This document is the pre-bid conference minutes for the Greensville Correctional Center Walk-In Freezer project, which is being managed by the Virginia Department of Corrections (VDOC). The project generally consists of the installation of a concrete slab and extending electrical power supply for the installation of a walk-in freezer provided by the owner. Key details include the scope of work, special site/project conditions, staging area information, coordination requirements, contract details such as substantial and final completion timelines, bid document availability, separate owner's contracts, and the bid submission deadline of June 7, 2023 at 2:00 PM. The document also addresses contractor questions, addenda, and clarifications regarding the freezer model number and testing requirements.
The contract opportunity is limited to the state of Virginia and the Greensville County jurisdiction. The contract does not mention any pricing terms, set asides, incumbents, funding requirements or sources, or other salient financial information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabulation | — | |
| IFB Greensville Walk-In Freezer.pdf | ||
| 799-B2799-019 Addendum_001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERS ARCHITECTS SURVEYORS
T&L 103 East Main Street P.O. Box 1307 Wise, Virginia 24293 tel: 276.328.2161 fax: 276.328.1738 www.T-L.com
PRE-BID CONFERENCE MINUTES
PROJECT: Greensville Correctional Center Walk-In Freezer
Virginia Department of Corrections
VDOC Project No. 799-B2799-019
T&L Project No. 16371
DATE: May 11, 2023
1. PROJECT PERSONNEL:
Owner: Virginia Department of Corrections
Owner Representative: Marcia Powers R.A.
Telephone: (804) 337-7044
Facility Representative: Tony Mitchell (Director of Building & Grounds)
(434)-602-3070
Milton Lee (Supt of Building & Grounds)
(434)-602-3071
Architectural/Engineering Firm: Thompson & Litton, Inc.
Architectural/Engineering Representative: Thompson & Litton, Inc.
Telephone: 423-989-9491
Project Manager: Scott N. Wilson, PE
Telephone: 276-356-6536
2. SCOPE OF PROJECT:
The project generally consists of the installation of a concrete slab and extend electrical power supply for the installation of a walk-in freezer.
3. PROJECT REVIEW:
Pre-Bid Conference Minutes
Greensville Correctional Center Walk-In Freezer
May 11, 2023
T&L www.T-L.com
• Sawcut and remove existing asphalt and subgrade in area of future concrete pad.
• Install 15ft x 51ft reinforced concrete pad (8-in thick with turndown on perimeter) on 8-in thick stone base (21A or 21B)
• Install inlet protection on existing storm drain inlet in parking lot
• Install 13ea concrete-filled steel bollards
• Install houskeeping pad for new transformer inside the building
• Install feeders inside exposed roof structure on RGS, and underground from building to freezer. Trench detail shown on plans.
• Provide asphalt patching for trench and around freezer slab.
• Set new freezer in place (freezer provided by Owner)
4. SPECIAL SITE/PROJECT CONDITIONS:
• This facility is a correctional center and as such, a background check will be needed for all construction personnel as well as an in-person PREA (Prison Rape Elimination Act) course
• The wearing of blue jeans/denim, orange and camouflage clothing is prohibited.
5. STAGING AREA:
Utilities, Site Limitations, Access, Parking, Storage:
The work zone is a heavy traffic area due to the adjacent warehouse moving good in and out.
There will be limited parking available. A staging area is available about 250ft north of the B&G office for equipment and materials. There is an area to the west of the facility that can be used for the broken asphalt. This area can be accessed via the loop road, but requires a pass from the vehicular sallyport in the form of a magnetic sign they will issue for the side of the vehicle.
6. PROTECTION OF ADJACENT AREAS AND FACILITIES:
The work area is quite busy with traffic and space for parking vehicles is limited near the construction work.
7. COORDINATION:
Coordination will be needed with the Building & Grounds staff regarding work hours and access inside the building. Work hours can generally start at 7am. Upon arriving at the site, the
Contractor will need to check in with Tammy Greco (434-602-3074) at the Building & Grounds office.
8. CONTRACT(S) DETAILS:
Substantial Completion shall be achieved within 120 consecutive calendar days after Notice to
Proceed. Final Completion shall be achieved within 30 consecutive calendar days after Substantial
Completion.
Liquidated Damages: N/A
9. BID DOCUMENTS:
Bid Documents (electronic and/or hard copy) are available from Thompson & Litton, Inc, and at the Virginia Department of Corrections Headquarters and Builder’s Exchange in Richmond, VA.
10. SEPARATE OWNER’S CONTRACTS INTERFACING:
Owner is providing the walk-in freezer, and the freezer manufacturer will set the unit in place.
11. CONFIRMATION OF BID DATE AND TIME:
Sealed bids will be received until 2:00 P.M., prevailing time on June 7, 2023, by the Virginia
Department of Corrections, at the electronically through eVA.
12. CONTRACTOR QUESTIONS:
All questions must be submitted in writing using the Pre-Bid Question Form provided in the Bid
Documents. Instructions for submission (via email or fax) are included on the form. Responses to questions, if deemed necessary, will be made via addendum(a).
Deadline (Date/Time) for Submitting Questions: May 24, 2023 at 5:00pm
13. ADDENDA/ITEMS TO BE CLARIFIED:
A. What is the model number of the freezer being installed?
a. The freezer is manufactured by ICS and is model number IF1450
B. Is compaction testing and concrete testing required? If so, who is responsible?
a. The Contractor is responsible for compaction and concrete testing per the technical specifications in the project manual. Refer to 03 3000 Section 3.9, 31 2316 Section
3.11 and 31 2323 1.6 for requirements.
14. SITE VISIT
Pre-Bid meeting held on site.