2022_06_14-OCCT Sampling Plan (1).docx

DOCX document 21 KB Posted

Attached to
USCG Base Kodiak Sampling of Soda Ash System
Solicitation number
70Z035-22-Q-000794
Issued by

View the file

Other files

File Type Posted
SODA ASH SYSTEM MONITORING PLAN Rev I (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Coast Guard BASE Kodiak, Alaska

14JUN22

KODIAK SAMPLING

Purpose:

This proposed contract action is intended to provide sampling required to support US Coast Guard Base Kodiak’s implementation of the Base’s Soda Ash system.

Background:

A sampling and monitoring plan is established to assess the effectiveness of the modified soda ash mixing and delivery system recently installed and commissioned for the United States Coast Guard (USCG) at Base Kodiak. The plan will utilize samples collected from a combination of existing coupon stations, housing, locations near the end of distribution piping, and the municipal wastewater treatment plant (WWTP) to evaluate how the new soda ash system has affected overall drinking water quality and establishing an effective corrosion control treatment for the facility. The monitoring plan assess the effectiveness of the soda ash system in reducing the corrosiveness of the drinking water, preventing lead and copper dissolution from pipes and fittings, and verifying if scaling if occurring.

For Purposes of this contract, the contractor is NOT required to sample or report on the coupon stations addressed in the report.

Scope of Work:

Task 1:

Sampling on a monthly basis for a period of 12-months, sample the following locations:

Building 7, Barracks 4, Room 202 Building 7, Barracks 4, Drinking Water Fountain, 2nd Floor Building N45, Ready Crew Berthing Room 4 Building N45, Ready Crew Berthing, Room 12 Fuel Pier, Far-side Building 3, Galley Sink For the following:

•pH
•Temperature
•Residual Chlorine

All location samples will be collected and shipped off-site for:

•Alkalinity
•Lead
•Copper
•Zinc

In addition, end of distribution system samples shall also be analyzed off-site for:

• Total Coliform The contractor will be required to coordinate with various facility managers including the housing office, BOSS contractors (Fuel Pier), Galley, and the environmental team.

Sample protocol Six to eight hours prior to sampling the faucets will be flushed for a period of 5 minutes, then they shall be sealed and labeled to prevent use of the faucet. After the six to eight hour waiting period, a first draw sample will be taken followed by 5 minutes of flushing, then a second draw will be taken. Two samples for each sample location shall be collected.

For the fuel pier far, there will be a first draw, a second draw after 30 seconds of flushing, and a third draw after 5 minutes of flushing.

Task 2:

The contractor shall provide a monthly report in excel format.

File details come from the government source that posted it. Updated .