220846_SHEET_SET_2024_0326.pdf
PDF 7 MB Posted
- Solicitation number
- 64901
- Issued by
- Goochland County, Virginia
About this file
This document contains the plans and specifications for a state and local contract opportunity in Grayson County, Virginia to construct a commercial entrance and private paved access drive. The scope of work includes grading, erosion and sediment control, culvert and storm drain installations, fire hydrant relocation, curbing, and sidewalk installation. The contract is to be awarded on a lump sum basis.
The project location is in Grayson County, Virginia. The owner and developer is Grayson County, Virginia. The civil engineer is Hurt & Proffitt, Inc. The project consists of constructing a commercial entrance and 24-foot wide paved access drive. The work includes earthwork, erosion and sediment control, storm drainage, water main work, pavement, sidewalks, and other related site improvements. The solicitation does not provide a response due date, but indicates the contract will be awarded on a lump sum basis.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20220846_FINAL CD_TECH SPECS.pdf | ||
| 20220846_FINAL CD_TECH SPECS.pdf | ||
| 220846_SHEET_SET_2024_0326.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2024 Microsoft Corporation © 2024 TomTom
SHEET NO.
PROJECT NO.
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
M ar
7,
- 3
:3 9p m
\d at a0 1\ pr oj ec ts
\2
2\
\e ng in ee rin g\ C
AD
\2
6_
SH
EE
T_
C O
VE
R
.d w g
EN
G
IN
EE
R
IN
G
SU
R
VE
YI
N
LA
D
D
EV
EL
O
PM
EN
T
E
N
VI
R O
N M
EN
TA
L G
EO
TE
C H
N
IC
AL
C O
N
ST
R U
C
TI
O N
T
ES
TI
N
G
IN
SP
EC
TI
O N
C
U
LT
U R
AL
R
ES
O
U R
C
ES
0.
2.
P R
A
TT
D R
, S
TE
B
LA
C
K
SB
U R
G , V
A . 2
H A
N D
P.
C
O M
IN
SP
IR
ED
R
ES
PO
N
SI
VE
TR
U
ST
ED
REV.
COVER
C001
MTC
KJH, BEC
26 MAR 2024
-81.129531 36.623684 20220846
G R
AY
SO
N C
O U
N
TY
, V A
AC
CE
SS
D
RI
VE
G
RA
YS
O
N
CO
UN
TY
R
EC
RE
AT
IO
NA
L
PA
RK
C
O
VE
R
GRAYSON COUNTY RECREATIONAL PARK
ACCESS DRIVE
GRAYSON COUNTY, VA
ABBREVIATIONS:
CONC. = CONCRETE INV. = INVERT
DI = DRAINAGE INLET CPP = CORRUGATED PLASTIC PIPE
PVC = POLYVINYLCHLORIDE PIPE INST. = INSTRUMENT
BM = BENCHMARK PKS = PK NAIL SET
PP = POWER POLE A.L. = APPROXIMATE LOCATION
P.U.E. = PUBLIC UTILITY EASEMENT C&G = CURB AND GUTTER
GWP = GASLINE WITNESS POST TC = TOP OF CURB ELEVATION
BW = GRADE AT BOTTOM SIDE OF WALL TW = GRADE AT TOP SIDE OF WALL
ME = MATCH EXISTING GRADE
THE ENGINEER AND/OR SURVEYOR TAKES NO RESPONSIBILITY FOR THE
LOCATION OR ACCURACY OF THE UTILITIES AS SHOWN HEREON OR ANY
UTILITIES WITHIN THE PROJECT THAT MAY NOT BE SHOWN HEREON. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE UTILITY
COMPANIES TO SEE IF ANY UTILITIES EXIST WITHIN THE AREA OF THE PROJECT
BEFORE ANY CONSTRUCTION BEGINS. ANY COST INCURRED BY DAMAGING ANY
UTILITY WITHIN THE PROJECT SHALL BE AT THE EXPENSE OF THE CONTRACTOR.
48 WORKING HOURS PRIOR TO STARTING THE WORK, THE CONTRACTOR SHALL
CALL MISS UTILITY AT PHONE NUMBER 811 AND ADVISE THE NATURE AND
LOCATION OF THE WORK.
CALL "MISS UTILITY"
C A R E
A
LW
AY
S
K
EEP
VIRGINIA SAFE!
BEFORE
YOU
D
IG!
PROPERTY INFORMATION:
INDUSTRIAL DEVELOPMENT AUTHORITY
TAX MAP # 73-A-112
D.B. 340, PG. 367
ZONING: INDUSTRIAL
LOT SIZE: 4.565 ACRES
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT
DB. 574 PG. 286
OWNER / DEVELOPER:
GRAYSON COUNTY, VIRGINIA
C/O MS. JADA BLACK
DIRECTOR OF PLANNING AND ZONING
GRAYSON COUNTY, VA
PO BOX 217
INDEPENDENCE, VA 24348
276-773-2000
CIVIL ENGINEER:
HURT & PROFFITT, INC.
MARK T. CLINE, PROJECT MANAGER
1861 PRATT DRIVE, SUITE 1100
BLACKSBURG, VA 24060
540-552-5592
PROJECT LOCATION
VICINITY MAP
1. WATER / SEWER
TOWN OF INDEPENDENCE
PHONE: 276-773-3703
2. ELECTRIC
AEP
PHONE: 276-429-4101
3. VDOT
WYTHEVILLE RESIDENCY
PHONE: 276-228-2153
GENERAL PROJECT INFORMATION
SITE UTILITY CONTACT INFORMATION
N
Sheet List Table Sheet Number Sheet Title
C001 COVER
C002 GENERAL NOTES
C101 EXISTING CONDITIONS
C201 DEMOLITION PLAN
C301 SITE GRADING PLAN & PROFILES
C401 ESC PLAN
C501 ESC DETAILS
C502 ESC NOTES
C601 DETAILS 1
C602 DETAILS 2
26 MAR 2024
AutoCAD SHX Text
GRAPHIC SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
ROBERT K. BOYD
AutoCAD SHX Text Lic. No. 21814 uge uge g
24"
8"ss
UGT
18"
8"
8"W8"w
CONSTRUCTION NOTES:
1. COMPLY WITH S59.1-406, ET SEQ. OF THE CODE OF VIRGINIA (OVERHEAD HIGH VOLTAGE LINES
SAFETY ACT).
2. CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA).
3. CONSTRUCTION TRAILER, FENCING, PARKING, AND STAGING AREAS SHALL BE COORDINATED
WITH AND APPROVED BY THE OWNER.
4. MAINTAIN EMERGENCY, SERVICE, AND DELIVERY VEHICLE ACCESS TO THE SURROUNDING AREA
AND COORDINATE THIS WITH THE OWNER.
5. THESE PLANS SHALL BE USED IN CONJUNCTION WITH THE EROSION AND SEDIMENT CONTROL
NARRATIVE DATED 26 MAR 2024, AND THE PROJECT CONTRACT DOCUMENTS/TECHNICAL
SPECIFICATIONS DATED 26 MAR 2024.
6. THIS PROJECT DOES NOT LIE WITHIN A 100-YEAR FLOOD ZONE.
7. THIS PROJECT DOES NOT PROPOSE ANY IMPACTS TO WETLANDS OR WATERS OF THE U.S.
8. THIS SITE IS LOCATED IN ZONE "X", SHOWN ON FIRM COMMUNITY PANEL NO.51077C0360C.
(EFFECTIVE DATE: 8/28/2008)
9. ANY DISCREPANCIES FOUND BETWEEN THE DRAWINGS AND SITE CONDITIONS OR ANY
INCONSISTENCIES OR AMBIGUITIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO
THE OWNER'S REPRESENTATIVE, WHO SHALL PROMPTLY CORRECT SUCH INCONSISTENCIES OR
AMBIGUITIES. WORK DONE BY THE CONTRACTOR WITHOUT DIRECTION AFTER HIS DISCOVERY OF
SUCH INCONSISTENCIES OR AMBIGUITIES, SHALL BE DONE AT THE CONTRACTOR'S RISK.
10. THERE ARE NO KNOWN GRAVES, OBJECTS, OR STRUCTURES ON SITE MARKING PLACE OF
HUMAN BURIAL.
11. MOST RECENT OSHA TRENCHING STANDARDS SHALL APPLY ON THIS PROJECT.
12. WORK IN THE VDOT RIGHT-OF-WAY WILL REQUIRE A VDOT PERMIT. A PERMIT FEE AND BOND WILL BE REQUIRED; THE CONTRACTOR WILL NEED TO SUBMIT 3 COPIES OF THE APPROVED SITE PLAN
WITH THE PERMIT APPLICATION.
13. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM TO VDOT STANDARDS AS
APPLICABLE.
14. ALL WORK PERFORMED WITHIN THE VDOT RIGHTS-OF-WAY SHALL COMPLY WITH THE CURRENT
VDOT ROAD AND BRIDGE STANDARDS AND SPECIFICATIONS AND TO THE LATEST EDITIONS OF
THE WORK AREA PROTECTION MANUAL.
SURVEY AND STAKEOUT NOTES:
1. TOPOGRAPHIC SURVEY WAS PREPARED BY HURT & PROFFITT, INC. DATED MAY 2023.
2. HORIZONTAL COORDINATE POINTS ARE BASED ON VA STATE PLANE NAD83 ADJUSTMENT.
VERTICAL ELEVATIONS ARE BASED ON NAVD88 DATUM.
3. CONTRACTOR SHALL FIELD VERIFY HORIZONTAL AND VERTICAL SURVEY CONTROL.
4. EXISTING CONTOUR INTERVAL = 1' UNLESS OTHERWISE SHOWN.
5. THIS PROPERTY DOES NOT LIE WITHIN A H.U.D. 100-YEAR FLOOD HAZARD ZONE.
DEMOLITION NOTES:
1. INSTALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO COMMENCING LAND
DISTURBING ACTIVITIES.
2. UTILITIES, STRUCTURES, AND VEGETATION TO BE REMOVED/DEMOLISHED ARE SHOWN BOLD ON
THE DEMOLITION PLAN. NOTIFY OWNER TO REVIEW REMOVAL/ALTERATION 0F EXISTING ITEMS
FOUND WITHIN WORK AREA BUT NOT SHOWN ON THE PLANS. UTILITIES SHOWN TO BE REMOVED
MAY BE ABANDONED IN PLACE WITH APPROVAL FROM THE OWNER AND UTILITY PROVIDER.
3. COORDINATE UTILITY DEMOLITION/INSTALLATION WITH THE APPROPRIATE UTILITY PROVIDER.
INSTALL TEMPORARY CONNECTIONS NECESSARY TO MAINTAIN UTILITY SERVICES DURING
CONSTRUCTION. COORDINATE TEMPORARY CONNECTIONS AND UTILITY SERVICE DISRUPTIONS
WITH THE OWNER AND UTILITY PROVIDERS.
4. PAVEMENTS, SIDEWALKS, AND CURBS TO BE REMOVED SHALL BE SAWCUT. SIDEWALKS AND
CURBS SHALL BE SAW CUT AT THE NEAREST EXPANSION JOINT OR CONTROL JOINT. PAVEMENT
AND SIDEWALKS DISTURBED BY UTILITY CONNECTIONS AND OTHER WORK SHALL BE REPLACED
AS SOON AS THE WORK CAUSING THE DISTURBANCE IS COMPLETE.
5. RESTORE ITEMS NOT NOTED TO BE REMOVED THAT ARE DISTURBED DURING CONSTRUCTION
(INCLUDING, BUT NOT LIMITED TO, UTILITIES, TREES, SIDEWALKS, CURBS, AND PAVEMENT) TO
PRECONSTRUCTION CONDITIONS. ANY SIGNAGE DISTURBED DURING CONSTRUCTION MUST BE
REPLACED BY CONTRACTOR . COORDINATE WITH VDOT.
DIMENSION AND SITE FURNISHING NOTES:
1. DIMENSIONS ARE PERPENDICULAR TO THE FACE OF CURB, SIDEWALK, AND PAVEMENT UNLESS
OTHERWISE NOTED. CURVE RADII ARE 5' UNLESS OTHERWISE NOTED.
2. UPON REQUEST A CAD VERSION OF THIS PLAN CAN BE PROVIDED TO CONTRACTOR FOR
STAKING PURPOSES.
PAVING NOTES:
1. SITE CONCRETE SHALL COMPLY WITH STD. DETAIL CP-1. CONTROL JOINTS SHALL BE INSTALLED
EVERY 10' (MAX), AND EXPANSION JOINTS SHALL BE INSTALLED EVERY 30' (MAX) UNLESS
OTHERWISE NOTED. DOWELS SHALL BE INSTALLED AT EXPANSION JOINTS.
2. ASPHALT PAVING SHALL COMPLY WITH STD. DETAILS AP-1, AP-2A, & AP-2B (AP-2B IS FOR
ALTERNATE BID ITEM 1). WHERE NEW PAVEMENT IS INSTALLED ADJACENT TO EXISTING
PAVEMENT, EXISTING PAVEMENT SHALL BE SAW CUT 1' BACK FROM THE EXISTING EDGE AND
PRIMED WITH VDOT APPROVED PRIMER PRIOR TO PLACEMENT OF NEW ASPHALT MATERIAL.
3. ALL PAVEMENT STRIPING AND ROADWAY SIGNAGE SHALL BE IN ACCORDANCE WITH THE LATEST
VERSION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
GENERAL UTILITY NOTES:
1. LOCATION OF EXISTING UNDERGROUND UTILITIES ARE APPROXIMATE BASED ON AVAILABLE
ABOVEGROUND STRUCTURES (VALVES, MANHOLES, ETC.). FIELD VERIFY ALL EXISTING UTILITIES
TO DETERMINE THAT FINAL UTILITY ARRANGEMENTS SHOWN ON THE PLANS ARE FEASIBLE
PRIOR TO ORDERING MATERIALS. IF LOCATIONS OF EXISTING UTILITIES ARE FOUND TO BE IN
LOCATIONS OTHER THAN THOSE INDICATED ON PLANS, CONTACT THE OWNER IN A TIMELY
MANNER TO DETERMINE IF PLAN MODIFICATIONS ARE REQUIRED.
2. UTILITY SERVICE MUST BE MAINTAINED THROUGHOUT CONSTRUCTION. SERVICE SHALL NOT BE
INTERRUPTED WITHOUT PRIOR APPROVAL FROM THE OWNER. APPROVED PERIODS OF
INTERRUPTED SERVICE SHALL BE MINIMIZED IN DURATION AND SHALL BE COORDINATED WITH
THE OWNER AND UTILITY PROVIDER.
3. FIELD VERIFY LOCATION AND SIZE OF EXISTING UTILITIES AT THEIR CONNECTION TO UTILITIES
SHOWN ON THE PLANS AS A FIRST STEP TO SITE UTILITY CONSTRUCTION.
WATER NOTES:
1. WATER LINE PIPING AND FITTINGS SHALL BE C900 PVC OR DUCTILE IRON IN ACCORDANCE WITH
THE SPECIFICATIONS.
2. WATER LINE SHALL BE INSTALLED WITH A MINIMUM COVER OF 3 FEET IN ACCORDANCE WITH THE
PROJECT SPECIFICATIONS AND THE WATER PIPE MANUFACTURER'S SPECIFICATIONS.
WATERLINES SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS. WATERLINE SHALL BE BEDDED ACCORDING TO STD. DETAIL TB-3W.
3. WATER LINE VALVE BOXES SHALL BE IN ACCORDANCE WITH STD. DETAIL VB-1.
4. WATER LINE BENDS SHALL BE INSTALLED AT ALL CHANGES IN DIRECTION, HORIZONTAL OR
VERTICAL, THAT EXCEED THE SPECIFICATION REQUIREMENTS AND MANUFACTURER'S JOINT
DEFLECTIONS. CONCRETE ANCHORS SHALL BE INSTALLED AT ALL BENDS, AND TEES IN
ACCORDANCE WITH STD. DETAILS CA-1, CA-1A.
5. CONTACT THE OWNER, UTILITY PROVIDER, AND LOCAL FIRE AND POLICE DEPARTMENTS (IF
APPLICABLE) WHEN THE WATER SYSTEM IS TAKEN OUT OF, AND PUT BACK INTO, SERVICE.
DOWNTIME SHALL BE MINIMIZED AS MUCH AS POSSIBLE AND SHALL BE COORDINATED WITH THE
OWNER. CONTRACTOR SHALL NOT OPERATE ANY SYSTEM VALVES OR SHUT OFF ANY
WATERMAINS OR SERVICES. ANY REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE
UTILITY PROVIDER IN ADVANCE OF ANY PROPOSED WORK.
6. FIRE HYDRANTS SHALL BE IN ACCORDANCE WITH STD. DETAIL FH-1.
STORM SEWER NOTES:
1. STORM SEWER PIPING AND FITTINGS SHALL BE HDPE AS INDICATED ON THE PLAN AND PROFILE
AND IN ACCORDANCE WITH VDOT SPECIFICATIONS.
2. HDPE STORM SEWER LINES SHALL BE BEDDED IN ACCORDANCE WITH STD. DETAIL TB-7. STORM
CULVERTS (WHERE SHOWN ON THE PLANS) SHALL BE BEDDED IN ACCORDANCE WITH VDOT STD.
PB-1.
3. ALL STORM SEWER OR CULVERT PIPE SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
4. ANY STRUCTURES TO BE LOCATED WITHIN THE VDOT RIGHTS-OF WAY SHALL CONFORM TO VDOT
STANDARDS.
GRADING AND DRAINAGE NOTES:
1. CONTOUR INTERVAL IS 1' WITH ADDITIONAL SPOT ELEVATIONS FOR CLARITY, UNLESS SHOWN
OTHERWISE.
2. EXISTING UTILITY TOPS SHALL BE ADJUSTED TO FINAL GRADE. UTILITY TOPS SHALL BE
INSTALLED FLUSH WITH FINAL GRADE. FIELD VERIFY UTILITY STRUCTURE (MANHOLES, VALVES, ETC.) TOP ELEVATIONS PRIOR TO ORDERING MATERIALS.
3. MAINTAIN DRAINAGE FACILITIES ON AND THROUGH THE SITE AT ALL TIMES DURING
CONSTRUCTION. PROVIDE TEMPORARY FACILITIES, PUMPING ARRANGEMENTS, AND/OR
CONNECTIONS AS REQUIRED TO MAINTAIN DRAINAGE.
4. MATCH EXISTING GRADE WHERE NEW SIDEWALK/ASPHALT MEETS EXISTING SIDEWALK/ASPHALT.
5. HANDICAP ACCESSIBLE ROUTES SHALL BE INSTALLED AT 5% MAX SLOPE AND 2% MAX CROSS SLOPE. HANDICAP RAMPS AND CURB RAMPS SHALL BE INSTALLED AT 8.33% MAX SLOPE AND 2% MAX CROSS SLOPE. HC PARKING SPACES AND AISLES SHALL BE INSTALLED AT 2% MAX SLOPE IN
ANY DIRECTION.
6. DISTURBED AREAS NOT TO BE PAVED SHALL BE TOPSOILED, SEEDED, AND MULCHED
ACCORDING TO VESCH STANDARDS. GRADED AREAS AT A SLOPE OF 3:1 OR STEEPER SHALL
HAVE SURFACE ROUGHENING ACCORDING TO VESCH STANDARDS.
7. SPOT ELEVATIONS INDICATED ARE FINISHED GRADE, TOP OF PAVEMENT, OR TOP OF SIDEWALK
AT THE POINT DESIGNATED BY "+".
8. THE CONTRACTOR SHALL RETAIN A LICENSED INDEPENDENT GEOTECHNICAL ENGINEER AND
TESTING LABORATORY TO VERIFY COMPACTION REQUIREMENTS.
9. WHEN FILL OPERATIONS ARE CEASED DUE TO WEATHER (RAIN, FREEZING, SNOW, ETC.),
CONSTRUCTION SHALL NOT BE RESUMED UNTIL THE GEOTECHNICAL ENGINEER HAS VERIFIED
SOIL STRENGTH HAS NOT BEEN ADVERSELY AFFECTED. IF SOIL STRENGTH HAS BEEN
DECREASED, THE AFFECTED PORTION OF FILL SHALL BE RESCARIFIED, MOISTENED, OR DRIED
AS REQUIRED AND RECOMPACTED TO THE SPECIFIED DENSITY.
10. BLASTING WILL NOT BE ALLOWED.
11. ALL FILL MATERIALS SHALL BE FREE FROM MUD, REFUSE, CONSTRUCTION DEBRIS, ORGANIC
MATERIAL, ROCK OR GRAVEL GREATER THAN 4 INCHES IN ANY DIMENSION, FROZEN OR
OTHERWISE UNSUITABLE MATERIAL.
12. ALL VEGETATION SUCH AS ROOTS, BRUSH, HEAVY SODS, HEAVY GROWTH OF GRASS, AND ALL
DECAYED VEGETATIVE MATTER, RUBBISH, AND OTHER UNSATISFACTORY MATERIAL WITHIN THE
AREA UPON WHICH FILL IS TO BE PLACED, SHALL BE STRIPPED OR OTHERWISE REMOVED
BEFORE THE FILL IS STARTED. IN NO CASE WILL UNSATISFACTORY MATERIAL REMAIN IN OR
UNDER THE FILL AREA.
13. THE CUT SUBGRADE MATERIAL SHALL BE COMPACTED TO 100 PERCENT OF ITS MAXIMUM DRY
DENSITY AS DETERMINED BY ASTM D 698. THE UPPER LAYER UNDER PROPOSED PAVED AREAS
SHALL BE COMPACTED TO 98%. THE MOISTURE CONTENT SHALL BE WITHIN +/-3 PERCENTAGE
POINTS OF THE MATERIAL'S OPTIMUM AS DETERMINED BY ASTM D 2216. SUB-BASE STONE SHALL BE COMPACTED TO 100 PERCENT OF ITS MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D 698
AT OPTIMUM MOISTURE CONTENT, PER VDOT SPECIFICATIONS.
14. EACH LAYER OF THE FILL SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF THE MAXIMUM THEORETICAL DENSITY AS DETERMINED BY ASTM D 698. MOISTURE CONTENT SHALL BE WITHIN
+/-3 PERCENTAGE POINTS OF OPTIMUM AS DETERMINED BY ASTM D 2216.
15. TOPSOIL SHALL BE REMOVED AS REQUIRED WITHOUT CONTAMINATION WITH SUBSOIL AND
STOCKPILED CONVENIENT TO AREAS FOR LATER APPLICATION OR AT LOCATIONS SPECIFIED.
ANY SURPLUS OF TOPSOIL FROM EXCAVATIONS AND GRADING SHALL BE STOCKPILED IN
LOCATION APPROVED BY THE OWNER. IF EXCAVATION ON SITE DOES NOT YIELD AN ADEQUATE
VOLUME OF TOPSOIL TO RESTORE SITE, CONTRACTOR SHALL PROVIDE SUITABLE TOPSOIL FROM
OFFSITE SOURCES AT NO ADDITIONAL COST TO OWNER.
16. ON AREAS TO RECEIVE TOPSOIL, THE COMPACTED SUBGRADE SHALL BE SCARIFIED TO A 2-INCH DEPTH FOR BONDING OF TOPSOIL WITH SUBSOIL. TOPSOIL THEN SHALL BE SPREAD EVENLY AND
GRADED TO THE ELEVATIONS AND SLOPES SHOWN. TOPSOIL SHALL NOT BE SPREAD WHEN
FROZEN OR EXCESSIVELY WET OR DRY. MINIMUM TOPSOIL THICKNESS OF 4" SHALL BE
PROVIDED.
17. TESTING SERVICES SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE PERFORMED BY
AN APPROVED INDEPENDENT TESTING LABORATORY QUALIFIED TO PERFORM SUCH TESTS.
FIELD DENSITY TESTS CONFORMING TO ASTM D 698, SHALL BE MADE BY THE GEOTECHNICAL
ENGINEER OR HIS REPRESENTATIVE ON EACH SOIL TYPE FOUND IN THE AREAS PREPARED TO
RECEIVE FILL AND IN THE SOIL TO BE USED FOR FILL. FIELD DENSITY TESTS SHALL BE MADE BY THE GEOTECHNICAL ENGINEER OR HIS REPRESENTATIVE IN ACCORDANCE WITH ASTM D 1556 OR ASTM D 2922 AND ASTM D 3017 ON THE AREAS PREPARED TO RECEIVE FILL AND ON EACH LAYER
OF COMPACTED FILL.
18. A MINIMUM OF ONE MOISTURE-DENSITY TEST SHALL BE PERFORMED FOR EACH TYPE OF FILL
MATERIAL, AND EACH TYPE OF EXISTING SUBGRADE MATERIAL. ONE ATTERBERG LIMITS TEST
AND ONE GRADATION ANALYSIS IS REQUIRED FOR EVERY SIX FIELD DENSITY TESTS. FIELD
DENSITY TESTS SHALL BE PERFORMED AS FOLLOWS: A MINIMUM OF ONE TEST PER LIFT PER
2,500 SQUARE FEET IN PAVEMENT/STONE AREAS.
19. UPON COMPLETION OF ALL EXCAVATION OF UNSUITABLE MATERIAL, AND FOR ALL FOOTINGS, THE GEOTECHNICAL ENGINEER SHALL VISUALLY INSPECT THE SUBGRADE AND EXCAVATIONS.
UPON COMPLETION OF THE INSPECTION, THE GEOTECHNICAL ENGINEER SHALL PROVIDE
WRITTEN NOTIFICATION TO THE OWNER.
20. FOLLOWING VISUAL INSPECTION, CONTRACTOR SHALL DEMONSTRATE TO THE GEOTECHNICAL
ENGINEER THAT THE EXPOSED SUBGRADE DOES NOT CONTAIN PREVIOUSLY UNIDENTIFIED SOFT
AREAS BY PROOF ROLLING. PROOF ROLLING SHALL CONSIST OF ROLLING THE ENTIRE SURFACE
WITH APPROVED MECHANICAL EQUIPMENT WHILE OBSERVING THE SUBGRADE FOR
DISPLACEMENT OR DEFORMATION.
21. ANY HANDICAPPED ACCESSIBLE SIDEWALKS BUILT WITHIN VDOT RIGHTS-OF WAY SHALL
CONFORM TO VDOT STANDARDS.
SHEET NO.
PROJECT NO.
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
M ar
7,
- 3
:3 9p m
\d at a0 1\ pr oj ec ts
\2
2\
\e ng in ee rin g\ C
AD
\2
6_
SH
EE
T_
C O
VE
R
.d w g
EN
G
IN
EE
R
VE
YI
D
D
EV
EL
O
PM
N
VI
R O
N M
EN
TA
L G
EO
TE
C H
N
IC
AL
C O
N
ST
R U
C
TI
O N
T
ES
TI
N
G
IN
SP
EC
TI
O N
C
U
LT
U R
AL
R
ES
O
U R
C
ES
0.
2.
P R
A
TT
D R
, S
TE
B
LA
C
K
SB
U R
G , V
A . 2
H A
N D
P.
C
O M
IN
SP
IR
ED
R
ES
PO
N
SI
VE
TR
U
ST
ED
REV.
GENERAL NOTES
C002
MTC
KJH, BEC
26 MAR 2024
-81.129531 36.623684 20220846
G R
AY
SO
N C
O U
N
TY
, V A
AC
CE
SS
D
RI
VE
G
RA
YS
O
N
CO
UN
TY
R
EC
RE
AT
IO
NA
L
PA
RK
G
EN
ER
AL
N
O
TE
Sx x
E
E T
ITEMEXISTING PROPOSED
WATER LINE
SANITARY SEWER
STORM SEWER
GAS LINE
U/G TELECOMMUNICATIONS
U/G ELECTRIC LINE
EASEMENT
BENCHMARK
ELECTRIC BOX
ELECTRIC MANHOLE
TELECOMMUNICATIONS PEDESTAL
SIGN
LIGHT POLE
FENCE
DECIDUOUS TREE
EVERGREEN SHRUB
PROPERTY CORNER
HORIZONTAL CONTROL
CONTOUR LINE - 1'
CONTOUR LINE - 5'
LIMITS OF DISTURBANCE
GRAVEL ROAD
ASPAHLT PAVEMENT
SANITARY MANHOLE MARKER
STORM SEWER MARKER
SPOT ELEVATION76.9 X
LOD
N/A
N/A
N/A
N/A
N/A
B
N/A
N/A
N/A
LEGEND
N/A
N/A
N/A
83.5
N/A
LIMITS OF DUCT BANK N/A
DI-7 INLET
CURB INLETD
PARKING BLOCKN/A
PROPERTY LINE N/A
POST N/A
ADA ACCESSIBLE RAMP
WALL
SS
D
BOLLARD
WATER METER
WATER VALVE
FIRE HYDRANT
SANITARY SEWER MANHOLE
STORM SEWER MANHOLE
ADA PARKING SPACE
N/A
N/A
N/A
CURB
CURB AND GUTTER
BUILDING
N/A
D
ADA ACCESSIBLE ROUTEN/A
26 MAR 2024
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
ROBERT K. BOYD
PROJECT NO.
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
M ar
7,
- 3
:4 0p m
\d at a0 1\ pr oj ec ts
\2
2\
\e ng in ee rin g\ C
AD
\2
6_
SH
EE
T_
EX
IS
TI
N
G _C
O N
D
IT
IO
N
S.
dw g
EN
G
IN
EE
R
VE
YI
D
D
EV
EL
O
PM
N
VI
R O
N M
EN
TA
L G
EO
TE
C H
N
IC
AL
C O
N
ST
R U
C
TI
O N
T
ES
TI
N
G
IN
SP
EC
TI
O N
C
U
LT
U R
AL
R
ES
O
U R
C
ES
0.
2.
P R
A
TT
D R
, S
TE
B
LA
C
K
SB
U R
G , V
A . 2
H A
N D
P.
C
O M
IN
SP
IR
ED
R
ES
PO
N
SI
VE
TR
U
ST
ED
REV.
EXISTING
CONDITIONS
C101
NAM
DGH
26 MAR 2024
-81.129531 36.623684 20220846
G R
AY
SO
N C
O U
N
TY
, V A
AC
CE
SS
D
RI
VE
G
RA
YS
O
N
CO
UN
TY
R
EC
RE
AT
IO
NA
L
PA
RK
EX
IS
TI
N G
C O
N D
IT
IO
N S
AutoCAD SHX Text N
AutoCAD SHX Text
SCALE IN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FEET
AutoCAD SHX Text Virginia State Plane South Zone
AutoCAD SHX Text
BM "A" CHSQ IN CONC WALK ELEVATION=2583.29'
AutoCAD SHX Text
BM "B"= ROD ELEVATION=2622.11'
AutoCAD SHX Text
IRF
AutoCAD SHX Text [2]
AutoCAD SHX Text
APCO 1017-915
AutoCAD SHX Text
AEP 1017-916
AutoCAD SHX Text 2577.59'
AutoCAD SHX Text 2579.30'
AutoCAD SHX Text [1]
AutoCAD SHX Text
24" TREE
AutoCAD SHX Text
18" PINE
AutoCAD SHX Text uge
AutoCAD SHX Text
18" RCP
AutoCAD SHX Text
GRAVEL PARKING LOT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CORPORATE LANE
AutoCAD SHX Text
CONC. WALK
AutoCAD SHX Text
N/F TAX MAP # 73-A-112A DEAN SBRAGIA D.B. 670, PG. 296 MAP BOOK M-1128
AutoCAD SHX Text
ROCK
AutoCAD SHX Text
ROCK
AutoCAD SHX Text
SOIL ROAD
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
N/F TAX MAP # 73-A-112 INDUSTRIAL DEVELOPMENT AUTHORITY D.B. 340, PG. 367
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
MIXED BRUSH AND TREES
AutoCAD SHX Text
MIXED HARDWOODS
AutoCAD SHX Text
55' TRAIL EASEMENT DB. 574 PG. 291
AutoCAD SHX Text N/F TAX MAP # 53-A-78 BOARD OF SUPERVISORS GRAYSON RECREATIONAL PARK D.B. 169, PG. 119
AutoCAD SHX Text
HCR
AutoCAD SHX Text
15' PUBLIC USE AND DRAINAGE EASEMENT DB. 581 PG. 450
AutoCAD SHX Text APPROXIMATE RIGHT OF WAY SHOWN PER GRAYSON COUNTY INDEPENDENCE PEDESTRAIN TRAIL PLAN INST. #150000195
AutoCAD SHX Text
PINES
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text NOTES: 1. THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE DIRECT AND RESPONSIBLE CHARGE OF, THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE DIRECT AND RESPONSIBLE CHARGE OF, NEIL MARTIN OF HURT & PROFFITT, INC. FROM AN ACTUAL GROUND SURVEY MADE UNDER MY SUPERVISION; THAT THE IMAGERY AND/OR ORIGINAL DATA WAS OBTAINED ON MAY 15, 2023; AND THAT THIS PLAT, MAP, OR DIGITAL GEOSPATIAL DATA INCLUDING METADATA MEETS MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE NOTED. 2. THIS TOPOGRAPHIC SURVEY IS ON HORIZONTAL DATUM NAD83; VERTICAL DATUM NAVD88. THIS TOPOGRAPHIC SURVEY IS ON HORIZONTAL DATUM NAD83; VERTICAL DATUM NAVD88. 3. BOUNDARY INFORMATION SHOWN HEREON WAS COMPILED FROM DEEDS AND PLATS OF RECORD BOUNDARY INFORMATION SHOWN HEREON WAS COMPILED FROM DEEDS AND PLATS OF RECORD AND FIELD INFORMATION. THIS DOES NOT REPRESENT A BOUNDARY SURVEY. 4. THIS TOPOGRAPHIC SURVEY WAS PREPARED FROM A FIELD SURVEY CONDUCTED BY HURT & THIS TOPOGRAPHIC SURVEY WAS PREPARED FROM A FIELD SURVEY CONDUCTED BY HURT & PROFFITT, INC. MAY 15, 2023 AND ONLY REFLECTS FIELD CONDITIONS AT THAT TIME. 5. UNDERGROUND UTILITIES SHOWN HEREON ARE COMPILED FROM ABOVE GROUND UTILITY EVIDENCE UNDERGROUND UTILITIES SHOWN HEREON ARE COMPILED FROM ABOVE GROUND UTILITY EVIDENCE AND MISS UTILITY DESIGNATIONS ONLY. MISS UTILITY TICKET # B312500552-00B. CONTRACTOR IS RESPONSIBLE FOR UTILITY LOCATION IN THE FIELD AND MUST CONTACT MISS UTILITY BEFORE CONSTRUCTION. 6. CONTOUR INTERVAL = 1' CONTOUR INTERVAL = 1'
AutoCAD SHX Text ABBREVIATIONS: CONC. = CONCRETE RCP = REINFORCED CONCRETE PIPE D.B. = DEED BOOK PG. = PAGE N/F = NOW OR FORMERLY BM = BENCHMARK TNS = TRAVERSE NAIL SET PKS = PK NAIL SET APCO = APPALACHIAN POWER COMPANY AEP = AMERICAN ELECTRIC POWER IRF = IRON ROD FOUND CHSQ = CHISELED SQUARE HCR = HANDI CAP RAMP
LEGEND POWER POLE GUY WIRE ELECTRIC BOX POST/BOLLARD PROPERTY CORNER SURVEY CONTROL POINT BENCHMARK FIRE HYDRANT SHRUB TREE RIGHT OF WAY EASEMENT LINE ADJACENT PROPERTY LINE CURB EDGE OF PAVEMENT EDGE OF GRAVEL EDGE OF DIRT ROAD EDGE OF WALK STORM TREELINE OVERHEAD POWER UNDERGROUND ELECTRIC
SCALE 1" = 30'
0 15 30 60
SHEET NO.
PROJECT NO.
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
M ar
7,
- 3
:4 0p m
\d at a0 1\ pr oj ec ts
\2
2\
\e ng in ee rin g\ C
AD
\2
6_
SH
EE
T_
D
EM
O
LI
TI
O
N .d w g
EN
G
IN
EE
R
VE
YI
D
D
EV
EL
O
PM
N
VI
R O
N M
EN
TA
L G
EO
TE
C H
N
IC
AL
C O
N
ST
R U
C
TI
O N
T
ES
TI
N
G
IN
SP
EC
TI
O N
C
U
LT
U R
AL
R
ES
O
U R
C
ES
0.
2.
P R
A
TT
D R
, S
TE
B
LA
C
K
SB
U R
G , V
A . 2
H A
N D
P.
C
O M
IN
SP
IR
ED
R
ES
PO
N
SI
VE
TR
U
ST
ED
REV.
DEMOLITION
PLAN
C201
MTC
KJH, BEC
26 MAR 2024
-81.129531 36.623684 20220846
G R
AY
SO
N C
O U
N
TY
, V A
AC
CE
SS
D
RI
VE
G
RA
YS
O
N
CO
UN
TY
R
EC
RE
AT
IO
NA
L
PA
RK
D
EM
O
LI
TI
O N
P
LA
N
26 MAR 2024
LEGEND:
ASPHALT PAVEMENT TO BE REMOVED
STONE PARKING AREA TO BE REMOVED
FIRE HYDRANT TO BE REMOVED
TREES AND BRUSH TO BE REMOVED
SAW-CUT AND REMOVE CURB
SAW-CUT AND REMOVE ASPHALT PAVEMENT
REMOVE EXISTING FIRE HYDRANT
(REFERENCE NOTES ON SHEET C301 FOR WATER MAIN AND HYDRANT WORK)
-CAP EXISTING SERVICE LINE
-ROD CAP AND INSTALL CONCRETE THRUST BLOCK
WATER MAIN LOCATION NOT MARKED AT TIME OF THIS SURVEY
LOCATION SHOWN FROM FORMER PLANS BY OTHERS
VERIFY LOCATION AND SIZE PRIOR TO START OF EXCAVATION WORK
LOCATIONS OF WATER MAINS NOT MARKED AT TIME OF THIS SURVEY
LOCATION SHOWN FROM FORMER PLANS BY OTHERS
NOTES:
1. SEE GENERAL NOTES ON SHEET C002.
2. INSTALL EROSION AND SEDIMENT CONTROL MEASURES
PRIOR TO START OF ANY DEMOLITION WORK.
4X4 POST
IT IS ASSUMED THAT THE POST MAY MARK THE ENDPOINT OF THE EXISTING WATERMAIN.
VERIFY PRIOR TO REMOVAL
SOIL ROAD TO BE REMOVED BY SLOPE GRADING
SOIL ROAD TO BE REMOVED BY SLOPE GRADING
REMOVE EXISTING TREES AND BRUSH AS REQUIRED TO
INSTALL SILT FENCE AND FOR GRADING WORK
(SEE SHEETS C301 AND C401 FOR PROPOSED WORK)
AutoCAD SHX Text N
AutoCAD SHX Text Virginia State Plane South Zone
AutoCAD SHX Text
IRF
AutoCAD SHX Text
APCO 1017-915
AutoCAD SHX Text
AEP 1017-916
AutoCAD SHX Text
18" PINE
AutoCAD SHX Text uge
AutoCAD SHX Text
GRAVEL PARKING LOT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CORPORATE LANE
AutoCAD SHX Text
CONC. WALK
AutoCAD SHX Text
N/F TAX MAP # 73-A-112A DEAN SBRAGIA D.B. 670, PG. 296 MAP BOOK M-1128
AutoCAD SHX Text
SOIL ROAD
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
MIXED BRUSH AND TREES
AutoCAD SHX Text
MIXED HARDWOODS
AutoCAD SHX Text
55' TRAIL EASEMENT DB. 574 PG. 291
AutoCAD SHX Text N/F TAX MAP # 53-A-78 BOARD OF SUPERVISORS GRAYSON RECREATIONAL PARK D.B. 169, PG. 119
AutoCAD SHX Text
HCR
AutoCAD SHX Text
15' PUBLIC USE AND DRAINAGE EASEMENT DB. 581 PG. 450
AutoCAD SHX Text APPROXIMATE RIGHT OF WAY SHOWN PER GRAYSON COUNTY INDEPENDENCE PEDESTRAIN TRAIL PLAN INST. #150000195
AutoCAD SHX Text
PINES
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
ROBERT K. BOYD
SCALE 1" = 30'
0 15 30 60
HORIZ:
VERT:
SCALE IN
6 12
FEET SHEET NO.
PROJECT NO.
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
M ar
7,
- 3
:4 0p m
\d at a0 1\ pr oj ec ts
\2
2\
\e ng in ee rin g\ C
AD
\2
6_
SH
EE
T_
G R
AD
IN
G .d w g
EN
G
IN
EE
R
VE
YI
D
D
EV
EL
O
PM
N
VI
R O
N M
EN
TA
L G
EO
TE
C H
N
IC
AL
C O
N
ST
R U
C
TI
O N
T
ES
TI
N
G
IN
SP
EC
TI
O N
C
U
LT
U R
AL
R
ES
O
U R
C
ES
0.
2.
P R
A
TT
D R
, S
TE
B
LA
C
K
SB
U R
G , V
A . 2
H A
N D
P.
C
O M
IN
SP
IR
ED
R
ES
PO
N
SI
VE
TR
U
ST
ED
REV.
SITE GRADING
PLAN &
PROFILES
C301
MTC
KJH, BEC
26 MAR 2024
-81.129531 36.623684 20220846
G R
AY
SO
N C
O U
N
TY
, V A
AC
CE
SS
D
RI
VE
G
RA
YS
O
N
CO
UN
TY
R
EC
RE
AT
IO
NA
L
PA
RK
SI
TE
G
R
AD
IN
G
P
LA
N
P R
O
FI
LE
S
VDOT CG-6
3' GRASS STRIP
5' SIDEWALK
PROPOSED 15" DIA
CULVERT
FIRE HYDRANT & GATE VALVE
(SEE NOTES THIS SHEET)
TRAIL
EASEMENT
CURBED CONCRETE FLUME
(SEE DETAIL, SHEET C602)
26 MAR 2024
LEGEND:
HEAVY DUTY ASPHALT PAVEMENT (DETAIL AP-1, SHEET C602)
ACCESS DRIVE PAVEMENT(DETAILS AP-2A & AP-2B, SHEET C602)
CURB (VDOT CG-6)
SIDEWALK / TRAIL (DETAIL CP-1, SHEET C602)
VDOT CG-12
VDOT CG-12
R10.0 R50.0
EXCESS SOIL
STOCKPILE AREA
NOTES:
1. LOCATION OF EXISTING WATER MAIN SERVING THE EXISTING FIRE
HYDRANT WAS NOT MARKED AT TIME OF THIS PLAN SURVEY.
WATER LINES ARE SHOWN FROM FORMER GRAYSON COUNTY
INDEPENDENCE TRAIL PLAN AND ARE TO BE CONSIDERED
APPROXIMATE. CONTRACTOR SHALL LOCATE WATER MAIN AND
VERIFY LOCATION AND SIZE PRIOR TO START OF
DEMOLITION/CONSTRUCTION.
2. REMOVE EXISTING HYDRANT. EXISTING VALVE SERVING HYDRANT
MAY REMAIN BUT PIPE TO HYDRANT SHALL BE CAPPED AND CAP
SHALL BE RODDED AND THRUST BLOCKING INSTALLED. INSTALL A
NEW 8" PIPE TO LOCATION SHOWN. INSTALL A NEW GATE VALVE &
BOX AND A NEW FIRE HYDRANT ASSEMBLY. SEE DETAILS FH-1 &
VH-1, SHEET C601. A FIRE HYDRANT EXTENSION MAY BE REQUIRED
TO ASSURE HYDRANT IS INSTALLED AT THE REQUIRED HEIGHT.
3. CONTRACTOR SHALL COORDINATE ALL WATERMAIN SERVICE
INTERRUPTIONS, DEMOLITION ACTIVITIES, AND CONSTRUCTION
ACTIVITIES (INCLUDING DISINFECTION AND TESTING OF NEW LINE
AND APPURTENANCES) WITH GRAYSON COUNTY AND TOWN OF
INDEPENDENCE REPRESENTATIVES.
STOP SIGN (R1-1) 30"
2" (14 GA.) SQUARE TUBE POST
WITH VDOT STD. STP-1 FOUNDATION
TAPER DOWN CURBING TO FLUSH OVER LAST 2 FEET
CROSS WALK STRIPING
6" WIDE STRIPES, 6' APART
(C-C), PER VDOT DETAIL PM-3
2%2% 2:1 MAX. CUT
2:1 MAX. FILL
2:12:1
2:1 MAX. CUT
2:1 MAX. FILL
2%2%
TYPICAL ROADWAY SECTION
NTS
SEE TYPICAL ROAD SECTION (THIS SHEET)
BID ALTERNATE
REFERENCE PAVEMENT SECTIONS AP-2A AND AP-2B ON SHEET C602 AND
THE ALTERNATE BID INFORMATION IN THE PROJECT BID FORM. THE
BASE BID SHALL INCLUDE THE PRIME AND DOUBLE SEAL PAVING
SECTION (AP-2A) FOR THE DRIVEWAY, AND AN ALTERNATE BID WILL BE
PROVIDED FOR ELIMINATION OF THE PRIME AND DOUBLE SEAL SECTION
AND PAVING WITH VDOT 12.5D ASPHALT SECTION (AP-2B).
AutoCAD SHX Text N
AutoCAD SHX Text Virginia State Plane South Zone
AutoCAD SHX Text
BM "A" CHSQ IN CONC WALK ELEVATION=2583.29'
AutoCAD SHX Text
BM "B"= ROD ELEVATION=2622.11'
AutoCAD SHX Text
IRF
AutoCAD SHX Text [2]
AutoCAD SHX Text
APCO 1017-915
AutoCAD SHX Text
AEP 1017-916
AutoCAD SHX Text
18" PINE
AutoCAD SHX Text uge
AutoCAD SHX Text
GRAVEL PARKING LOT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CORPORATE LANE
AutoCAD SHX Text
CONC. WALK
AutoCAD SHX Text
N/F TAX MAP # 73-A-112A DEAN SBRAGIA D.B. 670, PG. 296 MAP BOOK M-1128
AutoCAD SHX Text
SOIL ROAD
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
MIXED BRUSH AND TREES
AutoCAD SHX Text
MIXED HARDWOODS
AutoCAD SHX Text
55' TRAIL EASEMENT DB. 574 PG. 291
AutoCAD SHX Text N/F TAX MAP # 53-A-78 BOARD OF SUPERVISORS GRAYSON RECREATIONAL PARK D.B. 169, PG. 119
AutoCAD SHX Text
HCR
AutoCAD SHX Text
15' PUBLIC USE AND DRAINAGE EASEMENT DB. 581 PG. 450
AutoCAD SHX Text APPROXIMATE RIGHT OF WAY SHOWN PER GRAYSON COUNTY INDEPENDENCE PEDESTRAIN TRAIL PLAN INST. #150000195
AutoCAD SHX Text
PINES
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text 8"W
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
ROBERT K. BOYD
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD LOD
LOD LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LODLOD
LODLOD
LO
D
LOD
LO
D
EXCESS SOIL
STOCKPILE AREA
SHEET NO.
PROJECT NO.
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
M ar
7,
- 3
:4 0p m
\d at a0 1\ pr oj ec ts
\2
2\
\e ng in ee rin g\ C
AD
\2
6_
SH
EE
T_
ES
C
_P
LA
N .d w g
EN
G
IN
EE
R
VE
YI
D
D
EV
EL
O
PM
N
VI
R O
N M
EN
TA
L G
EO
TE
C H
N
IC
AL
C O
N
ST
R U
C
TI
O N
T
ES
TI
N
G
IN
SP
EC
TI
O N
C
U
LT
U R
AL
R
ES
O
U R
C
ES
0.
2.
P R
A
TT
D R
, S
TE
B
LA
C
K
SB
U R
G , V
A . 2
H A
N D
P.
C
O M
IN
SP
IR
ED
R
ES
PO
N
SI
VE
TR
U
ST
ED
REV.
ESC PLAN
C401
MTC
KJH, BEC
26 MAR 2024
-81.129531 36.623684 20220846
G R
AY
SO
N C
O U
N
TY
, V A
AC
CE
SS
D
RI
VE
G
RA
YS
O
N
CO
UN
TY
R
EC
RE
AT
IO
NA
L
PA
RK
ES
C P
LA
N
26 MAR 2024
MULCHING
VESCH STD. & SPEC. 3.35
PERMANENT SEEDING
VESCH STD. & SPEC. 3.32
TEMPORARY SEEDING
VESCH STD. & SPEC. 3.31
TOPSOILING
VESCH STD AND SPEC 3.30
SURFACE ROUGHENING
VESCH STD. & SPEC. 3.29
LIMITS OF DISTURBANCELOD
STORM DRAIN PROTECTION
VESCH STD. & SPEC. 3.07
SILT FENCE
VESCH STD. & SPEC. 3.05
CONSTRUCTION ENTRANCE
VESCH STD. & SPEC. 3.02
DUST CONTROL
VESCH STD AND SPEC 3.39
PROPOSED ESC MEASURES LEGEND
CULVERT INLET PROTECTION
VESCH STD. & SPEC. 3.08
TEMPORARY DIVERSION DIKE
VESCH STD. & SPEC. 3.09
SOIL STABILIZATION BLANKETS AND MATTING
VESCH STD. & SPEC. 3.36
OUTLET PROTECTION
VESCH STD. & SPEC. 3.18
OUTLET PROTECTION B1
Do: 15" La: 6.15' W: 3.65
USE CLASS A1 RIPRAP
OUTLET PROTECTION A1
Do: 15"
La: 6.15' W: 3.65
USE CLASS A1 RIPRAP
LOD = 0.93 ACRES
EROSION SEDIMENT CONTROL PHASING NOTES:
1. INSTALL PERIMETER SILT FENCE, CONSTRUCTION ENTRANCE, AND CULVERT
INLET PROTECTION ON EXISTING 18" CULVERT.
2. INSTALL CLEAN WATER DIVERSION ALONG WESTERN SIDE. SEED AND MULCH
IMMEDIATELY.
3. START EXCAVATION FOR ROADWAY & TRAIL.
4. WHEN AT GRADE, ALL DITCHES SHALL BE STABILIZED IMMEDIATELY. DITCHES
SHALL BE TOPSOILED AND HAVE ES-2 MATTING WITH PERMANENT SEEDING .
5. STABILIZE ROADWAY AND TRAIL AREAS WITH STONE OR FINAL SURFACE.
6. INSTALL TOPSOIL, PERMANENT SEEDING, AND MULCH.
7. REMOVE ESC MEASURES, INCLUDING REMOVAL, REGRADING AND PERMANENT
SEEDING OF TEMPORARY DIVERSION AREAS, AFTER SITE IS STABILIZED.
SUPER SILT FENCE
(LOUDOUN COUNTY, VA SPECIFICATION)
AutoCAD SHX Text N
AutoCAD SHX Text Virginia State Plane South Zone
AutoCAD SHX Text
IRF
AutoCAD SHX Text
APCO 1017-915
AutoCAD SHX Text
AEP 1017-916
AutoCAD SHX Text
18" PINE
AutoCAD SHX Text uge
AutoCAD SHX Text
GRAVEL PARKING LOT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CORPORATE LANE
AutoCAD SHX Text
CONC. WALK
AutoCAD SHX Text
N/F TAX MAP # 73-A-112A DEAN SBRAGIA D.B. 670, PG. 296 MAP BOOK M-1128
AutoCAD SHX Text
SOIL ROAD
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
MIXED BRUSH AND TREES
AutoCAD SHX Text
MIXED HARDWOODS
AutoCAD SHX Text
55' TRAIL EASEMENT DB. 574 PG. 291
AutoCAD SHX Text N/F TAX MAP # 53-A-78 BOARD OF SUPERVISORS GRAYSON RECREATIONAL PARK D.B. 169, PG. 119
AutoCAD SHX Text
HCR
AutoCAD SHX Text
15' PUBLIC USE AND DRAINAGE EASEMENT DB. 581 PG. 450
AutoCAD SHX Text APPROXIMATE RIGHT OF WAY SHOWN PER GRAYSON COUNTY INDEPENDENCE PEDESTRAIN TRAIL PLAN INST. #150000195
AutoCAD SHX Text
PINES
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text
TRITEX,LLC TRAIL AND PARKING LOT EASEMENT DB. 574 PG. 286
AutoCAD SHX Text 8"W
AutoCAD SHX Text
DD
AutoCAD SHX Text
DD
AutoCAD SHX Text
DD
AutoCAD SHX Text
CIP
AutoCAD SHX Text
IP
AutoCAD SHX Text
CIP
AutoCAD SHX Text
OP
AutoCAD SHX Text
CE
AutoCAD SHX Text
MU
AutoCAD SHX Text
PS
AutoCAD SHX Text
SR
AutoCAD SHX Text
TO
AutoCAD SHX Text B/M
AutoCAD SHX Text
MU
AutoCAD SHX Text
PS
AutoCAD SHX Text
TO
AutoCAD SHX Text
SF
AutoCAD SHX Text
SF
AutoCAD SHX Text
SSF
AutoCAD SHX Text
SF
AutoCAD SHX Text
SSF
AutoCAD SHX Text
TS
AutoCAD SHX Text
MU
AutoCAD SHX Text
PS
AutoCAD SHX Text
SR
AutoCAD SHX Text
TO
AutoCAD SHX Text B/M
AutoCAD SHX Text
SF
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
ROBERT K. BOYD
AutoCAD SHX Text Lic. No. 21814
AutoCAD SHX Text
TO
AutoCAD SHX Text
MU
AutoCAD SHX Text
PS
AutoCAD SHX Text
TS
AutoCAD SHX Text
SR
AutoCAD SHX Text
MU
AutoCAD SHX Text
PS
AutoCAD SHX Text
TS
AutoCAD SHX Text
TO
AutoCAD SHX Text
SR
AutoCAD SHX Text
IP
AutoCAD SHX Text
SF
AutoCAD SHX Text
CE
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
CIP
AutoCAD SHX Text
DD
AutoCAD SHX Text B/M
AutoCAD SHX Text
OP
SSF
26 MAR 2024
PROJECT NO.
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
M ar
7,
- 3
:4 0p m
\d at a0 1\ pr oj ec ts
\2
2\
\e ng in ee rin g\ C
AD
\2
6_
SH
EE
T_
ES
C
_P
LA
N .d w g
EN
G
IN
EE
R
VE
YI
D
D
EV
EL
O
PM
N
VI
R O
N M
EN
TA
L G
EO
TE
C H
N
IC
AL
C O
N
ST
R U
C
TI
O N
T
ES
TI
N
G
IN
SP
EC
TI
O N
C
U
LT
U R
AL
R
ES
O
U R
C
ES
0.
2.
P R
A
TT
D R
, S
TE
B
LA
C
K
SB
U R
G , V
A . 2
H A
N D
P.
C
O M
IN
SP
IR
ED
R
ES
PO
N
SI
VE
TR
U
ST
ED
REV.
ESC DETAILS
C501
MTC
KJH, BEC
26 MAR 2024
-81.129531 36.623684 20220846
G R
AY
SO
N C
O U
N
TY
, V A
AC
CE
SS
D
RI
VE
G
RA
YS
O
N
CO
UN
TY
R
EC
RE
AT
IO
NA
L
PA
RK
ES
C D
ET
AI
LS
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
ROBERT K. BOYD
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
M ar
7,
- 3
:4 0p m
\d at a0 1\ pr oj ec ts
\2
2\
\e ng in ee rin g\ C
AD
\2
6_
SH
EE
T_
ES
C
_P
LA
N .d w g
EN
G
IN
EE
R
VE
YI
D
D
EV
EL
O
PM
N
VI
R O
N M
EN
TA
L G
EO
TE
C H
N
IC
AL
C O
N
ST
R U
C
TI
O N
T
ES
TI
N
G
IN
SP
EC
TI
O N
C
U
LT
U R
AL
R
ES
O
U R
C
ES
0.
2.
P R
A
TT
D R
, S
TE
B
LA
C
K
SB
U R
G , V
A . 2
H A
N D
P.
C
O M
IN
SP
IR
ED
R
ES
PO
N
SI
VE
TR
U
ST
ED
REV.
ESC NOTES
C502
MTC
KJH, BEC
26 MAR 2024
-81.129531 36.623684 20220846
G R
AY
SO
N C
O U
N
TY
, V A
AC
CE
SS
D
RI
VE
G
RA
YS
O
N
CO
UN
TY
R
EC
RE
AT
IO
NA
L
PA
RK
ES
C N
O
TE
S
26 MAR 2024
NO. A VESCP MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: PRACTICES PROVIDED
PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS
UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE
UPSLOPE LAND DISTURBANCE TAKES PLACE.
5 STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED.
CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH
ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
8 CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. NOT APPLICABLE
9 WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. NOT APPLICABLE
ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO
REMOVE SEDIMENT.
BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE
CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.
NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. NOT APPLICABLE
WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED.
NOT APPLICABLE
14 ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. NOT APPLICABLE
15 THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. NOT APPLICABLE
UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 200 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE
PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER.
F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.
NOT APPLICABLE
WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND-DISTURBING
ACTIVITIES.
ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
19 PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR
MAN-MADE CHANNELS:
a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED.
b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER:
(1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR
(2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS.
(B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT
STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND
(C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM.
c. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL:
(1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR
(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES;
(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR
(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION.
d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.
e. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT.
f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE.
g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM
THE FACILITY TO THE RECEIVING CHANNEL.
h. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
i. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY.
j. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS.
k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE.
l. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT.
m. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND-DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER
MANAGEMENT PROGRAM (VSMP) REGULATIONS.
n. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF
THIS SUBSECTION.
STORMWATER CALCULATIONS ARE INCLUDED
IN THE EROSION SEDIMENT CONTROL
NARRATIVE
EROSION AND SEDIMENT CONTROL NOTES:
1. UPON AWARD OF THE CONTRACT AND PRIOR TO ANY LAND DISTURBANCE, DESIGNATE A PERSON WHO IS CERTIFIED BY THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) AS A RESPONSIBLE LAND DISTURBER (RLD) FOR THIS PROJECT. NOTIFY THE OWNER, THE PROGRAM AUTHORITY, AND HURT & PROFFITT, INC. IN WRITING OF THIS DESIGNATION. NAME OF RLD AND CERTIFICATE NUMBER SHALL BE HANDWRITTEN ON
THE APPROVED PLANS.
2. THE RESPONSIBLE LAND DISTURBER SHALL INSPECT EROSION AND SEDIMENT CONTROL DEVICES AND MEASURES FOR PROPER INSTALLATION AND DEFICIENCIES IMMEDIATELY AFTER EACH RAINFALL, AT LEAST DAILY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .