20211207 CANTONMENTS STORAGE PEB.pdf

PDF 1 MB Posted

Attached to
Cantonments PEB Federal contract opportunity
Solicitation number
FA4626-22-Q-0004
Issued by
Department of the Air Force Global Strike Command

About this file

This document package includes a government file and federal contract opportunity related to the design and fabrication of a Pre-Engineered Building (PEB) at Malmstrom Air Force Base in Montana.

The government file provides design drawings and notes for a 10,000 square foot PEB facility intended to store RED HORSE equipment and supplies. The drawings show the site plan, floor plan, elevations, and other details of the proposed building. The opportunity solicits bids to design, fabricate, and deliver structural steel, insulated metal panels, doors, and other components for the PEB. The Department of the Air Force Global Strike Command is seeking these goods and services for contract number FA4626-22-Q-0004. Delivery of designed and fabricated components is the scope of work, while electrical, plumbing, and other build-out will be Government-furnished. The response due date and award timing are not specified.

View the file

Other files for this federal contract opportunity

Other files attached to Cantonments PEB, newest first.
File Type Posted
Solicitation Amendment FA462622Q00040001 SF 30.pdf PDF
NZAS201003 Specifications Sheet for Cantonments PEB 20220119.doc DOC document
Solicitation - FA462622Q0004.pdf PDF
Yellow Knife Combined PEB Dwgs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CS

NLOCATION MAP

819 RED HORSE SQUADRON

CONTONMENTS STORAGE PEB

MALMSTROM, AFB

30% DESIGN

SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S

COVER SHEET.dwg

OF

COVER SHEET

PROJECT NUMBER 0901

BUILD ANYTHING, ANYTIME, ANYPLACE!

TO THE HORSE!

PROJECT LOCATION

COMMANDER:

CHIEF ENLISTED:

ENGINEERING FLIGHT CC:

PROJECT ENGINEER:

PROJECT MANAGER:

PROJECT SAFETY:

EA SUPERINTENDENT:

EA LEAD:

AIRFIELDS CRAFT LEAD:

HVAC CRAFT LEAD:

UTILITIES CRAFT LEAD:

ELECTRICAL CRAFT LEAD:

STRUCTURES CRAFT LEAD:

ENGINEERING STAMP LT COL VELAZQUEZ

CMSGT LAIDLAW

CAPT. SANDERS

CAPT. TANAP

TBD

TBD

MSGT PERKINS

SRA LEWIS

TBD

TBD

TBD

TBD

TBD

819TH RHS

CONTONMENTS STORAGE PEB

8 9 10 11 12 13 14 15 16654321

A

B

C

D

E

F

G

H

I

J

REVISION DATE: Tuesday, December 7, 2021 1:25:29 PM

AutoCAD SHX Text

PROJECT MILESTONE

AutoCAD SHX Text

TITLE

AutoCAD SHX Text

DRAWING PATH

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

SHEET DESIGNATOR

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

SHEET LIST TABLE

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

AutoCAD SHX Text

NOTES AND LEGEND

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING SITE

AutoCAD SHX Text

AutoCAD SHX Text

DEMO PLAN

AutoCAD SHX Text

AutoCAD SHX Text

GRADING PLAN

AutoCAD SHX Text

AutoCAD SHX Text

FLOOR PLAN

AutoCAD SHX Text

AutoCAD SHX Text

EXTERIOR ELEVATION

REVISION DATE: Tuesday, December 7, 2021 1:23:40 PM 7 8 9 10 11 12 13 14 15 16654321

A

B

C

D

E

F

G

H

I

J G-1PROJECT MILESTONE

TITLE

DRAWING PATH

SHEET NUMBER

CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE

PROJECT NUMBER30% DESIGN

SRA LEWIS TSGT HEAPE CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S

NOTES AND LEGEND.dwg

OF

NOTES AND LEGEND

PROJECT NUMBER 0902

PROJECT NAME

CONTONMENTS STORAGE PEB

GENERAL NOTES

1. CONTACT THE ONE CALL UTILITY LOCATE AND PROCESS THE WORK CLEARANCE REQUEST -

(AF FORM 103).

2. GAS MAINS, UNDERGROUND ELECTRICAL AND COMMUNICATION CABLES, TELEPHONE POLES, LIGHT POLES, IRRIGATION SYSTEM, SIGNS, ETC., REQUIRED TO BE MOVED OR LOWERED FOR NEW CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR.

3. HAND OR HYDRO-VAC EXCAVATE AND EXPOSE ALL UTILITIES PRIOR TO BEGINNING EXCAVATION. LOWER ANY COMMUNICATION OR

ELECTRICAL LINES TO MAINTAIN 30" OF COVER TO FINISHED GRADE.

4. OBTAIN ANY NECESSARY PERMITS. ANY FEES ASSOCIATED WITH PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR.

5. RESTORE ALL DISTURBED AREAS AFFECTED BY CONSTRUCTION TO ORIGINAL CONDITION, UNLESS OTHERWISE NOTED ON PLANS.

6. FIELD VERIFY LINE AND GRADE OF EXISTING UTILITIES & CONNECTIONS PRIOR TO ORDERING/PROCURING MATERIALS OR BEGINNING

TRENCH EXCAVATION.

7. WHERE CURB, GUTTER OR SIDEWALK MUST BE REMOVED & REPLACED, DEMO SHALL EXTEND TO THE NEAREST CONTROL JOINT BEYOND LIMITS IDENTIFIED ON THE PLANS. ADDITIONAL REMOVED AND REPLACED QUANTITIES BEYOND PLAN LIMITS SHALL BE THE RESPONSIBILITY OF

THE CONTRACTOR.

8. PROTECT ALL EXISTING SURVEY MONUMENTATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REPLACE ANY DISTURBED MONUMENTATION.

9. COORDINATE ALL TRAFFIC CONTROL, SITE ACCESS ISSUES, AND TEMPORARY DUMPSTER LOCATION WITH THE CONTRACTING OFFICER'S

TECHNICAL REPRESENTATIVE (COTR).

10. ALL OPEN TRENCHES, CONSTRUCTION HAZARDS OR CONDITIONS POTENTIALLY CONSIDERED AN "ATTRACTIVE NUISANCE" SHALL BE SECURED

WITH FENCING, BARRICADES OR OTHER MEANS TO CONTROL SITE ACCESS.

11. ALL POWER, COMMUNICATION, OR OTHER UTILITIES THAT INTERFERE WITH THE CONSTRUCTION SHALL BE LOWERED OR RELOCATED.

CONTRACTOR TO COORDINATE WITH COTR/SHOPS PRIOR TO CONSTRUCTION. SEE ELECTRICAL PLANS FOR PLANNED LIMITS OF ADJUSTMENTS

NEEDED.

12. DESIGNED IAW UFC 1-200-01 DoD BUILDING CSDA

13. UNITS IN IMPERIAL SYSTEM UNLESS OTHERWISE NOTED.

WATER NOTES

1. ALL GRAVITY STORM SEWER PIPE IS TO BE SDR35 PVC AND MEET ASTM 3034 STANDARDS UNLESS OTHERWISE NOTED ON PLANS.

2. MAINTAIN A MINIMUM OF 18" VERTICAL SEPARATION AT CROSSINGS BETWEEN OUTSIDE OF SEWER/STORM DRAIN PIPE AND OUTSIDE OF

WATER PIPE.

3. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL SEPARATION BETWEEN OUTSIDE OF SEWER OR STORM DRAIN PIPE AND OUTSIDE OF WATER

PIPE.

4. FIELD VERIFY LINE AND GRADE OF EXISTING CONNECTIONS.

5. EXCAVATE ALL CROSSINGS BETWEEN WATER LINES AND STORM DRAIN LINES PRIOR TO BEGINNING TRENCH EXCAVATION TO ENSURE

CROSSING CLEARANCE.

SURVEYING NOTES

1. BENCHMARK CONTROL - BRASS CAP #59 NORTHING: XXXXXXXXX.XXXX, EASTING: XXXXXXXXX.XXXX, ELEVATION: XXXXX.XXX

1.1 COORDINATE SYSTEM - NAD 1983, MONTANA STATE PLANE 2500. ENTIRE PROJECT SURVEYED IN U.S. SURVEY FEET. NO GEOID IS USED.

2. LOCAL SITE CONTROL WAS ESTABLISHED BY 819 RHS/RE UTILIZING GPS (TRIMBLE R10-2) MOBILE BASE STATION AND ROVER SET UP.

2.1. TEMPORARY SITE CONTROLS WERE ESTABLISHED USING A 15 MIN OBSERVED CONTROL POINT MEASUREMENT

3. TEMPORARY SITE CONTROL POINTS WERE MARKED WITH ALIGNMENT MARKINGS AND IDENTIFIED WITH PINK MARKING PAINT

3.1 TBM1 N:1190891.134, E:1550262.677, ELEV:3483.706 (BOLT ON OBSERVATION MONITORING WELL CAP)

3.2 TBM2 N:1191082.341, E:1550311.287, ELEV:3483.024 (EDGE OF ELECTRIC MAN HOLE COVER)

3.3 TBM1 N:1191121.024, E:1550184.775, ELEV:3483.532 (INSIDE CORNER #7 ON FLIGHT LINE FUEL ACCESS COVER)

3.4 TBM2 N:1190917.657, E:1549975.808, ELEV:3485.461 (INNER, UPPER CORNER #4 ON FLIGHT LINE FUEL ACCESS COVER)

4. ANY QUESTIONS REGARDING THE ESTABLISHMENT OF SITE CONTROLS FOR THIS PROJECT SHOULD BE DIRECTED TO 819 RHS/DE - DSN 731-4918

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

TBM1

TBM2

TBM3

TBM4

3484.00

3483.00

3482.03

3484.32

0+

1+

0+00

1+00 0+

1+

0+00

1+00

FENCE

FENCE

FENCE

FENCE

FENCE

REVISION DATE: Tuesday, December 7, 2021 2:46:31 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531

N 1" = 40'

A

C

E

G

I

K

M

O

Q

S

C-01PROJECT MILESTONE

TITLE

DRAWING PATH

SHEET NUMBER

CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE

PROJECT NUMBER30% DESIGN

SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21

EXISTING SITE PLAN-ANSI_D.dwg

OF

EXISTING SITE PLAN

PROJECT NUMBER 0903

PROJECT NAME

CONTONMENTS STORAGE PEB

B

D

F

H

J

L

N

P

R

T

LEGEND

ELECTRICAL

FUEL

WATER

FENCE

WORKING SURFACE

CANTONMENTS

STORAGE PEB

FUTURE PEB

SITES

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

PEB CRNR

TBM1

TBM2

TBM3

TBM4

3484.00

3483.00

3482.03

3484.32

0+

1+

0+00

1+00 0+

1+

0+00

1+00

FENCE

FENCE

FENCE

FENCE

FENCE

REVISION DATE: Tuesday, December 7, 2021 2:50:36 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531

N

A

C

E

G

I

K

M

O

Q

S

C-03PROJECT MILESTONE

TITLE

DRAWING PATH

SHEET NUMBER

CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE

PROJECT NUMBER30% DESIGN

SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 1"= 40'

GRADING PLAN.dwg

OF

GRADING PLAN

PROJECT NUMBER 0904

PROJECT NAME

CONTONMENTS STORAGE PEB

B

D

F

H

J

L

N

P

R

T

MECH

ROOM

RE

ST

RO

OM

OFFICE

REVISION DATE: Tuesday, December 7, 2021 2:47:02 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531

N

A

C

E

G

I

K

M

O

Q

S

A-5PROJECT MILESTONE

TITLE

DRAWING PATH

SHEET NUMBER

CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE

PROJECT NUMBER30% DESIGN

SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 1"= 10'

FLOOR PLAN.dwg

OF

FLOOR PLAN

PROJECT NUMBER 0913

PROJECT NAME

CONTONMENTS STORAGE PEB

B

D

F

H

J

L

N

P

Elevation

Station

NE Alignment PROFILE

-0+50 0+00 1+00 1+50

0+00 1+00 1+50

REVISION DATE: Tuesday, December 7, 2021 2:50:36 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531

NE ALIGNMENT

SCALE: NTS

A

C

E

G

I

K

M

O

Q

S

A-02PROJECT MILESTONE

TITLE

DRAWING PATH

SHEET NUMBER

CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE

PROJECT NUMBER30% DESIGN

SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S

GRADING PLAN.dwg

OF

ELEVATION PLAN - NE Side

PROJECT NUMBER 0906

PROJECT NAME

CONTONMENTS STORAGE PEB

B

D

F

H

J

L

N

P

SE Alignment PROFILE

-0+50 0+00 1+00 1+50

0+00 1+00 1+50

EXISTING GROUND

FINISHED FLOOR

REVISION DATE: Tuesday, December 7, 2021 2:50:36 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531

SE ALIGNMENT

SCALE:

A

C

E

G

I

K

M

O

Q

S

A-03PROJECT MILESTONE

TITLE

DRAWING PATH

SHEET NUMBER

CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE

PROJECT NUMBER30% DESIGN

SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S

GRADING PLAN.dwg

OF

ELEVATION PLAN - SE Side

PROJECT NUMBER 0907

PROJECT NAME

CONTONMENTS STORAGE PEB

B

D

F

H

J

L

N

P

SW Alignment PROFILE

-0+50 0+00 1+00 1+50

0+00 1+00 1+50 0+00

.8

.8

1+00

.4

.3

REVISION DATE: Tuesday, December 7, 2021 2:50:36 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531

SE ALIGNMENT

SCALE:

A

C

E

G

I

K

M

O

Q

S

A-04PROJECT MILESTONE

TITLE

DRAWING PATH

SHEET NUMBER

CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE

PROJECT NUMBER30% DESIGN

SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S

GRADING PLAN.dwg

OF

ELEVATION PLAN - SW Side

PROJECT NUMBER 0908

PROJECT NAME

CONTONMENTS STORAGE PEB

B

D

F

H

J

L

N

P

NW Alignment PROFILE

-0+50 0+00 1+00 1+50

0+00 1+00 1+50 0+00

.1

.1

1+00

.8

.8

REVISION DATE: Tuesday, December 7, 2021 2:50:36 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531

NE ALIGNMENT

SCALE: NTS

A

C

E

G

I

K

M

O

Q

S

A-05PROJECT MILESTONE

TITLE

DRAWING PATH

SHEET NUMBER

CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE

PROJECT NUMBER30% DESIGN

SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S

GRADING PLAN.dwg

OF

ELEVATION PLAN - NW Side

PROJECT NUMBER 0909

PROJECT NAME

CONTONMENTS STORAGE PEB

B

D

F

H

J

L

N

P

Sheets and Views
01 COVER SHEET
02 NOTES AND LEGEND
03 EXISTING SITE PLAN
04 GRADING PLAN
05 FLOOR PLAN
06 ELEVATION PLAN - NE Side
07 ELEVATION PLAN - SE Side
08 ELEVATION PLAN - SW Side
09 ELEVATION PLAN - NW Side

File details come from the government source that posted it. Updated .