2022 Fire Truck Tank PWS.pdf
PDF 134 KB Posted
- Attached to
- P-26 Firetruck Repair
- Solicitation number
- F9E6SQ2146A001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| fire truck Data plate.jpg | JPG image | |
| Truck 1.jpg | JPG image | |
| Truck 4.jpg | JPG image | |
| Data plate 2.jpg | JPG image | |
| Truck 2.jpg | JPG image | |
| Truck 3.jpg | JPG image | |
| Wage Determination No. 2015-4157 (Updated 27 Jun 2022).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
P-26 TANK REMOVAL &
REPLACEMENT
106th Rescue WING
150 Old Riverhead Road
Westhampton Beach, NY 11978
LOCATED ON
Gabreski Airport ANGB
JUNE 7, 2022
1. SCOPE OF WORK
The contractor shall provide all equipment, tools, materials, supervision, and services necessary to complete the work as described in this Performance Work Statement (PWS).
Work location is on site. If work location needs to be at vendor, vendor must provide transportation of vehicle, tank & all parts. All tank equipment will be removed & re-installed onto new tank. This includes but not limited too. piping, dumps, air lines, ladders, switches, electrical & lights.
2. AREA OF WORK
Contractor shall work only on areas of the equipment as described in this statement of work.
3. DESCRIPTION OF WORK
Contractor will remove & re-install entire tank back to factory setting.
4. PERIOD OF PERFORMANCE
Contractor shall complete all work within a three month period of time from tank being built.
5. MATERIALS
P-26 Tank will be supplied as part of a separate contract. The tank will be pre-assembled & painted. Means of lifting tank will not be supplied.
6. GOVERNMENT WORKING HOURS
Work / Pick-up and delivery hours will be Monday through Friday 0730 -1530 based on Available personnel, with the exception of scheduled off federal holidays.
7. DISPOSAL OF MATERIALS AND CLEANUP
Contractor is responsible to properly dispose of any hazardous waste generated performing contract duties (If any). Old tank will be disposed of properly by contractor.
8. SECURITY
Contractor will be responsible for equipment and contents while in their care and custody to include theft, vandalism, or any other damage. An Air Force Form 1297 Will be signed by the contractor for each individual unit being serviced. AF FORM 1297 will be relinquished when the unit specified on the receipt is returned / inspected.
9. POINT OF CONTACT
106th Contracting Office 631-723-7562.
| 1. SCOPE OF WORK |
| 2. AREA OF WORK |
| 3. DESCRIPTION OF WORK |
| 4. PERIOD OF PERFORMANCE |
| 5. MATERIALS |
| 6. GOVERNMENT WORKING HOURS |
| 7. DISPOSAL OF MATERIALS AND CLEANUP |
| 8. SECURITY |
| 9. POINT OF CONTACT |
File details come from the government source that posted it. Updated .