The document consists of contract documents for the construction of a commercial entrance and private 24' wide paved access drive in Grayson County, Virginia. The project scope includes grading, erosion and sediment control, culvert and storm drain installations, fire hydrant relocation, curbing, and sidewalk installation. Sealed bids for the project will be received until 2:00 PM on May 24, 2024, with a non-mandatory pre-bid conference scheduled for May 2, 2024. The contract will be awarded on a lump sum basis and the work is to be substantially completed within 120 days and fully completed within 150 days after the contract start date.

The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide bid security in the amount of 5% of the bid price. Progress payments will be made monthly based on the percentage of work completed, with retainage of 10% until substantial completion. Liquidated damages of $300 per day for late substantial completion and $200 per day for late final completion will apply.

View the file

Other files

File Type Posted
20220846_FINAL CD_TECH SPECS.pdf PDF
220846_SHEET_SET_2024_0326.pdf PDF
220846_SHEET_SET_2024_0326.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hurt & Proffitt, Inc.

1861 Pratt Drive, Suite 1100

Blacksburg, Virginia

JN 20220846

CONTRACT DOCUMENTS

GRAYSON COUNTY RECREATIONAL PARK

ACCESS DRIVE

GRAYSON COUNTY, VIRGINIA

March 26, 2024

Prepared for:

Economic Development Authority of Grayson County, Virginia c/o Stephen A. Boyer, County Administrator

129 Davis Street (PO Box 217)

Independence, Virginia 24348

QA/QC: RKB

bcooper RKB Seal bcooper Text Box

26 MAR 2024

Grayson County Rec Park Access Drive (Project 20220846)

\\data01\Projects\2022\20220846\Engineering\Bid Documents\Project Manual\Front End\Front End\20170642_TOC_2017_CD.docx

TABLE OF CONTENTS

No. of Pages

CONTRACT DOCUMENTS

Document 00 11 13 – Advertisement for Bids 1

Document 00 21 13 – Instructions to Bidders 8

Document 00 31 05 – Prebid Question Form 1

Document 00 41 00 – Bid Form 5

Document 00 43 13 – Bid Bond Penal Sum 2

Document 00 45 13.11 – Contractor Bid Qualification Certification Virginia Debarment 1

Document 00 45 13 – Bidder’s Qualifications 3

Document 00 45 19.11 – Contractor’s Certification of Participation (Virginia) 1

Document 00 45 33 – Nonsegregated Facilities Affidavit 1

Document 00 51 00 – Notice of Award 1

Document 00 52 13 – Agreement Between Owner & Contractor for Construction Contract

(Stipulated Price) 6

Document 00 55 00 – Notice to Proceed 1

Document 00 61 13.13 – Performance Bond 3

Document 00 61 13.16 – Payment Bond 3

Document 00 62 76 – Contractor’s Application for Payment 1

Document 00 63 36 – Field Order 1

Document 00 63 63 – Change Order Form 1

Document 00 65 16 – Certificate of Substantial Completion 1

Document 00 65 19 – Certificate of Completion Form 1

Document 00 72 00 – Standard General Conditions 62

Document 00 73 00 – Supplementary Conditions 1

Document 00 73 16 – Insurance Requirements 2

Proof of Authority to Transact Business in Virginia

TECHNICAL SPECIFICATIONS

Document 01 11 00 – Summary of Work

Document 01 33 00 – Submittal Procedures

Document 01 45 00 – Testing and Inspecting Services

Document 01 66 00 – Product Delivery, Storage, and Handling Requirements

Document 31 00 00 – Earthwork

Document 31 10 00 – Site Clearing

Document 31 23 33 – Trenching and Backfilling

Document 31 25 00 – Erosion and Sedimentation Controls

Document 32 10 00 – Bases, Ballasts, and Pavements

Document 32 91 19.13 – Topsoil Placement and Grading

Document 32 92 19 – Seeding

Document 33 03 00 – Utility Pipe and Materials

Document 33 04 00 – Valves and Cocks

Document 33 05 00 – Common Work Results for Utilities

Document 33 10 00 – Water Utilities

Document 33 12 19 - Water Utility Distribution Fire Hydrants

Document 33 40 00 – Storm Drainage Utilities

Document 33 41 00 – Storm Utility Drainage Piping

EJCDC® C-111, Suggested Advertisement for Bids for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_11_13_advertisement_for_bids.doc Advertisement for Bids Page 00 11 13-1

DOCUMENT 00 11 13 – ADVERTISEMENT FOR BIDS

Grayson County Recreational Park Access Drive

Economic Development Authority of Grayson County, Virginia

Mr. Stephen A. Boyer – County Administrator

129 Davis Street, PO Box 217

Sealed Bids for the Grayson County Recreational Park Access Drive will be received at the Office of the County

Administrator, 129 Davis Street, Suite 204 (PO Box 217) Independence Virginia until 2:00 PM local prevailing time on May 24, 2024, and then at said office publicly opened and read aloud.

Project consists of the construction of a commercial entrance and a private 24’ width paved access drive. The scope of work includes grading, erosion and sediment control, culvert and storm drain installations, fire hydrant relocation, curbing, and sidewalk installation. Contract is to be awarded on a lump sum basis.

Contract Documents will be available for inspection and download (free of charge) at http://www.handp.com/bid-info/.

Bidding Documents also may be examined at:

Grayson County Planning Department - 129 Davis Street, Independence, VA 24348 eVA http://eva.virginia.gov/

Hurt & Proffitt, Inc., 1861 Pratt Drive, Suite 1100, Blacksburg, VA 24060

DODGE Data, 3315 Central Avenue, Hot Springs, AR 71913

Valley Construction News Plan Room, 426 Campbell Avenue, Roanoke, VA 24016

A non-mandatory pre-bid conference will be held at 10:00 am local time on May 2, 2024, at the Grayson County

Board Room, 129 Davis Street, Suite 204, Independence, Virginia, followed by a site visit.

Bid security shall be furnished in accordance with the Instructions to Bidders. The procedure for withdrawal of bids shall be in accordance with procedure (i) of Section 2.2 - 4330 of the Code of Virginia.

BIDDER’S attention is invited to the requirements of Section 54.1, Chapter 11 of the Code of Virginia pertaining to registration and contractor licensure. The bidder shall place on the outside of the envelope containing the bid and shall place in the bid over his signature whichever of the following notations is appropriate:

"Licensed Class A Virginia Contractor No. ."

"Licensed Class B Virginia Contractor No. ."

Owner: Economic Development Authority of Grayson County, Virginia

By: Stephen A. Boyer

Title: County Administrator

Date: April 21, 2024

END OF DOCUMENT 00 11 13 – ADVERTISEMENT FOR BIDS

EJCDC® C-200, Suggested Instructions to Bidders for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_21_13_instructions_to_bidders_2013.doc

Instructions to Bidders Page 00 21 13-1

DOCUMENT 00 21 13 – INSTRUCTIONS TO BIDDERS

ARTICLE 1 – DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and

Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office – The office from which the Bidding Documents are to be issued.

ARTICLE 2 – COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement or invitation to bid.

2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding

Documents.

2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within 5 days of

Owner’s request, Bidder shall submit (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:

A. Evidence of Bidder’s authority to do business in Virginia

B. Bidder’s contractor license number

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify

Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.

ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE;

OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE

4.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by

Contractor.

4.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify:

a. Those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_21_13_instructions_to_bidders_2013.doc

Instructions to Bidders Page 00 21 13-2

b. Those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).

c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical

Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the

General Conditions, has been identified and established in the Supplementary Conditions.

Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of

Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract

Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.

C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and

Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the

General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.

4.03 Site Visit and Testing by Bidders

A. Bidder shall conduct any scheduled Site visits during normal working hours, and shall not disturb any ongoing operations at the Site.

B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful

Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.

D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.04 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. As the General

Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary

Conditions.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_21_13_instructions_to_bidders_2013.doc

Instructions to Bidders Page 00 21 13-3

4.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these

Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 5 – BIDDER’S REPRESENTATIONS

5.01 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;

B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the

Site and all drawings of physical conditions relating to existing surface or subsurface structures at the

Site that have been identified in the Supplementary Conditions, especially with respect to Technical

Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental

Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary

Conditions, especially with respect to Technical Data in such reports and drawings;

E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the

Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;

F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;

G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;

H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work; and

J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that

Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding

Documents.

ARTICLE 6 – PRE-BID CONFERENCE

6.01 A pre-Bid conference will be held at the time and location stated in the invitation or advertisement to bid.

Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_21_13_instructions_to_bidders_2013.doc

Instructions to Bidders Page 00 21 13-4 attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such

Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

ARTICLE 7 – INTERPRETATIONS AND ADDENDA

7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents.

Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.

ARTICLE 8 – BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five (5) percent of

Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such

Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the

Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the

Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 91 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.

ARTICLE 9 – CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.

ARTICLE 10 – LIQUIDATED DAMAGES

10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS

11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.

11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_21_13_instructions_to_bidders_2013.doc

Instructions to Bidders Page 00 21 13-5

Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.

12.02 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for any of the work on the project.

If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of

Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

12.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or

Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.

ARTICLE 13 – PREPARATION OF BID

13.01 The Bid Form is included with the Bidding Documents. Additional copies may be obtained from Engineer.

A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and

Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words

“No Bid” or “Not Applicable.”

13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.

13.03 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.

13.04 A Bid by an individual shall show the Bidder’s name and official address.

13.05 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.

13.06 All names shall be printed in ink below the signatures.

13.07 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_21_13_instructions_to_bidders_2013.doc

Instructions to Bidders Page 00 21 13-6

13.08 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.

13.09 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the

Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.

ARTICLE 14 – BASIS OF BID

14.01 Lump Sum

A. Bidders shall submit a Bid on a lump sum basis as set forth in the Bid Form. Bidder shall provide unit pricing for select items as noted on the Bid Form.

14.02 Unit Price

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price

Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph

13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

ARTICLE 15 – SUBMITTAL OF BID

15.01 A copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 7 of the Bid Form.

15.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the Project title

(and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to the person and location noted in the Advertisement for Bids.

15.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.

ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID

16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of

Bids.

16.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_21_13_instructions_to_bidders_2013.doc

Instructions to Bidders Page 00 21 13-7

ARTICLE 17 – OPENING OF BIDS

17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive;

provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.

19.03 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid

Form. To determine the Bid prices for purposes of comparison, Owner shall announce to all bidders a

“Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.

19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the

Bidding Documents.

19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 20 – BONDS AND INSURANCE

20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth

Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_21_13_instructions_to_bidders_2013.doc

Instructions to Bidders Page 00 21 13-8

ARTICLE 21 – SIGNING OF AGREEMENT

21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement.

Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract

Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the

Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

END OF DOCUMENT 00 21 13 – INSTRUCTIONS TO BIDDERS

\\data01\Projects\2022\20220846\Engineering\Bid Documents\Project Manual\Front End\Front End\00_31_05_Pre_Bid_Question_Form.doc

Pre-Bid Questions Form Page 00 31 05-1

DOCUMENT 00 31 05 – PRE-BID QUESTIONS FORM

PROJECT: Date:

Grayson County Recreational Park Access Drive

ENGINEER:

Hurt & Proffitt, Inc.

1861 Pratt Drive, Suite 1100

Blacksburg, Virginia 24060

Submit all prebid questions to the Engineer.

All responses to questions will be made by Addendum.

The following questions concerns Specifications, Section (number) Page Paragraph

The following question concerns Drawings, Sheet (number)

Questions submitted by:

Name Organization

Telephone Fax

Page

END OF DOCUMENT 00 31 05 – PRE-BID QUESTION FORM

EJCDC® C-410, Bid Form for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_41_00_bid_form_2013.docx

Bid Form Page 00 41 00-1

DOCUMENT 00 41 00 – BID FORM

GRAYSON COUNTY RECREATIONAL PARK

ACCESS DRIVE

GRAYSON COUNTY, VIRGINIA

TABLE OF CONTENTS

Page

ARTICLE 1 – Bid Recipient

ARTICLE 2 – Bidder’s Acknowledgements

ARTICLE 3 – Bidder’s Representations

ARTICLE 4 – Bidder’s Certification

ARTICLE 5 – Basis of Bid

ARTICLE 6 – Time of Completion

ARTICLE 7 – Attachments to this Bid

ARTICLE 8 – Defined Terms

ARTICLE 9 – Bid Submittal

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, \\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_41_00_bid_form_2013.docx

Bid Form Page 00 41 00-2

ARTICLE 1 – BID RECIPIENT

1.01 This Bid is submitted to:

Economic Development Authority of Grayson County Virginia

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

ARTICLE 3 – BIDDER’S REPRESENTATIONS

3.01 In submitting this Bid, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:

Addendum No. Addendum, Date

B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.

E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on

(1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, \\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_41_00_bid_form_2013.docx

Bid Form Page 00 41 00-3

F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and confirms that the written resolution thereof by Engineer is acceptable to Bidder.

I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.

J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 4 – BIDDER’S CERTIFICATION

4.01 Bidder certifies that:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and

D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:

1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;

2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;

3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and

4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.

ARTICLE 5 – BASIS OF BID

5.01 Bidder will complete the Work in accordance with the Contract Documents for the following lump sum pricing:

LUMP SUM BID FOR ALL BASE BID WORK:

Lump Sum Base Bid Price

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, \\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_41_00_bid_form_2013.docx

Bid Form Page 00 41 00-4

ALTERNATE BID ITEM #1 – TOTAL COST ASSOCIATED WITH ELIMINATION OF PRIME

AND DOUBLE SEAL PAVING (PLAN DETAIL AP-2A) AND REPLACEMENT WITH

STANDARD ASPHALT PAVEMENT (PLAN DETAIL AP-2B) – DESIGNATE BELOW IF

ALTERNATE BID WILL RESULT IN AN ADDITION TO OR A DEDUCTION FROM THE

BASE BID PRICE:

Alternate Bid #1 (if additional cost of base bid) + ________________________(+$___________)

Alternate Bid #1 (if deduction from base bid) - ________________________(- $___________)

TOTAL BID PRICE W/ ALTERNATE BID #1 INCLUDED

Base Bid Price plus or minus Alternate Bid #1 __________________________( $____________)

ARTICLE 6 – TIME OF COMPLETION

6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the number of calendar days indicated in the Agreement.

6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.

ARTICLE 7 – ATTACHMENTS TO THIS BID

7.01 The following documents are submitted with and made a condition of this Bid:

A. Required Bid security in the form of a certified check or Bid Bond

B. Contractor’s License Number

C. Contractor Bidder Qualification Certification (Virginia Debarment)

D. Contractor’s Certification of Participation

E. Non-Segregated Facilities Affidavit

F. Proof of Authority to Transact Business in Virginia

ARTICLE 8 – DEFINED TERMS

8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 9 – BID SUBMITTAL

BIDDER:

By:

[Signature]

[Printed name]

(If Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.)

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, \\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_41_00_bid_form_2013.docx

Bid Form Page 00 41 00-5

Attest:

[Signature]

[Printed name]

Title:

Submittal Date:

Address for giving notices:

Telephone Number:

Fax Number:

Contact Name and e-mail address:

Bidder’s License No.:

END OF DOCUMENT 00 41 00 – BID FORM

EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.

Prepared by the Engineers Joint Contract Documents Committee.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_43_13_bid_bond_penal_sum_2013.doc Bid Bond (Penal Sum) Page 00 43 13-1

DOCUMENT 00 43 13 – BID BOND (PENAL SUM FORM)

Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.

BIDDER (Name and Address):

SURETY (Name, and Address of Principal Place of Business):

OWNER

Economic Development Authority of Grayson County Virginia

BID

Bid Due Date:

May 23, 2024

Description:

Grayson County Recreational Park Access Drive

BOND

Bond Number:

Date:

Penal sum $

(Words) (Figures) Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.

BIDDER SURETY

(Seal) (Seal)

Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal

By: By:

Signature Signature (Attach Power of Attorney)

Print Name Print Name

Title Title

Attest: Attest:

Signature Signature

EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.

Prepared by the Engineers Joint Contract Documents Committee.

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_43_13_bid_bond_penal_sum_2013.doc Bid Bond (Penal Sum) Page 00 43 13-2

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.

3. This obligation shall be null and void if:

3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or

3.2 All Bids are rejected by Owner, or

3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.

END OF DOCUMENT 00 43 13 – BID BOND (PENAL SUM)

\\data01\projects\2022\20220846\engineering\bid documents\project manual\front end\front end\00_45_13_11_contractor_bid_qualification_certification_va_debarment.doc

Contractor Bid Qualification Certification (Virginia Debarment) Page 00 45 13.11-1

DOCUMENT 00 45 13.11 – CONTRACTOR BID QUALIFICATION CERTIFICATION (VIRGINIA

DEBARMENT)

(THIS COMPLETED DOCUMENT MUST ACCOMPANY BID)

CONTRACTOR BID QUALIFICATION CERTIFICATION

This is to certify that this person/firm/corporation has not been barred from bidding on contracts by any agency of the Commonwealth of Virginia, nor is this person/firm/corporation a part of any firm/corporation that has been barred from bidding on contracts by any agency of…