THIS WORK.
19. EXISTING FLOORS TO RECEIVE NEW FLOOR COVERING SHALL HAVE ALL HOLES FILLED, RIDGES MOVED AND FLOORS LEVELED AS REQ'D & ANY OTHER REPAIR WORK REQUIRED TO READY THE FLOORS FOR
THE NEW FLOOR COVERING PER THE MFR'S RECOMMENDATIONS.
20. INVESTIGATE LOCATION OF NEW OPENINGS FOR CONFLICTS WITH EXISTING COLUMNS, PLUMBING, ELECTRICAL, MECHANICAL, AND OTHER EXISTING CONSTRUCTION AND REPORT CONFLICTS TO
ARCHITECT PRIOR TO CUTTING FOR NEW OPENINGS.
21. EXISTING STRUCTURAL ITEMS - DO NOT CUT, DRILL, NOTCH, OR MODIFY WITHOUT SPECIFIC, PRIOR
APPROVAL OF ARCHITECT/STRUCTURAL ENGINEER.
22. NO STRUCTURAL ELEMENTS SHALL BE REMOVED UNLESS PORTIONS AFFECTED ARE ADEQUATELY
SUPPORTED BY EITHER TEMPORARY SHORING OR NEW STRUCTURAL ELEMENTS AS REQUIRED TO
PROTECT THE STABILITY AND INTEGRITY OF THE EXISTING STRUCTURE.
23. WHETHER OR NOT SPECIFICALLY NOTED REMOVE ALL MISC. NAILS, SCREWS, BOLTS, ETC., WHICH PENETRATE EXISTING WALLS, CEILING, FLOOR SURFACES TO REMAIN. PATCH ALL VOIDS IN EXISTING WALLS LEFT FROM REMOVAL OF SUCH ITEMS AND FROM ELECTRICAL, MECHANICAL AND PLUMBING ITEMS INCLUDING WIRING, PIPING, CONDUIT, DUCTWORK, ETC., TO OBTAIN A SMOOTH LEVEL SURFACE FOR NEW FINISHES. PERFORMANCE OBJECTIVE IS TO HAVE EXISTING SURFACE CONDITION MATCH NEW
SURFACES.
24. EXISTING WALLS AND CEILING (IF ANY) TO RECEIVE NEW FINISHES SHALL HAVE HOLES FILLED, RIDGES REMOVED, AND OTHER OBSTRUCTIONS WHICH WILL TELEGRAPH OR HINDER INSTALLATION OF NEW
FINISH.
25. WHERE EXISTING PLUMBING FIXTURES ARE TO BE REMOVED, AND THE EXISTING PLUMBING LINES SERVING HEM TO BE ABANDONED, CAP THOSE LINES AS REQUIRED SUCH THAT THE CAP CAN BE
CONCEALED BEHIND THE FINISH MATERIAL AT THE SURFACE.
26. WHERE EXISTING CONSTRUCTION MATERIALS/FINISHES ARE TO BE REMOVED, MAKE CLEAN BREAK (SAW CUT ACCEPTABLE), AND DO NOT DISTURB ADJACENT EXISTING CONSTRUCTION TO REMAIN.
USE OF CONTRACT DOCUMENTS
1. DRAWINGS AND SPECIFICATIONS OF ALL DISCIPLINES INCLUDED HEREIN CONSTITUTE THE FULL SCOPE OF THIS PROJECT. THESE DOCUMENTS ARE INTENDED TO ESTABLISH THE FULL CONTRACTUAL OBLIGATION OF THE GENERAL CONTRACTOR TO COMPLETE THE WORK SHOWN AND SPECIFIED. IT SHALL BE THE GENERAL CONTRACTOR'S ULTIMATE RESPONSIBILITY TO COORDINATE THE PROPOSALS AND WORK OF
ALL TRADES.
2. ARCHITECTURAL AND ENGINEERING DRAWINGS ARE COMPLIMENTARY. ITEMS INDICATED ON
ARCHITECTURAL DRAWINGS SHALL BE PROVIDED WHETHER OR NOT THEY ARE INDICATED ON AND/OR
COORDINATED WITH CONSULTANTS' DRAWINGS. ANY CONFLICTS BETWEEN ARCHITECTURAL AND
ENGINEERING WORK SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO
PROCEEDING WITH THE WORK.
3. CONTRACTORS SHALL COORDINATE THE SCOPE OF THEIR WORK WITH THE CONTRACT DOCUMENTS.
PLANS AND SPECIFICATIONS SHALL NOT BE SEPARATED. NO CLAIMS FOR EXTRAS WILL BE CONSIDERED
DUE TO SUB-CONTRACTOR NOT RELATING SCOPE OF WORK TO CONTRACT DOCUMENTS.
4. ALL WORK IS TO BE IN STRICT COMPLIANCE WITH ALL STATE LAWS AND CODES WHICH APPLY TO THIS
USE AND TO GENERALLY ACCEPTED CONSTRUCTION TRADE PRACTICES.
5. THE ARCHITECT WAIVES ANY AND ALL RESPONSIBILITY AND LIABILITY FOR PROBLEMS WHICH ARISE FROM FAILURE TO FOLLOW THESE PLANS, SPECIFICATIONS AND THE DESIGN INTENT THEY CONVEY, OR FOR
PROBLEMS WHICH ARISE FROM OTHERS' FAILURE TO OBTAIN AND/OR FOLLOW THE DESIGN
PROFESSIONAL'S GUIDANCE WITH RESPECT TO ANY ERRORS, OMISSIONS, INCONSISTENCIES,
AMBIGUITIES OR CONFLICTS WHICH ARE ALLEGED.
6. SECTIONS AND DETAILS CONTAINED IN THE CONTRACT DOCUMENTS ARE TYPICAL. CONTRACTOR IS RESPONSIBLE FOR PROVIDING COMPONENTS AND/OR CONSTRUCTION NOTED OR INDICATED IN OTHER SIMILAR AREAS OF THE PROJECT IF THEY CAN BE REASONABLY INFERRED TO BE A PART OF THE
ASSEMBLY BASED ON OTHER SIMILAR SECTIONS AND DETAILS CONTAINED IN THE CONTRACT
DOCUMENTS.
7. NOT ALL COMPONENTS IN EACH DETAIL MAY BE SPECIFICALLY CALLED OUT ON THAT PARTICULAR ARCHITECTURAL DETAIL. CONTRACTOR SHALL STILL BE RESPONSIBLE FOR PROVIDING THESE ITEMS IF THEY CAN BE REASONABLY INFERRED TO BE A PART OF THE ASSEMBLY BASED ON OTHER SIMILAR
DETAILS CONTAINED WITHIN THE CONTRACT DOCUMENTS.
8. DO NOT SCALE ANY DRAWINGS TO DETERMINE DIMENSIONS. RELY ONLY ON FIELD MEASUREMENT AND
WRITTEN DIMENSIONS FOR NEW WORK.
9. ALL DIMENSIONS ARE FROM FACE OF STUD OR FACE OF MASONRY (UNO).
10. ALL DIMENSIONS AND CONDITIONS SHALL BE FIELD VERIFIED PRIOR TO PROCEEDING WITH THE WORK OF
THIS CONTRACT. ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND CONTRACT DOCUMENTS SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO PROCEEDING WITH THE
WORK.
11. "SCALE" INDICATED ON THE ELEVATIONS MAY NOT BE REPRESENTATIVE OF A SCALED DRAWING. THE
CONTRACTOR SHALL MAKE FIELD MEASUREMENTS AS REQUIRED TO ASCERTAIN THE EXTENT AND
QUANTITY OF WORK TO BE PERFORMED.
12. SUBCONTRACTORS SHALL INVESTIGATE ALL EXISTING CONDITIONS ASSOCIATED WITH THEIR SCOPE OF WORK AND VERIFY REQ'D QUANTITIES OF MATERIALS PRIOR TO PROVIDING A BID TO THE GENERAL CONTRACTOR. NO CHANGE ORDERS WILL BE GRANTED FOR ADDITIONAL WORK REQ'D WHICH IS EVIDENT
FROM FIELD INVESTIGATION AND IS CONSISTENT WITH THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS.
13. SUBCONTRACTORS SHALL VERIFY REQ'D QUANTITIES OF MATERIALS WITH THE GENERAL CONTRACTOR PRIOR TO PURCHASING. NO CHANGE ORDERS WILL BE GRANTED FOR ADDITIONAL QUANTITIES OR DETAIL WORK REQ'D WHICH IS EVIDENT FROM FIELD CONDITIONS AND IS CONSISTENT WITH THE REQUIREMENTS
OF THE CONTRACT DOCUMENTS.
14. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS EXPENSE AND AT NO ADDITIONAL EXPENSE TO THE OWNER, ARCHITECT, OR
CONSULTANTS.
CONTRACTOR RESPONSIBILITY
1. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PERMITS AND INSPECTIONS
2. CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL
PERMITS AND FEES REQUIRED, NOT NORMALLY COVERED BY THE BUILDING PERMIT.
3. THE CONTRACTOR SHALL FILE ALL NECESSARY CERTIFICATES OF INSURANCE, PAY ALL FEES, AND
OBTAIN ANY AND ALL BONDS REQUIRED BY ANY AGENCY IN ORDER TO DO THE WORK HEREIN
DESCRIBED.
4. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES BELOW GRADE AND
RELATED SERVICE CONNECTIONS WITH THE RESPECTIVE UTILITY COMPANIES.
5. THE CONTRACTOR SHALL REMOVE FROM THE SITE AND DISPOSE OF ALL TRASH, DEBRIS AND CONSTRUCTION MATERIALS DUE TO CONSTRUCTION OR DEMOLITION PRIOR TO COMPLETION OF THE WORK. THE CONTRACTOR SHALL LEAVE THE SITE IN A CONDITION EQUAL TO OR BETTER THAN IT WAS BEFORE COMMENCEMENT OF WORK ON THIS CONTRACT. THE CONTRACTOR SHALL ALSO ENSURE THAT TRASH AND DEBRIS ARE NOT BLOWN OR SPREAD ON OR OFF SITE DURING PERFORMANCE OF THE WORK.
6. THE CONTRACTOR SHALL RESTRICT ACCESS TO THE ROOF TO ONLY THOSE FORCES NEEDING ACCESS
TO THE ROOF IN ORDER TO COMPLETE THEIR WORK. FINISHED ROOF SURFACES ARE TO BE
PROTECTED AT ALL TIMES.
7. THE CONTRACTOR SHALL LIMIT HIS WORK AND FORCES UNDER HIS CONTROL TO ONLY THOSE AREAS OF
WORK AS DEFINED BY THE CONTRACT DOCUMENTS.
8. THE CONTRACTOR SHALL PROVIDE CRAFTSMAN-LIKE INSTALLATION AND FINISH OF ALL EXPOSED
CONSTRUCTION SYSTEMS.
9. PAINT ALL EXPOSED SCHEDULED PIPING, CONDUIT AND MECHANICAL EQUIPMENT IN AREAS NOTED TO BE
PAINTED.
10. THE CONTRACTOR SHALL REPAIR AT HIS EXPENSE DAMAGE TO ANY FINISHES TO REMAIN WHICH ARE
INCURRED DURING WORK ON THIS CONTRACT.
11. THE CONTRACTOR SHALL PROVIDE ADEQUATE WEATHER PROTECTION FOR THE BUILDING AND ITS CONTENTS DURING THE COURSE OF THE WORK. ALL OPENINGS IN ANY WALL OR ROOF SHALL BE
PROTECTED FROM ALL FORMS OF WEATHER OR WATER.
SITE WORK
1. SOD, LANDSCAPING, SIDEWALKS, CURBS OR ANY OTHER SITE APPURTENANCES DAMAGED DURING DEMOLITION OR CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO PRE-CONSTRUCTION CONDITIONS
AT THE CONTRACTOR'S EXPENSE PRIOR TO COMPLETION OF THIS PROJECT.
2. WHERE CONC. WALKWAYS ABUT EXTERIOR MASONRY WALLS, CONTRACTOR SHALL ADJUST THE HEIGHT OF WEEPS AND BASE FLASHING AS NECESSARY TO PROVIDE CAVITY DRAINAGE ABOVE ADJACENT
SURFACES, TYP.
Date:
Drawn By:
Project Number:
Revisions:
Sheet Description
Sheet Number
Checked By:
P R
IN
T
E D
F
IL
E
P A
T H
INDEX TO DRAWINGS
11 Ninth Street
Suite 120
Columbus, GA 31901
P. (706) 571-6923
F. (706) 571-6928
/2
/2
:3
:4
A
M A u to d e s k D o c s /2
-0
T ro u p
C o u n ty
D a lli s S t R e -r o o f/ -0
T R
O U
P C
O
D
A L L
IS
S T rv t
T1.1
COVER SHEET
TROUP COUNTY
LAGRANGE, GA 30240
TROUP
COUNTY GA -
900 DALLIS
STREET,
RE-ROOF
29 SEPTEMBER 2023
23-01599
CONSTRUCTION
DOCUMENTS
TROUP COUNTY GA - 900 DALLIS STREET,
RE-ROOF
TROUP COUNTY
LAGRANGE, GA 30240
CONSTRUCTION DOCUMENTS
29 SEPTEMBER 2023
2WR # 23-01599
T1.1 COVER SHEET
D1.1 DEMOLITION ROOF PLAN
D1.2 DETAILS
A3.1 ROOF PLAN
A3.2 ROOF DETAILS
ARCHITECTURAL
No. Date Description
ElsiEckstein Snapshot
GENERAL DEMOLITION NOTES
1. ALL DEMOLITION WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE
LATEST EDITION OF NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION,
ALTERATION, AND DEMOLITION OPERATIONS.
2. DRAWINGS ARE BASED ON PARTIAL PLANS PROVIDED BY OWNER AND UPON
FIELD OBSERVATION.
3. FIELD VERIFY CURB CONDITIONS FOR EXISTING EQUIPMENT TO REMAIN.
EQUIPMENT CURB FRAMING AND FLASHING TO BE PROTECTED, REUSED, AND
UNDAMAGED TO THE GREATEST EXTENT POSSIBLE. REMOVAL OF EQUIPMENT
SHOULD ONLY OCCUR WHERE NEW CURB AND FLASHING IS REQUIRED PER
ROOFING MANUFACTURER'S WRITTEN SPECIFICATIONS TO ACHIEVE SPECIFIED
WARRANTY. NOTIFY ARCHITECT OF ANY CONFLICTS PRIOR TO BEGINNING NEW
WORK.
4. ELECTRICAL, PLUMBING, GAS PIPING, AND OTHER MECHANICAL STUB UP
PENETRATIONS NOT SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY
THE QUANTITY NEEDED FOR NEW ROOFING.
5. COORDINATE REMOVAL AND REINSTALLATION OF ROOF TOP STRUCTURES AND
EQUIPMENT WITH OTHERS AS REQUIRED TO INSTALL NEW ROOF SYSTEM.
6. REMOVE ALL EXISTING COPING TO FACILITATE INSTALLATION OF NEW ROOFING.
7. REPLACE ANY DAMAGED WOOD AS REQUIRED FOR PROPER ANCHORING OF
NEW ROOFING SYSTEM AND NEW METAL COPING.
8. COORDINATE WITH OWNER THE RELOCATION OF FURNISHINGS THAT COULD BE
DISTURBED DURING NEW WORK CONSTRUCTION.
9. PROTECT INTERIOR BUILDING ELEMENTS WHILE EXTERIOR DEMOLITION AND
NEW CONSTRUCTION OCCUR. PROTECTION FROM WEATHER AND
CONSTRUCTION RELATED DAMAGES SHALL BE IN PLACE TO MINIMIZE IMPACT
TO INTERIOR SPACES THAT ARE NOT PART OF THE PROJECT SCOPE.
10. PROTECT FROM DAMAGE ALL BUILDING COMPONENTS AND FINISHES THAT ARE
EXISTING TO REMAIN.
11. EXISTING VENTS, EQUIPMENT, AND OTHER ROOFTOP PENETRATIONS TO
REMAIN, (UNO). REMOVE ANY PIPE BOOTS, FLASHING, AND SEALANTS AROUND
EQUIPMENT. RAISE AS REQUIRED TO RECEIVE NEW ROOFING AND INSULATION
SYSTEM.
LEGEND
RD ROOF DRAIN
OD OVERFLOW DRAIN
OS OVERFLOW SCUPPER
VTR VENT THRU ROOF
HSV HOT STACK VENT
EF EXHAUST FAN
SJ SPLICE JOINT IN COPING
SLOPE TO DRAIN
RA ROOF ANCHOR
GD GUTTER DRAIN
GEJ GUTTER EXPANSION JOINT
KEYED CONSTRUCTION NOTES
A REMOVE EXISTING COPPER, TECTUM, AND ALL RELATED ITEMS.
B REMOVE AND DISPOSE OF EXISTING MODIFIED BITUMEN ROOF SYSTEM.
C DISPOSE OF CONCRETE BLOCKS, ANTENA, ROOF SYSTEM, AND ALL RELATED
ITEMS. PREPARE AREA TO RECEIVE NEW ROOF SYSTEM.
D REPOINT EXISTING BRICK VENEER.
E DISPOSE OF WOOD SOFFIT, TRIM, AND LIGHT FIXTURES. PREPARE AREA TO
RECEIVE NEW CEILING SYSTEM. COORDINATE WITH THE OWNER
TEMPORARILY DISCONNECT SECURITY CAMARA AND REINSTALLATION AFTER
COMPLETION OF WORK.
F EXISTING PRECAST CORNICE TO REMAIN.
G DISPOSE OF TARP AND ALL RELATED ROOF SYSTEMS.
H REMOVE EXISTING GUTTER AND DOWNSPOUT SYSTEM.
J EXISTING CONCRETE CANOPY TO REMAIN.
TYP
A
TYP
A
TYP
A
TYP
A
TYP
B
TYP
B
TYP
B
TYP
A
TYP
A
TYP
A
TYP
C
D
E
BELOW
TYP
A
TYP
A
TYP
F
TYP
F
TYP
F
TYP
G
J
TYP
H
TYP
H
TYP
H
TYP
F
TYP
H
TYP
H
Date:
Drawn By:
Project Number:
Revisions:
Sheet Description
Sheet Number
Checked By:
P R
IN
T
E D
F
IL
E
P A
T H
11 Ninth Street
Suite 120
Columbus, GA 31901
P. (706) 571-6923
F. (706) 571-6928
/2
/2
:3
:4
A
M A u to d e s k D o c s /2
-0
T ro u p
C o u n ty
D a lli s S t R e -r o o f/ -0
T R
O U
P C
O
D
A L L
IS
S T rv t
D1.1
DEMOLITION
ROOF PLAN
TROUP COUNTY
LAGRANGE, GA 30240
TROUP
COUNTY GA -
900 DALLIS
STREET,
RE-ROOF
XXX
29 SEPTEMBER 2023
23-01599
CONSTRUCTION
DOCUMENTS
XXX
SCALE: 1/8" = 1'-0"D1.1
1 DEMOLITION ROOF PLAN
No. Date Description
Date:
Drawn By:
Project Number:
Revisions:
Sheet Description
Sheet Number
Checked By:
P R
IN
T
E D
F
IL
E
P A
T H
11 Ninth Street
Suite 120
Columbus, GA 31901
P. (706) 571-6923
F. (706) 571-6928
/2
/2
:3
:4
A
M A u to d e s k D o c s /2
-0
T ro u p
C o u n ty
D a lli s S t R e -r o o f/ -0
T R
O U
P C
O
D
A L L
IS
S T rv t
D1.2
DETAILS
TROUP COUNTY
LAGRANGE, GA 30240
TROUP
COUNTY GA -
900 DALLIS
STREET,
RE-ROOF
29 SEPTEMBER 2023
23-01599
CONSTRUCTION
DOCUMENTS
REMOVE AND TURN OVER TO THE OWNER EXISTING COPPER
ROOF SYSTEM AND ALL RELATED ITEMS DOWN TO TECTUM
DECK.
A REMOVE AND TURN OVER TO THE OWNER EXISTING COPPER
ROOF SYSTEM AND ALL RELATED ITEMS DOWN TO TECTUM
DECK.
A REMOVE AND DISPOSE OF EXISTING MODIFIED BITUMEN ROOF
SYSTEM AND ASSOCIATED ITEMS.
B
DISPOSE OF CONCRETE BLOCKS, ANTENA, ROOF SYSTEM, AND ALL
RELATED ITEMS. PREPARE AREA TO RECEIVE NEW ROOF SYSTEM.
C
DISPOSE OF TARP. REPLACE ANY DAMAGED TECTUM DECK - MATCH
ADJACENT SURFACES. PREPARE AREA TO RECEIVE NEW ROOF
SYSTEM.
GEXISTING PRECAST CORNICE TO REMAIN. F REMOVE AND TURN OVER TO THE OWNER EXISTING COPPER
GUTTER AND DOWNSPOUT SYSTEM.
H
DISPOSE OF WOOD SOFFIT, TRIM, AND LIGHT FIXTURES. PREPARE
AREA TO RECEIVE NEW CEILING SYSTEM. COORDINATE WITH THE
OWNER TEMPORARILY DISCONNECT SECURITY CAMARA AND
REINSTALLATION AFTER COMPLETION OF WORK.
EREPOINT EXISTING BRICK VENEER.D
No. Date Description
A3.2 1 /4
:1
1/4:12 1/4:12
/4
:1
/4
:1
/4
:1
E X
S
L O
P E
E X
S
L O
P E
EX. SLOPE
EX. SLOPE
/4
:1
/4
:1
E X
S
L O
P E
E X
S
L O
P E
EX. SLOPEEX. SLOPE
EX. SLOPEEX. SLOPE
EX. SLOPEEX. SLOPE
E X
S
L O
P E
E X
S
L O
P E
EX. SLOPEEX. SLOPE
E X
S
L O
P E
E X
S
L O
P E
E X
S
L O
P E
EX. SLOPE
EX. SLOPE
EX. SLOPE
E X
S
L O
P E
E X
S
L O
P E
E X
S
L O
P E
E X
S
L O
P E
1/4 / 12
/4
ROOF #1
ROOF #5
1/4:12
DS
DS
DS
GEJ
DSDS
DS
DS DS
GEJ
GEJ
DS
DSDS GEJ
DS
DSGEJDS
DS
DS
DS
DS
DS
DSGEJDS
DS
GEJ
DS
GEJ
A3.2
DSDS
DS DS
A3.2
BELOW
1/4:12
A3.2
A3.2
ROOF #4
ROOF #3
ROOF #2
A3.1
A3.2
A3.2
A3.2
A3.2
A3.2
A3.2
A3.2
TYP
EX. SLOPE
EX. SLOPE
A3.2
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
A3.2
A3.2
A3.2
TYP
TYP
TYP
TYP
ROOF #1
ROOF #5
ROOF #2
ROOF #3
ROOF #4
KEY PLAN
NTS
EXISTING METAL
ORNAMENTAL
TRELLIS TO REMAIN
NEW PREFIN METAL
GUTTER
NEW RECESSED
LIGHT FIXTURE, TYP
VENTED SMOOTH
CEMENT BOARD
SOFFIT SYSTEM
PREFIN DOWNSPOUT
SYSTEM - ANCHOR AT
TOP, MIDDLE, AND
BOTTOM
CEMENT BOARD TRIM
GENERAL ROOF NOTES
KEYED ROOF NOTES
ROOF LEGEND
VTR VTR (REFER TO PLUMBING)
RD ROOF DRAIN
O.F. OVERFLOW ROOF DRAIN
EF EXHAUST FAN (REFER TO MECHANICAL)
OS OVERFLOW SCUPPER
DS DOWNSPOUT
GEJ GUTTER EXPANSION JOINT
ELEVATION OF RAISED
ELEMENTS
3 SLOPE
SLOPE TO DRAIN
4:12
A. PROVIDE ALL COMPONENTS FOR A COMPLETE ROOF SYSTEM AND FLASHING AT
THE ENTIRE SCOPE OF WORK. PROVIDE COMPLETE WEATHER TIGHT CONDITION IN
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
B. PROTECT ALL EXISTING BUILDING FACADES, DOORS, AND WINDOWS ADJACENT TO
WORK AREA FROM DAMAGE.
C. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION.
DIMENSIONS SHOWN ON PLAN INDICATE APPROXIMATE ROOF SIZES.
D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MISCELLANEOUS REPAIRS AND
MODIFICATIONS ASSOCIATED WITH THE SCOPE OF THE WORK DIRECTED.
E. MINIMUM FINISHED ROOF SLOPE 1/4"/FT TO DRAINS,U.N.O.
F. FLASHING DETAILS ARE TYPICAL FOR ALL SIDES OF ROOF SYSTEM (UNLESS NOTED
OTHERWISE).
G. ALL CONTINUOUS MTL CLEATS OR REVERSE MTL CLEATS SHALL BE A MIN (1) GAUGE
HEAVIER THAN SPECIFIED THICKNESS OF MTL FLASHING.
H. ALL ROOFING AND SHEET MTL FLASHING WORK SHALL BE DONE IN ACCORDANCE
WITH ALL CURRENT PRACTICES OF SMACNA AND NRCA.
I. STAGGER ALL INSULATION AND COVER BOARDS.
J. ALL WOOD TO BE PRESSURE TREATED (UNLESS NOTED OTHERWISE).
K. SEE SPECIFICATIONS FOR INSULATION TYPE AND THICKNESS. WOOD NAILERS TO
MATCH INSULATION THICKNESS.
L. TAPER FIELD INSULATION A MINIMUM OF 1/4" PER FOOT WHERE THE ROOF DECK IS
NOT SLOPED. TAPER CRICKETS AND SADDLES A MINIMUM OF 1/2" PER FOOT.
M. PROVIDE PROPER BOOTS, STORM COLLARS, AND FLASHING FOR ALL
PENETRATIONS THROUGH THE ROOF. NOTE THAT NOT ALL EXISTING
PENETRATIONS ARE INDICATED ON THE ROOF PLANS.
N. WHEREVER PRACTICALLY POSSIBLY, ROOF TOP PENETRATIONS SHALL OCCUR
BETWEEN STANDING SEAMS. STANDING SEAMS SHALL BE INTERRUPTED ONLY
WHEN ABSOLUTELY NECCESARY.
O. PROVIDE SCREEN AT ALL DOWNSPOUT INLETS AND CONNECT ALL TO STORMWATER
SYSTEM (UNO).
0'-0"
1 NEW 60 MIL TPO ROOF MEMBRANE FULLY ADHERED SYSTEM OVER 1/2"
COVER BOARD ON R-25 POLYISO INSULATION. SLOPE WITH MINIMUM 1/4" PER
FOOT.
2 NEW PREFIN STANDING SEAM METAL ROOF SYSTEM ON 16 GA 6" Z PURLINS
AT 3'-0" OC. PROVIDE (2) LAYERS OF R-19 BATT INSULATION WITH 1" MINIMUM
STEEL BANDS AT 30" OC FOR INSULATION SUPPORT.
3 NEW PREFIN METAL GUTTER AND DOWNSPOUT SYSTEM. ANCHOR
DOWNSPOUTS TO BUILDING AT TOP, MIDDLE, AND BOTTOM MAX 8'-0" OC.
4 ROOF RIDGE. SEE DETAIL 2/A3.2
5 NEW 60 MIL TPO ROOF MEMBRANE FULLY ADHERED SYSTEM OVER 1/2"
COVER BOARD ON TAPERED INSULATION. SLOPE WITH MINIMUM 1/4" PER
FOOT.
ROOF DESIGN
ROOF #1
100 YEARS OF RAINFALL INTENSITY
ROOF AREA: 200 SF
GUTTER SIZE: MINIMUM 4" X 4"
NUMBER OF DOWNSPOUTS: MINIMUM (1)
DOWNSPOUT SIZE: 3" X 3"
ROOF #2
100 YEARS OF RAINFALL INTENSITY
ROOF AREA: 6,435 SF
GUTTER SIZE: MINIMUM 7" X 5"
NUMBER OF DOWNSPOUTS: MINIMUM (2)
DOWNSPOUT SIZE: 4" X 4"
ROOF #3
100 YEARS OF RAINFALL INTENSITY
ROOF AREA: 5,761 SF
GUTTER SIZE: MINIMUM 7" X 5"
NUMBER OF DOWNSPOUTS: MINIMUM (2)
DOWNSPOUT SIZE: 4" X 4"
ROOF #4
100 YEARS OF RAINFALL INTENSITY
ROOF AREA: 7,232 SF
GUTTER SIZE: MINIMUM 7" X 5"
NUMBER OF DOWNSPOUTS: MINIMUM (2)
DOWNSPOUT SIZE: 4" X 4"
ROOF #5
100 YEARS OF RAINFALL INTENSITY
ROOF AREA: 5,110 SF
GUTTER SIZE: MINIMUM 7" X 5"
NUMBER OF DOWNSPOUTS: MINIMUM (2)
DOWNSPOUT SIZE: 4" X 4"
6 ALIGN CENTER LINE OF DOWNSPOUT WITH CENTER LINE OF WALL BELOW.
CONNECT TO
7 CLEAN EXISTING PRECAST CORNICE. COORDINATE EXTENTS OF WORK WITH
OWNER.
8 PROVIDE KICK-OUT FLASHING WITH WELDED SEAMS.
9 FORMED METAL BOX GUTTER. PROVIDE SLOPE ON GUTTER WITH A MINIMUM
OF 1/4" PER FOOT AND DISCHARGE DIRECTLY ONTO ADJACENT ROOF.
10 EXTEND EXISTING VTRS TO REMAIN TO A MINIMUM OF 8" ABOVE NEW
FINISHED ROOF PLANE AND INSTALL NEW FLASHING.
11 INFILL EXISTING WALL VENTS. PROVIDE CEMENT BOARD WITH WEATHER
BARRIER AND 2" OF RIGID INSULATION. TAPE ALL SEAMS.
Date:
Drawn By:
Project Number:
Revisions:
Sheet Description
Sheet Number
Checked By:
P R
IN
T
E D
F
IL
E
P A
T H
11 Ninth Street
Suite 120
Columbus, GA 31901
P. (706) 571-6923
F. (706) 571-6928
/2
/2
:3
:4
A
M A u to d e s k D o c s /2
-0
T ro u p
C o u n ty
D a lli s S t R e -r o o f/ -0
T R
O U
P C
O
D
A L L
IS
S T rv t
A3.1
ROOF PLAN
TROUP COUNTY
LAGRANGE, GA 30240
TROUP
COUNTY GA -
900 DALLIS
STREET,
RE-ROOF
EE
29 SEPTEMBER 2023
23-01599
CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"A3.1
1 ROOF PLAN
SCALE: 1/4" = 1'-0"A3.1
2 SOFFIT PLAN
No. Date Description
PREFIN VALLEY FLASHING
"Z" RETAINER
STRIP SET IN SEALANT
PANEL CLIP W/ FASTENERS
PREFIN STANDING SEAM
METAL ROOF PANEL
EXISTING BUILDING STRUCTURE
SEALANT
FULLY ADHERED TPO
MEMBRANEMIN. WELD CONT.
1 1/2" (38 mm)
INSULATION / COVER
BOARD
TPO ROUND SPLIT PIPE BOOT
FLASHING
CAULK
SEALING MASTIC
ADJUSTABLE METAL STRAP
(2 m m
WELD FLASHING BASE TO
FIELD MEMBRANE MIN. 1
1/2" (38 mm) CONTINUOUS
INSTALLED BOOT
ISOMETRIC VIEW
UNINSTALLED BOOT
ISOMETRIC VIEW
CAULK (NOT SHOWN FOR CLARITY)
ADJUSTABLE METAL STRAP
OVERLAP WELDED MIN.
1 1/2" (38 mm)
CONTINUOUS
ROUND SPLIT PIPE BOOT FLASHING
WELD FLASHING BASE TO FIELD
MEMBRANE MIN. 1 1/2" (38 mm)
CONTINUOUS
JM TPO EDGE SEALANT
HIP/RIDGE FLASHING W/ "Z"
CLOSURES
SEALANT (AT VERTICAL LEG
& UNDER "Z")
THERMAL BLOCK
PREFIN STANDING SEAM
METAL ROOF PANEL
PANEL CLIP ON
THERMAL BLOCK
EXISTING ROOF
STRUCTURE TO REMAIN
(2) LAYERS OF R-19
BATT INSULATION
1" STEEL
STRAPPING@ 30" OC
EXISTING PRECAST
METAL COUNTERFLASHING
HOT AIR WELDED SPLICE
NEW 60 MIL TPO ROOF
MEMBRANE FULLY ADHERED
TPO FLASHING MEMBRANE
CONT BEAD OF SEALANT
CONT BEAD OF SEALANT
TERMINATION BAR
SEALANT MASTIC
M
IN
IM
U
M
1/2" COVER BOARD
TAPERED INSULATION
EXISTING ROOF DECK TO REMAIN
1" STEEL STRAPPING @ 30" OC
GUTTER STRAP
PREFIN METAL
GUTTER - SEE ROOF
DESIGN FOR SPECIFIC
DESIGNATION
RETAINER STRIP SET IN SEALANT
PANEL CLIP W/FASTENER
PREFIN STANDING SEAM METAL ROOF
6" Z-GIRT @ 3'-0" OC
CROSS-SECTION VIEW TOWARDS ROOF VIEW TOWARDS ROOF EDGE
NOTE: GUTTERS, GUTTER ENDS
BE 24 GA.
& 0.S./ D.S. SLEEVES SHALL
3" EXPANSION JOINT COVER
3/4" fLANGE RETURNS AT TOP OF
GUTTER TO RECIEVE EXP. JT. COVER,
UNDER ROOF PANEL
EXP. JT. COVER TO MATCH ROOFING
CUT VERTICAL FLANGE OF CAP
FLASHING AT EXP. JT. COVER
RIVET & SOLDER/WELD GUTTER ENDS
WATERTIGHT TO GUTTER
H E
IG
H
T V
A R
IE
S
BOTTOM OF
GUTTER TYP
SLOPE GUTTERS DOWN TO
DOWNSPOUTS AT A MIN OF 1/16"/FT.
CONTINUOUSLY SOLDER/WELD
FLASHING COVER PLATE TO EXP.
JT. COVER. DO NOT SOLDER TO
GUTTER
11"
3/4"
3/4"
3/4"
SEE BELOW
FOR DIM.
EXPANSION JOINT WIDTH AS FOLLOWS:
1/2" WARM TEMPERATURES. 3/4" AT MODERATE
AND 1" AT COOL TEMPERATURES
CONT. SOLDER TYP
PREFIN STANDING SEAM METAL ROOF PANEL
BASIS OF DESIGN: MBCI BATTENLOK HS
PANEL CLIP ON
THERMAL BLOCK
6" Z PURLIN 16 GA
@ 3'-0" OC
R-19 BATT INSULATION
EXISTING STEEL ROOF
STRUCTURE
R-19 BATT INSULATION
1" STEEL STRAPPING
@ 30" OC
6" 'C' CHANNEL
FIELD CUT & BEND RETURN IN PANEL - APPLY
SEALANT & HOOK RETURN OVER EAVE FLASHING
ALUMINUM BOX GUTTER SYSTEM
1/2" EXTERIOR GRADE PLYWOOD
SIMPSON HEAVY ANGLE
1'-0" MINIMUM
COVER SET ON CONT BUTYL
EXPANSION JOINT COVER
1" EXPANSION JOINT WITH PRECOMPRESSED
INSULATION FILLER AND RETAINER
PT 2X8 ENSURE THAT THE FRONT EDGE OF
THE GUTTER IS A MINIMUM OF 1" LOWER
THAN THE OPPOSITE SIDE
METAL CAP SECURED WITH CONT METAL CLEAT
EXISTING ROOF STRUCTURE
CONTINUOUS SELF-ADHERING FLASHING MEMBRANE
OVERLAP OVER PARAPET.
STEEL ANGLE
EXISTING PRECAST CORNICE
NEW METAL CLEAT - NAILS @ 3" OC
SEALANT MASTIC
NEW DRIP EDGE FLASHING
CONT BEAD OF TPO SEALANT
STRIP OF TPO FLASHING
NEW 1/2" COVER BOARD
EXISTING ROOF STRUCTURE TO REMAIN
NEW 60 MIL TPO MEMBRANE FULLY ADHERED
PREFIN METAL BRAKE W/ 'Z' CLOSURE
R-19 BATT INSULATION
PREFIN STANDING SEAM METAL ROOF
TAPERED INSULATION
R-19 BATT INSULATION
16 GA 6" Z-PURLINS @ 3'-0" OC
1" STEEL STRAPPING
@ 30" OC
Date:
Drawn By:
Project Number:
Revisions:
Sheet Description
Sheet Number
Checked By:
P R
IN
T
E D
F
IL
E
P A
T H
11 Ninth Street
Suite 120
Columbus, GA 31901
P. (706) 571-6923
F. (706) 571-6928
/2
/2
:3
:4
A
M A u to d e s k D o c s /2
-0
T ro u p
C o u n ty
D a lli s S t R e -r o o f/ -0
T R
O U
P C
O
D
A L L
IS
S T rv t
A3.2
ROOF DETAILS
TROUP COUNTY
LAGRANGE, GA 30240
TROUP
COUNTY GA -
900 DALLIS
STREET,
RE-ROOF
XXX
29 SEPTEMBER 2023
23-01599
CONSTRUCTION
DOCUMENTS
XXX
SCALE: 3" = 1'-0"A3.2
6 VALLEY DETAIL
SCALE: 6" = 1'-0"A3.2
8 ROOF PENETRATION DETAIL
SCALE: 3" = 1'-0"A3.2
2 TYPICAL RIDGE DETAIL
SCALE: 3" = 1'-0"A3.2
4 ROOF / WALL DETAIL
SCALE: 3" = 1'-0"A3.2
3 GUTTER DETAIL
SCALE: 3" = 1'-0"A3.2
7 GUTTER EXPANSION JOINT DETAIL
SCALE: 3" = 1'-0"A3.2
1 GUTTER DETAIL AT CORNICE
No. Date Description
SCALE: 3" = 1'-0"A3.2
5 ROOF EDGE DETAIL
| Sheets |
| T1.1 - COVER SHEET |
| D1.1 - DEMOLITION ROOF PLAN |
| D1.2 - DETAILS |
| A3.1 - ROOF PLAN |
| A3.2 - ROOF DETAILS |
File details come from the government source that posted it. Updated .