2022604.5 Pay Item Worksheet_06_04_2026.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Jupiter Plantation Ditch Pipe Replacement
- Solicitation number
- IFB 360 2022604 3
- Issued by
- Palm Beach County, Florida
About this file
This is a bid proposal pay item worksheet for the Jupiter Plantation Ditch Pipe Replacement Contract (PBC Project #2022604) administered by the State of Florida. The project encompasses roadway and structural improvements including the replacement of a 48-inch reinforced concrete pipe (196 linear feet), clearing and grubbing, excavation (50 cubic yards of regular excavation and 125 cubic yards for rip-rap and endwall), embankment work (12 cubic yards compacted in place), installation of floating turbidity barriers (152 linear feet), performance turf sodding (771 square yards), and fencing installation (60 linear feet of Type B standard fencing). Structural pay items include settlement and vibration monitoring of existing structures, auger grouted piles (18-inch diameter, 265 linear feet), reinforced steel installation (1,062 pounds), concrete work for retaining walls and seal applications (20 cubic yards total), riprap rubble ditch lining (110 tons), bedding stone (21 tons), and installation of a duck bill check valve and manatee grate (fixed, non-hinged, inside pipe). Contingency items totaling an additional 200 cubic yards of regular excavation, 15 cubic yards of flowable fill, 10 cubic yards of miscellaneous Class I concrete, 200 linear feet of fence resetting, storm sewer cleaning, and tree/palm relocation are included in the bid proposal.
The pay item worksheet presents all bid line items with quantities and unit prices currently listed at zero dollars, indicating this is a blank bid form awaiting contractor pricing submissions. The project utilizes FDOT item numbering and specifications for standardized roadway and structural construction work. No pricing terms, award dates, response deadlines, or funding source information is provided in this worksheet document.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2022604.500
| BID PROPOSAL | ||||||
| JUPITER PLANTATION DITCH PIPE REPLACEMENT | ||||||
| CONTRACT | ||||||
| PBC PROJECT # 2022604 | ||||||
| # | FDOT ITEM NUMBER | ITEM DESCRIPTION | QTY. | UNITS | UNIT PRICE | AMOUNT |
| ROADWAY ITEMS | ||||||
| 1 | 101-1 | MOBILIZATION | 1 | LS | $ - 0 | |
| 2 | 102-1 | MAINTENANCE OF TRAFFIC(INCL. PEDESTRIAN MOT) | 1 | LS | $ - 0 | |
| 3 | 104-11 | FLOATING TURBIDITY BARRIER | 152 | LF | $ - 0 | |
| 4 | 110-11-1 | CLEARING AND GRUBBING | 1 | LS | $ - 0 | |
| 5 | 120-1 | REGULAR EXCAVATION | 50 | CY | $ - 0 | |
| 6 | 120-6 | EMBANKMENT (COMPACTED IN PLACE) | 12 | CY | $ - 0 | |
| 7 | N/A | PIPE CULVERT (48" RCP) | 196 | LF | $ - 0 | |
| 8 | 530-1100 | RIP-RAP, SAND-CEMENT BAGS | 15 | CY | $ - 0 | |
| 9 | 550-10220 | FENCING, TYPE B, STANDARD (6' HIGH) | 60 | LF | $ - 0 | |
| 10 | 570-1-2 | PERFORMANCE TURF, SOD | 771 | SY | $ - 0 | |
| 11 | 0430-94-3 | STORM SEWER PUMPING (EXIST)(>24' TO 48")(SEE SP'S) | 8 | LF | $ - 0 | |
| SUBTOTAL (ROADWAY) | $ - 0 |
| STRUCTURAL PAY ITEMS | |||||
| 12 | 108-1 | MONITORING EXISTING STRUCTURE-SETTLEMENT MONITORING | 1 | LS | $ - 0 |
| 13 | 108-2 | MONITORING EXISTING STRUCTURE-VIBRATION MONITORING | 1 | LS | $ - 0 |
| 14 | 415-1-3 | REINF STEEL, RETAINING WALL | 1062 | LB | $ - 0 |
| 15 | 455-112-18 | AUGER GROUTED PILE 18" DIAMETER | 265 | LF | $ - 0 |
| 16 | 400-1-30 | CONCRTE CLASS I, SEAL | 10 | CY | $ - 0 |
| 17 | 120-72 | GRAVEL FILL | 17 | CY | $ - 0 |
| 18 | 530-3-4 | RIPRAP RUBBLE DITCH LINING | 110 | TN | $ - 0 |
| 19 | 530-74 | BEDDING STONE | 21 | TN | $ - 0 |
| 20 | 400-4-11 | CONCRETE CLASS IV RETAINING WALL | 10 | CY | $ - 0 |
| 21 | 430-880-48 | DUCK BILL CHECK VALVE | 1 | EA | $ - 0 |
| 22 | 430-886-48 | MANATEE GRATE, FIXED, NON-HINGED, INSIDE PIPE | 1 | EA | $ - 0 |
| 23 | 120-5 | EXCAVATION FOR RIP-RAP AND ENDWALL | 125 | CY | $ - 0 |
| SUBTOTAL (ROADWAY) | $ - 0 |
| CONTINGENCY ITEMS | |||||
| 24 | 120-1 | REGULAR EXCAVATION | 200 | CY | $ - 0 |
| 25 | 121-70 | FLOWABLE FILL | 15 | CY | $ - 0 |
| 26 | 400-1-15 | CLASS 1 CONCRETE (MISCELLANEOUS) | 10 | CY | $ - 0 |
| 27 | N/A | RESETTING FENCE (SEE SP'S) | 200 | LF | $ - 0 |
| 28 | 0430-94-3 | STORM SEWER CLEANING (EXIST)(>24" TO 48")(SEE SP'S) | 8 | LF | $ - 0 |
| 29 | 0581-1-7 | RELOCATE TREES, PALMS, <14' OF CLEAR TRUNK, SABAL PALM ONLY | 2 | EA | $ - 0 |
| 30 | 0522-1 | 4" CONCRETE SIDEWALK AND DRIVEWAYS | 40 | SY | $ - 0 |
| 31 | 570-1-2 | PERFORMANCE TURF, SOD | 3500 | SY | $ - 0 |
| SUBTOTAL (CONTINGENCY ITEMS) | $ - 0 | ||||
| TOTAL BID | $ - 0 |
| THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET. | ||
| THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS. | ||
| PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE. | ||
| Note # | FDOT Item # | PAY ITEM FOOTNOTES |
| 1 | All | All items shall include cost to furnish and install unless otherwise noted. |
| 2 | All | FDOT Item numbers are for use in determining eligibility for price adjustment per General Provision 9-2 only. |
| 3 | All | All pay items to adhere to the FDOT Standard Plans (FY 2024 - 2025) and Palm Beach County construction standards. See project technical specifications for further measurement and payment provisions. |
&"Times New Roman,Bold"&12PROPOSAL FORM
&"Times New Roman,Bold"&12P-&P
File details come from the government source that posted it. Updated .