2021103 Pay Items Worksheet - revised.pdf
PDF 116 KB Posted
- Solicitation number
- IFB 360 2021103 5
- Issued by
- Palm Beach County, Florida
About this file
This is a Pay Items Worksheet for the Florida Department of Transportation (FDOT) related to the Military Trail & Golf Road Intersection Improvement Project in Florida. The document outlines roadway construction items required for the project, including mobilization, maintenance of traffic with pedestrian accommodation, clearing and grubbing, and earthwork operations. Specific quantities include 1,025 cubic yards of regular excavation, 51 cubic yards of compacted embankment, 2,061 square yards of optional base material, 7,453 square yards of milled existing asphalt pavement at 1 inch average depth, 147 tons of Superpave asphalt concrete traffic course at 1.5 inches, and 510 tons of asphalt concrete friction course at 1.0 inches. The worksheet also includes provisions for inlet installation, though the specific quantity and details are partially cut off in the document.
The proposal form requires contractors to provide unit prices and calculate total amounts for each line item. Pricing will be lump sum for mobilization and maintenance of traffic, with unit pricing applied to quantified items such as excavation, embankment, base material, milling, and asphalt concrete placement. This worksheet serves as the basis for bid preparation, allowing contractors to calculate their total project cost by multiplying unit prices by specified quantities across all roadway improvement items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Qualifications and Experience Package Form.docx | DOCX document | |
| Alternate Format Availability.pdf | ||
| 2021103 Pre-Bid Sign-In-Sheet.pdf | ||
| 2021103 Signing and Pavement Marking Plans.pdf | ||
| Qualifications and Experience Package Form.pdf | ||
| 2021103 Addendum 1.pdf | ||
| 2021103 RFI Form.docx | DOCX document | |
| 2021103 Roadway Plans Part 1 of 2.pdf | ||
| 2021103 Roadway Plans Part 2 of 2.pdf | ||
| 2021103 Addendum 2.pdf | ||
| OSBD Schedules and Instructions.pdf | ||
| 2021103 Pay Items Worksheet - revised.xlsx | XLSX spreadsheet | |
| 2021103 Spec Book.pdf | ||
| 2021103 RFI Form.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL FORM
# FDOT ITEM
NUMBER ITEM DESCRIPTION QTY UNITS UNIT PRICE AMOUNT
ROADWAY ITEMS
1 0101 1 MOBILIZATION 1 LS
2 0102 1 MAINTENANCE OF TRAFFIC (INCLUDING PED. MOT) 1 LS
3 0110 1 1 CLEARING AND GRUBBING 1 LS
4 0120 1 REGULAR EXCAVATION 1,025 CY
5 0120 6 EMBANKMENT (COMPACTED IN PLACE) 51 CY
6 0285 713 OPTIONAL BASE, BASE GROUP 13 2,061 SY
7 0327 70 1 MILL EXISTING ASPHALT PAVEMENT, 1" AVG DEPTH 7,453 SY
8 0334 1 13 SUPERPAVE ASPHALT CONCRETE (TRAFFIC C) (1.5" ) 147 TN
9 0337 7 82 ASPHALT CONCRETE FRICTION COURSE (1.0") (FC-9.5) 510 TN
10 0425 1521 INLETS, DT BOT, TYPE C, <10' 2 EA
11 0425 1910 INLETS CLOSED FLUME 2 EA
12 0425 5 ADJUST MANHOLE 4 EA
13 0430 174118 PIPE CULVERT (18") 67 LF
14 0443 70 3 FRENCH DRAIN (18" HDPE) 4' WIDE 70 LF
15 0520 1 10 CONCRETE CURB & GUTTER (TYPE F) 815 LF
16 0520 70 CONCRETE TRAFFIC SEPERATOR VARIABLE WIDTH (5" THICK) 182 SY
17 0522 1 CONCRETE SIDEWALK (4" THICK) 3 SY
18 0522 2 CONCRETE SIDEWALK (6" THICK) 17 SY
19 0570 1 2 SODDING 1,619 SY
SUBTOTAL (ROADWAY)
21 0102 99 CHANGEABLE (VARIABLE MESSAGE) (NON MOT) 7 ED
22 0121 70 FLOWABLE FILL 50 CY
23 N/A STORM SEWER PUMPING (EXIST.) (24" OR LESS) (SEE SP'S) 544 LF
24 N/A STORM SEWER CLEANING (EXIST.) (24" OR LESS) (SEE SP'S) 544 LF
25 N/A REMOVE AND RESET FENCE 500 LF
26 N/A TEMPORARY FENCE 150 LF
27 0400 1 15 CLASS I CONCRETE MISCELLANEOUS 10 CY
SUBTOTAL (CONTINGENCY)
Note # FDOT Item #
1 All
2 All
3 All
4 0102 1
5 0110-11
6 0285 713
0327 70 1
0334 1 13
0337 7 82
Includes all items for maintenance of traffic which are not included for payment under separate items. includes the preparation of temporary traffic control plans. Includes pedestrian maintenance of traffic in accordance with the specifications. Includes temporary pavement markings & signal.
Includes removal of existing, drainage structures & pipes, culverts, signs, fence, trees, hedge, curbs, sidewalks, asphalt, base, concrete, guardrail, temporary construction detours, capping or modifying monitoring wells and any other items to be removed that are not specifically covered under another separate pay item. Includes tree removal and trimming for utility installation. Includes all saw cutting as shown on the plans or as directed by the engineer.
Includes cost of 12" thick compaction of subgrade per FDOT standards.
Includes bituminous material, prime coat and tack coat, as required. Includes removal of existing rpm's, saw cutting and removal of existing asphalt at butt joint, tie-in existing pavement.7
FDOT Item numbers are for use in determining eligibility for price adjustment per General Provision 9-2 only.
THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS.
PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE.
All costs for Maintenance of Traffic (MOT) and mobilization shall be considered incidental to, and shall be included in, unit prices for the pay items.
All items shall include cost to furnish and install unless otherwise noted.
PAY ITEM FOOTNOTES
BID PROPOSAL
Military Trl & Golf Rd. Intersection Improvements
PBC PROJECT #2021103
THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET.
TOTAL BID
CONTINGENCY ITEMS
20 0102 14 TRAFFIC CONTROL OFFICER (NON MOT) 20 HR $
P-2B
PROPOSAL FORM
# FDOT ITEM
NUMBER ITEM DESCRIPTION QTY UNITS UNIT PRICE AMOUNT
BID PROPOSAL
Military Trl & Golf Rd. Intersection Improvements
PBC PROJECT #2021103
0425 1521
0425 1910
0425 5
0430 174115
0430 174118
0443 70 3
9 0520 1 10
0522 1
0522 2 10 The cost of detectable warning surfaces and ADA ramps are included in the cost of this pay item. Includes cost of concrete slabs.
Items include saw-cutting and removal of existing pipe, core drilling or concrete collars to join new pipe to existing pipe, and all repair/restoration of existing facilities and surfaces as required, including any/all shoring, sheeting and bracing and/or trench boxes as required for construction or as directed by the engineer. Includes the cost of fabrication, furnishing and installing all components of storm water control structure(s) as detailed in the plans. Includes the cost of all labor and material for “open-cut” pavement repairs. The cost of pipe shall include the cost of back filling required over pipes to finished grades as shown on the plans.
Includes the cost of curb pad, flared end, modified type F curb and gutter, and engraving of curb face.
P-3B
Roadway Quantities
File details come from the government source that posted it. Updated .