20220923_CoP_412_Specifications_REV.pdf
PDF 3 MB Posted
- Solicitation number
- 2022-IFB-175
- Issued by
- Allegheny County, Philadelphia City, Pennsylvania
About this file
This document is a comprehensive project manual for a City of Pittsburgh Department of Public Works construction project located at 412 Boulevard of the Allies, involving multiple government entities including the City of Pittsburgh, Housing Authority of the City of Pittsburgh (HACP), and Urban Redevelopment Authority (URA). The project involves interior renovations and build-out of office spaces, encompassing selective demolition, construction of business, assembly, and storage occupancy spaces within an existing multi-story building. The project will be executed using a multiple prime contractor approach, with separate contracts for General, Electrical, Mechanical (HVAC), and Plumbing work. The project specifications cover a wide range of construction activities including architectural, structural, mechanical, and electrical improvements, with detailed requirements for materials, installation methods, and finish standards.
The project is designed to be a LEED Silver certified interior design and construction project, with specific sustainability requirements including waste management goals, low-VOC material restrictions, and indoor air quality controls. The estimated budget and specific funding sources are not explicitly detailed in the document, but the project involves comprehensive renovations across multiple trades and disciplines. The specification manual provides extensive technical details across 50+ specification sections, covering everything from temporary environmental controls to final finishes, with a focus on high-performance, sustainable design principles. The project appears to be a significant interior renovation and modernization effort for municipal office spaces, with careful attention to environmental performance, material quality, and functional design.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2840 Liberty Avenue Pittsburgh, PA 15222• Tel: 412.932.2044 • www.ae-7.com
PROJECT MANUAL
City of Pittsburgh Department of Public Works
412 Boulevard of the Allies
Pittsburgh, PA 15219
DIVISIONS 01 THROUGH 12
July 28, 2022 AE7 Project 190428.00
City of Pittsburgh-Department of Public Works July 28, 2022
Addendum #2 - September 23, 2022
TABLE OF CONTENTS TOC - 1
TABLE OF CONTENTS
Division Section Title
000102 TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
Not Used
DIVISION 01 – GENERAL CONDITIONS
011000 SUMMARY
012200 UNIT PRICES
012300 ALTERNATES
012500 SUBSTITUTION PROCEDURES
012500a SUBSTITUTION REQUEST FORM
013118 COORDINATION DRAWINGS
013118A ELECTRONIC FILE TRANSFER AGREEMENT
013300 SUBMITTAL PROCEDURES
015719 TEMPORARY ENVIRONMENTAL CONTROLS
016116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
018113 SUSTAINABLE DESIGN REQUIREMENTS
018113.01 LEED CHECKLIST
018113.02 LEED SUBMITTAL FORM
DIVISION 02 – EXISTING CONDITIONS
024116 SELECTIVE DEMOLITION
DIVISION 03 – CONCRETE
035416 HYDRAULIC CEMENT UNDERLAYMENT
DIVISION 04 – MASONRY
Not Used
DIVISION 05 – METALS
055000 METAL FABRICATIONS
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
061000 ROUGH CARPENTRY
064023 INTERIOR ARCHITECTURAL CASEWORK & FINISH CARPENTRY
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
078100 APPLIED FIREPROOFING
078413 PENETRATION FIRESTOPPING
TABLE OF CONTENTS TOC - 2
079200 JOINT SEALANTS
DIVISION 08 – OPENINGS
081113 HOLLOW METAL DOORS AND FRAMES
084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
084413 GLAZED ALUMINUM CURTAIN WALL
087100 DOOR HARDWARE
088000 GLAZING
088113 WINDOW FILM
DIVISION 09 – FINISHES
092216 NON-STRUCTURAL METAL FRAMING
092900 GYPSUM BOARD
093000 TILING
095110 ACOUSTICAL FELT CEILINGS
095113 ACOUSTICAL PANEL CEILINGS
095133 ACOUSTICAL METAL PANEL CEILINGS
096513 RESILIENT BASE AND ACCESSORIES
096519 RESILIENT TILE FLOORING
096525 LUXURY VINYL TILE
096813 TILE CARPETING
097200 WALL COVERINGS
099123 PAINTING
DIVISION 10 – SPECIALTIES
102239 FOLDING GLASS PARTITIONS
102800 TOILET, BATH, AND LAUNDRY ACCESSORIES
104400 FIRE PROTECTION SPECIALTIES
105500 USPS-DELIVERY POSTAL SPECIALTIES
DIVISION 11 – EQUIPMENT
Not Used
DIVISION 12 – FURNISHINGS
122413 ROLLER WINDOW SHADES
123661 QUARTZ AGGLOMERATE COUNTERTOPS
DIVISION 13 – SPECIAL CONSTRUCTION
Not Used
DIVISION 14 – CONVEYING EQUIPMENT
Not Used
END OF DOCUMENT
SUMMARY 011000 - 1
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Phased construction and Occupant Disruption.
4. Use of premises.
5. Coordination with occupants.
6. Work restrictions.
7. Specification and drawing conventions.
B. Related Requirements:
1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of City's facilities.
1.2 PROJECT INFORMATION
A. Project Identification:
1. Project Location: 412 Boulevard of the Allies, Pittsburgh, PA 15219
B. Owners:
1. (COP) City of Pittsburgh, Dept. of Public Works, Bureau of Facilities, 414 Grant Street, Room 301, Pittsburgh, PA 15219
a. COP Contact Calli Baker, (412) 255-2604
2. (HACP) Housing Authority of the City of Pittsburgh, 100 Ross Street, 2nd Floor, Pittsburgh, PA 15219
a. HACP Contact: Alexis Narotsky, (412) 643-2762
3. (URA) Urban Redevelopment Authority, 412 Blvd. of the Allies 9th Floor, Pittsburgh, PA 15219
a. URA Contact: Corey E. Derico, (412) 255-6689
C. Architect: AE7; 2840 Liberty Avenue Suite 403, Pittsburgh, PA 15222
1. AE7 Contact: Roberto Vega Peralta, (415) 518-8179
D. Architect's Consultants: The Architect has retained the following design professionals who have prepared designated portions of the Contract Documents:
1. Electrical Engineer:
a. Representative: Mark Maydak, (412) 567-2581
2. Mechanical Engineer
a. Representative: Alexander Radkoff, (412) 224-4846
3. Plumbing Engineer
a. Representative: Shane Brant, (412) 535-0021
SUMMARY 011000 - 2
4. IT/AV Security
a. Representative: Jason Whitfield, (412) 657-8672
E. General Prime Contractor: To be determined.
F. Electrical Prime Contractor: To be determined.
G. Mechanical (HVAC) Prime Contractor: To be determined.
H. Plumbing Prime Contractor: To be determined.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
1. The Scope of Work Area includes selective demolition and construction of B (Business), A-3 (Assembly) and S-2 (Storage) Occupancy spaces on the interior of the existing Core
& Shell classified, multiple story, Type 1B construction, building that may be partially occupied during demolition and construction. Minimal demolition and construction to existing site elements. Project is Multiple Primes: General, Electrical, Mechanical
(HVAC), and Plumbing and respective subcontractors to those primes.
2. All City-issued permits will have fees waived.
3. General Prime Contractor: General demolition and construction includes, but is not limited to:
a. The interior scope of work includes: repair of existing gypsum surfaces; repair and cleanup of existing beams and columns, floor leveling where needed for demountable wall partitions, furnishing and installation of countertops and casework, installation of floor finishes; installation of finishes inclusive of floors, walls and ceilings in all common areas, offices and corridors and all as indicated on the Construction Documents. Coordination of the Work of all contracts including regularly scheduled and conducted coordination meetings and preparation of coordination drawings in collaboration with each contractor to coordinate work. Prepare combined Contractors’ Construction Schedule for entire
Project. Base schedule on preliminary construction schedule. Secure time commitments for performing critical construction activities from contractors.
Prepare a summary sheet indicating combined construction activities of contracts.
1) Submit schedules for approval.
2) Distribute copies of approved schedules to COP and all contractors.
4. Electrical Prime Contractor:
a. The scope of work includes: salvage/re-use of selected existing light fixtures;
selective demolition of existing interior building light fixtures and devices;
installation of interior lighting fixtures and devices in corridors, common areas, and offices; installation of security cameras, equipment required to complete interior scope of work; and all as indicated in the Construction Documents. All associated fees for 3rd-party inspections required to complete the scope of work described above are to be included in bid pricing.
b. The fire alarm protection scope of work includes tie-in of new equipment/devices to the existing Fire Alarm Panel; adding additional strobes, horns and pull stations as necessary to satisfy current code and local ordinances; and all as indicated in the
Construction Documents.
c. The Telecom scope.
SUMMARY 011000 - 3
d. The A/V scope.
e. The Security scope.
5. Mechanical (HVAC) Prime Contractor
a. The scope of work includes: Installation of all equipment, corresponding components, and tie-ins for the heating, cooling, & ventilation system(s); and all as indicated in the Construction Documents.
6. Plumbing Prime Contractor:
a. The scope of work includes: Plumbing for new restrooms, kitchenettes/breakrooms, Fire Protection, Suppression and Suspension; and all as indicated in the Construction Documents.
b. All associated fees for Allegheny County Health Department (ACHD) permits and inspections required to complete the scope of work described above are to be included in bid pricing.
B. Type of Contract:
1. Project will be constructed under a multi-prime format. General Prime, Electrical Prime, Mechanical (HVAC) Prime, and Plumbing Prime. Refer to City’s Procurement terms and conditions for further clarification.
C. Cooperation with Owner’s Contractors:
1. Provide coordination with Owner’s interior partition contractor:
DIRTT Project Manager
Dianna Schuchert dschuchert@construktpgh.com
412-719-6792
1.4 PHASED CONSTRUCTION AND OCCUPANT DISRUPTION
A. The Work will be required to be coordinated and sequenced by the General Prime Contractor, with each phase substantially complete as indicated:
1. General Prime Contractor is responsible for the Demolition and Construction Phasing and
Occupant Disruption Schedule, (DCPOD Schedule), coordination with all Contactors and disciplines and providing an update on a weekly basis during the Construction Phase. All
Contractors and disciplines are required to coordinate and provide detailed Demolition and Construction Phasing and Occupant Disruption Schedules, for their disciplines scope of work, to the General Prime Contractor, to be incorporated into the comprehensive schedule. All milestones and occupancy disruptions shall be identified within the schedule, and shall be provided at least 1 week prior to occupant disruptions, to allow
COP’s Representative to coordinate with occupants.
a. General Phasing and Occupant Disruption Schedule Milestones to be Minimally
Identified: Start and End dates of specific scope of work milestones, occupant milestones, substantially complete milestones, ready for occupancy milestones, and other associated milestones for approval from COP and the Architect minimally for the Site, Building, each Elevation, each Individual Floor, each
Public Area, each Occupied Area, Roofs, and all Interior Scope of Work.
Schedules to be inclusive of all required Occupant Disruption and
b. Displacement time frames for each scope of work Weekly and Daily. Listing all types of disruption. Examples: Noise, Light, Odors, Displacement of Occupant, etc.
mailto:dschuchert@construktpgh.com
SUMMARY 011000 - 4
2. General Prime Contractor to Schedule a Demolition and Construction Phase Occupant
Disruption Meeting within 7 calendar days of receiving the Notice to Proceed.
3. Demolition and Construction Phasing Occupant Disruption Schedule (DCPOD Schedule) shall be provided by each Contractor/Discipline to the General Prime Contractor within
14 calendar days from Notice to Proceed.
4. General Prime Contractor is to provide the initial DCPOD Schedule within 28 calendar days after the Notice to Proceed.
5. Phases can include multiple areas of scope of work simultaneously and this phasing is encouraged by the COP.
6. No Demolition or Construction shall start until the DCPOD Schedule has been provided and approved by Architect and COP’s Representative to Proceed.
1.5 USE OF PREMISES
A. General: Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.
B. Use of Site: Limit use of Project site to work zones delineated in General Prime Contractor’s approved DCPOD Plan and Schedule. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine construction operations to COP approved limits of work per construction plan.
2. COP Occupancy: Allow for employee occupancy of Project site.
3. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to URA, City of Pittsburgh, HACP, and emergency vehicles at all times. Parking at the site is limited.
a. Schedule deliveries to minimize use of driveways and entrances by construction operations and minimize space and time requirements for materials and equipment onsite.
C. Condition of Existing Building: Maintain existing building in a weather-tight condition throughout all phases of the demolition and construction period. Repair damage caused by construction operations. Protect building and its occupants at all times during construction period.
1.6 COORDINATION WITH OCCUPANTS
A. Co-Owner Employee Occupancy: URA, HACP and City of Pittsburgh employees could occupy the site and existing building during entire construction period. Cooperate with Co-Owner
Representatives during construction operations to minimize conflicts and facilitate Co-Owner usage. Perform the Work so as not to interfere with Co-Owner's day-to-day operations and to have minimal daily disruption to each Co-Owner. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from COP and approval of authorities having jurisdiction.
2. Notify COP not less than 48 hours in advance of activities that will affect COP's operations.
SUMMARY 011000 - 5
3. Contractor will have limited hours daily at coordinated Co-Owner units to complete work and shall be indicated within the DCPOD Schedule and coordinated with the COP.
B. Owner Limited Occupancy of Completed Areas of Construction: COP reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to
Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work.
1. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied prior to COP acceptance of the completed Work.
2. Obtain a Certificate of Occupancy from authorities having jurisdiction before limited
COP occupancy.
3. Before limited COP occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed.
4. Upon occupancy, COP will assume responsibility for maintenance and custodial service for occupied portions of Work.
C. Access to Occupied Building and Occupied Areas of the Building during Construction:
COP shall require access to certain occupied areas of the building during the entire construction period. The Contractor shall provide temporary access and cooperate with COP and COP’s contractors to provide access for the duration of the Work. Any temporary public entrances shall be accessible as determined by UFAS standards and meet COP’s requirements for secure access to the building.
1. General Prime Contractor (G.C.) shall provide
a. Demolition to accommodate temporary entrances and the reinstallation or replacement in like kind of materials removed or damage during the work.
b. Temporary security Door & frame
1) Door to be insulated hollow metal painted black to match existing frame, with half wire glass for security. Door to be UFAS compliant.
2) Frame to be hollow metal
c. Wall area adjacent to opening to be in filled. Interior- drywall, exterior with material to maintain building weather tightness.
d. Any ramp and landing required to provide temporary access to the entrance area shall be removed without visible signs or have areas replaced in kind.
1.7 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Work in the existing building is permissible to take place between the working hours of 6:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated or directed by COP’s Representative.
1. Refer to City code 917.06 – Construction Operations for complete details.
2. Weekend Hours: Only upon receipt of written approval from COP.
3. Hours for Utility Shutdowns: None without prior approval of COP.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by COP or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
https://library.municode.com/pa/pittsburgh/codes/code_of_ordinances?nodeId=PIZOCO_TITNINEZOCO_ARTVIDEST_CH917OPPEST_917.05HAMA
SUMMARY 011000 - 6
1. Notify COP’s Representative and Architect not less than 7 calendar days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without COP’s written permission.
3. Interruptions shall be scheduled such that current tenants are not without service for more than 2 hours.
4. Schedule interruptions such that the minimum numbers of locations are without heat or water at any given time.
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to COP occupancy with COP.
1. Refer to City code section 917.02 – Noise
2. Notify COP and Tenant Representative not less than two days in advance of proposed disruptive operations.
3. Obtain COP's written permission before proceeding with disruptive operations.
E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor-air intakes.
F. Controlled Substances: Use of tobacco products and other controlled substances on Project site is not permitted.
G. Employee Identification: Provide identification tags for Contractor personnel working on
Project site. Require personnel to use identification tags at all times.
1.8 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections or as a Basis-for-Design.
2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard and scheduled on Drawings.
3. Keynoting: Materials and products are identified by reference keynotes referencing
Specification Section numbers found in this Project Manual.
https://library.municode.com/pa/pittsburgh/codes/code_of_ordinances?nodeId=PIZOCO_TITNINEZOCO_ARTVIDEST_CH917OPPEST_917.02NO
SUMMARY 011000 - 7
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION 011000
UNIT PRICES 012200 - 1
SECTION 012200 - UNIT PRICES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for unit prices.
1.2 DEFINITIONS
A. Unit price is an amount incorporated into the Agreement, applicable during the duration of the
Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.
1.3 PROCEDURES
A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.
B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.
C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.
D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the Part 3 "Schedule of Unit Prices" Article contain requirements for materials described under each unit price.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF UNIT PRICES
A. Unit Price No. 1 – Hydraulic Cement Underlayment:
1. Description: Provide a unit price for hydraulic cement underlayment per Section 035416 in quantity specified below. Base scope should include ½” underlayment for 10,000 SF.
Added or reduced quantities shall be charged or credited at the provided unit price.
2. Unit of Measurement:1/2 inch thick; per one square foot.
UNIT PRICES 012200 - 2
END OF SECTION 012200
City of Pittsburgh-Department of Public Works Addendum #2 - September 23, 2022
ALTERNATES 012300 - 1
SECTION 012300 - ALTERNATES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.2 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if
Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the
Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.
1.3 PROCEDURES
A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
B. Execute accepted alternates under the same conditions as other work of the Contract.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. Alternate No. 1: Custom Perforated Metal Ceiling
1. Base Design: Provide MCT-01 suspended ceiling in Reception 103 with linear lighting as shown in 1/A111.
2. Alternate: Provide backlit ACP-01 in lieu of MCT-01. Custom laser-cut metal panels with 4” fascia, wall channels, and grid systems should be provided by Arktura with
LumiCurtain integrated lighting. Ceiling diffuser design to be linear diffusers outside of
City of Pittsburgh-Department of Public Works Addendum #2 - September 23, 2022
ALTERNATES 012300 - 2
main portion of ceiling. Contractor shall submit shop drawings for review to architect.
Custom laser cut pattern on file with Arktura team. Contact Mike Cebulak at Environ
Contract. 412-253-6549. mike@environcontract.com. Job Title: Design Assist
Presentation R3 – Style 3.
B. Alternate No. 2: Large Format Wall Graphic
1. Base Design: Provide PT-04 wall paint up to 9’-0”, PT-02 above.
2. Alternate: Provide WC-06 as indicated in 2/A450. AE7 to provide custom CAD file. File has been provided to Fashion Design Resource, 4005 Carnegie Avenue, Cleveland OH
44103. Quote Number: 1295711000038438073.
END OF SECTION 012300
mailto:mike@environcontract.com
SUBSTITUTION PROCEDURES 012500 - 1
SECTION 012500 - SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract and Division 1 Specification Sections apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for substitutions.
1.3 DEFINITIONS
A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.
2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required in order to meet other Project requirements but may offer advantage to
Contractor or Owner.
1.4 ACTION SUBMITTALS
A. Substitution Requests: Submit one copy of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.
1. Documentation: Show compliance with requirements for substitutions and the following, as applicable:
a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.
b. Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.
c. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section.
Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.
SUBSTITUTION PROCEDURES 012500 - 2
d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.
e. Samples, where applicable or requested.
f. Certificates and qualification data, where applicable or requested.
g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.
h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.
i. Research reports evidencing compliance with building code in effect for Project, from ICC-ES.
j. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall
Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.
k. Cost information, including a proposal of change, if any, in the Contract Sum.
l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.
m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
2. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within five days of receipt of a request for substitution.
Architect will notify Contractor of acceptance or rejection of proposed substitution within
7 days of receipt of request, or 7 days of receipt of additional information or documentation, whichever is later.
a. Forms of Acceptance: Change Order, Construction Change Directive, or
Architect's Supplemental Instructions for minor changes in the Work.
b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.
1.5 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.
1.6 PROCEDURES
A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.
SUBSTITUTION PROCEDURES 012500 - 3
1.7 SUBSTITUTIONS
A. Substitutions: The Architect and Owner will consider requests for substitution during the bid period only. Submit requests for substitution during bidding and until four days prior to the bid due date.
1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution is consistent with the Contract Documents and will produce indicated results.
b. Substitution request is fully documented and properly submitted.
c. Requested substitution will not adversely affect Contractor's construction schedule.
d. Requested substitution has received necessary approvals of authorities having jurisdiction.
e. Requested substitution is compatible with other portions of the Work.
f. Requested substitution has been coordinated with other portions of the Work.
g. Requested substitution provides specified warranty.
h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 012500
© Copyright 2013, CSI, 110 S. Union St., Suite 100, Alexandria, VA 22314
Page ___ of ___ Form Version: January 2013
CSI Form 13.1A
SUBSTITUTION
REQUEST
Project:
To:
Re:
Substitution Request Number:
From:
Date:
A/E Project Number:
Contract For:
Specification Title:
Section: Page:
Description:
Article/Paragraph:
Proposed Substitution:
Manufacturer: Address: Phone:
Trade Name: Model:
Installer: Address: Phone:
History: X New product ☐ 1-4 years old ☐ 5-10 years old ☐ More than 10 years old
☐ Point-by-point comparative data attached — REQUIRED BY A/E
Reason for not providing specified item: 1)
2)
Similar Installation:
Project: Architect:
Address: Owner:
Date Installed:
Proposed substitution affects other parts of Work: ☐ No ☐ Yes; explain
Savings to Owner for accepting substitution:
Proposed substitution changes Contract Time: ☐ No ☐ Yes Deduct
Supporting Data Attached: ☐Drawings ☐ Product Data ☐ Samples ☐ Tests ☐ Reports ☐
SUBSTITUTION
REQUEST
(Continued)
The Undersigned certifies:
Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.
Same warranty will be furnished for proposed substitution as for specified product.
Same maintenance service and source of replacement parts, as applicable, is available.
© Copyright 2013, CSI, 110 S. Union St., Suite 100, Alexandria, VA 22314
Page ___ of ___ Form Version: January 2013
CSI Form 13.1A
Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.
Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.
Proposed substitution does not affect dimensions and functional clearances.
Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.
Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.
Submitted by:
Signed by:
Firm:
Address:
Telephone:
Attachments:
A/E’s REVIEW AND RECOMMENDATION
☐ Approve Substitution - Make submittals in accordance with Specification Section 01 25 00 Substitution Procedures.
☐ Approve Substitution as noted - Make submittals in accordance with Specification Section 01 25 00 Substitution Procedures.
☐ Reject Substitution - Use specified materials.
☐ Substitution Request received too late - Use specified materials.
Signed by: Date:
OWNER'S REVIEW AND ACTION
☐ Substitution approved - Make submittals in accordance with Specification Section 01 25 00 Substitution Procedures. Prepare Change
Order.
☐ Substitution approved as noted - Make submittals in accordance with Specification Section 01 25 00 Substitution Procedures. Prepare
Change Order.
☐ Substitution rejected - Use specified materials.
Signed by: Date:
Additional Comments: ☐Contractor ☐Subcontractor ☐Supplier ☐Manufacturer ☐A/E
COORDINATION DRAWINGS 013118 - 1
SECTION 013118 – COORDINATION DRAWINGS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract and Division 01 Specification Sections apply to this Section.
1.2 SUMMARY
A. This Section specifies minimum administrative and supervisory requirements necessary for coordination drawings on the Project to be collectively fulfilled by the Contractor including, but not limited to:
B. Each Contractor and Subcontractor shall participate and be responsible for completion of coordination requirements.
1.3 COORDINATION
A. Coordination: Contractor shall coordinate its construction activities with those of other
Contractors and Subcontractors, the Owner's on-site representative, and other entities involved to assure efficient and orderly installation of each part of the Work. Each Contractor shall coordinate its operations with operations included under different Sections of the Specification that are dependent upon each other for proper installation, connection, and operation.
1. Coordination drawings are required. The Contractor and Subcontractors may bill the
Owner for coordination drawings upon completion and upon review of coordination drawings by the Architect. Coordination Drawings are assigned the following values and shall appear on each Contractors’ Schedule of Values. Payment for completion of coordination drawings shall be by the monthly pay application process.
a. General Trades – minimum of 3.0 percent (3%) of the general trades contract.
b. HVAC – minimum of 3.0 percent (3%) of the HVAC contract.
c. Plumbing – minimum of 5.0 percent (5%) of the plumbing contract.
d. Fire Protection- minimum of 4.5 percent (4 1/2%) of the fire protection contract.
e. Electrical – minimum of 2 percent (2%) of the electrical contract.
2. Where installation of one part of the Work is dependent on installation of other components, either before or after its own installation, each Contractor shall schedule its construction activities in the sequence required to obtain the best results.
3. Where availability of space is limited, each Contractor shall coordinate installation of different components with other Contractors to assure maximum accessibility for required maintenance, service, and repair.
4. Each Contractor shall make adequate provisions to accommodate items scheduled for later installation.
COORDINATION DRAWINGS 013118 - 2
5. Review: Architect will review coordination drawings to confirm that, in general, the
Work is being coordinated, but not for the details of the coordination, which are
Contractor's responsibility. If Architect determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, Architect will so inform Contractor, who shall make suitable modifications and resubmit
6. No installation of permanent systems shall proceed until the coordination drawings have been reviewed by the Architect. When work is installed prior to the completion of the
Architect’s review, the Owner has the right to have the work removed and reinstalled in sequence and in accordance with the reviewed coordination drawings at the defaulting contractor’s expense.
7. When a Contractor goes beyond the specified coordination drawing duration or otherwise fails to fulfill its coordination drawing responsibilities the Owner also has the right but not the obligation to any Contractor to withhold the Contractor’s Application for
Payment(s) until the Contractor has fulfilled its coordination drawing responsibilities and forwarded the coordination drawings to the successor Contractor and/or Architect as applicable.
8. When work has been installed without proper coordination, changes to this work deemed necessary by the Architect shall be made to correct the conditions without extra cost to the Owner.
9. Device locations shall be coordinated to insure that conflicts will not exist once finishes and wall mounted items are installed.
B. Conservation: Each Contractor shall coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.
1.4 SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings between all Contractors to achieve the most efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.
Upon execution of the Architects “Electronic File Transfer Agreement” electronic drawing files may be provided to each Contractor for their use in preparation of the Coordination Drawings.
1. Within 25 days of Notice to Proceed, the Contractor shall prepare and submit to the
HVAC Sub contractor electronic drawing files and drawings of ¼-inch scale that indicate proposed structural elements and ceiling layouts in this Contract. These Coordination drawings are to include the following items:
2. Top and bottom of steel elevations.
3. Additional structural elements.
4. Reflected ceiling plans showing layout, type and height of ceilings.
a. Include ceiling mounted items including but not limited to bulkheads, cubicle curtain tracks, banners, LCD projector mounts, projection screens, television brackets, ceiling fans etc.
5. Refer to the Contract Documents for additional items, not listed, that require coordination.
B. Within 10 days of receipt, the HVAC Subcontractor shall prepare and submit to the Plumbing
Subcontractor electronic drawing files and drawings of ¼-inch scale that indicate proposed
COORDINATION DRAWINGS 013118 - 3
routing of ductwork and piping in this Contract. These Coordination drawings are to include the following items:
1. Ductwork, showing top and bottom of duct elevations.
2. Piping, showing centerline of pipe. State outside diameter and insulation thickness.
3. Equipment (including recessed equipment in walls, chases or above ceilings and housekeeping pads). Include minimum required access space for operation and maintenance.
4. Floor, wall and roof penetrations.
5. Fire and smoke dampers.
6. Existing piping and equipment scheduled to remain.
7. Indicate size, elevation and general location of potential obstructions. Highlight and note any conflict points that might occur
8. Show and dimension services required of other Contractors.
9. Indicate required installation sequences.
10. Show access door locations.
11. Refer to the Contract Documents for additional items, not listed, that require coordination.
C. Within 10 days of receipt, the Plumbing Subcontractor shall prepare and submit to the Fire
Protection or Electrical Subcontractor electronic drawing files and drawings of ¼-inch scale that indicate proposed routing of ductwork and piping in this Contract. These Coordination drawings are to include the following items:
1. Piping, showing centerline of pipe. State outside diameter and insulation thickness.
2. Equipment (including recessed equipment in walls, chases or above ceilings and housekeeping pads). Include minimum required access space for operation and maintenance.
3. Underground piping noting areas that penetrate footings and walls.
4. Floor, wall and roof penetrations.
5. Floor drains, and cleanout locations.
6. Service entrances (including required access space for operation and maintenance).
7. Existing piping and equipment (if applicable).
8. Indicate size, elevation and general location of potential obstructions. Highlight and note any conflict points that might occur.
9. Show and dimension services required of other Contractors.
10. Indicate required installation sequences.
11. Show access door locations.
12. Refer to the Contract Documents for additional items, not listed, that require coordination.
D. Within 10 days of receipt, the Fire Protection Subcontractor shall prepare and submit to the
Electrical subcontractor electronic drawing files and drawings of ¼-inch scale that indicate proposed routing of ductwork and piping in this Contract. These Coordination drawings are to include the following items:
1. Piping, showing centerline of pipe. State outside diameter and insulation thickness.
2. Equipment (including recessed equipment in walls, chases or above ceilings and housekeeping pads). Include minimum required access space for operation and maintenance.
3. Underground piping noting areas that penetrate footings and walls.
COORDINATION DRAWINGS 013118 - 4
4. Floor, wall and roof penetrations.
5. Floor drains, and cleanout locations.
6. Service entrances (including required access space for operation and maintenance).
7. Existing piping and equipment (if applicable).
8. Indicate size, elevation and general location of potential obstructions. Highlight and note any conflict points that might occur.
9. Show and dimension services required of other Contractors.
10. Indicate required installation sequences.
11. Show access door locations.
12. Refer to the Contract Documents for additional items, not listed, that require coordination.
E. Within 10 days of receipt, the Electrical Subcontractor shall prepare and submit to the
Contractor electronic drawing files and drawings of ¼-inch scale that indicate proposed routing of ductwork and piping in this Contract. These Coordination drawings are to include the following items:
1. Electrical conduit greater than 1-1/2-inches in diameter. Both above and below grade.
2. Electrical conduit groupings containing 10 or more conduits. Both above and below grade.
3. Locations of Electrical Power Distribution Equipment (including switchboards, distribution panelboards, branch circuit panelboards and transformers). Include minimum required access space for operation and maintenance.
4. Emergency generator and associated distribution equipment
5. Control Panels (including but not limited to Fire Alarm, Lighting Control, Dimming)
6. Floor and roof penetrations.
7. Housekeeping pads.
8. Communications conduit greater than 1-1/2-inches in diameter. Both above and below grade.
9. Communications conduit groupings containing 10 or more conduits. Both above and below grade.
10. Cabletrays.
11. Telecommunications equipment racks.
12. Control Panels (including but not limited to Security, Public Address, Telephone System and local sound reinforcement systems).
13. Existing conduit ductbanks, distribution equipment and control panels that are to remain
(if applicable).
14. Indicate size, elevation and general location of potential obstructions. Highlight and note any conflict points that might occur.
15. Show and dimension services required of other Contractors.
16. Indicate required installation sequences.
17. Show access door locations.
18. Refer to the Contract Documents for additional items, not listed, that require coordination.
F. The Electrical subcontractor shall submit the prepared Coordination Drawings to the Contractor who will call for a Coordination Meeting within five days of receipt of the drawings.
G. The Contractor shall conduct Coordination Meetings.
COORDINATION DRAWINGS 013118 - 5
H. The Contractor shall deliver electronic copies of the final Coordination Drawings to the
Architect for review. Each set of Coordination Drawings shall bear the signature of an authorized representative from the Contractor and Subcontractors who have prepared and reviewed the Coordination Drawings. Submit 3 CD’s containing color .pdf’s and the CAD files of each of the drawings to the Architect.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 GENERAL COORDINATION DRAWING PROVISIONS
A. Upon execution of the Architect’s electronic transfer agreement, electronic drawing files may be provided to the Contractor for his use in preparation of the Coordination Drawings.
1. Sample of the Architects “Electronic File Transfer Agreement” can be found at the end of this section.
B. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:
1. File Preparation Format:
a. Same digital data software program, version, and operating system as original
Drawings.
b. DWG or DGN, Version <Insert designation>, operating in [Microsoft Windows]
[Apple Macintosh] operating system.
2. File Submittal Format: Submit or post coordination drawing files using PDF format.
3. Architect will furnish Contractor one set of digital data files of Drawings for use in preparing coordination digital data files.
a. Architect makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings.
b. Digital Data Software Program: Drawings are available in <Insert name and version of digital data software program and operating system>.
C. The electronic files shall be updated by each prime contractor and include the work of the previous trades. Each component (ie: general trades, mechanical, plumbing, fire protection, electrical, general communications, etc.) shall have its own unique layer/ level within the file.
D. Each major component of the coordination drawings shall be visually represented with its own unique color in both electronic and printed forms.
1. Contractor’s general trades items shall be shown in BLACK
a. Structural steel shall be shown in BLACK with 50% opacity (GRAY).
2. HVAC items shall be shown in BLUE.
3. Plumbing items shall be shown in RED.
4. Fire suppression items shall be shown in GREEN.
COORDINATION DRAWINGS 013118 - 6
5. Electrical items shall be shown in CYAN (Lt. Blue).
6. Communications items shall be shown in MAGENTA (Fuscia).
E. Mounting Heights: Where mounting heights are not indicated, install individual components at standard mounting heights recognized within the industry for the particular application indicated. Refer questionable mounting height decisions to the Architect for final decision.
END OF SECTION 013118
ELECTRONIC FILE TRANSFER AGREEMENT
THIS ELECTRONIC FILE TRANSFER AGREEMENT (“Agreement”) is made on , 2022 between AE7
Pittsburgh LLC (the “AE7”), and **Consultant Company Name Here** (the “Company”).
1. Purpose. AE7 has agreed to provide the Company with electronic data files including computer aided design (CAD) files. In making use of AE7’s CAD files the Company acknowledges, understands and agrees to the following:
2. Agreement. AE7 is providing, by agreement with certain parties, materials stored electronically.
The parties recognize that data, plans, specifications, reports, documents or other information recorded on or transmitted as electronic media (including but not necessarily limited to “CAD
Documents”) are subject to undetectable alteration, either intentional or unintentional, due to, among other causes, transmission, conversion, media degradation, software error, or human alteration. Accordingly, all such documents are provided to the parties for informational purposes only and not as an end product or as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and/or stamped hard copies of the
Architect’s Instruments of Service are the only true contract documents of record.
By signing below, the Company acknowledges that they understand and will comply with the aforementioned terms and conditions, and hereby verifies that the signature on this form is authorized by the Company.
AE7 Pittsburgh, LLC.
By: xxxxx, Project Manager
Signature:
AE7 Pittsburgh, LLC.
By: Jeff Wetzel, Principal
Signature:
xxxx(Consultant)
By: xxxxx
Signature:
SUBMITTAL PROCEDURES 013300 - 1
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract and Division 1 Specification Sections apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Submittal schedule requirements.
2. Schedule of Values.
3. Administrative and procedural requirements for submittals.
1.3 DEFINITIONS
A. Action Submittals: Written and graphic information and physical samples that require
Architect's responsive action. Action submittals are those submittals indicated in individual
Specification Sections as "action submittals."
B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification
Sections as "informational submittals."
C. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract
Sum to various portions of the Work and used as the basis for reviewing Contractor's
Applications for Payment.
1.4 SUBMITTAL SCHEDULE
A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by Architect and additional time for handling and reviewing submittals required by those corrections.
1.5 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.
SUBMITTAL PROCEDURES 013300 - 2
1. Coordinate line items in the schedule of values with items required to be indicated as separate activities in Contractor's construction schedule.
2. Submit a preliminary schedule of values to Architect in conjunction with coordination drawing submittal or as follows; whichever is earlier.
3. Submit the schedule of values to Architect at earliest possible date, but no later than seven calendar days before the date scheduled for submittal of initial Applications for
Payment.
B. Format and Content: Use Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.
1. Identification: Include the following Project identification on the schedule of values:
a. Project name and location.
b. Owner's name.
c. Owner's Project number.
d. Name of Architect.
e. Architect's Project number.
f. Contractor's name and address.
g. Date of submittal.
2. Arrange the schedule of values in tabular form, with separate columns to indicate the following for each item listed:
a. Related Specification Section or division.
b. Description of the Work.
c. Name of subcontractor.
d. Name of manufacturer or fabricator.
e. Name of supplier.
f. Change Orders (numbers) that…