2024_03_01_CCGA_Hargett_BidSet_Hvac.pdf

PDF 1 MB Posted

Attached to
CCGA-2420 Hargett Admin Building TU Replacement
Solicitation number
PE-56300-RFQ-2024-000000006
Issued by
Dooly County, Georgia

About this file

This document is a bid set for the College of Coastal Georgia Hargett Administration Building Terminal Unit Replacement project located in Brunswick, Georgia. The project involves the demolition and replacement of existing terminal units at the Hargett Administration Building. The bid set includes drawings for the HVAC demolition and new work, with details and schedules for the new terminal units. The project number is CCGA-2420 and the bid set was issued on 03.01.24. No specific bid due date or award date is provided. The project contract term is not specified.

The bid set provides details on the new terminal units to be installed, including quantities, capacities, and other technical specifications. Existing HVAC ductwork is to remain in place except where required for proper connections to the new equipment. New 120V power circuits will be extended from the existing panel to serve each new terminal unit. No pricing terms, set asides, or incumbent information is included in the documents provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT CONSULTANTS

INDEX OF

DRAWINGS

TITLESHEET NO.

316 CORPORATE PARKWAY MACON, GEORGIA

NBP ENGINEERS, INC.

CONSULTANTS

M001

M101

M201

ABBREVIATIONS, LEGENDS, & SCHEDULES - HVAC

03.01.24 BID SET

College of Coastal Georgia Hargett Administration Building - Terminal Unit Replacement

Brunswick, Georgia

M002 DETAILS - HVAC

FLOOR PLAN - DEMOLITION - HVAC

FLOOR PLAN - NEW WORK - HVAC

Project No.: CCGA-2420

WSH

LTF

WSH

03.01.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

24016

B

ID

S E

T

C o ll e g e o f

C o a st a l

G e o rg ia

H a rg e tt A d m in is tr a ti o n

B u il d in g

T e rm in a l

U n it R e p la c e m e n t

B ru n sw ic k G e o rg ia

SEAL

SCALE:

FILE PATH:

P:\24016\24016m001.dgn

DATE PLOTTED

DGN FILE

29-FEB-2024

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24016\24016m001.dgn

AS SHOWN

P ro je c t

N o

C

C G

A

M001

SINGLE LINE DUCT LEGEND

DUCTWORK (SUPPLY, RETURN & EXHAUST)

SUPPLY DUCT UP

SUPPLY DUCT DOWN

RETURN OR EXHAUST DUCT UP

RETURN OR EXHAUST DUCT DOWN

DUCT RISE

DUCT DOWN

VOLUME DAMPER (MANUAL UNLESS INDICATED A.V.D.)

FIRE DAMPER (F.D.) OR SMOKE DAMPER (S.D.)

TRANSITION

DUCT TAKE-OFF (SEE SPEC. PERTAINING TO DEFLECTROLS)

TRANSITION (FLAT ON TOP)

TRANSITION (FLAT ON BOTTOM)

TRANSITION (TOP OR BOTTOM ONLY)

SUPPLY CEILING DIFFUSER

RETURN OR EXHAUST CEILING GRILLE

SIDEWALL SUPPLY

SIDEWALL RETURN

FLEXIBLE CONNECTION (DUCT)

RELIEF AIR SUPPLY TO TOILET

DUCT SPLIT WITH SPLITTER DAMPER

FLEX. DUCT WITH SCREW ON COLLAR, TAKE-OFF

LINED DUCT

SQUARE ELBOW WITH TURNING VANES

FIRE DAMPER (FD)

RADIUS ELBOW (SEE SPECS. PERTAINING TO TURNING VANES)

AUTOMATIC VOLUME DAMPER

DN

R

F.D. OR S.D.

F.O.T.

F.O.B.

T. OR B.

R.A.S.

12\10 SPLIT

A.V.D.

OR

OR

RETURN AIR GRILLE WITH FULLSIZE LINED TRANSFER DUCT.

FD/SCD

COMBINATION FIRE/SMOKE CONTROL DAMPER

SUMMER WINTER

DESIGN CONDITIONS

OUTSIDE

INSIDE

29.2 F DB

72 F DB

A COMPRESSED AIR

AAV AUTOMATIC AIR VENT

ACD ACCESS DOOR

AD AREA DRAIN

AF AIR FOIL

-AFF ABOVE FINISHED FLOOR

AV ACID VENT

AW ACID WASTE

-AC ABOVE CEILING

AH- AIR HANDLING UNIT

BBD BOILER BLOW DOWN

BE BOTTOM ELEVATION

BOL BOTTOM OF LINE (UNINSULATED)

BOD BOTTOM OF DUCT

BP- BOOSTER PUMP

BTUH BRITISH THERMAL UNIT PER HOUR

-BF BELOW FLOOR

BFP BACK FLOW PREVENTOR

C CONDUIT

CC COOLING COIL

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSER WATER RETURN

CS CONDENSER WATER SUPPLY

CW DOMESTIC COLD WATER

CAB CABINET FAN

CF CENTRIFICAL FAN

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CHEMICAL FEED TANK

CH CABINET HEATER

CHR CHILLER

CL CENTER LINE

CO CLEANOUT

CP CHILLER PUMP

CPHB CHROME PLATED HOSE BIBB

CT COOLING TOWER

CU COPPER

CV- CONVECTOR

Cv VALVE COEFFICIENT

D DRAIN

DDC DIRECT DIGITAL CONTROL

DHW DOMESTIC HOT WATER

DN DOWN

DP DIFFERENTIAL PRESSURE

DPT DIFFERENTIAL PRESSURE TRANSMITTER

DS DOWN SPOUT

DSO DOWN SPOUT OVER FLOW

DX DIRECT EXCHANGE

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EWB ENTERING WET BULB

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EQT EQUIPMENT TRAP SET

EWT ENTERING WATER TEMPERATURE

EX EXPANSION TANK LINE

EXT EXTERNAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

F&BP FACE & BYPASS

FC FAN COIL UNIT

BPD BYPASS DAMPER

EAL EXHAUST AIR LOUVER

ECH ELECTRIC CABINET HEATER

ABBREVIATIONS

FD FIRE DAMPER

FF FOULING FACTOR

FF- FLY FAN

FF FINISHED FLOOR

FF FINAL FILTER

FFM FIRE FLOW METER

FLEX FLEXIBLE

FM FIRE MAIN

FOR FUEL OIL RETURN

FOV FUEL OIL VENT

FOP FUEL OIL PUMP

FP FIRE PUMP

FP- FAN POWERED

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

G LOW PRESSURE GAS

GA GAUGE

GPM GALLONS PER MINUTE

GT GREASE TRAP

GTH GRAND TOTAL HEAT

H HEIGHT

HC HEATING COIL

HB HOSE BIBB

HBT HORIZONTAL BLOW THROUGH

HD HUB DRAIN

HDT HORIZONTAL DRAW THROUGH

HPA HIGH PRESSURE AIR

HPG HIGH PRESSURE GAS

HPS HIGH PRESSURE STEAM

HPWS HEAT PUMP WATER SUPPLY

HPWR HEAT PUMP WATER RETURN

HSC HORIZONTAL SPLIT CASE

HWG HOT WATER GENERATOR

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

ILC IN-LINE CENTRIFICAL

IT INTERVAL TIMER

IN INCHES

INV INVERT

JB JUNCTION BOX

L LENGTH

LR LONG RADIUS

LAT LEAVING AIR TEMPERATURE

LCP LOCAL CONTROL PANEL

LDB LEAVING DRY BULB

LN LIQUID NITROGEN

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM

MAV MANUAL AIR VENT

MVD MANUAL VOLUME DAMPER

MAX MAXIMUM

MBH ONE THOUSAND BTU PER HOUR

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MH MAN HOLE

MP SUMP (MUD) PUMP

MPS MEDIUM PRESSURE STEAM

MPR MEDIUM PRESSURE RETURN

MTS MEDIUM TEMPERATURE SUPPLY

MTR MEDIUM TEMPERATURE RETURN

MUA MAKE-UP AIR

MUW MAKE-UP WATER

MZ MULTIZONE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

ODT OUTDOOR TEMPERATURE

PC PUMP CONDENSATE

PD PRESSURE DROP

PRV PRESSURE REDUCING VALVE

PWF PROPELLER WALL FAN

R REFRIGERANT

RA RETURN AIR

RAS RELIEF AIR SUPPLY

RP RECIRCULATING PUMP

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RD ROOF DRAIN

RV RELIEF VALVE

OAL OUTSIDE AIR LOUVER

SAN SANITARY SEWER

SC SILL COCK

SCIM STANDARD CUBIC INCHES PER MINUTE

SD STORM DRAIN

SD SMOKE DETECTOR

SF SQUARE FEET

SDO STORM DRAIN OVERFLOW

SHC SENSIBLE HEAT CAPACITY

SP STAND PIPE

SP SUMP PUMP

O2 OXYGEN

SP STATIC PRESSURE

SP SPRINKLER PIPE

SG SPECIALTY GAS

EUH ELECTRIC UNIT HEATER

DHR DOMESTIC HOT WATER CIRCULATING

FPR FINNED PIPE RADIATION

PRF PROPELLER ROOF FAN

RF ROOF FAN

RSF ROOF SUPPLY FAN

CAB CABINET FAN

CLG CEILING FAN

FRT FLOW RATE TRANSDUCER

AVD AUTOMATIC VOLUME CONTROL DAMPER

CU-# CONDENSING UNIT

EAD EXHAUST AIR CONTROL DAMPER

ELL ELBOW

ERG EXISTING RETURN GRILLE

ESG EXISTING SUPPLY DIFFUSER

ES END SUCTION

FLRD FLOOR DRAIN

FMS FLOW MEASURING STATION

FM FLOW METER

HP HORSEPOWER

HP HIGH PRESSURE

OAD OUTSIDE AIR CONTROL DAMPER

REF RANGE EXHAUST FAN

RAD RETURN AIR CONTROL DAMPER

SCD SMOKE CONTROL DAMPER

SA SUPPLY AIR

SAF SUPPLY AIR FAN

SMBH SENSIBLE MBH

RAF RETURN AIR FAN

BTD BACK-TOP DISCHARGE(FAN)

FTD FRONT-TOP DISCHARGE(FAN)

94.5 F DB / 77.3 F WB

75 F DB / 55% RH

DUCT

INLET

MIN

CFM

MAX.

CFM

MIN

WIN

MBH

COIL

CV

VALVE

RUNOUT

PIPE

GPM

COIL

2,000

1,200

1,005

1,830

1,040

1,065

1,460

36.7

0.7

0.6

1.3

0.7

1.1

1.0

1.0

0.4

1.3

0.5

0.4

0.8

1.6

1.5

1.4

2.4

.7

.7

0.72-0.91

.7

.7

.7

.7

.7

.7-0.8

.7

.7

.7

0.86-1.09

0.78-0.99

0.75-0.95

1.31-1.66

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

3/4

1/2

1/2

3/4

MARK

TUA-01

TUA-02

TUA-03

TUA-04

TUA-05

TUA-06

TUA-07

TUA-08

TUA-09

TUA-10

TUA-1 1

TUA-12

TUA-13

TUA-14

TUA-15

TUA-16

TUA-17

SPS

SD

COMBINATION STARTER

STARTER

PIPE SLEEVE

CONCENTRIC REDUCER

PIPE ANCHOR

HVAC LEGEND

BALL VALVE WITH

3/4" HOSE END

BALANCE VALVE

THREADED & FLANGED

GLOBE VALVE

CHECK VALVE

3-WAY MIXING VALVE

BALL VALVE

BUTTERFLY VALVE

SOLENOID VALVE

CONTROL VALVE

PLAN VIEW

2-WAY MOTORIZED VALVE

RELIEF VALVE

FLANGED UNION

BRANCH OUT TOP

STRAINER

BRANCH OUT BOTTOM

ELBOW DOWN

ELBOW UP

TEE OUT TOP

BLIND FLANGE

PIPE CAP

AUTOMATIC AIR VENTAAV

FLEX. PIPE CONN.

BACKFLOW PREVENTER

THERMOMETER

TEE OUT BOTTOM

MANUAL AIR VENT

PIPE TEST PLUG

HEATING WATER FLOW

COLD WATER DOMESTIC

NATURAL GAS

CONDENSER WATER FLOW

DRAIN

HEATING WATER RETURN

HOT WATER DOMESTIC

G

D

DUCT SIZE FIRST DIMENSION

IS SIDE SHOWN

24\12

DOOR GRILLE

REFERS TO DETAIL OR

PLAN ON SHEET M-1.THERMOSTAT

INTERVAL TIMER

T

I.T.

1\M-4

DUCT/PLENUM w/LINER

FIRE DAMPER

ELBOW WITH

TURNING VANES

FLEX. DUCT CONN.

TURNING VANES

ELBOW WITHOUT

ADJUSTABLE AIR

EXTRACTOR

INSULATED FLEX. DUCT

INSULATED FLEX. DUCT

c

ECCENTRIC REDUCER

HWS

HWR

SCHS

SCHR

CONDENSER WATER RETURN

CS

CR

STATIC PRESSURE SENSOR

SMOKE DETECTOR

POINT OF CONNECTION

DUCT SPLIT

THREADED & FLANGED

THREADED & FLANGED

UNION

GAUGE TAPPING

GAUGE WITH TAPPING

THREADED & FLANGED

THREADED & FLANGED

PIPE SOCKET WELL

FLOW INDICATOR BALANCER

M

T G THERMOSTAT w/GROUND

ANNULAR ELEMENT FLOW STATION

M

DAMPER - BLADE VIEW DAMPER - END VIEW

xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)

DOUBLE WALL INSULATED

ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}

CHILLED WATER FLOW

CHILLED WATER RETURN

CHS

CHR

WATER SUPPLY

SECONDARY CHILLED

WATER RETURN

SECONDARY CHILLED

CV

CVA

CONSTANT VOLUME

ADJUSTABLE

CONSTANT VOLUME

CFM

PRESSURE SENSOR

SCHEDULES - HVAC

LEGENDS, &

ABBREVIATIONS,

TERMINAL BOX UNIT SCHEDULE

REMARKS

WSH

LTF

WSH

03.01.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

24016 ll e g e o f

C o a st a l

G e o rg ia

H a rg e tt A d m in is tr a ti o n

B u il d in g

T e rm in a l

U n it R e p la c e m e n t

B ru n sw ic k G e o rg ia

SEAL

SCALE:

FILE PATH:

P:\24016\24016m002.dgn

DATE PLOTTED

DGN FILE

29-FEB-2024

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24016\24016m002.dgn

AS SHOWN

P ro je c t

N o

C

C G

A

M002

DETAILS - HVAC

TYPICAL PIPE OUT

MAINS

BRANCH

BOTTOM OF HYDRONIC MAINS

NOT TO SCALE

HANGER ROD - SEE SPECIFICATIONS

SECTION OF RIGID INSULATION

SPECIFIED INSULATION

PIPE

PLATE WASHER

CUT ROD ABOVE ANGLE LEG

1" MIN.

DOUBLE HEX NUTS

TRAPEZE PIPE HANGER

NOT TO SCALE

•" ROUND BEARING PLATE

SEE SPECIFICATIONS

LONG LEG VERTICAL-

TRAPEZE HANGER

TEST PLUGS

UNIONS (3)

SUPPLY

RETURN

CONTROL VALVE

COIL

(PROVIDE IF RUNOUT PIPING

IS A HIGH POINT)

MANUAL AIR VENT

GAUGE COCK

6" MAXIMUM

TEST PLUG IN TEE

(REMOVE PLUG FOR

DRAIN).

WALL

MANUAL AIR VENT

BRACKET

ARRANGEMENT FOR LOCATIONS

WITH LIMITED CLEARANCE

NOT TO SCALE

WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE

VALVE FOR VERTICAL DOWN DISCHARGE.

CEILING, LOCATE VALVE AND TERMINATE DRAIN

HERE UNLESS NOTED OTHERWISE AND POSITION

…" PIPE SAME MATERIAL

3"

4" AND LARGER PIPING

3"

3" AND SMALLER PIPING

TOGETHER WITH ONE DRAIN CONNECTION.

FLOOR. CONNECT OUTLETS FROM MULTIPLE VALVES

TERMINATE DRAIN WITH •" HOSE END 18" ABOVE

AS SYSTEM PIPE

GAUGE COCK

NOT TO SCALE

TYPICAL PIPING AT

TU HEATING COILS - 2 WAY

STRAINER

N

T

T U

A

270|

300|180|

120|

120|

260| 260|160|

310|210|240|

T

135|

1 15|

250|

60| 145|

16/12

250|

205|

18/10

150|

150|

150|

110|

260|

220|

255|

330|

14/14

10/14

220|340|

100|

FAN ON ROOF

16/16 UP TO

250|250|

16/12

12/12 100|

100|

400|

EF-1

12/1020/1028/10

8/6

T

T

300|

8/6

8/6

95|

T

100|

TEF-1 ON ROOF

ON ROOF

TEF-3

|170 |180 |180

T

|290

|170

T

TUA-1

TUA-2

TUA-1 1

TUA-4

TUA-6

TUA-5

TUA-8

TUA-7

TUA-9

TUA-10

TUA-16

TUA-17

T

T

T

12/10

16/10

26/12

TUA-14

TUA-15 2

/1

14/10

18/12

TUA-13

8/12

10/8

T

EF-3

T

T

46/24

48/24

T

190|

190|

6/10

30/14

16/7

40/24

28/20 28/14

36/20

T

18/9 14/9 14/6

16/1 1

23/10

T

UP

UP

ƒ"

1"

1‚"

1‚"

R

1" ƒ"

1‚"

UP

ƒ"

SPS

175|

EF-2

8 @ 175| EACH 2 @ 250| EACH

2 @ 250| EACH

175|

300|

95|

390| 310| 200|

95| H

W R H

W S

1‚" 4 ƒ"

175|

T ƒ"

125|

ON ROOF

TEF-2

ƒ"

SCALE:

= 1'-0

8 0 4 8 16

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

M101

HVAC

DEMOLITION -

FLOOR PLAN -FLOOR PLAN - DEMOLITION - HVAC

250|

GENERAL NOTES:(THIS SHEET ONLY)

A

NOTES:(THIS SHEET ONLY)

SURVEY EXISTING CONDITIONS TO VERIFY ITEMS TO BE DEMOLISHED.

ALL CONDITIONS FOR DEMOLITION MAY NOT BE SHOWN.

IF DAMAGED DURING CONSTRUCTION.

CEILING TILES, CEILING GRIDS, OR FIXTURES TO MATCH EXISTING

PERFORMED ABOVE FINISHED SPACES. REPAIR/REPLACE ANY

REMOVE EXISTING CEILING TILES WHERE SCOPE OF WORK IS

TO NEW EQUIPMENT IN NEW WORK.

WHICH IS REQUIRED TO REPLACE FOR PROPER CONNECTIONS

ALL EXISTING DUCTWORK TO REMAIN EXCEPT FOR THATC

B

WITH NEW EQUIPMENT IN NEW WORK.

ALL EXISTING TERMINAL UNITS TO BE REMOVED AND REPLACED

DIV. 26 (TYPICAL).

BOX AND CONDUIT FOR THERMOSTAT IN ACCORDANCE WITH

AT EXISTING THERMOSTAT LOCATION, PROVIDE NEW JUNCTION

THERMOSTAT IN PLACE. IF NO JUNCTION BOX OR CONDUIT EXIST

FOR PLACEMENT OF NEW THERMOSTAT. DO NOT ABANDON

REMOVE EXISTING THERMOSTAT. REUSE EXISTING WALL LOCATION

PROTECT BUILDING FINISHES DURING REMOVAL OF EXISTING PIPING.

BUILDING HW PIPING PRIOR TO REMOVING ANY HW PIPING.

ISOLATE BUILDING HW FROM CENTRAL HW PIPING AND DRAIN

CONTROL VALVE, STRAINER, ISOLATION VALVES, AND TEST PLUGS.

REMOVE EXISTING HWS/R PIPING AT TERMINAL UNIT INCLUDING

D

SERVE NEW TERMINAL UNIT IN SAME LOCATION.

DISCONNECT EXISTING POWER. CIRCUIT SHALL BE REUSED TO

FROM PANEL LA LOCATED IN THE MECHANICAL ROOM.

THE EXISTING TERMINAL UNITS ARE SERVED WITH 120 VOLT POWER

HA

HS

HA LA LA LA T 4

K V

A

G

HM

WOMEN

STOR.

OFFICE

OFFICE

OFFICE

OFFICE

COPY/

STORAGE

FILES

OFFICE

CORR.

OFFICE

OFFICE

OFFICE

OFFICE

C O

R R

OFFICE

OFFICE

FILES OFFICE

EQUIP.

MECHANICAL

MECHANICAL

H.R. DIRECTOR VAULT

MEN

OFFICE

OFFICE

STOR.

OFFICE CONFERENCE

WAITING

RECEPT./

OFFICE

STUDENT

OFFICE

JAN.

MEETING RM/

LIBRARY

STOR./

COPY

CONFERENCE

PRESIDENT'S

OFFICE

OFFICE

BOARD ROOM

KITCH.

OFFICE

RECEPT.

STOR.

CLOSET

TOILET

RECEPT.

CORR.

CORR.

CORR.

MEN

WOMEN

LOBBY

CORR.

CORR.

CLOSET

RECEPT.

C O

R R

. BREAK

OFFICE

OFFICE

RECPT./WAITING

CORR.

OFFICE

OFFICE OFFICE

F.A.

120106

114 115

132134

139140

152 146

154 155

148A

124-A

COPY/FILE

WSH

LTF

WSH

03.01.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

24016 ll e g e o f

C o a st a l

G e o rg ia

H a rg e tt A d m in is tr a ti o n

B u il d in g

T e rm in a l

U n it R e p la c e m e n t

B ru n sw ic k G e o rg ia

SEAL

SCALE:

FILE PATH:

P:\24016\24016m101.dgn

DATE PLOTTED

DGN FILE

29-FEB-2024

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24016\24016m101.dgn

AS SHOWN

P ro je c t

N o

C

C G

A

N

T

T U

A

T

T

T

T

T

TUA-4

TUA-6

TUA-5

TUA-16

TUA-17

T

T

T

TUA-15

TUA-13

T

T

T

T

SCALE:

= 1'-0

8 0 4 8 16

M201

LINE LEGEND

POINT OF CONNECTION

EXISTING TO REMAIN

NEW WORK

FLOOR PLAN - NEW WORK - HVAC

HVAC

NEW WORK -

FLOOR PLAN -

TUA-14

NOTES:(THIS SHEET ONLY)

GENERAL NOTES:(THIS SHEET ONLY)

A

IF DAMAGED DURING CONSTRUCTION.

CEILING TILES, CEILING GRIDS, OR FIXTURES TO MATCH EXISTING

PERFORMED ABOVE FINISHED SPACES. REPAIR/REPLACE ANY

REMOVE EXISTING CEILING TILES WHERE SCOPE OF WORK ISB

C

TO NEW EQUIPMENT IN NEW WORK.

WHICH IS REQUIRED TO REPLACE FOR PROPER CONNECTIONS

ALL EXISTING DUCTWORK TO REMAIN EXCEPT FOR THAT

SURVEY EXISTING CONDITIONS TO VERIFY ITEMS TO BE DEMOLISHED.

ALL CONDITIONS FOR NEW WORK MAY NOT BE SHOWN.

NEW TERMINAL UNIT (TYPICAL).

NEW THERMOSTAT.

TUA-10

TUA-8

TUA-7

TUA-9

TUA-1 1

TUA-1

TUA-2

D

CONDUCTORS AS REQUIRED.

TO EACH TERMINAL UNIT. EXTEND THE EXISTING BRANCH CIRCUIT

AS THE LOCAL DISCONNECTING MEANS. MAKE ALL FINAL CONNECTIONS

A NEW MOTOR RATED SWITCH AT EACH TERMINAL UNIT TO SERVE

CIRCUIT FROM EXISTING PANEL LA AT EACH LOCATION. PROVIDE

CONNECT ALL NEW TERMINAL UNITS TO THE EXISTING 120 VOLT

WOMEN

STOR.

OFFICE

OFFICE

OFFICE

OFFICE

COPY/

STORAGE

FILES

OFFICE

CORR.

OFFICE

OFFICE

OFFICE

OFFICE

C O

R R

OFFICE

OFFICE

FILES OFFICE

EQUIP.

MECHANICAL

MECHANICAL

H.R. DIRECTOR VAULT

MEN

OFFICE

OFFICE

STOR.

OFFICE CONFERENCE

WAITING

RECEPT./

OFFICE

STUDENT

OFFICE

JAN.

MEETING RM/

LIBRARY

STOR./

COPY

CONFERENCE

PRESIDENT'S

OFFICE

OFFICE

BOARD ROOM

KITCH.

OFFICE

RECEPT.

STOR.

CLOSET

TOILET

RECEPT.

CORR.

CORR.

CORR.

MEN

WOMEN

LOBBY

CORR.

CORR.

CLOSET

RECEPT.

C O

R R

. BREAK

OFFICE

OFFICE

RECPT./WAITING

CORR.

OFFICE

OFFICE OFFICE

F.A.

120106

114 115

132134

139140

152 146

154 155

148A

124-A

COPY/FILE

WSH

LTF

WSH

03.01.24

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

24016 ll e g e o f

C o a st a l

G e o rg ia

H a rg e tt A d m in is tr a ti o n

B u il d in g

T e rm in a l

U n it R e p la c e m e n t

B ru n sw ic k G e o rg ia

SEAL

SCALE:

FILE PATH:

P:\24016\24016m201.dgn

DATE PLOTTED

DGN FILE

29-FEB-2024

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24016\24016m201.dgn

AS SHOWN

P ro je c t

N o

C

C G

A

270|

300|180|

120|

120|

260| 260|160|

310|210|240|

135|

1 15|

250|

60| 145|

16/12

250|

205|

18/10

150|

150|

150|

110|

260|

220|

255|

330|

14/14

10/14

220|340|

100|

FAN ON ROOF

16/16 UP TO

250|250|

16/12

12/12 100|

100|

400|

EF-1

12/1020/1028/10

8/6

300|

8/6

8/6

95|

100|

TEF-1 ON ROOF

ON ROOF

TEF-3

|170 |180 |180

T

|290

|170

12/10

16/10

26/12

/1

14/10

18/12

8/12

10/8

T

EF-3

T

46/24

48/24

190|

190|

6/10

30/14

16/7

40/24

28/20 28/14

36/20

18/9 14/9 14/6

16/1 1

23/10

UP

UP

ƒ"

1"

1‚"

1‚"

R

1" ƒ"

1‚"

UP

ƒ"

SPS

175|

EF-2

8 @ 175| EACH 2 @ 250| EACH

2 @ 250| EACH

175|

300|

95|

390| 310| 200|

95| H

W R H

W S

1‚" 4 ƒ"

175|

T ƒ"

125|

ON ROOF

TEF-2

ƒ"

250|

HA

HS

HA LA LA LA T 4

K V

A

G

HM

24016aCov
24016m001
References
tb, 24016tb.dgn
24016m002
References
tb, 24016tb.dgn
24016m101
References
afp1, 24016aX1.dgn
tb, 24016tb.dgn
24016m201
References
afp1, 24016aX1.dgn
tb, 24016tb.dgn
existing , 24016m101.dgn

File details come from the government source that posted it. Updated .