20223834 001 BOM R10.xlsx

XLSX spreadsheet 590 KB Posted

Attached to
R10, Tongass NF Twin Peaks Shelter and Install
Solicitation number
12760422Q0045
Issued by

View the file

Other files

File Type Posted
Q n A.pdf PDF
Q n A.pdf PDF
Shelter PWS January_05_2022.pdf PDF
Request for Quote Twin Peaks.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

SITERegionBOM AmountIAS ApproverBOC
Twin Peaks Manufacture10$0.00Sara Ryan3220
Twin Peaks Installation10$0.00Sara Ryan3220
TOTALS$0.00

R10 Twin Peaks Manufacture Bill of Materials

Shipping Information: Use one sheet per shipping location.
Unit Name to Ship to:R10, Prince of Wales, Tongass NF
Point of Contact (Local SAT):Brandon Thomas
Phone (Local SAT):
Street Address:1312 Federal Way
City, State:Thorne Bay, Alaska
Zip:99919
Additional Information needed for request.
Project Point of Contact (name and phone):Brandon Thomas
Additional Technical Contact (name and phone), if applicable:Tom Hall
WR# or Incident Number:20223834
Override/Job Code:D1BWAA22
Q-CodeR0502222
IAS PMOSara Ryan
UIA110710050522COM
BOC3220
AAP#RPSH
POW Line Item # and Project DescriptionTwin Peaks Communication Building Replacement
COR, if applicable:Marc Kaschmitter
Comments:Twin Peaks communications site Lat N55⁰ 46' 30.50", Long W133⁰ 08' 45.40", Elevation 2308 ft. Door location: East, Tower: West To East.
LINE
ITEMDESCRIPTIONManufacturers Part NumberUnit of IssueQTYUNIT
PRICETOTAL

PRICE

1SHELTER DESCRIPTION
26x6 Walk-in Enclosure w/20' (With fortklift ready base frame)EA1$ - 0
3INTERIOR LAYOUT
4DC Layout - Solar System Voltage 48VdcEA1$ - 0
5Equipment rackEA1$ - 0
6Battery Tray: install on rack closest to wallEA1$ - 0
7Rack Mounted BussbarEA1$ - 0
8DrainEA1$ - 0
9Fire ExtinguisherEA1$ - 0
10First Aid KitEA1$ - 0
11POWER ENTRY
12Dual DC Entry - Solar System Voltage 48VdcDUAL DCEA1$ - 0
13VENTILATION
14PassiveINCLUDEDEA
15With AK Small Particle Prevention Louver SystemEA1$ - 0
16TOWER
1720'EA1$ - 0
18Antennas: (1) ANT150F2 at 20'
19ANCHORING
20Long Outriggers w/compression support legsEA4$ - 0
20Corner Support JacksEA4$ - 0
21Steel Ballast (100#'s each) (Alternative is 44 plates with 4 rock anchors)EA44$ - 0
22Ufer Grounded Concrete PadEA4$ - 0
23Rock AnchorsEA4$ - 0
24Solar
25Roof and Wall MountEA1$ - 0
26Solar BracketEA1$ - 0
27CABLE ENTRY$ - 0
28Cable Entry Glands - LMR600 1 per glandEA1$ - 0
29Cable Entry CoversEA8$ - 0
30Ice ShieldEA1$ - 0
31LMR600 cable
32JVJ
33JVJ 4" 180⁰EA0$ - 0
34JVJ 6" 180⁰EA1$ - 0
35STANDOFFS$ - 0
36Single 4"EA1$ - 0
37Single 18"EA0$ - 0
38Mast mount solarEA0$ - 0
39Fall RestraintEA1$ - 0
40Site Specific Drawing1$ - 0
41
42Transportation to R10 (Transport to Seattle, WA, Barge to Thorne Bay)EA1$ - 0
43Off-Load in Thorne BayEA1$ - 0
44Delivery Address: 1312 Federal Way, Thorne Bay, Alaska 99919 Offload required by vendor.
45Contract Management Fee$ - 0
46GRAND TOTAL$ - 0

R10 Twin Peaks Installation Bill of Materials

Shipping Information: Use one sheet per shipping location.
Unit Name to Ship to:R10, Prince of Wales, Tongass NF
Point of Contact (Local SAT):Brandon Thomas
Phone (Local SAT):
Street Address:1312 Federal Way
City, State:Thorne Bay, Alaska
Zip:99919
Additional Information needed for request.
Project Point of Contact (name and phone):Brandon Thomas
Additional Technical Contact (name and phone), if applicable:Tom Hall
WR# or Incident Number:20223834
Override/Job Code:D1BWAA22
Q-CodeR0502222
IAS PMOSara Ryan
UIA110710050522COM
BOC3220
AAP#RPSH
POW Line Item # and Project DescriptionTwin Peaks Communication Building Replacement
COR, if applicable:Marc Kaschmitter
Comments:Twin Peaks communications site Lat N55⁰ 46' 30.50", Long W133⁰ 08' 45.40", Elevation 2308 ft. Door location: East, Tower: West To East.
LINE
ITEMDESCRIPTIONManufacturers Part NumberUnit of IssueQTYUNIT
PRICETOTAL

PRICE

1SHELTER DESCRIPTION
26x6 Walk-in Enclosure w/20' InstallationEA1$ - 0
3Mob/DemobEA1$ - 0
4Truck RentalEA1$ - 0
5Trailer RentalEA1$ - 0
6Standby perdayEA0$ - 0
7Helicopter costEA1$ - 0
8Installation: Fly-in Latitude N55° 46' 30.50", Longitude W133° 08' 45.40", Elevation 2308ft
9Backhaul of old building: 6x8 Vertex, 2600 pounds.EA0$ - 0
10Backhaul to Staging area is included in the Installation as long as Shelter is demolished prior to installation.
11Shelter Location: Offload required by vendor.
12Delivery Address:
13Staging area: 55⁰ 47' 44.2" 133⁰ 07' 30.1"
14Contract Management Fee$ - 0
15GRAND TOTAL$ - 0

File details come from the government source that posted it. Updated .