2022-05-20 Renovate Sleep and Home Oxygen Areas FINAL BID ISSUE-DRAWINGS.pdf
PDF 25 MB Posted
- Solicitation number
- 36C25021B0072
About this file
This federal contract opportunity solicits bids to renovate sleep and home oxygen areas at the Louis Stokes Cleveland VA Medical Center in Cleveland, Ohio. The project includes providing additional sleep labs on the second floor and reconfiguring adjacent space to consolidate the Sleep and Home Oxygen programs. The solicitation is identified as number 36C25021B0072 and is a SDVOSB set-aside issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Bids are due in response to the solicitation to provide renovations that will expand and improve facilities for sleep labs and home oxygen programs at the Cleveland VA medical center.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
MECHANICAL/TECH. ENGINEERING:
HEAPY
THE HANNA BUILDING
1422 EUCLID AVE. STE. 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS
ASSESSMENT:
STEPHEN J. SEBESTA &
ASSOC., INC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
STRUCTURAL ENGINEERING:
THORSON BAKER & ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
BID ISSUE SUBMISSION
C U s e rs \d a v e \D o c u m e n ts \V
A M
P
S le e p
L a b H o m e O x y g e n
R d a k a p la n .r v t
/2
/2
:0
:2
A
M
GI-1
TITLE SHEET & DRAWING INDEX RENOVATE SLEEP AND HOME
OXYGEN AREAS
10701 EAST BLVD. CLEVELAND, OHIO
541-21-104
5.20.22 CJK DAK
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK
RENOVATE SLEEP AND HOME OXYGEN AREAS
10701 EAST BLVD. CLEVELAND, OH 44106
PROJECT NO. 541-21-104
Cleveland Veterans Affairs Medical Center
SECOND FLOOR
NORT
H
CODE INFORMATION:
I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER
10701 EAST BLVD.
CLEVELAND, OHIO
II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING
A. NATURE OF PROJECT: INTERIOR RENOVATIONS OF EXISTING 2ND FLOOR PULMONARY DEPT.
AREAS - SLEEP LAB, HOME OXYGEN, PULMONARY FUNCTION TESTING
B. DESIGN CODES: 2018 NFPA LIFE SAFETY CODE 101, IBC 2018
C. USE GROUP: I-2 HEALTH CARE - NO CHANGE PROPOSED
D. CONSTRUCTION TYPE: TYPE I-332, IB - NON-COMBUSTIBLE, PROTECTED
FIRE RATED CONSTRUCTION (LSC A.8.2.1.1)
EXTERIOR BEARING WALLS 3 HRS
INTERIOR BEARING WALLS 3 HRS
STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)
2 HRS (SUPPORTING 1 FLOOR ONLY)
2 HRS (SUPPORTING ROOF ONLY)
BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING WALLS)
FLOOR-CEILING ASSEMBLIES 2 HRS
ROOF-CEILING ASSEMBLIES 1-1/2 HRS
INTERIOR NON-BEARING WALLS 0 HRS
EXTERIOR NON-BEARING WALLS 0 HRS
WALL ASSEMBLIES
EXIT ACCESS CORRIDOR WALLS 0 HR SMOKE PARTITIONS
E. PROJECT AREA: 5,468 SF
F. PROJECT AREA OCCUPANT LOAD: 55
G. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS REQUIRED PER
NEW IMPROVEMENTS PROPOSED
DRAWING INDEX:
BID ISSUE SUBMISSION
5.20.22
GI-1 TITLE SHEET & DRAWING INDEX
ARCHITECTURAL
LS-2.1 SECOND FLOOR LIFE SAFETY PLAN - PHASE I
LS-2.2 SECOND FLOOR LIFE SAFETY PLAN - PHASE II
AS-X-2.0 SECOND FLOOR - EXISTING CONDITIONS PLAN
AS-XC-2.0 SECOND FLOOR - EXISTING REFLECTED CEILING PLAN
AS-D-2.1 SECOND FLOOR DEMOLITION PLAN - PHASE I & PHASE II WEST
AS-D-2.2 SECOND FLOOR DEMOLITION PLAN - PHASE II EAST
AS-DC-2.1 SECOND FLOOR CEILING DEMOLITION PLAN - PHASE I & PHASE II WEST
AS-DC-2.2 SECOND FLOOR CEILING DEMOLITION PLAN - PHASE II EAST
AS-2.0 SECOND FLOOR MASTER IMPROVEMENT PLAN - PHASES I & II
AS-2.1 SECOND FLOOR IMPROVEMENT PLAN - PHASE I & PHASE II WEST
AS-2.2 SECOND FLOOR IMPROVEMENT PLAN - PHASE II EAST
AS-C-2.1 SECOND FLOOR REFLECTED CEILING PLAN - PHASE I & PHASE II WEST
AS-C-2.2 SECOND FLOOR REFLECTED CEILING PLAN - PHASE II EAST
AS-200 ENLARGED FLOOR PLANS & INTERIOR ELEVATIONS
AS-201 INTERIOR ELEVATIONS
AS-202 INTERIOR ELEVATIONS, MILLWORK SECTIONS, & DETAILS
AS-203 MILLWORK SECTIONS & DETAILS
AS-500 DOOR SCHEDULE, DETAILS, AND PARTIAL ROOF PLAN
AS-600 WALL TYPES AND DETAILS
AS-700 PHASE I & PHASE II WEST - FINISH PLANS
AS-701 PHASE II EAST - FINISH PLAN
AS-702 FINISH SCHEDULE
PHASING DURATION:
THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED
PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND
FUNCTION OF THE EXISTING HOSPITAL. THE PROPOSING PHASING DURATION PLAN IS AS FOLLOWS:
PRE-CONSTRUCTION: 60 DAYS
PHASE I: 20 DAYS
VA ACTIVATION: 30 DAYS
PHASE II: 270 DAYS
TOTAL TIMEFRAME: 380 DAYS
THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED
TO:
-UTILITY SHUTDOWNS
-EXISTING MEP SYSTEM SHUTDOWNS
-WORK IN PUBLIC CORRIDORS
-CUTTING OF FLOOR OPENINGS
-WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING
ACCESS OF CEILING PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION
AREAS (1ST FLOOR CEILING/MEP WORK)
WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE
VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND
APPROVED BY COR. REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS
SCOPE OF WORK
AREAS IN GRAY
MECHANICAL
M-001 MECHANICAL LEGEND, NOTES, & INDEX OF DRAWINGS
MD-102 HVAC SECOND FLOOR - DEMOLITION - DUCTWORK & PIPING
MH-102 HVAC SECOND FLOOR - NEW WORK - DUCTWORK
MH-104 HVAC FOURTH FLOOR & SEVENTH FLOOR - DUCTWORK
MP-102 HVAC SECOND FLOOR - NEW WORK - PIPING
M-501 DETAILS
M-502 DETAILS
M-601 SCHEDULES
M-901 CONTROLS
PLUMBING
P-001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
PD-101.2 PARTIAL 1ST FLOOR - DEMOLITION - PHASE II
PD-102.2 PARTIAL 2ND FLOOR - DEMOLITION - PHASE II
PL-101.1 PARTIAL 1ST FLOOR - DRAINAGE - PHASE I
PL-101.2 PARTIAL 1ST FLOOR - DRAINAGE - PHASE II
PL-102.1 PARTIAL 2ND FLOOR - DRAINAGE - PHASE I
PL-102.2 PARTIAL 2ND FLOOR - DRAINAGE - PHASE II
PP-102.1 PARTIAL 2ND FLOOR - DISTRIBUTION - PHASE I
PP-102.2 PARTIAL 2ND FLOOR - DISTRIBUTION - PHASE II
P-601 SCHEDULES AND DIAGRAMS
ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS
ED-102 ELECTRICAL DEMOLITION PLAN -
PHASES I & II
EL-102.2 ELECTRICAL LIGHTING PLAN - PHASE II
EP-102.2 ELECTRICAL POWER & FIRE ALARM PLAN -
PHASE 2
EP-107 ROOF PLAN - ELECTRICAL
E-501 ELECTRICAL DETAILS
E-601 PANEL SCHEDULES
TECHNOLOGY
T-001 LEGEND, NOTES, & INDEX OF DRAWINGS
TD-102 PARTIAL SECOND FLOOR TECHNOLOGY
DEMOLITION PLAN
T-102 PARTIAL SECOND FLOOR TECHNOLOGY
PLAN
T-500 DETAILS
T-501 DETAILS
FIRE PROTECTION
FS-102 PARTIAL SECOND FLOOR - FIRE SUPPRESSION
HAZARDOUS MATERIALS ABATEMENT
HA-001 STANDARD ASBESTOS ABATEMENT DETAILS
HA-102 PARTIAL SECOND FLOOR ASBESTOS ABATEMENT PLAN - PHASE II
Revisions: Date:
SCHEMATIC DESIGN 9.2.20
DESIGN DEVELOPMENT 11.13.20
65% CDs SUBMISSION 3.26.21
100% CDs SUBMISSION 5.5.21
FINAL CDs SUBMISSION 5.28.21
BID ISSUE SUBMISSION 5.20.2022
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
LIFE SAFETY LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA
SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF
CASEWORK/FURNITURE. CONTRACTOR TO COORDINATE SEQUENCING OF INSTALL WITH COR
EXISTING/NEW 2 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED SMOKE BARRIER
EXISTING/NEW O HOUR RATED SMOKE PARTITION
E EXIT
FE
FIRE EXTINGUISHER
EXIT SIGN LOCATION
LIFE SAFETY GENERAL NOTES:
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. PROJECT AREA IS CLASSIFIED AS A
RECONSTRUCTION IN COMPLIANCE WITH "NEW HEALTH CARE OCCUPANCY" PER NFPA 101 2018.
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.
5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, CONTRACTOR SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD.
CONTRACTOR SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS.
FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, CONTRACTOR
SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING
6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE
FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT
ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.
CONTRACTOR SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE
OPENING SIZE AS DICTATED BY THE ASSEMBLY.
7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: CONTRACTOR SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA ELECTRICAL SHOP. CONTRACTOR SHALL COORDINATE WITH VA SAFETY DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY STANDARDS. TEMPORARY FIRE ALARM DEVICES SHALL BE PROGRAMMED INTO THE SYSTEM BY CERTIFIED NOTIFIER VENDOR. ANY OLD FA DEVICES THAT ARE REMOVED SHALL BE DEPROGRAMED OUT BY THE SAME CERTIFIED VENDOR. ALL COSTS ASSOCIATED WITH THE PROGRAMMING/DE-PROGRAMMING OF THE TEMPORARY FIRE ALARM SYSTEM SHALL BE INCLUDED IN THE CONTRACTOR'S SCOPE/BID.
HAZARDOUS ROOM
EXISTING/NEW 2 HOUR RATED SMOKE BARRIER
FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"
SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON
REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"
TYPICAL PARTITION DETAIL ON SHEET AS-600. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY
BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE
APPROVED BY THE COR.
SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT
CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE
SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.
PROJECT SCOPE BOUNDARY
SOLID WHITE AREA INDICATES
CONSTRUCTION AREA WITHIN SCOPE
OF WORK
GRAY HATCHED AREA INDICATES AREA
OUTSIDE OF SCOPE OF WORK
SUITE AREA DESIGNATION
INFECTION CONTROL CLASS & SAFETY MEASURES:
THE WORK IDENTIFIED IN THIS PROJECT IS ASSIGNED A CLASS III INFECTION CONTROL CLASS AND SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF CONSTRUCTION. ALL CONTRACTORS AND CONSTRUCTION WORKERS ARE REQUIRED TO VACUUM THEIR CLOTHING FULLY IN THE TEMPORARY CONSTRUCTION ANTEROOMS IDENTIFIED ON THE DRAWINGS PRIOR TO ENTERING OCCUPIED PORTIONS OF THE
BUILDING.
REFER TO LIFE SAFETY AND DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT. REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS"
01 35 26 THROUGHOUT THE ENTIRETY OF THE PROJECT.
SPECIAL NOTE:
* NOTE 1 - CONTRACTOR SHALL BE AWARE THAT NEGATIVE PRESSURIZATION MUST BE MAINTAINED IN ALL CONSTRUCTION AREAS THROUGHOUT CONSTRUCTION. THIS AREA OF THE SECOND FLOOR HAS BEEN HISTORICALLY DIFFICULT TO MAINTAIN NEGATIVE PRESSURE WITHOUT ADDITIONAL MEASURES DUE TO THE
FOLLOWING ISSUES:
1) EXHAUST FROM THE ADJACENT MAIN ATRIUM PULLS AIR DOWN THE CORRIDOR
2) THE LOCATION OF THE PROJECT IS AT THE END OF THE RUN FOR THE AIR HANDLER SERVING THE AREA
CONTRACTOR SHALL INCLUDE IN BID TEMPORARY REMOVAL OF WINDOWS IN A MINIMUM OF THREE (3) LOCATIONS AS NOTED, AND PROVDING INFILL PANELS/HEPA EXHAUST FANS IN OPENINGS TO ACHIEVE PRESSURIZATION. ANTEROOM SHALL ALSO BE CONSTRUCTED AS DEPICTED. GC SHALL RE-INSTALL AND RECAULK WINDOWS AT PROJECT COMPLETION, PATCH/REPAIR ALL SURROUNDING CONDITIONS AS REQUIRED TO RESTORE TO ORIGINAL CONDITIONS. GC MAY SELECT DIFFERENT WINDOW LOCATIONS IF DESIRED, OBTAIN
APPROVAL FROM VA PRIOR TO PROCEEDING
F E
FE
F E
E
E
E
E
PHASE I SCOPE OF WORK
BOUNDARY
FE
E.
FE
F
OFFICE
2C137
UPS
ROOM
2C135
Comm.
2B149
Hemodialysis Storage
2B150
Elect.
2B148
Equip.
Closet 2C144A
E.P. Lab 2C144
Storage 2C143
Lockers 2C142
Toilet 2C141
Corridor 2C140
Control 2C145A
Control 2C145B
Scrub 2C145
Office 2C146
Intervention 2C148
Cath. Lab 2C147
Equip.
Closet 2C147A
Soiled Utility 2C149
Clean Utility 2C150
Staff Work 2C151
Endo.
Computers
2C171
Endo. Conf.
2C170
EMS Clos.
2C154
Corridor 2C157
Holding 2C153
Viewing/Fellows 2C155
Exam Room 2C424
Exam Room 2C425
Holding 2C423
G.I. Office 2C438
Storage 2C437
ICU
Cleveland
Clinic Resident
2C439
Sec'y Reception
2C422
G.U.
Urology Clinic 2C420
Stair #6 2C121
Cardiothoracic 2C440
F.A.C.
2C421
Office 2C415
Office 2C414
Office 2C413
Electrical Room 2C411
Corridor 2C400A
Fan Room 2C129
Reception Alcove 2C133
Control 2C133A
Elevator Lobby 2C400B
Endo/Cath Waiting 2C133B
TELECOMM
2C134
CORRIDOR
2C100C
OPEN
OFFICE
AREA
2C136
Sub-Sterile 2C235
Procedure 2C233
Stair #9 2C202
OXYGEN
STORAGE
(CLEAN)
2B121A
HOME
OXYGEN
CLINIC
2B119
CLEAN
UTILITY
2B120
OFFICE/CONSULT
2B122
OFFICE/CONSULT
2B123
OFFICE/CONSULT
2B124
ELECT.
ROOM
2B125
ELEC.
ROOM
2B126
RECEPTION/WAITING
2B141
PFT LAB
2B142
TOILET
2B143
PFT LAB
2B144
PFT LAB
(CPET)
2B145
Administration Center 2B336
Passage 2B330
Meds 2B339 Cubicle 6
2B336A
Cubicle 7 2B336B
Clean Utility 2B338
Soiled 2B337
Seclusion 2 2B333B
Seclusion 3 2B333C
Seclusion 4 2B333D
Seclusion 5 2B333E
Linen 2B338A
Chute 2B335
Seclusion 1 2B333A
Water Processing/ Equip. Rm
2B332A
Toilet 2B334
Water Processing/ Equipment
Room 2B332
Waiting 2B310
PD Training Room 2B321
Office 2B322
IT Closet 2B322A
Corridor 2B320Supply
Room 2B234
Closet 2B324A
Break Room 2B323
Office Space 2B325
Office 2B325A
Office 2B325B
Office 2B325C
Office 2B325D
Office 2B325E
Office 2B325F
Office 2B325G
Office 2B325HToilet
2B325J
Stair #11 2B146
Endoscopy Procedure
Procedure Room
Sub-Sterile 2052A
Scrub 2C172
Medication
Male Lockers
Female Lockers
Toilet 2064A
Toilet 2065A
Workroom/ Inst Clean
Electrical Closet 2C156
Corridor
Corridor 2C100A
Corridor 2C100B
CORRIDOR
2B134
SLEEP
LAB
2B133
TOILET/SHOWER
2B133A
OFFICE
2B132
OFFICE
2B131
OFFICE
2B130
SLEEP
LAB
2B135
TOILET/SHOWER
2B135A
OFFICE
2B136
SLEEP
LAB DAY
TESTING
2B137
Stair #8 2B138
OFFICE
2B139
PCAS/CHECK-IN
2B140
OFFICE
2B127
FELLOWS
OFFICE
2B128
OFFICE
2B129
Corridor 2B147
CORRIDOR
2B100B
CORRIDOR
2B100A
HAC
2C224
CLOSET
2B126A
Stair #5 2C127
Service Elevator Lobby 2C400C
EMS
2C416
Office 2C417
EMS
2C100
Elect.
2C140A
Chute 2C134A
CONTROL
STATION
2B134A
ALCOVE
2B143A
Elect.
2B146A
Corridor 2B480A
Penthouse 2B480
HOME
O2/CPAP
2B121E
HOME
O2/CPAP
2B121C
HOME
OXYGEN -
ENTRY
2B121
Clean Linen 2B412
Procedure 2B413
Exam 8 2B414
Exam 7 2B415
Staff Lounge
2B411
Exam 4 2B420
Exam 3 2B421
Corridor 2B410
Corridor 2B418
Corridor 2B419
Exam 6 2B416
Exam 5 2B417
Exam 2 2B423
Exam 1 2B422
ASMT.
2B432
Office 2B431
Nurse Intake 2B433
Storage 2B435
Corridor 2B430
Waiting 2B434
Recpt.
2B462
Pharmacy Buffer Room 2B461A
Pharmacy Anteroom
2B461 Staff Toilet
2B460
Patient Toilet 2B438
EMS
2B436
Family/ Consult
2B437
Patient Toilet 2B439
Private Infusion 1
2B440
Private Infusion 2
2B453
2B146B
Mech 2C412
OFFICE
2C138
OFFICE
2C139
Nurse Mgr.
2D262
Work
2D260F
Control
2D261
Corridor
2D260J
Holding
Corridor
2500B
Stretcher Storage
Anesthesia
Corridor
2500H
OR-7
General
2504 OR-6
General
Electric
EMS
Anesthesia Storage
EMS
2508A
Control
Sub Sterile
Corridor
2500A
Corridor
2500C
Corridor
2500J Corridor
2C280
Storage
JC
2B201
Rehab Office
2B203
Psychology Office
2B204
Psychology Office
2B206
Psychology Office
2B207
Psychology Office
2B209
Surgical Lounge
2B211
Corridor
2B200C
HOME
O2/CPAP
2B121D
MINOR IMPROVEMENTS IN EXISTING
HOME O2 DEPARTMENT. EXISTING
OFFICES ARE OCCUPIED MON. - FRI. UNTIL
5:30 PM DAILY. CONTRACTOR SHALL
PROVIDE TEMP. PROTECTION OF EX.
FURNITURE/ITEMS WITHIN EACH SPACE
AS REQ'D. ICRA MEASURES SHALL BE
FULLY IN PLACE DURING DOORWAY
DEMOLITION
EGRESS PATHS THROUGH ALL EXISTING
CORRIDORS SHALL AND WILL NOT BE IMPEDED AS
A RESULT OF PHASE I CONSTRUCTION IN ANY WAY
CONSTRUCTION
AREA
PACU
CUBICLE 1
2C237A
PACU
CUBICLE 2
2C237B
PACU
CUBICLE 3
2C237C
PACU
CUBICLE 4
2C237D
PACU
CUBICLE 6
2C237F
PACU
CUBICLE 5
2C237E
PACU/EMS
2C234
PACU
PASSAGE
2C323A
PACU
ADMIN.
CENTER
2C323
PACU
MEDS.
2C324
PACU
NOUR.
2C325
PACU
CUBICLE 7
2C326A
PACU
CUBICLE 8
2C326B
PACU
CUBICLE 9
2C326C
PACU
CUBICLE
2C326D
PACU
CUBICLE
2C326E
PACU
TOILET
2C322
PACU
CLEAN
2C330A
PACU
STORAGE
2C328
PACU
CUBICLE
2C326H
PACU
CUBICLE
2C326G
PACU
CUBICLE
2C326F
PACU
SOILED
UTILITY
2C321
ELEC.
2C327
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
MECHANICAL/TECH. ENGINEERING:
HEAPY
THE HANNA BUILDING
1422 EUCLID AVE. STE. 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS
ASSESSMENT:
STEPHEN J. SEBESTA &
ASSOC., INC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
STRUCTURAL ENGINEERING:
THORSON BAKER & ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
BID ISSUE SUBMISSION
C U s e rs \d a v e \D o c u m e n ts \V
A M
P
S le e p
L a b H o m e O x y g e n
R d a k a p la n .r v t
/2
/2
:5
:5
A
M
LS-2.1
SECOND FLOOR LIFE SAFETY PLAN - PHASE I RENOVATE SLEEP AND HOME
OXYGEN AREAS
10701 EAST BLVD. CLEVELAND, OHIO
541-21-104
5.20.22 CJK DAK
SCALE: 3/32" = 1'-0"
SECOND FLOOR LIFE SAFETY PLAN - PHASE I
NORTH
Revisions: Date:
SCHEMATIC DESIGN 9.2.20
DESIGN DEVELOPMENT 11.13.20
65% CDs SUBMISSION 3.26.21
100% CDs SUBMISSION 5.5.21
UP
UP
UP
UP
UP
UP
UP
UP
UP
LIFE SAFETY LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA
SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF
CASEWORK/FURNITURE. CONTRACTOR TO COORDINATE SEQUENCING OF INSTALL WITH COR
EXISTING/NEW 2 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED SMOKE BARRIER
EXISTING/NEW O HOUR RATED SMOKE PARTITION
E EXIT
FE
FIRE EXTINGUISHER
EXIT SIGN LOCATION
LIFE SAFETY GENERAL NOTES:
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. PROJECT AREA IS CLASSIFIED AS A
RECONSTRUCTION IN COMPLIANCE WITH "NEW HEALTH CARE OCCUPANCY" PER NFPA 101 2018.
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.
5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, CONTRACTOR SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD.
CONTRACTOR SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS.
FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, CONTRACTOR
SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING
6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE
FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT
ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.
CONTRACTOR SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE
OPENING SIZE AS DICTATED BY THE ASSEMBLY.
7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: CONTRACTOR SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA ELECTRICAL SHOP. CONTRACTOR SHALL COORDINATE WITH VA SAFETY DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY STANDARDS. TEMPORARY FIRE ALARM DEVICES SHALL BE PROGRAMMED INTO THE SYSTEM BY CERTIFIED NOTIFIER VENDOR. ANY OLD FA DEVICES THAT ARE REMOVED SHALL BE DEPROGRAMED OUT BY THE SAME CERTIFIED VENDOR. ALL COSTS ASSOCIATED WITH THE PROGRAMMING/DE-PROGRAMMING OF THE TEMPORARY FIRE ALARM SYSTEM SHALL BE INCLUDED IN THE CONTRACTOR'S SCOPE/BID.
HAZARDOUS ROOM
EXISTING/NEW 2 HOUR RATED SMOKE BARRIER
FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"
SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON
REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "TEMPORARY CONSTRUCTION BARRIER"
TYPICAL PARTITION DETAIL ON SHEET AS-600. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY
BARRIERS SHALL BE PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE
APPROVED BY THE COR.
SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT
CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE
SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BE ONE-HOUR FIRE RATED.
PROJECT SCOPE BOUNDARY
SOLID WHITE AREA INDICATES
CONSTRUCTION AREA WITHIN SCOPE
OF WORK
GRAY HATCHED AREA INDICATES AREA
OUTSIDE OF SCOPE OF WORK
SUITE AREA DESIGNATION
INFECTION CONTROL CLASS & SAFETY MEASURES:
THE WORK IDENTIFIED IN THIS PROJECT IS ASSIGNED A CLASS III INFECTION CONTROL CLASS AND SHALL APPLY TO THIS PROJECT THROUGHOUT THE ENTIRETY OF CONSTRUCTION. ALL CONTRACTORS AND CONSTRUCTION WORKERS ARE REQUIRED TO VACUUM THEIR CLOTHING FULLY IN THE TEMPORARY CONSTRUCTION ANTEROOMS IDENTIFIED ON THE DRAWINGS PRIOR TO ENTERING OCCUPIED PORTIONS OF THE
BUILDING.
REFER TO LIFE SAFETY AND DEMOLITION PLANS FOR SCOPE OF TEMPORARY CONSTRUCTION BARRIERS REQUIRED FOR THE PROJECT. REFER TO AND FOLLOW ALL PROTOCOL IDENTIFIED IN "SAFETY REQUIREMENTS"
01 35 26 THROUGHOUT THE ENTIRETY OF THE PROJECT.
SPECIAL NOTE:
* NOTE 1 - CONTRACTOR SHALL BE AWARE THAT NEGATIVE PRESSURIZATION MUST BE MAINTAINED IN ALL CONSTRUCTION AREAS THROUGHOUT CONSTRUCTION. THIS AREA OF THE SECOND FLOOR HAS BEEN HISTORICALLY DIFFICULT TO MAINTAIN NEGATIVE PRESSURE WITHOUT ADDITIONAL MEASURES DUE TO THE
FOLLOWING ISSUES:
1) EXHAUST FROM THE ADJACENT MAIN ATRIUM PULLS AIR DOWN THE CORRIDOR
2) THE LOCATION OF THE PROJECT IS AT THE END OF THE RUN FOR THE AIR HANDLER SERVING THE AREA
CONTRACTOR SHALL INCLUDE IN BID TEMPORARY REMOVAL OF WINDOWS IN A MINIMUM OF THREE (3) LOCATIONS AS NOTED, AND PROVDING INFILL PANELS/HEPA EXHAUST FANS IN OPENINGS TO ACHIEVE PRESSURIZATION. ANTEROOM SHALL ALSO BE CONSTRUCTED AS DEPICTED. GC SHALL RE-INSTALL AND RECAULK WINDOWS AT PROJECT COMPLETION, PATCH/REPAIR ALL SURROUNDING CONDITIONS AS REQUIRED TO RESTORE TO ORIGINAL CONDITIONS. GC MAY SELECT DIFFERENT WINDOW LOCATIONS IF DESIRED, OBTAIN
APPROVAL FROM VA PRIOR TO PROCEEDING
Toilet 2064A
Workroom/ Inst Clean
Corridor
Corridor 2C100B
Exam Room 2C424
Sec'y Reception
2C422
Stair #6 2C121
F.A.C.
2C421
Office 2C415
Office 2C414
Office 2C413
Electrical Room 2C411
Fan Room 2C129
Procedure Room
Sub-Sterile 2052A
Scrub 2C172
Medication
Male Lockers
Female Lockers
Toilet 2065A
Electrical Closet 2C156
Corridor 2C100A
Stair #5 2C127
Mech 2C412
TELECOM
2C134
UPS
ROOM
2C135
ELECTRICAL
2B125
ELECT./
OIT
2B126
CLOSET
2B126A
SLEEP
MDs
OFFICE
2B128
SLEEP
NPs
OFFICE
2B129
SLEEP
LAB DAY
STUDY
2B130
SLEEP
LAB
2B131
STAIR #8
2S10
BC353
SLEEP MD
CHIEF
OFFICE
2B138
PFT LAB
2B143
PFT LAB
2B144
EXISTING
PFT LAB
CPET
2B145
WAITING
2B140
Comm.
2B149
Hemodialysis Storage
2B150
Elect.
2B148
Equip.
Closet 2C144A
E.P. Lab 2C144
Storage 2C143
Lockers 2C142
Toilet 2C141
Corridor 2C140
Control 2C145A
Control 2C145B
Scrub 2C145
Office 2C146
Intervention 2C148
Cath. Lab 2C147
Equip.
Closet 2C147A
Soiled Utility 2C149
Clean Utility 2C150
Staff Work 2C151
Endo.
Computers
2C171
Endo. Conf.
2C170
EMS Clos.
2C154
Corridor 2C157
Holding 2C153
Viewing/Fellows 2C155
Exam Room 2C425
Holding 2C423
Passage 2C400D
G.I. Office 2C438
Storage 2C437
ICU
Cleveland
Clinic Resident
2C439
G.U.
Urology Clinic 2C420
Cardiothoracic 2C440
Corridor 2C400A
Reception Alcove 2C133
Control 2C133A
Elevator Lobby 2C400B
Endo/Cath Waiting 2C133B
CORRIDOR
2C100C
PACU
ADMIN.
CENTER
2C323
PASSAGE
2C323A
PACU
TOILET
2C322
PACU
STORAGE
2C328
PACU
SOILED
UTILITY
2C321
Oxygen Storage 2B121A
PACU
MEDS.
2C324
PACU
NOUR.
2C325
Lead Therapist
2B119 Clean Utility
2B120
Administration Center 2B336
Passage 2B330
Meds 2B339 Cubicle 6
2B336A
Cubicle 7 2B336B
Clean Utility 2B338
Soiled 2B337
Seclusion 2 2B333B
Seclusion 3 2B333C
Seclusion 4 2B333D
Seclusion 5 2B333E
Linen 2B338A
Chute 2B335
Seclusion 1 2B333A
Water Processing/ Equip. Rm
2B332A
Toilet 2B334
Water Processing/ Equipment
Room 2B332
Waiting 2B310
PD Training Room 2B321
Office 2B322
IT Closet 2B322A
Corridor 2B320Supply
Room 2B234
Closet 2B324A
Break Room 2B323
Stair #11 2B146
Corridor 2B147
CORRIDOR
2B100B
CORRIDOR
2B100A
Service Elevator Lobby 2C400C
EMS
2C416
Office 2C417
EMS
2C100
Elect.
2C140A
Chute 2C134A
Elect.
2B146A
Corridor 2B480A
Clean Linen 2B412
Procedure 2B413
Exam 8 2B414
Exam 7 2B415
Staff Lounge
2B411
Exam 4 2B420
Exam 3 2B421
Corridor 2B410
Corridor 2B418
Corridor 2B419
Exam 6 2B416
Exam 5 2B417
Exam 2 2B423
Exam 1 2B422
ASMT.
2B432
Office 2B431
Nurse Intake 2B433
Storage 2B435
Corridor 2B430
Waiting 2B434
Recpt.
2B462
Pharmacy Buffer Room 2B461A
Pharmacy Anteroom
2B461 Staff Toilet
2B460
Patient Toilet 2B438
EMS
2B436
Family/ Consult
2B437
Patient Toilet 2B439
Private Infusion 1
2B440
Private Infusion 2
2B453
2B146B
F E
FE
F E
E
E
E
E
PHASE II SCOPE OF WORK BOUNDARY
P H
A S
E
II
S C
O P
E O
F W
O R
K B
O U
N D
A R
Y
P H
A S
E I
I S C
O P
E O
F W
O R
K B
O U
N D
A R
Y
PHASE II SCOPE OF WORK BOUNDARY
SOILED
HOLDING
2B127
MD
OFFICE
2B128A
56'-5" COMMON
PATH OF TRAVEL
OPEN
OFFICE
AREA
2C136
PULM. MD
ATTENDING
OFFICE
2C137
CLEAN O2
STORAGE
2C138
PULM.
ADMIN./CHIEF
OFFICE
2C139
HOME O2
CLINIC
2B123
PULM. NPs
OFFICE
2B124
HOME
O2/CPAP
2B121C
HOME
O2/CPAP
2B121D
HOME
O2/CPAP
2B121E
HOME
OXYGEN
ENTRY
2B121
PAT.
TOILET
2B142
PULM.
FELLOWS
OFFICE
2B141
PCAS/CHECK-IN
2B139
MD
OFFICE
2B137
PAT.
TOILET
2B135A
SLEEP
LAB
2B135
SLEEP
LAB
2B134
PAT.
TOILET
2B134A
CONTROL
STATIONS
2B133
CORRIDOR
2B136
PAT.
TOILET
2B131A
PAT.
TOILET
2B132A
FE
E.
FE
F
PACU
CLEAN
2C330AELEC.
2C327
Stair #9 2C202
PACU EMS
2C234
HAC
2C224
SPACES CLASSIFIED AS "WAITING AND
SIMILAR AREAS" - OPEN TO CORRIDOR.
SHALL BE PROTECTED BY AN AUTOMATIC
FIRE AND SMOKE DETECTION SYSTEM
ALIGN
M
IN
6'-0" CLEAR MINIMUM IN
CORRIDOR MUST BE
MAINTAINED AT ALL TIMES
VIF
GC SHALL LOCATE EAST TEMP. WALL IN
FIELD TO ENSURE THAT EX. DOUBLE
EGRESS DOORS (ON HOLD-OPENS) CAN
FULLY OPEN AS SHOWN
GC ACCESS
DOOR
GC ACCESS
DOOR M
IN
6'-0" CLEAR MINIMUM IN
CORRIDOR MUST BE
MAINTAINED AT ALL TIMES
NOTE: ACCESS FROM STAIR
INTO PROJECT SITE TO BE
CONTROLLED BY THE VA
DASHED LINES INDICATE EXISTING
EGRESS PATHS WHICH SHALL BE
MAINTAINED THROUGHOUT
CONSTRUCTION, TYP.
CARE PROVIDER'S
STATION - PERMITTED TO
BE OPEN TO CORRIDOR
CONSTRUCTION AREACONSTRUCTION AREA
CONSTRUCTION AREA
SPECIAL PHASING NOTE: DOOR REMOVAL AND WALL
DEMOLITION ALONG THIS PORTION OF CORRIDOR WALL SHALL
BE DEFERRED TOWARDS THE END OF PHASE 2 AT A TIME
WHEN THE TEMPORARY CONSTRUCTION PARTITION LOCATED
TO THE WEST CAN BE TAKEN DOWN (SINK REMOVAL CAN BE
DONE PRIOR). THE INTENT IS TO PERMIT SAFE USAGE OF THE
EXISTING DOUBLE EGRESS AND SAFE PASSAGE OF
STRETCHERS, BOTH OF WHICH WOULD BE AFFECTED BY THE
PRESENCE OF TWO (2) CONSTRUCTION PARTITIONS. UPON
REMOVAL OF WEST CONST. PARTITION, GC SHALL SET UP A
NEW PARTITION AROUND THESE DOORS/CORRIDOR WALLS
FOR DEMOLITION & IMPROVEMENTS. MAINTAIN 6'-0" CLEAR IN
CORRIDOR. ALL OTHER ICRA MEASURES SHALL BE ADHERED
TO (BLOCKING OF DIFFUSERS, SMOKE DETECTORS, ETC.)
A N
T E
R O
O M
GC SHALL PERMIT VA
ACCESS INTO ELEC. RM.
DURING CONSTRUCTION
NOTE 1
NOTE 1
NOTE 1
GC ACCESS
DOOR
PACU
CUBICLE 1
2C237A
PACU
CUBICLE 2
2C237B
PACU
CUBICLE 3
2C237C
PACU
CUBICLE 4
2C237D PACU
CUBICLE 6
2C237F
PACU
CUBICLE 5
2C237E
PACU
CUBICLE
2C326E
PACU
CUBICLE
2C326D
PACU
CUBICLE 9
2C326C
PACU
CUBICLE 8
2C326B
PACU
CUBICLE 7
2C326A
PACU
CUBICLE
2C326F
PACU
CUBICLE
2C326G
PACU
CUBICLE
2C326H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
MECHANICAL/TECH. ENGINEERING:
HEAPY
THE HANNA BUILDING
1422 EUCLID AVE. STE. 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS
ASSESSMENT:
STEPHEN J. SEBESTA &
ASSOC., INC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
STRUCTURAL ENGINEERING:
THORSON BAKER & ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
BID ISSUE SUBMISSION
C U s e rs \d a v e \D o c u m e n ts \V
A M
P
S le e p
L a b H o m e O x y g e n
R d a k a p la n .r v t
/2
/2
:5
:0
A
M
LS-2.2
SECOND FLOOR LIFE SAFETY PLAN - PHASE II RENOVATE SLEEP AND HOME
OXYGEN AREAS
10701 EAST BLVD. CLEVELAND, OHIO
541-21-104
5.20.22 CJK DAK
SCALE: 3/32" = 1'-0"
SECOND FLOOR LIFE SAFETY PLAN - PHASE II
NORTH
Revisions: Date:
SCHEMATIC DESIGN 9.2.20
DESIGN DEVELOPMENT 11.13.20
65% CDs SUBMISSION 3.26.21
100% CDs SUBMISSION 5.5.21
24 25 26 27 29 30 33 34 35
E
G1
H
J
K
L1
L2
N
P
Q
R
T
V
F
D
C1
G
L3
S
U
23d 24b 25a 26a 28a 30a 38
M
OFFICE
2C137
UPS
ROOM
2C135
Equip.
Closet 2C144A
E.P. Lab 2C144
Storage 2C143
Lockers 2C142
Toilet 2C141
Corridor 2C140
Control 2C145A
Control 2C145B
Scrub 2C145
Office 2C146
Intervention 2C148
Cath. Lab 2C147
Equip.
Closet 2C147A
Soiled Utility 2C149
Clean Utility 2C150
G.I. Office 2C438
ICU
Cleveland
Clinic Resident
2C439
Cardiothoracic 2C440
TELECOMM
2C134
CORRIDOR
2C100C
OPEN
OFFICE
AREA
2C136
PACU
CUBICLE 4
2C237D
PACU
CUBICLE 6
2C237F
PACU
CUBICLE 7
2C326A
PACU
CUBICLE 8
2C326B
PACU
CUBICLE 9
2C326C
PACU
CUBICLE
2C326D
PACU
ADMIN.
CENTER
2C323
PACU
PASSAGE
2C323A
PACU
TOILET
2C322
PACU
CUBICLE
2C326E
PACU
STORAGE
2C328
PACU
CUBICLE
2C326F
PACU
CUBICLE
2C326G
PACU
CUBICLE
2C326H
PACU
SOILED
UTILITY
2C321
OXYGEN
STORAGE
(CLEAN)
2B121A
PACU
MEDS
2C324
PACU
NOUR.
2C325
HOME
OXYGEN
CLINIC
2B119
CLEAN
UTILITY
2B120
OFFICE/CONSULT
2B122
OFFICE/CONSULT
2B123
OFFICE/CONSULT
2B124
ELECT.
ROOM
2B125
ELEC.
ROOM
2B126
RECEPTION/WAITING
2B141
PFT LAB
2B142
TOILET
2B143
PFT LAB
2B144
PFT LAB
(CPET)
2B145
Administration Center 2B336
Passage 2B330
Meds 2B339 Cubicle 6
2B336A
Cubicle 7 2B336B
Clean Utility 2B338
Soiled 2B337
Seclusion 2 2B333B
Seclusion 3 2B333C
Seclusion 4 2B333D
Seclusion 5 2B333E
Linen 2B338A
Chute 2B335
Seclusion 1 2B333A
Water Processing/ Equip. Rm
2B332A
Toilet 2B334
Water Processing/ Equipment
Room 2B332
Closet 2B324A
Stair #11 2B146
CORRIDOR
2B134
SLEEP
LAB
2B133
TOILET/SHOWER
2B133A
OFFICE
2B132
OFFICE
2B131
OFFICE
2B130
SLEEP
LAB
2B135
TOILET/SHOWER
2B135A
OFFICE
2B136
SLEEP
LAB DAY
TESTING
2B137
Stair #8 2B138
OFFICE
2B139
PCAS/CHECK-IN
2B140
OFFICE
2B127
FELLOWS
OFFICE
2B128
OFFICE
2B129
CORRIDOR
2B100B
CORRIDOR
2B100A
CLOSET
2B126A
EMS
2C416
Office 2C417
Elect.
2C140A
Chute 2C134A
CONTROL
STATION
2B134A
ALCOVE
2B143A
Corridor 2B480A
Penthouse 2B480
HOME
OXYGEN
OFFICE
2B121E
HOME
OXYGEN -
EXAM
2B121C
HOME
OXYGEN -
ENTRY
2B121
Staff Lounge
2B411
Exam 3 2B421
Corridor 2B419
Exam 1 2B422
Nurse Intake 2B433
Storage 2B435
Family/ Consult
2B437
OFFICE
2C138
OFFICE
2C139
Elevator Lobby 2C400B
HOME
OXYGEN
OFFICE
2B121D
PHASE II SCOPE OF WORK BOUNDARY
P H
A S
E I
I S C
O P
E O
F W
O R
K B
O U
N D
A R
Y
P H
A S
E I
I S C
O P
E O
F W
O R
K B
O U
N D
A R
Y
EXISTING ROOF
AREA
EXISTING ROOF
AREA
EXISTING ROOF
AREA
EXISTING ROOF
AREA
EXISTING ROOF
AREA
PHASE II SCOPE OF WORK BOUNDARY
EXISTING
ROOF
AREA
PHASE I SCOPE OF WORK BOUNDARY
ELEC.
2C327
PACU
CUBICLE 3
2C237C
PACU
CUBICLE 2
2C237B
PACU
CUBICLE 5
2C237E
PACU
CUBICLE 1
2C237A
PACU EMS
2C234
HAC
2C224
PACU
CLEAN
2C330A
STAIR #9
2C202
HOME
OXYGEN
DEPT.
2" BUILDING
EXPANSION JT.
GENERAL NOTES:
CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.
ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.
ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.
CONTRACTOR (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE
CODES.
PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.
WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, CONTRACTOR SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW TO
MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.
ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS
REQUIRED.
NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED
BY THE OWNER UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY
POINTS.
CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.
PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.
DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"
ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.
THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE
PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.
REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT
WALLS TO MATCH EXISTING.
ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE
REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE VA COR.
DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.
ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS
OTHERWISE APPROVED BY THE COR.
EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, CONTRACTOR SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND CONTRACTOR SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD.
CONTRACTOR SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS.
FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, CONTRACTOR SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED
INFILL FIRESTOP ASSEMBLY WHEN APPROVED BY THE COR.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
SYMBOL LEGEND:
INDICATES EXISTING DOOR
INDICATES NEW DOOR
EXISTING WALLS TO REMAIN
NEW WALLS
WALLS TO BE REMOVED FULL HEIGHT U.N.O.
DASHED LINES INDICATE ITEMS TO BE DEMOLISHED
HATCHED AREA OUTSIDE OF PROJECT SCOPE.
ACCESS INTO CEILING SPACES MAY OCCUR, REFER
TO MEP DWGS.
FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"
SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON
REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO TEMPORARY CONSTRUCTION BARRIER
DETAIL ON SHEET AS-600. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE
PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR.
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA
SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF
CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR
GENERAL CONSTRUCTION PARTITION NOTE: WHERE TEMP. CONST. PARTITIONS CONFLICT
W/EX. LIGHTS/DIFFUSER/MEP ITEM LOCATIONS (INDICATED ON CEILING DEMOLITION PLANS), GC
SHALL COORD. W/COR TO EITHER TEMPORARILY REMOVE SUCH ITEMS, OR ADJUST LOCATION
OF CONST. PARTITION ACCORDINGLY TO ALLOW ITEMS TO REMAIN IN PLACE. TEMPORARY
REMOVAL/REINSTALLATION SHALL BE PERFORMED BY THE CONTRACTOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
MECHANICAL/TECH. ENGINEERING:
HEAPY
THE HANNA BUILDING
1422 EUCLID AVE. STE. 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS
ASSESSMENT:
STEPHEN J. SEBESTA &
ASSOC., INC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
STRUCTURAL ENGINEERING:
THORSON BAKER & ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
BID ISSUE SUBMISSION
C U s e rs \d a v e \D o c u m e n ts \V
A M
P
S le e p
L a b H o m e O x y g e n
R d a k a p la n .r v t
/2
/2
:5
:3
A
M
AS-X-2.0
SECOND FLOOR EXISTING CONDITIONS PLAN RENOVATE SLEEP AND HOME
OXYGEN AREAS
10701 EAST BLVD. CLEVELAND, OHIO
541-21-104
5.20.22 CJK DAK
SCALE: 3/32" = 1'-0"
2ND FLOOR EXISTING CONDITIONS PLAN
NORTH
Revisions: Date:
SCHEMATIC DESIGN 9.2.20
DESIGN DEVELOPMENT 11.13.20
65% CDs SUBMISSION 3.26.21
100% CDs SUBMISSION 5.5.21
24 25 26 27 29 30 33 34 35 36
EE
G1
H
J
K
L
L1
L2
N
P
Q
R
T
V
F
D
C1
G
L3
S
U
24b 25a 26a 28a 30a 38
M
Equip.
Closet 2C144A
E.P. Lab 2C144
Storage 2C143
Lockers 2C142
Toilet 2C141
Corridor 2C140
Control 2C145A
Control 2C145B
Scrub 2C145
Office 2C146
Intervention 2C148
Cath. Lab 2C147
Equip.
Closet 2C147A
Soiled Utility 2C149
G.I. Office 2C438
ICU
Cleveland
Clinic Resident
2C439
Cardiothoracic 2C440
TELECOMM
2C134
CORRIDOR
2C100C
OPEN
OFFICE
AREA
2C136
Sub-Sterile 2C235
Procedure 2C233
STAIR #9
2C202
PACU EMS
2C234
PACU
CUBICLE 1
2C237A
PACU
CUBICLE 2
2C237B
PACU
CUBICLE 4
2C237D
PACU
CUBICLE 5
2C237E
PACU
CUBICLE 6
2C237F
PACU
CUBICLE 7
2C326A
PACU
CUBICLE 8
2C326B
PACU
CUBICLE 9
2C326C
PACU
CUBICLE
2C326D
PACU
ADMIN.
CENTER
2C323
PACU
PASSAGE
2C323A
PACU
TOILET
2C322
PACU
CUBICLE
2C326E
PACU
STORAGE
2C328
PACU
CUBICLE
2C326F
PACU
CUBICLE
2C326G
PACU
CUBICLE
2C326H
PACU
SOILED
UTILITY
2C321
OXYGEN
STORAGE
(CLEAN)
2B121A
PACU
MEDS
2C324
PACU
NOUR.
2C325
HOME
OXYGEN
CLINIC
2B119
CLEAN
UTILITY
2B120
OFFICE/CONSULT
2B122 OFFICE/CONSULT
2B123
OFFICE/CONSULT
2B124
ELECT.
ROOM
2B125
ELEC.
ROOM
2B126
RECEPTION/WAITING
2B141
PFT LAB
2B142
TOILET
2B143
PFT LAB
2B144
PFT LAB
(CPET)
2B145
Administration Center 2B336
Passage 2B330
Meds 2B339 Cubicle 6
2B336A
Cubicle 7 2B336B
Clean Utility 2B338
Soiled 2B337
Seclusion 2 2B333B
Seclusion 3 2B333C
Seclusion 4 2B333D
Seclusion 5 2B333E
Linen 2B338A
Chute 2B335
Seclusion 1 2B333A
Water Processing/ Equip. Rm
2B332A
Toilet 2B334
Water Processing/ Equipment
Room 2B332
Closet 2B324A
Office 2B325A
Office 2B325B
Office 2B325C
Stair #11 2B146
CORRIDOR
2B134
SLEEP
LAB
2B133
TOILET/SHOWER
2B133A
OFFICE
2B132
OFFICE
2B131
OFFICE
2B130
SLEEP
LAB
2B135
TOILET/SHOWER
2B135A
OFFICE
2B136
SLEEP
LAB DAY
TESTING
2B137
Stair #8 2B138
OFFICE
2B139
PCAS/CHECK-IN
2B140
OFFICE
2B127
FELLOWS
OFFICE
2B128
OFFICE
2B129
CORRIDOR
2B100B
CORRIDOR
2B100A
HAC
2C224
CLOSET
2B126A
EMS
2C416
Office 2C417
Elect.
2C140A
Chute 2C134A
CONTROL
STATION
2B134A
ALCOVE
2B143A
Corridor 2B480A
HOME
OXYGEN
OFFICE
2B121E
HOME
OXYGEN -
EXAM
2B121C
HOME
OXYGEN -
ENTRY
2B121
Staff Lounge
2B411
Exam 3 2B421
Corridor 2B419
Exam 1 2B422
Storage 2B435
Family/ Consult
2B437
Corridor 2500H
OR-7
General
OR-6
General
Electric
EMS
Anesthesia Storage
EMS
2508A
Sub Sterile
JC
2B201
Rehab Office 2B203
Psychology Office 2B204
Psychology Office 2B206
Psychology Office 2B207
Psychology Office 2B209
Surgical Lounge
2B211
Corridor 2B200C
CORRIDOR
2C100C
OFFICE
2C137
OFFICE
2C138
OFFICE
2C139
UPS
ROOM
2C135
Penthouse 2B480
PHASE II SCOPE OF WORK BOUNDARY
P H
A S
E I
I S C
O P
E O
F W
O R
K B
O U
N D
A R
Y
P H
A S
E I
I S C
O P
E O
F W
O R
K B
O U
N D
A R
Y
PHASE II SCOPE OF WORK BOUNDARY
HOME
OXYGEN
OFFICE
2B121D
S
S
S
S
S
S
SD
W
W
W
W W W
W
W
W
S
2" BUILDING
EXPANSION JOINT
S
PHASE I SCOPE OF WORK BOUNDARY
PACU
CLEAN
2C330A
ELEC.
2C327
S
PACU
CUBICLE 3
2C237C
S
S
S
S
W
W
W
GENERAL NOTES:
CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.
ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.
ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.
CONTRACTOR (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE
CODES.
PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.
WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, CONTRACTOR SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW TO
MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.
ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS
REQUIRED.
NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED
BY THE OWNER UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY
POINTS.
CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.
PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.
DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"
ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.
THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE
PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.
REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT
WALLS TO MATCH EXISTING.
ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE
REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE VA COR.
DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.
ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS
OTHERWISE APPROVED BY THE COR.
EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, CONTRACTOR SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND CONTRACTOR SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD.
CONTRACTOR SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS.
FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, CONTRACTOR SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED
INFILL FIRESTOP ASSEMBLY WHEN APPROVED BY THE COR.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
CEILING SYMBOL LEGEND:
EXISTING 2 X 2
CEILING TILE
AREAS TO REMAIN
EXISTING 2 X 4
CEILING TILE
AREAS TO REMAIN
SCOPE OF WORK
AREA
GYPSUM BOARD
CEILING/SOFFIT -
PAINTED FINISH
2 X 4 LIGHT
FIXTURE
2 X 2 LIGHT FIXTURE
RECESSED CAN
LIGHT FIXTURE
RETURN AIR
DIFFUSERS
SUPPLY AIR DIFFUSERS
SECURITY CAMERA
S RECESSED SPEAKER
W WIRELESS ACCESS POINT
SD SMOKE DETECTOR
GENERAL NOTE: ACCESS INTO CEILINGS OUTSIDE OF TEMPORARY CONSTRUCTION BARRIERS AS A PART OF A CONSTRUCTION PHASE MAY OCCUR. REFER TO MEP DRAWINGS FOR ABOVE-CEILING DEMOLITION THAT OCCURS OUTSIDE THE TEMPORARY CONSTRUCTION BARRIER EXTENTS. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION MEASURES IN SUCH AREAS TO PROTECT EXISTING CONDITIONS. COORD. REQUIREMENTS W/VA
COR
CONTINUOUS LINEAR COVE
LIGHT
CORRIDOR WALL
SCONCE
CLG. MTD. PATIENT BED
LIFT - FURNISHED/INSTALLED
BY VA. GC TO PROVIDE
JUNCTION BOX ONLY - SEE
ELEC. DWGS.
WALL-MTD. SINK LIGHT
FIXTURE
NURSE CALL ALERT LIGHT
WALL-MTD. TV ON SWING-
ARM MOUNT,
FURNISHED/INSTALLED BY
VA. CONTRACTOR TO
PROVIDE SOLID IN-WALL
BLOCKING BETWEEN 6'-0"
& 7'-0" AFF
U
V CLG. MOUNTED UV LIGHT
FIXTURE, FURNISHED BY
VA, INSTALLED BY GC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
MECHANICAL/TECH. ENGINEERING:
HEAPY
THE HANNA BUILDING
1422 EUCLID AVE. STE. 1162
CLEVELAND, OH 44115
P. 216.862.5846
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
ELECTRICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS
ASSESSMENT:
STEPHEN J. SEBESTA &
ASSOC., INC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
STRUCTURAL ENGINEERING:
THORSON BAKER & ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
BID ISSUE SUBMISSION
C U s e rs \d a v e \D o c u m e n ts \V
A M
P
S le e p
L a b H o m e O x y g e n
R d a k a p la n .r v t
/2
/2
:5
:4
A
M
AS-XC-2.0
SECOND FLOOR EXISTING REFLECTED
CEILING PLAN
RENOVATE SLEEP AND HOME
OXYGEN AREAS
10701 EAST BLVD. CLEVELAND, OHIO
541-21-104
5.20.22 CJK DAK
SCALE: 3/32" = 1'-0"
2ND FLOOR EXISTING REFLECTED CEILING PLAN
NORTH
Revisions: Date:
SCHEMATIC DESIGN 9.2.20
DESIGN DEVELOPMENT 11.13.20
65% CDs SUBMISSION 3.26.21
100% CDs SUBMISSION 5.5.21
27 29 30 33 34
G1
H
J
K
F
D
26a 28a 30a
H
T
1'-1"
@ 7'-2" HT.
3'-10"
NO DEMO
SCOPE
HOME
OXYGEN
CLINIC
2B119
25 26 27 29 30
K
L1
30a
CLOSET
2B126A
CORRIDOR
2B100B
1A
1A
2 2
1A
3 3
M
IN
GC ACCESS
DOOR
SEE SHEET AS-D-2.2
ALIGN
55'-9" +/-
GC SHALL LOCATE EAST TEMP. WALL IN
FIELD TO ENSURE THAT EX. DOUBLE
EGRESS DOORS (ON HOLD-OPENS) CAN
FULLY OPEN AS SHOWN
2 2
MAINTAIN EX. PLUMBING
ENCLOSURE
ENTIRE
ROOM
ENTIRE
ROOM
ENTIRE
ROOM
ENTIRE
ROOM
ENTIRE
ROOM
ENTIRE
ROOM
ENTIRE
ROOM
7'-2" HT.
4'-4" 9"
7'-2" HT.
3'-4"1
2"
SPECIAL PHASING NOTE: DOOR
REMOVAL AND WALL DEMOLITION
ALONG THIS PORTION OF
CORRIDOR WALL SHALL BE
DEFERRED TOWARDS THE END OF
PHASE 2 AT A TIME WHEN THE
TEMPORARY CONSTRUCTION
PARTITION LOCATED TO THE WEST
CAN BE TAKEN DOWN (SINK
REMOVAL CAN BE DONE PRIOR).
THE INTENT IS TO PERMIT SAFE
USAGE OF THE EXISTING DOUBLE
EGRESS AND SAFE PASSAGE OF
STRETCHERS, BOTH OF WHICH
WOULD BE AFFECTED BY THE
PRESENCE OF TWO (2)
CONSTRUCTION PARTITIONS. UPON
REMOVAL OF WEST CONST.
PARTITION, GC SHALL SET UP A NEW
PARTITION AROUND THESE
DOORS/CORRIDOR WALLS FOR
DEMOLITION & IMPROVEMENTS.
MAINTAIN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .