20222-01 - Addendum No2 Lighting Project.pdf

PDF 6 MB Posted

Attached to
Lighting Fixture and Controls Replacement Various Schools project # 20222-01
Solicitation number
S-P26028-00001821
Issued by
Multnomah County, Oregon

About this file

This document is an Addendum No. 2 for the Light Fixture & Control Replacement project, Project No. 20222-01, issued by the jurisdictions of Multnomah County and the City of Portland, Oregon. The addendum provides clarification that there is no engineer's count of replacement fixtures, but the attached energy code forms provide approximate quantities that bidders can use as a reference. The bid is due on Wednesday, February 2, 2022, at 2:00 PM, and bidders will not be compensated for any discrepancies between the fixture counts on the forms and the actual number of fixtures required per the drawings.

The related state and local contract opportunity is for the Lighting Fixture and Controls Replacement project, project number 20222-01, across various schools within Multnomah County and the City of Portland, Oregon. No other pricing, set-aside, incumbent, funding, or contract term details are provided in the addendum.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Light Fixture & Control Replacement

PROJECT NO.: 20222-01

January 27, 2022

ADDENDUM NO. TWO (2)

PAGE 1 OF 1 (PLUS ATTACHMENTS)

THE FOLLOWING CHANGES, ADDITIONS, AND DELETIONS TO THE CONTRACT DOCUMENTS

HEREBY BECOME A PART OF THE CONTRACT DOCUMENTS.

NOTIFY ALL SUBCONTRACTORS AFFECTED BY THIS ADDENDUM.

BID DUE: Wednesday, February 2, 2022 at 2:00 PM

SPECIFICATIONS

NOTHING CHANGED

DRAWINGS

NOTHING CHANGED

GENERAL INFORMATION

a. Some potential bidders have asked if there is an engineer’s count of replacement fixtures with a break down by site. There is not. There is, however, the attached energy code forms that give quantities of fixtures that are approximate only and may be used as reference. Bidders will not be compensated extra if the counts on these forms are less than the actual number of fixtures required to be replaced per the drawings.

END OF ADDENDUM TWO (2)