2023-05-01 NB I5 228 Off-Ramp and OR34 Paving Plans_signed.pdf
PDF 4 MB Posted
- Solicitation number
- S-73000-00006773
- Issued by
- Lincoln County, Oregon
About this file
This document appears to be a set of plans for the NB I5 228 Off-Ramp and OR34 Paving project, which is being undertaken by the Oregon Department of Transportation (ODOT) on the Corvallis-Lebanon Highway in Linn County. The project involves grinding and paving work on the northbound I-5 off-ramp and a portion of OR34, with estimated quantities including 28,125 square yards of grinding, 3,960 tons of asphalt concrete paving, and 16,034 linear feet of striping. The work is to be completed by the contractor, who will also be responsible for reproducing the existing striping after paving is complete. The project also involves replacing turn arrow symbols and existing detector loops.
The plans provide detailed information on the paving limits, which are shoulder-to-shoulder, as well as the inlay limits for the off-ramp and intersection. The exact limits for the paving work are to be painted in the field by ODOT. The plans also indicate that the existing concrete island on OR34 is to be retained and protected.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sample Contract~16.pdf | ||
| 35662_RFB.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS THE FILENAME LOCATION: F:\_PROJECTS\D4\PAVING\I5 MP 228 RAMP AND OR34 PAVING\_CAD\PLANS.DWG 1-May-2023 11:19 HWYR20G
OREGON DEPARTMENT
OF TRANSPORTATION
Checker:Drafter:
Designer:
SHEET NO.
COUNTY Reviewer:
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
NB I5 228 OFF-RAMP AND OR34 PAVING
CORVALLIS-LEBANON HIGHWAY
LINN COUNTYHWY:
M.P.:
DATE
10.09-10.67
Linn
05/23 A01
Mike Metz
Mike Metz
Cody Stone
Cody Stone
O R
EG
ON
DE PAR TMEN
T
O F
T RAN S P OR T A T I ON
OREGON
EXPIRES: 06-30-2024
99533PEREG
ISTERED PROFESSIONALENGINEER
MARCH 08, 2022CODY G. STONE
2 12 INCH CPPR (TYP)
2 12 INCHES OF LEVEL 3, 12" DENSE ACP
(TYP)
PROJECT OVERVIEW
EXISTING STRIPING COLOR, WIDTH, AND
LAYOUT TO BE DOCUMENTED BY THE
CONTRACTOR BEFORE GRINDING AND
PAVING WORK BEGINS. ONCE PAVING IS
COMPLETE, THE CONTRACTOR SHALL
REPRODUCE THE EXISTING STRIPING
THE EXISTING LOOPS IN THIS
INTERSECTION ARE NOT IN USE
AND DO NOT NEED TO BE
RECONNECTED AFTER PAVING.
OR34 WEST TO CORVALLIS
OR34 EAST TO LEBANON
IN
TE
R
ST
AT
E
ESTIMATED QUANTITIES:
28,125 TOTAL SQYD OF GRINDING
3,960 TONS ACP
16,034 LF OF STRIPING
316 LF OF STOP BAR
6 SYMBOLS (TURN ARROWS)
https://secure.na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAtNm4mND1yzS5adK1GQyHVFzoKpR3xy_J
10.09-10.67
Linn
05/23 A02
Mike Metz
Mike Metz
Cody Stone
Cody Stone
O R
EG
ON
DE PAR TMEN
T
O F
T RAN S P OR T A T I ON
OREGON
EXPIRES: 06-30-2024
99533PEREG
ISTERED PROFESSIONALENGINEER
MARCH 08, 2022CODY G. STONE
THIS IS THE FILENAME LOCATION: F:\_PROJECTS\D4\PAVING\I5 MP 228 RAMP AND OR34 PAVING\_CAD\PLANS.DWG 1-May-2023 11:19 HWYR20G
OREGON DEPARTMENT
OF TRANSPORTATION
Checker:Drafter:
Designer:
SHEET NO.
COUNTY Reviewer:
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
NB I5 228 OFF-RAMP AND OR34 PAVING
CORVALLIS-LEBANON HIGHWAY
LINN COUNTYHWY:
M.P.:
DATE
RE:MATCHLINE A03
PAVING LIMITS ARE
SHOULDER-TO-SHOULDER (TYP)
INLAY ENDS AT
EXISTING ACP JOINT
INLAY PAVING LIMITS FOR
THE OFF RAMP ARE ONE
FOOT OUTSIDE OF PAINT
BEGIN INLAY AT OFF
RAMP BEGINNING
POINT
REPLACE TURN
ARROW SYMBOLS (2)
REPLACE TURN
ARROW SYMBOLS (2)
REPLACE TURN
ARROW SYMBOL
EXACT LIMITS TO BE PAINTED
IN THE FIELD BY ODOT
EXISTING DETECTOR LOOPS
TO BE REPLACED AFTER
PAVING IS COMPLETE (TYP)
OFF RAMP AND INTERSECTION PAVING
Linn
05/23 A03
Mike Metz
Mike Metz
Cody Stone
Cody Stone
O R
EG
ON
DE PAR TMEN
T
O F
T RAN S P OR T A T I ON
OREGON
EXPIRES: 06-30-2024
99533PEREG
ISTERED PROFESSIONALENGINEER
MARCH 08, 2022CODY G. STONE
THIS IS THE FILENAME LOCATION: F:\_PROJECTS\D4\PAVING\I5 MP 228 RAMP AND OR34 PAVING\_CAD\PLANS.DWG 1-May-2023 11:19 HWYR20G
OREGON DEPARTMENT
OF TRANSPORTATION
Checker:Drafter:
Designer:
SHEET NO.
COUNTY Reviewer:
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
NB I5 228 OFF-RAMP AND OR34 PAVING
CORVALLIS-LEBANON HIGHWAY
LINN COUNTYHWY:
M.P.:
DATE
R E:
M
AT
C H
LI
N
E A0
R E:
M
AT
C H
LI
N
E A0
PAVING LIMITS ARE
SHOULDER-TO-SHOULDER (TYP)
REPLACE TURN
ARROW SYMBOL
EXACT LIMITS TO BE PAINTED
IN THE FIELD BY ODOT
EXACT LIMITS TO BE PAINTED
IN THE FIELD BY ODOT
EXACT LIMITS TO BE PAINTED
IN THE FIELD BY ODOT
OR34 MAINLINE PAVING
Linn
05/23 A04
Mike Metz
Mike Metz
Cody Stone
Cody Stone
O R
EG
ON
DE PAR TMEN
T
O F
T RAN S P OR T A T I ON
OREGON
EXPIRES: 06-30-2024
99533PEREG
ISTERED PROFESSIONALENGINEER
MARCH 08, 2022CODY G. STONE
THIS IS THE FILENAME LOCATION: F:\_PROJECTS\D4\PAVING\I5 MP 228 RAMP AND OR34 PAVING\_CAD\PLANS.DWG 1-May-2023 11:19 HWYR20G
OREGON DEPARTMENT
OF TRANSPORTATION
Checker:Drafter:
Designer:
SHEET NO.
COUNTY Reviewer:
FINAL ELECTRONIC DOCUMENT
AVAILABLE UPON REQUEST
NB I5 228 OFF-RAMP AND OR34 PAVING
CORVALLIS-LEBANON HIGHWAY
LINN COUNTYHWY:
M.P.:
DATE
R E:
M
AT
C H
LI
N
E A0
RETAIN AND PROTECT
EXISTING CONCRETE ISLAND
INLAY ENDS AT
EXISTING ACP JOINT
PAVING LIMITS ARE
SHOULDER-TO-SHOULDER (TYP)
OR34 MAINLINE PAVING
https://secure.na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAtNm4mND1yzS5adK1GQyHVFzoKpR3xy_J
| Sheets and Views |
| A01 PROJECT OVERVIEW |
| A02 OFF RAMP AND INTERSECTION PAVING |
| A03 OR34 MAINLINE PAVING |
| A04 OR34 MAINLINE PAVING |
| 2023-05-01T16:35:24-0700 | |
| Agreement certified by Adobe Acrobat Sign |
File details come from the government source that posted it. Updated .