This is a set of construction documents for the McKay Lodge Kitchen Renovation project at Looking Glass Youth and Family Services located at 2517 Martin Luther King Jr Boulevard in Eugene, Oregon. The renovation encompasses demolition and renovation work across four areas: the kitchen, dining room, storage room, and day room. The project includes removal of existing cabinetry, countertops, flooring, ceiling systems, and appliances, with salvage and reinstallation of specified items including stainless steel countertops, sinks, faucets, and appliances. New installations include plastic laminate cabinetry, stainless steel bases, polished concrete flooring with color stain, new ceiling grids with LED lighting, fiberglass reinforced plastic wall protection, solid surface window treatments, and hand washing stations with eye wash attachments. Mechanical, electrical, and plumbing work includes installation of new GFCI duplex receptacles, LED under-cabinet and flat panel lighting with dimmer controls, HVAC diffuser cleaning and reinstallation, and hand sink and eye wash station provisions. The bid and permit date is listed as July 1, 2022.
The construction documents specify detailed finishes including multiple paint colors and epoxy applications across the renovation areas, with particular attention to wall protection in the kitchen to 48 inches height. Material specifications include Lithonia Lighting 2'x4' flat panel LED fixtures, Liteline LED under-cabinet lighting, Advance Tabco hand sinks with emergency eye wash attachments, and reach-in and upright freezer appliances with GFCI protection. The existing grease interceptor and fire suppression systems are to remain in place. All cabinets and drawers are required to have locks. The documents note that contractors must confirm existing conditions and report inconsistencies to the owner or architect, with all demolition materials to be properly stored and coordinated with the owner.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7323-22_ClosedCaptioningForZoom_NoticeOfIntentToAward_070822.pdf | ||
| Closed_Captioning_RFQ_PhoneLog_2022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
McKAY LODGE KITCHEN RENOVATION
LOOKING GLASS YOUTH AND FAMILY SERVICES
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
7/01/2022
TITLE
McKAY LODGE KITCHEN RENOVATION
LOOKING GLASS YOUTH AND FAMILY SERVICES
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
7/01/2022
TITLE SHEET
ITB 2022200075 Attachment B
PROJECT
LIMITS
McKAY LODGE KITCHEN RENOVATION
LOOKING GLASS YOUTH AND FAMILY SERVICES
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
7/01/2022
General Notes
1. These drawings and details are copies of the original construction drawings, with new information in blue. Contractor to confirm all existing conditions and notify Owner or Architect of any inconsistencies.
2. Refer to specifications for additional information.
3. Existing appliances shown for salvage should be disconnected from utilities, and stored on taped sheets of cardboard in the Day Room as coordinated with owner.
Existing shutter to remain
Remove existing countertop, backsplash, and cabinets below
General Demo Dining Rm Notes -Remove existing flooring & rubber base -Remove ceiling grid, tile, and lighting -Remove and salvage existing tack-boards and wall mounted signage for re-installation
Area of work
DEMOLITION
FLOOR PLAN
Remove existing tile
Remove countertop and upper/ lower cabinets. Remove under cabinet lighting
Existing hood to remain in place
Existing shutter to remain
Remove existing wood trim around window
Salvage existing stainless steel countertop and sink for reuse
See Alt #2 listed in specs.
Remove existing base cabinets
General Demo Storage Rm Notes -Remove existing flooring & rubber base -Remove ceiling grid, tile, and lighting -Remove and salvage fire extinguisher
Remove existing countertop island and sink.
Remove existing wall mounted sink
Remove countertop and cabinets below
Remove existing countertop and all upper/ lower cabinets.
Salvage existing stainless steel countertop and sink for re-installation
See Alt #2 listed in specs.
General Demo Kitchen Notes -Remove ceiling grid, tile, and lighting -Remove existing flooring & base -Remove and salvage fire extinguisher
Remove all appliances and salvage for reinstallation
Existing recessed FE cabinet to remain
Remove existing countertop island and sink
Remove countertop and base cabinets
General Notes
1. These drawings and details are copies of the original construction drawings, with new information in blue. Contractor to confirm all existing conditions and notify Owner or Architect of any inconsistencies.
2. Refer to specifications for additional information.
3. Existing appliances shown for salvage should be disconnected from utilities, and stored on taped sheets of cardboard in the Day Room as coordinated with owner.
4. Patch and repair walls where existing casework and finishes are removed.
Remove (e) cabinets
Remove (e) cabinets
Remove countertop, base and upper cabinets
Existing 1-hour rated wall.
Salvage (e) faucets for reinstallation
DAY ROOM
Extent of flooring removal
McKAY LODGE KITCHEN RENOVATION
LOOKING GLASS YOUTH AND FAMILY SERVICES
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
7/01/2022
D101
(E) Semi-recessed Fire Extinguisher cabinet to remain in place.
Remove existing wall mounted sink
Salvage (E) Surface mounted Fire extinguisher for reinstallation
Alt #4 Add 220v outlet to south wall of room 127
Remove and store (e) soap and paper towel dispenser for reinstallation.
(E) grease interceptor to remain open
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
7/01/2022
D102
EXISTING CONDITIONS
PHOTOS
STORAGE ROOM
DINING ROOM
KITCHEN ROOM
(E) KITCHEN ISLAND (E) WINDOW SILL
SERVING COUNTER (E) 3 - COMPARTMENT SINK (E) SINK AND EYE WASH STATION(E) COUNTER AND CASEWORK
(E) AppliancesSTORAGE ROOM
General Notes
1. Protect existing to trim to remain in place.
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
7/01/2022
FOR REFERENCE ONLY
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
Area of Work
CEILING PLAN
McKAY LODGE KITCHEN RENOVATION
LOOKING GLASS YOUTH AND FAMILY SERVICES
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
7/01/2022
General Notes
1. These drawings and details are copies of the original construction drawings, with new information in blue. Contractor to confirm all existing conditions and notify Owner or Architect of any inconsistencies.
2. Refer to specifications for additional information.
ACT - 1 -
2 x 4 ACT & SUSPENDED GRID
ACT - 2 -
2 x 4 ACT & SUSPENDED GRID
RATED FOR KITCHEN USE
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
General Notes
1. These drawings and details are copies of the original construction drawings, with new information in blue. Contractor to confirm all existing conditions and notify Owner or Architect of any inconsistencies.
2. Refer to written narratives and specifications for additional information.
3. All cabinets and drawers to have locks
4. Patch and repair gypsum board and re-paint in all rooms with Demolition scope.
Stainless Steel Countertop w/ intergrated sinks and faucets
Plastic Laminate End Panel
Repaint door frame
- PT5
Under-counter Dishwasher, OFCI
Re-install (e) stainless steel 3-compartment sink and faucets w/ new support legs.
24" Deep Plastic laminate cabinets
Apply solid surface window surround and sill to (e) window
Wall mounted hand washing sink with eye wash
12" deep plam cabinets with adjustable shelves.
General Dining Rm Notes -New ceiling grid, tile, and lighting -Repaint all door frames -Polished concrete flooring (with color stain) & new rubber base
General Storage Rm Notes -New ceiling grid, tile, and lighting -Polished concrete flooring & new rubber base -Epoxy Paint all walls -
PT-1
Stainless steel countertop with plam cabinetry below.
Re-install stainless steel countertop and sink
See Alt #2 listed in specs.
Solid surface window sill and surround
Stainless steel countertop with plastic laminate cabinets below
See Alt #1 listed in specs.
Stainless steel countertop
See Alt #3 listed in specs.
Wall mounted hand washing sink and eye wash
Repaint door frame
- PT5
24" Deep Plastic laminate cabinet with roll-out shelves
Clean and Repaint existing shutter frame
Stainless steel table #2
Existing fume hood to remain in place
Re-install (e) range
Repaint door frame - PT5
Stainless Steel countertop
Repaint door frame - PT5
Re-install appliances
24" Deep plastic laminate cabinets & drawers
ENLARGED KITCHEN
PLAN AND ELEVATIONS
9' LED
under-cabinet lighting
Add GFCI duplex receptacle at this location
Add GFCI duplex receptacle at this location
New wire shelving
Add GFCI duplex receptacle at this location
Epoxy Accent Paint wall PT-4 (Above 48")
#Alt 1 - Free standing stainless steel island with integrated sink
Existing 1-hour rated wall.
Full height wall paint
See Alt #3 listed in specs.
Stainless steel table #1
See Alt #2 listed in specs.
12" deep plam cabinets with adjustable shelves.
24" Deep Plastic laminate cabinets with roll-out shelves
Stainless steel base, typ for all kitchen walls
New wire shelving
Clean and repaint (e) shutter frame
(E) ELEC
PANEL 'A'
Note:
Protect (e) wood trim and wainscot
Provide new transition strip carpet to concrete
Finish Legend:
PT 1 Paint Color BM-2141-60 Titanium
PT 2 Accent Paint Color SW-2053-30 - North Sea Green
PT 3 Accent Paint Color SW- 2146-10 - Dark Celery
PT 4 Accent Paint Color SW-AF-630 - Lucerne
PT 5 Door Frame color Match Rubberbase Color - Charcoal (Tarkett)
FRP Fiberglass Reinforced Plastic Panel (full height unless otherwise noted)
Plam Plastic Laminate Formica - 8994 - PX Paint Scrape Steel
NOT IN SCOPE
FRP
FRP
FRP
FRP
PT4
48"
PT1
PT3
PT2
PT1
FRP
General Kitchen Notes -New ceiling grid, tile, and lighting -Polished concrete flooring & new rubber base -Repaint all door frames -Install wall protection, full height on walls unless otherwise noted
- Install stainless steel base on all kitchen walls -Install resilient base in front of all cabinet bases.
To p of
F R
P
Existing recessed FE cabinet to remain
McKAY LODGE KITCHEN RENOVATION
LOOKING GLASS YOUTH AND FAMILY SERVICES
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
7/01/2022
FRP
PT4
(E) Semi-recessed Fire Extinguisher cabinet to remain in place.
(E) Surface mounted Fire Extinguisher to remain in place.
Mechanical, Electrical, and Plumbing Information:
HVAC:
Remove, clean, prep, paint, and re-install existing HVAC diffusers and grilles in Rooms 123, 124, and 127.
Electrical:
Add new duplex receptacles as shown on floor plan, 15A, GFCI. Run new circuit to existing panel “A” shown on plan.
Remove and replace existing gypsum board as required to accomplish the work. Comply with electrical codes for type of occupancy, and see drawings for extent of fire-rated assemblies. Fishing cable through walls is acceptable if permitted by codes.
Provide kitchen, Dining, and storage lights similar to Manufacturer LITHONIA LIGHTING – Model -
CPANL-2X4-40/50/60LM-35K-M2
Description - 2'X4' FLAT PANEL WITH FIELD-ADJUSTABLE DIP SWITCH CONTROLS FOR LUMEN OUTPUT AND
COLOR TEMPERATURE
Voltage - 120 V Load – VA - 32v VA Lamp Type - 3500K LED, 4500LM
Note: Provide dimmer control to dining room fixtures.
Provide surface mounted under counter light where indicated similar to manufacturer LITELINE – Model – LEDBAR
SERIES
Lumen Output - 775 Lamp Source – LED 400K Driver – Electronic, 0-10V DM Finish – White
VA – 9 VA
Fire Suppression:
No scope anticipated.
New reach in 3 -compartment freezer and upright freezer appliances, OFCI open
(E) grease interceptor to remain
Plumbing:
It is assumed that all existing domestic supply, waste, and vent piping within walls and below slab is sufficient for connecting new fixtures. There is an existing grease trap. See photos for additional context.
Provide hand sink similar to Advance Tabco Model No. 7‐PS‐55 Hand Sink with Emergency Eye Wash Attachment, wall mounted, 14" wide x 10" front‐to‐back x 5" deep bowl, 20-gauge 304 stainless steel, with splash mounted gooseneck faucet, basket drain, wall bracket.
Provide all necessary supports, piping, and accessories for a complete installation.
M ax
M ax
PT4
FRP
Repaint door frame - PT5
Repaint door frame - PT5
Stainless Steel countertop
12" deep plastic laminate cabinets with adjustable shelving
New rubber base, typ.
4' - 0"
Provide new transition strip vinyl to concrete
Provide new transition strip vinyl to concrete
2517 MARTIN LUTHER KING JR BLVD
EUGENE, OR 97401
BID AND PERMIT
7/01/2022
General Notes
1. These drawings and details are copies of the original construction drawings, with new information in blue. Contractor to confirm all existing conditions and notify Owner or Architect of any inconsistencies.
2. Refer to specifications for additional information.
3. Existing appliances shown for salvage should be disconnected from utilities, and stored on taped sheets of cardboard in the Day Room as coordinated with owner.
3/4" x 4" Solid surface window trim
3/4" Solid surface window trim
3/4" Solid surface window trim
3/4" x 3 1/2" Solid surface window trim
3/4" Solid surface window trim
| A000_TITLE |
| A001_SITE PLAN_Reduced Annotations |
| D101_DEMOLITION PLAND AND ELEV |
| A101_FLOOR PLAN |
| A102_FLOOR PLANS MEZZANINES |
| A103_FLOOR PLAN WALL INFORMATION |
| A104_CEILING PLAN |
| A201_BUILDING SECTIONS |
| A301_EXTERIOR ELEVATIONS |
| A407_ENLARGED PLAN AND ELEV |
| A506_WINDOW DETAILS |