20211207 CANTONMENTS STORAGE PEB.pdf
PDF 1 MB Posted
- Attached to
- Cantonments PEB Federal contract opportunity
- Solicitation number
- FA4626-22-Q-0004
About this file
This document package includes a government file and federal contract opportunity related to the design and fabrication of a Pre-Engineered Building (PEB) at Malmstrom Air Force Base in Montana.
The government file provides design drawings and notes for a 10,000 square foot PEB facility intended to store RED HORSE equipment and supplies. The drawings show the site plan, floor plan, elevations, and other details of the proposed building. The opportunity solicits bids to design, fabricate, and deliver structural steel, insulated metal panels, doors, and other components for the PEB. The Department of the Air Force Global Strike Command is seeking these goods and services for contract number FA4626-22-Q-0004. Delivery of designed and fabricated components is the scope of work, while electrical, plumbing, and other build-out will be Government-furnished. The response due date and award timing are not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA462622Q00040001 SF 30.pdf | ||
| NZAS201003 Specifications Sheet for Cantonments PEB 20220119.doc | DOC document | |
| Solicitation - FA462622Q0004.pdf | ||
| Yellow Knife Combined PEB Dwgs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CS
NLOCATION MAP
819 RED HORSE SQUADRON
CONTONMENTS STORAGE PEB
MALMSTROM, AFB
30% DESIGN
SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S
COVER SHEET.dwg
OF
COVER SHEET
PROJECT NUMBER 0901
BUILD ANYTHING, ANYTIME, ANYPLACE!
TO THE HORSE!
PROJECT LOCATION
COMMANDER:
CHIEF ENLISTED:
ENGINEERING FLIGHT CC:
PROJECT ENGINEER:
PROJECT MANAGER:
PROJECT SAFETY:
EA SUPERINTENDENT:
EA LEAD:
AIRFIELDS CRAFT LEAD:
HVAC CRAFT LEAD:
UTILITIES CRAFT LEAD:
ELECTRICAL CRAFT LEAD:
STRUCTURES CRAFT LEAD:
ENGINEERING STAMP LT COL VELAZQUEZ
CMSGT LAIDLAW
CAPT. SANDERS
CAPT. TANAP
TBD
TBD
MSGT PERKINS
SRA LEWIS
TBD
TBD
TBD
TBD
TBD
819TH RHS
CONTONMENTS STORAGE PEB
8 9 10 11 12 13 14 15 16654321
A
B
C
D
E
F
G
H
I
J
REVISION DATE: Tuesday, December 7, 2021 1:25:29 PM
AutoCAD SHX Text
PROJECT MILESTONE
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
DRAWING PATH
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
SHEET DESIGNATOR
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
SHEET LIST TABLE
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
AutoCAD SHX Text
NOTES AND LEGEND
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING SITE
AutoCAD SHX Text
AutoCAD SHX Text
DEMO PLAN
AutoCAD SHX Text
AutoCAD SHX Text
GRADING PLAN
AutoCAD SHX Text
AutoCAD SHX Text
FLOOR PLAN
AutoCAD SHX Text
AutoCAD SHX Text
EXTERIOR ELEVATION
REVISION DATE: Tuesday, December 7, 2021 1:23:40 PM 7 8 9 10 11 12 13 14 15 16654321
A
B
C
D
E
F
G
H
I
J G-1PROJECT MILESTONE
TITLE
DRAWING PATH
SHEET NUMBER
CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE
PROJECT NUMBER30% DESIGN
SRA LEWIS TSGT HEAPE CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S
NOTES AND LEGEND.dwg
OF
NOTES AND LEGEND
PROJECT NUMBER 0902
PROJECT NAME
CONTONMENTS STORAGE PEB
GENERAL NOTES
1. CONTACT THE ONE CALL UTILITY LOCATE AND PROCESS THE WORK CLEARANCE REQUEST -
(AF FORM 103).
2. GAS MAINS, UNDERGROUND ELECTRICAL AND COMMUNICATION CABLES, TELEPHONE POLES, LIGHT POLES, IRRIGATION SYSTEM, SIGNS, ETC., REQUIRED TO BE MOVED OR LOWERED FOR NEW CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR.
3. HAND OR HYDRO-VAC EXCAVATE AND EXPOSE ALL UTILITIES PRIOR TO BEGINNING EXCAVATION. LOWER ANY COMMUNICATION OR
ELECTRICAL LINES TO MAINTAIN 30" OF COVER TO FINISHED GRADE.
4. OBTAIN ANY NECESSARY PERMITS. ANY FEES ASSOCIATED WITH PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR.
5. RESTORE ALL DISTURBED AREAS AFFECTED BY CONSTRUCTION TO ORIGINAL CONDITION, UNLESS OTHERWISE NOTED ON PLANS.
6. FIELD VERIFY LINE AND GRADE OF EXISTING UTILITIES & CONNECTIONS PRIOR TO ORDERING/PROCURING MATERIALS OR BEGINNING
TRENCH EXCAVATION.
7. WHERE CURB, GUTTER OR SIDEWALK MUST BE REMOVED & REPLACED, DEMO SHALL EXTEND TO THE NEAREST CONTROL JOINT BEYOND LIMITS IDENTIFIED ON THE PLANS. ADDITIONAL REMOVED AND REPLACED QUANTITIES BEYOND PLAN LIMITS SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR.
8. PROTECT ALL EXISTING SURVEY MONUMENTATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REPLACE ANY DISTURBED MONUMENTATION.
9. COORDINATE ALL TRAFFIC CONTROL, SITE ACCESS ISSUES, AND TEMPORARY DUMPSTER LOCATION WITH THE CONTRACTING OFFICER'S
TECHNICAL REPRESENTATIVE (COTR).
10. ALL OPEN TRENCHES, CONSTRUCTION HAZARDS OR CONDITIONS POTENTIALLY CONSIDERED AN "ATTRACTIVE NUISANCE" SHALL BE SECURED
WITH FENCING, BARRICADES OR OTHER MEANS TO CONTROL SITE ACCESS.
11. ALL POWER, COMMUNICATION, OR OTHER UTILITIES THAT INTERFERE WITH THE CONSTRUCTION SHALL BE LOWERED OR RELOCATED.
CONTRACTOR TO COORDINATE WITH COTR/SHOPS PRIOR TO CONSTRUCTION. SEE ELECTRICAL PLANS FOR PLANNED LIMITS OF ADJUSTMENTS
NEEDED.
12. DESIGNED IAW UFC 1-200-01 DoD BUILDING CSDA
13. UNITS IN IMPERIAL SYSTEM UNLESS OTHERWISE NOTED.
WATER NOTES
1. ALL GRAVITY STORM SEWER PIPE IS TO BE SDR35 PVC AND MEET ASTM 3034 STANDARDS UNLESS OTHERWISE NOTED ON PLANS.
2. MAINTAIN A MINIMUM OF 18" VERTICAL SEPARATION AT CROSSINGS BETWEEN OUTSIDE OF SEWER/STORM DRAIN PIPE AND OUTSIDE OF
WATER PIPE.
3. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL SEPARATION BETWEEN OUTSIDE OF SEWER OR STORM DRAIN PIPE AND OUTSIDE OF WATER
PIPE.
4. FIELD VERIFY LINE AND GRADE OF EXISTING CONNECTIONS.
5. EXCAVATE ALL CROSSINGS BETWEEN WATER LINES AND STORM DRAIN LINES PRIOR TO BEGINNING TRENCH EXCAVATION TO ENSURE
CROSSING CLEARANCE.
SURVEYING NOTES
1. BENCHMARK CONTROL - BRASS CAP #59 NORTHING: XXXXXXXXX.XXXX, EASTING: XXXXXXXXX.XXXX, ELEVATION: XXXXX.XXX
1.1 COORDINATE SYSTEM - NAD 1983, MONTANA STATE PLANE 2500. ENTIRE PROJECT SURVEYED IN U.S. SURVEY FEET. NO GEOID IS USED.
2. LOCAL SITE CONTROL WAS ESTABLISHED BY 819 RHS/RE UTILIZING GPS (TRIMBLE R10-2) MOBILE BASE STATION AND ROVER SET UP.
2.1. TEMPORARY SITE CONTROLS WERE ESTABLISHED USING A 15 MIN OBSERVED CONTROL POINT MEASUREMENT
3. TEMPORARY SITE CONTROL POINTS WERE MARKED WITH ALIGNMENT MARKINGS AND IDENTIFIED WITH PINK MARKING PAINT
3.1 TBM1 N:1190891.134, E:1550262.677, ELEV:3483.706 (BOLT ON OBSERVATION MONITORING WELL CAP)
3.2 TBM2 N:1191082.341, E:1550311.287, ELEV:3483.024 (EDGE OF ELECTRIC MAN HOLE COVER)
3.3 TBM1 N:1191121.024, E:1550184.775, ELEV:3483.532 (INSIDE CORNER #7 ON FLIGHT LINE FUEL ACCESS COVER)
3.4 TBM2 N:1190917.657, E:1549975.808, ELEV:3485.461 (INNER, UPPER CORNER #4 ON FLIGHT LINE FUEL ACCESS COVER)
4. ANY QUESTIONS REGARDING THE ESTABLISHMENT OF SITE CONTROLS FOR THIS PROJECT SHOULD BE DIRECTED TO 819 RHS/DE - DSN 731-4918
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
TBM1
TBM2
TBM3
TBM4
3484.00
3483.00
3482.03
3484.32
0+
1+
0+00
1+00 0+
1+
0+00
1+00
FENCE
FENCE
FENCE
FENCE
FENCE
REVISION DATE: Tuesday, December 7, 2021 2:46:31 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531
N 1" = 40'
A
C
E
G
I
K
M
O
Q
S
C-01PROJECT MILESTONE
TITLE
DRAWING PATH
SHEET NUMBER
CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE
PROJECT NUMBER30% DESIGN
SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21
EXISTING SITE PLAN-ANSI_D.dwg
OF
EXISTING SITE PLAN
PROJECT NUMBER 0903
PROJECT NAME
CONTONMENTS STORAGE PEB
B
D
F
H
J
L
N
P
R
T
LEGEND
ELECTRICAL
FUEL
WATER
FENCE
WORKING SURFACE
CANTONMENTS
STORAGE PEB
FUTURE PEB
SITES
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
PEB CRNR
TBM1
TBM2
TBM3
TBM4
3484.00
3483.00
3482.03
3484.32
0+
1+
0+00
1+00 0+
1+
0+00
1+00
FENCE
FENCE
FENCE
FENCE
FENCE
REVISION DATE: Tuesday, December 7, 2021 2:50:36 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531
N
A
C
E
G
I
K
M
O
Q
S
C-03PROJECT MILESTONE
TITLE
DRAWING PATH
SHEET NUMBER
CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE
PROJECT NUMBER30% DESIGN
SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 1"= 40'
GRADING PLAN.dwg
OF
GRADING PLAN
PROJECT NUMBER 0904
PROJECT NAME
CONTONMENTS STORAGE PEB
B
D
F
H
J
L
N
P
R
T
MECH
ROOM
RE
ST
RO
OM
OFFICE
REVISION DATE: Tuesday, December 7, 2021 2:47:02 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531
N
A
C
E
G
I
K
M
O
Q
S
A-5PROJECT MILESTONE
TITLE
DRAWING PATH
SHEET NUMBER
CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE
PROJECT NUMBER30% DESIGN
SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 1"= 10'
FLOOR PLAN.dwg
OF
FLOOR PLAN
PROJECT NUMBER 0913
PROJECT NAME
CONTONMENTS STORAGE PEB
B
D
F
H
J
L
N
P
Elevation
Station
NE Alignment PROFILE
-0+50 0+00 1+00 1+50
0+00 1+00 1+50
REVISION DATE: Tuesday, December 7, 2021 2:50:36 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531
NE ALIGNMENT
SCALE: NTS
A
C
E
G
I
K
M
O
Q
S
A-02PROJECT MILESTONE
TITLE
DRAWING PATH
SHEET NUMBER
CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE
PROJECT NUMBER30% DESIGN
SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S
GRADING PLAN.dwg
OF
ELEVATION PLAN - NE Side
PROJECT NUMBER 0906
PROJECT NAME
CONTONMENTS STORAGE PEB
B
D
F
H
J
L
N
P
SE Alignment PROFILE
-0+50 0+00 1+00 1+50
0+00 1+00 1+50
EXISTING GROUND
FINISHED FLOOR
REVISION DATE: Tuesday, December 7, 2021 2:50:36 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531
SE ALIGNMENT
SCALE:
A
C
E
G
I
K
M
O
Q
S
A-03PROJECT MILESTONE
TITLE
DRAWING PATH
SHEET NUMBER
CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE
PROJECT NUMBER30% DESIGN
SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S
GRADING PLAN.dwg
OF
ELEVATION PLAN - SE Side
PROJECT NUMBER 0907
PROJECT NAME
CONTONMENTS STORAGE PEB
B
D
F
H
J
L
N
P
SW Alignment PROFILE
-0+50 0+00 1+00 1+50
0+00 1+00 1+50 0+00
.8
.8
1+00
.4
.3
REVISION DATE: Tuesday, December 7, 2021 2:50:36 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531
SE ALIGNMENT
SCALE:
A
C
E
G
I
K
M
O
Q
S
A-04PROJECT MILESTONE
TITLE
DRAWING PATH
SHEET NUMBER
CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE
PROJECT NUMBER30% DESIGN
SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S
GRADING PLAN.dwg
OF
ELEVATION PLAN - SW Side
PROJECT NUMBER 0908
PROJECT NAME
CONTONMENTS STORAGE PEB
B
D
F
H
J
L
N
P
NW Alignment PROFILE
-0+50 0+00 1+00 1+50
0+00 1+00 1+50 0+00
.1
.1
1+00
.8
.8
REVISION DATE: Tuesday, December 7, 2021 2:50:36 PM 14 16 18 20 22 24 26 28 30 3212108642 13 15 17 19 21 23 25 27 29 311197531
NE ALIGNMENT
SCALE: NTS
A
C
E
G
I
K
M
O
Q
S
A-05PROJECT MILESTONE
TITLE
DRAWING PATH
SHEET NUMBER
CHECKED BYDRAWN BY DESIGNED BY SHEET DESIGNATORDATE SCALE
PROJECT NUMBER30% DESIGN
SRA LEWIS MSGT PERKINS CAPT. TANAP 7-Dec-21 HORZ: N.T.S VERT:N.T.S
GRADING PLAN.dwg
OF
ELEVATION PLAN - NW Side
PROJECT NUMBER 0909
PROJECT NAME
CONTONMENTS STORAGE PEB
B
D
F
H
J
L
N
P
| Sheets and Views |
| 01 COVER SHEET |
| 02 NOTES AND LEGEND |
| 03 EXISTING SITE PLAN |
| 04 GRADING PLAN |
| 05 FLOOR PLAN |
| 06 ELEVATION PLAN - NE Side |
| 07 ELEVATION PLAN - SE Side |
| 08 ELEVATION PLAN - SW Side |
| 09 ELEVATION PLAN - NW Side |
File details come from the government source that posted it. Updated .