This document is a bid set for the College of Coastal Georgia Hargett Administration Building Terminal Unit Replacement project located in Brunswick, Georgia. The project involves the demolition and replacement of existing terminal units at the Hargett Administration Building. The bid set includes drawings for the HVAC demolition and new work, with details and schedules for the new terminal units. The project number is CCGA-2420 and the bid set was issued on 03.01.24. No specific bid due date or award date is provided. The project contract term is not specified.
The bid set provides details on the new terminal units to be installed, including quantities, capacities, and other technical specifications. Existing HVAC ductwork is to remain in place except where required for proper connections to the new equipment. New 120V power circuits will be extended from the existing panel to serve each new terminal unit. No pricing terms, set asides, or incumbent information is included in the documents provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT CONSULTANTS
INDEX OF
DRAWINGS
TITLESHEET NO.
316 CORPORATE PARKWAY MACON, GEORGIA
NBP ENGINEERS, INC.
CONSULTANTS
M001
M101
M201
ABBREVIATIONS, LEGENDS, & SCHEDULES - HVAC
03.01.24 BID SET
College of Coastal Georgia Hargett Administration Building - Terminal Unit Replacement
Brunswick, Georgia
M002 DETAILS - HVAC
FLOOR PLAN - DEMOLITION - HVAC
FLOOR PLAN - NEW WORK - HVAC
Project No.: CCGA-2420
WSH
LTF
WSH
03.01.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
24016
B
ID
S E
T
C o ll e g e o f
C o a st a l
G e o rg ia
H a rg e tt A d m in is tr a ti o n
B u il d in g
T e rm in a l
U n it R e p la c e m e n t
B ru n sw ic k G e o rg ia
SEAL
SCALE:
FILE PATH:
P:\24016\24016m001.dgn
DATE PLOTTED
DGN FILE
29-FEB-2024
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24016\24016m001.dgn
AS SHOWN
P ro je c t
N o
C
C G
A
M001
SINGLE LINE DUCT LEGEND
DUCTWORK (SUPPLY, RETURN & EXHAUST)
SUPPLY DUCT UP
SUPPLY DUCT DOWN
RETURN OR EXHAUST DUCT UP
RETURN OR EXHAUST DUCT DOWN
DUCT RISE
DUCT DOWN
VOLUME DAMPER (MANUAL UNLESS INDICATED A.V.D.)
FIRE DAMPER (F.D.) OR SMOKE DAMPER (S.D.)
TRANSITION
DUCT TAKE-OFF (SEE SPEC. PERTAINING TO DEFLECTROLS)
TRANSITION (FLAT ON TOP)
TRANSITION (FLAT ON BOTTOM)
TRANSITION (TOP OR BOTTOM ONLY)
SUPPLY CEILING DIFFUSER
RETURN OR EXHAUST CEILING GRILLE
SIDEWALL SUPPLY
SIDEWALL RETURN
FLEXIBLE CONNECTION (DUCT)
RELIEF AIR SUPPLY TO TOILET
DUCT SPLIT WITH SPLITTER DAMPER
FLEX. DUCT WITH SCREW ON COLLAR, TAKE-OFF
LINED DUCT
SQUARE ELBOW WITH TURNING VANES
FIRE DAMPER (FD)
RADIUS ELBOW (SEE SPECS. PERTAINING TO TURNING VANES)
AUTOMATIC VOLUME DAMPER
DN
R
F.D. OR S.D.
F.O.T.
F.O.B.
T. OR B.
R.A.S.
12\10 SPLIT
A.V.D.
OR
OR
RETURN AIR GRILLE WITH FULLSIZE LINED TRANSFER DUCT.
FD/SCD
COMBINATION FIRE/SMOKE CONTROL DAMPER
SUMMER WINTER
DESIGN CONDITIONS
OUTSIDE
INSIDE
29.2 F DB
72 F DB
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
ACD ACCESS DOOR
AD AREA DRAIN
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FIRE DAMPER
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCIM STANDARD CUBIC INCHES PER MINUTE
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
O2 OXYGEN
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
DHR DOMESTIC HOT WATER CIRCULATING
FPR FINNED PIPE RADIATION
PRF PROPELLER ROOF FAN
RF ROOF FAN
RSF ROOF SUPPLY FAN
CAB CABINET FAN
CLG CEILING FAN
FRT FLOW RATE TRANSDUCER
AVD AUTOMATIC VOLUME CONTROL DAMPER
CU-# CONDENSING UNIT
EAD EXHAUST AIR CONTROL DAMPER
ELL ELBOW
ERG EXISTING RETURN GRILLE
ESG EXISTING SUPPLY DIFFUSER
ES END SUCTION
FLRD FLOOR DRAIN
FMS FLOW MEASURING STATION
FM FLOW METER
HP HORSEPOWER
HP HIGH PRESSURE
OAD OUTSIDE AIR CONTROL DAMPER
REF RANGE EXHAUST FAN
RAD RETURN AIR CONTROL DAMPER
SCD SMOKE CONTROL DAMPER
SA SUPPLY AIR
SAF SUPPLY AIR FAN
SMBH SENSIBLE MBH
RAF RETURN AIR FAN
BTD BACK-TOP DISCHARGE(FAN)
FTD FRONT-TOP DISCHARGE(FAN)
94.5 F DB / 77.3 F WB
75 F DB / 55% RH
DUCT
INLET
MIN
CFM
MAX.
CFM
MIN
WIN
MBH
COIL
CV
VALVE
RUNOUT
PIPE
GPM
COIL
2,000
1,200
1,005
1,830
1,040
1,065
1,460
36.7
0.7
0.6
1.3
0.7
1.1
1.0
1.0
0.4
1.3
0.5
0.4
0.8
1.6
1.5
1.4
2.4
.7
.7
0.72-0.91
.7
.7
.7
.7
.7
.7-0.8
.7
.7
.7
0.86-1.09
0.78-0.99
0.75-0.95
1.31-1.66
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
1/2
3/4
1/2
1/2
3/4
MARK
TUA-01
TUA-02
TUA-03
TUA-04
TUA-05
TUA-06
TUA-07
TUA-08
TUA-09
TUA-10
TUA-1 1
TUA-12
TUA-13
TUA-14
TUA-15
TUA-16
TUA-17
SPS
SD
COMBINATION STARTER
STARTER
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALL VALVE WITH
3/4" HOSE END
BALANCE VALVE
THREADED & FLANGED
GLOBE VALVE
CHECK VALVE
3-WAY MIXING VALVE
BALL VALVE
BUTTERFLY VALVE
SOLENOID VALVE
CONTROL VALVE
PLAN VIEW
2-WAY MOTORIZED VALVE
RELIEF VALVE
FLANGED UNION
BRANCH OUT TOP
STRAINER
BRANCH OUT BOTTOM
ELBOW DOWN
ELBOW UP
TEE OUT TOP
BLIND FLANGE
PIPE CAP
AUTOMATIC AIR VENTAAV
FLEX. PIPE CONN.
BACKFLOW PREVENTER
THERMOMETER
TEE OUT BOTTOM
MANUAL AIR VENT
PIPE TEST PLUG
HEATING WATER FLOW
COLD WATER DOMESTIC
NATURAL GAS
CONDENSER WATER FLOW
DRAIN
HEATING WATER RETURN
HOT WATER DOMESTIC
G
D
DUCT SIZE FIRST DIMENSION
IS SIDE SHOWN
24\12
DOOR GRILLE
REFERS TO DETAIL OR
PLAN ON SHEET M-1.THERMOSTAT
INTERVAL TIMER
T
I.T.
1\M-4
DUCT/PLENUM w/LINER
FIRE DAMPER
ELBOW WITH
TURNING VANES
FLEX. DUCT CONN.
TURNING VANES
ELBOW WITHOUT
ADJUSTABLE AIR
EXTRACTOR
INSULATED FLEX. DUCT
INSULATED FLEX. DUCT
c
ECCENTRIC REDUCER
HWS
HWR
SCHS
SCHR
CONDENSER WATER RETURN
CS
CR
STATIC PRESSURE SENSOR
SMOKE DETECTOR
POINT OF CONNECTION
DUCT SPLIT
THREADED & FLANGED
THREADED & FLANGED
UNION
GAUGE TAPPING
GAUGE WITH TAPPING
THREADED & FLANGED
THREADED & FLANGED
PIPE SOCKET WELL
FLOW INDICATOR BALANCER
M
T G THERMOSTAT w/GROUND
ANNULAR ELEMENT FLOW STATION
M
DAMPER - BLADE VIEW DAMPER - END VIEW
xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)
DOUBLE WALL INSULATED
ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}
CHILLED WATER FLOW
CHILLED WATER RETURN
CHS
CHR
WATER SUPPLY
SECONDARY CHILLED
WATER RETURN
SECONDARY CHILLED
CV
CVA
CONSTANT VOLUME
ADJUSTABLE
CONSTANT VOLUME
CFM
PRESSURE SENSOR
SCHEDULES - HVAC
LEGENDS, &
ABBREVIATIONS,
TERMINAL BOX UNIT SCHEDULE
REMARKS
WSH
LTF
WSH
03.01.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
24016 ll e g e o f
C o a st a l
G e o rg ia
H a rg e tt A d m in is tr a ti o n
B u il d in g
T e rm in a l
U n it R e p la c e m e n t
B ru n sw ic k G e o rg ia
SEAL
SCALE:
FILE PATH:
P:\24016\24016m002.dgn
DATE PLOTTED
DGN FILE
29-FEB-2024
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24016\24016m002.dgn
AS SHOWN
P ro je c t
N o
C
C G
A
M002
DETAILS - HVAC
TYPICAL PIPE OUT
MAINS
BRANCH
BOTTOM OF HYDRONIC MAINS
NOT TO SCALE
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
DOUBLE HEX NUTS
TRAPEZE PIPE HANGER
NOT TO SCALE
•" ROUND BEARING PLATE
SEE SPECIFICATIONS
LONG LEG VERTICAL-
TRAPEZE HANGER
TEST PLUGS
UNIONS (3)
SUPPLY
RETURN
CONTROL VALVE
COIL
(PROVIDE IF RUNOUT PIPING
IS A HIGH POINT)
MANUAL AIR VENT
GAUGE COCK
6" MAXIMUM
TEST PLUG IN TEE
(REMOVE PLUG FOR
DRAIN).
WALL
MANUAL AIR VENT
BRACKET
ARRANGEMENT FOR LOCATIONS
WITH LIMITED CLEARANCE
NOT TO SCALE
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
VALVE FOR VERTICAL DOWN DISCHARGE.
CEILING, LOCATE VALVE AND TERMINATE DRAIN
HERE UNLESS NOTED OTHERWISE AND POSITION
…" PIPE SAME MATERIAL
3"
4" AND LARGER PIPING
3"
3" AND SMALLER PIPING
TOGETHER WITH ONE DRAIN CONNECTION.
FLOOR. CONNECT OUTLETS FROM MULTIPLE VALVES
TERMINATE DRAIN WITH •" HOSE END 18" ABOVE
AS SYSTEM PIPE
GAUGE COCK
NOT TO SCALE
TYPICAL PIPING AT
TU HEATING COILS - 2 WAY
STRAINER
N
T
T U
A
270|
300|180|
120|
120|
260| 260|160|
310|210|240|
T
135|
1 15|
250|
60| 145|
16/12
250|
205|
18/10
150|
150|
150|
110|
260|
220|
255|
330|
14/14
10/14
220|340|
100|
FAN ON ROOF
16/16 UP TO
250|250|
16/12
12/12 100|
100|
400|
EF-1
12/1020/1028/10
8/6
T
T
300|
8/6
8/6
95|
T
100|
TEF-1 ON ROOF
ON ROOF
TEF-3
|170 |180 |180
T
|290
|170
T
TUA-1
TUA-2
TUA-1 1
TUA-4
TUA-6
TUA-5
TUA-8
TUA-7
TUA-9
TUA-10
TUA-16
TUA-17
T
T
T
12/10
16/10
26/12
TUA-14
TUA-15 2
/1
14/10
18/12
TUA-13
8/12
10/8
T
EF-3
T
T
46/24
48/24
T
190|
190|
6/10
30/14
16/7
40/24
28/20 28/14
36/20
T
18/9 14/9 14/6
16/1 1
23/10
T
UP
UP
ƒ"
1"
1‚"
1‚"
R
1" ƒ"
1‚"
UP
ƒ"
SPS
175|
EF-2
8 @ 175| EACH 2 @ 250| EACH
2 @ 250| EACH
175|
300|
95|
390| 310| 200|
95| H
W R H
W S
1‚" 4 ƒ"
175|
T ƒ"
125|
ON ROOF
TEF-2
ƒ"
SCALE:
= 1'-0
8 0 4 8 16
LINE LEGEND
EXISTING TO REMAIN
DEMOLITION
M101
HVAC
DEMOLITION -
FLOOR PLAN -FLOOR PLAN - DEMOLITION - HVAC
250|
GENERAL NOTES:(THIS SHEET ONLY)
A
NOTES:(THIS SHEET ONLY)
SURVEY EXISTING CONDITIONS TO VERIFY ITEMS TO BE DEMOLISHED.
ALL CONDITIONS FOR DEMOLITION MAY NOT BE SHOWN.
IF DAMAGED DURING CONSTRUCTION.
CEILING TILES, CEILING GRIDS, OR FIXTURES TO MATCH EXISTING
PERFORMED ABOVE FINISHED SPACES. REPAIR/REPLACE ANY
REMOVE EXISTING CEILING TILES WHERE SCOPE OF WORK IS
TO NEW EQUIPMENT IN NEW WORK.
WHICH IS REQUIRED TO REPLACE FOR PROPER CONNECTIONS
ALL EXISTING DUCTWORK TO REMAIN EXCEPT FOR THATC
B
WITH NEW EQUIPMENT IN NEW WORK.
ALL EXISTING TERMINAL UNITS TO BE REMOVED AND REPLACED
DIV. 26 (TYPICAL).
BOX AND CONDUIT FOR THERMOSTAT IN ACCORDANCE WITH
AT EXISTING THERMOSTAT LOCATION, PROVIDE NEW JUNCTION
THERMOSTAT IN PLACE. IF NO JUNCTION BOX OR CONDUIT EXIST
FOR PLACEMENT OF NEW THERMOSTAT. DO NOT ABANDON
REMOVE EXISTING THERMOSTAT. REUSE EXISTING WALL LOCATION
PROTECT BUILDING FINISHES DURING REMOVAL OF EXISTING PIPING.
BUILDING HW PIPING PRIOR TO REMOVING ANY HW PIPING.
ISOLATE BUILDING HW FROM CENTRAL HW PIPING AND DRAIN
CONTROL VALVE, STRAINER, ISOLATION VALVES, AND TEST PLUGS.
REMOVE EXISTING HWS/R PIPING AT TERMINAL UNIT INCLUDING
D
SERVE NEW TERMINAL UNIT IN SAME LOCATION.
DISCONNECT EXISTING POWER. CIRCUIT SHALL BE REUSED TO
FROM PANEL LA LOCATED IN THE MECHANICAL ROOM.
THE EXISTING TERMINAL UNITS ARE SERVED WITH 120 VOLT POWER
HA
HS
HA LA LA LA T 4
K V
A
G
HM
WOMEN
STOR.
OFFICE
OFFICE
OFFICE
OFFICE
COPY/
STORAGE
FILES
OFFICE
CORR.
OFFICE
OFFICE
OFFICE
OFFICE
C O
R R
OFFICE
OFFICE
FILES OFFICE
EQUIP.
MECHANICAL
MECHANICAL
H.R. DIRECTOR VAULT
MEN
OFFICE
OFFICE
STOR.
OFFICE CONFERENCE
WAITING
RECEPT./
OFFICE
STUDENT
OFFICE
JAN.
MEETING RM/
LIBRARY
STOR./
COPY
CONFERENCE
PRESIDENT'S
OFFICE
OFFICE
BOARD ROOM
KITCH.
OFFICE
RECEPT.
STOR.
CLOSET
TOILET
RECEPT.
CORR.
CORR.
CORR.
MEN
WOMEN
LOBBY
CORR.
CORR.
CLOSET
RECEPT.
C O
R R
. BREAK
OFFICE
OFFICE
RECPT./WAITING
CORR.
OFFICE
OFFICE OFFICE
F.A.
120106
114 115
132134
139140
152 146
154 155
148A
124-A
COPY/FILE
WSH
LTF
WSH
03.01.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
24016 ll e g e o f
C o a st a l
G e o rg ia
H a rg e tt A d m in is tr a ti o n
B u il d in g
T e rm in a l
U n it R e p la c e m e n t
B ru n sw ic k G e o rg ia
SEAL
SCALE:
FILE PATH:
P:\24016\24016m101.dgn
DATE PLOTTED
DGN FILE
29-FEB-2024
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24016\24016m101.dgn
AS SHOWN
P ro je c t
N o
C
C G
A
N
T
T U
A
T
T
T
T
T
TUA-4
TUA-6
TUA-5
TUA-16
TUA-17
T
T
T
TUA-15
TUA-13
T
T
T
T
SCALE:
= 1'-0
8 0 4 8 16
M201
LINE LEGEND
POINT OF CONNECTION
EXISTING TO REMAIN
NEW WORK
FLOOR PLAN - NEW WORK - HVAC
HVAC
NEW WORK -
FLOOR PLAN -
TUA-14
NOTES:(THIS SHEET ONLY)
GENERAL NOTES:(THIS SHEET ONLY)
A
IF DAMAGED DURING CONSTRUCTION.
CEILING TILES, CEILING GRIDS, OR FIXTURES TO MATCH EXISTING
PERFORMED ABOVE FINISHED SPACES. REPAIR/REPLACE ANY
REMOVE EXISTING CEILING TILES WHERE SCOPE OF WORK ISB
C
TO NEW EQUIPMENT IN NEW WORK.
WHICH IS REQUIRED TO REPLACE FOR PROPER CONNECTIONS
ALL EXISTING DUCTWORK TO REMAIN EXCEPT FOR THAT
SURVEY EXISTING CONDITIONS TO VERIFY ITEMS TO BE DEMOLISHED.
ALL CONDITIONS FOR NEW WORK MAY NOT BE SHOWN.
NEW TERMINAL UNIT (TYPICAL).
NEW THERMOSTAT.
TUA-10
TUA-8
TUA-7
TUA-9
TUA-1 1
TUA-1
TUA-2
D
CONDUCTORS AS REQUIRED.
TO EACH TERMINAL UNIT. EXTEND THE EXISTING BRANCH CIRCUIT
AS THE LOCAL DISCONNECTING MEANS. MAKE ALL FINAL CONNECTIONS
A NEW MOTOR RATED SWITCH AT EACH TERMINAL UNIT TO SERVE
CIRCUIT FROM EXISTING PANEL LA AT EACH LOCATION. PROVIDE
CONNECT ALL NEW TERMINAL UNITS TO THE EXISTING 120 VOLT
WOMEN
STOR.
OFFICE
OFFICE
OFFICE
OFFICE
COPY/
STORAGE
FILES
OFFICE
CORR.
OFFICE
OFFICE
OFFICE
OFFICE
C O
R R
OFFICE
OFFICE
FILES OFFICE
EQUIP.
MECHANICAL
MECHANICAL
H.R. DIRECTOR VAULT
MEN
OFFICE
OFFICE
STOR.
OFFICE CONFERENCE
WAITING
RECEPT./
OFFICE
STUDENT
OFFICE
JAN.
MEETING RM/
LIBRARY
STOR./
COPY
CONFERENCE
PRESIDENT'S
OFFICE
OFFICE
BOARD ROOM
KITCH.
OFFICE
RECEPT.
STOR.
CLOSET
TOILET
RECEPT.
CORR.
CORR.
CORR.
MEN
WOMEN
LOBBY
CORR.
CORR.
CLOSET
RECEPT.
C O
R R
. BREAK
OFFICE
OFFICE
RECPT./WAITING
CORR.
OFFICE
OFFICE OFFICE
F.A.
120106
114 115
132134
139140
152 146
154 155
148A
124-A
COPY/FILE
WSH
LTF
WSH
03.01.24
NBP Engineers, Inc. COA#PEF000774
COA Expiration: 6.30.2024
24016 ll e g e o f
C o a st a l
G e o rg ia
H a rg e tt A d m in is tr a ti o n
B u il d in g
T e rm in a l
U n it R e p la c e m e n t
B ru n sw ic k G e o rg ia
SEAL
SCALE:
FILE PATH:
P:\24016\24016m201.dgn
DATE PLOTTED
DGN FILE
29-FEB-2024
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\24016\24016m201.dgn
AS SHOWN
P ro je c t
N o
C
C G
A
270|
300|180|
120|
120|
260| 260|160|
310|210|240|
135|
1 15|
250|
60| 145|
16/12
250|
205|
18/10
150|
150|
150|
110|
260|
220|
255|
330|
14/14
10/14
220|340|
100|
FAN ON ROOF
16/16 UP TO
250|250|
16/12
12/12 100|
100|
400|
EF-1
12/1020/1028/10
8/6
300|
8/6
8/6
95|
100|
TEF-1 ON ROOF
ON ROOF
TEF-3
|170 |180 |180
T
|290
|170
12/10
16/10
26/12
/1
14/10
18/12
8/12
10/8
T
EF-3
T
46/24
48/24
190|
190|
6/10
30/14
16/7
40/24
28/20 28/14
36/20
18/9 14/9 14/6
16/1 1
23/10
UP
UP
ƒ"
1"
1‚"
1‚"
R
1" ƒ"
1‚"
UP
ƒ"
SPS
175|
EF-2
8 @ 175| EACH 2 @ 250| EACH
2 @ 250| EACH
175|
300|
95|
390| 310| 200|
95| H
W R H
W S
1‚" 4 ƒ"
175|
T ƒ"
125|
ON ROOF
TEF-2
ƒ"
250|
HA
HS
HA LA LA LA T 4
K V
A
G
HM
| 24016aCov |
| 24016m001 |
| References |
| tb, 24016tb.dgn |
| 24016m002 |
| References |
| tb, 24016tb.dgn |
| 24016m101 |
| References |
| afp1, 24016aX1.dgn |
| tb, 24016tb.dgn |
| 24016m201 |
| References |
| afp1, 24016aX1.dgn |
| tb, 24016tb.dgn |
| existing , 24016m101.dgn |
File details come from the government source that posted it. Updated .