2021-08 Bid Document Attachments.pdf
PDF 821 KB Posted
- Attached to
- Highway Salt Shed Roofing, Siding & Repairs
- Solicitation number
- 2021-08
- Issued by
- Racine County, Wisconsin
About this file
This Request for Bid (RFB) document is issued by the Portage County Purchasing Department in Wisconsin for highway salt shed roofing, siding, and repairs at the Portage County Highway Department facility located at 850 Cubbie Lane, Plover, Wisconsin. The project encompasses a complete roof replacement on Salt Shed #1 using 29-gauge steel panels with specific coating and warranty requirements, repairs to Salt Shed #2 involving shingle replacement and skylight repair, and steel siding installation on the brine production building. A mandatory pre-bid site visit was scheduled for February 16, 2021, at 10:00 a.m., and all bid submissions were due by 2:00 p.m. on March 2, 2021. The bid identification number is 2021-08, with all work required to be completed by August 1, 2021. Questions regarding specifications were required to be submitted in writing by the end of business on February 22, 2021, and any issued addenda would be posted on both VendorNet and the Portage County website.
Bidders were required to submit an original and one copy of all bid documents, including a Signature and Authority Affidavit Form, References Sheet, Bid Offer Form, and manufacturer's warranty statements. Award was to be made on the basis of the lowest responsive bid from a qualified bidder meeting all specifications, with consideration given to project completion timeliness. Bidders must have been in similar business for at least five years and were required to provide three references from comparable institutions served within the past three years. The awarded contractor was required to maintain a Certificate of Insurance with minimum coverage of one million dollars for general liability and automobile coverage, provide a two-year warranty on all workmanship and materials, and comply with all OSHA standards. Pricing was to remain firm for 60 calendar days following bid opening, and invoicing was to be submitted itemized to the address specified on the purchase order, with county payment or rejection to occur within 30 days of receipt.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2021-08 Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Bid (RFB) for
Highway Salt Shed Roofing, Siding & Repairs
Bid #2021-08
Issued by:
Portage County Purchasing Department
All required bid documents/copies must be submitted No later than 2 PM 03/02/2021 to:
Portage County Purchasing
1462 Strongs Ave Stevens Point WI 54481
LATE BIDS WILL BE REJECTED
There will be a public opening for this Bid
For further information regarding this RFB contact Karen Kluck
At (715) 346-1333 Email: kluckk@co.portage.wi.us
Issued: 2/9/2021
Portage County Bid #2021-08 Wisconsin Page 2 of 13
Table of Contents
Section Subject Page #
1. General Information and Scope
2. Mandatory Pre-Bid Site Visit
3. Questions
4. Method of Bid
5. Bid Submission
6. Bid Response Requirements
7. Method of Award
8. Bidder/Contractor Qualifications
9. Specifications
10. On-Site Service
11. Subcontracting or Third Party Payments
12. Firm prices
13. Invoicing Requirements
14. Contract Cancellation
15. Appeals Process
16. Special Conditions of this Bid
ATTACHMENT A – SIGNATURE AND AUTHORITY AFFIDAVIT FORM
ATTACHMENT B – REFERENCES SHEET
ATTACHMENT C – BID OFFER FORM
ATTACHMENT D – STANDARD TERMS AND CONDITIONS
ATTACHMENT E – SPECIFICATIONS
ATTACHMENT F - DRAWINGS
Wisconsin Page 3 of 13
1. General Information and Scope The County of Portage Wisconsin (County), through its Purchasing Department (Purchasing), requests to bids for a roof replacement on the Salt Shed (#1), repairs to Salt Shed (#2) and siding of the brine production building located at Portage County Highway Department, 850 Cubbie Lane, Plover, WI 54467.
The attached Standard Terms and Conditions shall govern this bid unless specifically modified in these bid documents. Conditions of bid that include the word "must" or "shall,” describe a mandatory requirement. All specifications are defined as mandatory minimum requirements unless otherwise stated. If no bidder is able to comply with a given specification or condition of bid, Purchasing reserves the right to delete that specification or condition of bid. Failure to meet specification requirements shall disqualify your bid. Vendors may not submit their own contract document as a substitute for these terms and conditions.
Retain a copy of these Bid documents for your files. Should you receive an award, these Bid documents become your contract terms and conditions.
Contract Execution: Portage County utilizes a web based electronic signature program (DocuSign) for the execution of contracts that do not require notarization. By submitting your bid you are agreeing to the use of this program to sign documents should you receive an award. There is no cost to the bidder associated with this process.
Definitions: The following definitions are used throughout the RFB documents:
Bidder/Vendor means a company or individual submitting a bid response to this RFB Contractor means bidder awarded the contract County means the County of Portage Wisconsin Purchasing means the County of Portage Purchasing Department RFB means Request for Bid State means the State of Wisconsin VendorNet means the State of Wisconsin’s electronic purchasing information system
2. Mandatory Pre-Bid Site Visit A mandatory vendor site visit will be held on 2/16/2021 at 10:00am at 850 Cubbie Ln, Plover, WI 54467 in front of the 2 salt sheds. A bid addendum will be issued if the site visit is changed or cancelled.
Failure to attend this pre-bid site visit will disqualify your bid. Failure to examine any and all bid documents and the site prior to submitting a bid will in no way relieve the successful bidder from the necessity of furnishing, without additional cost to the County, any materials or equipment or performing any work that may be required to complete the work in accordance with the specifications.
3. Questions If a vendor discovers any significant ambiguity, error, conflict, discrepancy, omission, or other deficiency in this RFB they shall notify the Procurement Director named below of such error and request a modification or clarification.
Any communications or questions regarding the specifications, or special conditions of bid should be written and submitted to Purchasing as soon as possible, but no later than End of day 2/22/2021.
Purchasing will respond to questions if necessary, by issuing an official addendum, posted on VendorNet and on the Portage County Website. Bidders are responsible for checking these websites for any addenda before submitting a bid. Failure to acknowledge addenda may disqualify your bid.
Wisconsin Page 4 of 13 https://vendornet.wi.gov/ https://www.co.portage.wi.us/
Any correspondence or questions submitted must include the bid number
Submit questions in writing via email to:
Karen Kluck, Procurement Specialist, e-mail: kluckk@co.portage.wi.us Phone: 715-346-1333
4. Method of Bid Bidder must submit a unit price and extended total for each item and a total price as designated. All prices must be quoted in U.S. Dollars.
Bidder must bid on the enclosed Bid Offer Form.
5. Bid Submission Bidders must submit an original and one copy including all required materials for acceptance of their bid by the date and time listed on the Bid Cover Sheet. Any bids received after that time and date will be rejected. Receipt of a bid by the US mail system does not constitute receipt of a bid by Purchasing, for purposes of this RFB. Also refer to the Bid Response Requirements.
Faxed and e-mailed bids are not accepted. Bids must be forwarded to:
Portage County Purchasing
ITEM OF NOTE: Due to COVID-19, County Offices are closed at this time. If you intend to physically drop off your bid to the above address, please call or email Chris Schultz during business hours and days (8am-4pm) for an appointment. Please do so with 24-hour advanced notice at 715-346-1393 or schultzc@co.portage.wi.us
All bids are to be packaged, sealed, and show the following information on the outside of the package:
-Vendor's Name and Address -Request for Bid Title -Request for Bid Number -Bid Due Date
6. Bid Response Requirements In order for your bid to be considered, the following information must be provided by the due date and time listed on the bid cover page. Failure to include any required documents will disqualify your bid.
Include an original and a copy:
6.1 Signature and Authority Affidavit Form with acknowledgement of any addendums, Attachment A
6.2 References Sheet, Attachment B
6.3 Bid Offer Form, Attachment C
6.4 Manufacturer’s/Bidder’s warranty statement
The Signature and Authority Affidavit submitted in response to this RFB must be signed by the person in the Contractor's organization who is responsible for the decision as to the prices being offered in the Bid or by a person who has been authorized in writing to act as agent for the person responsible for the decision on prices and services. Failure to provide these forms/information with your bid submittal may https://vendornet.wi.gov/ https://www.co.portage.wi.us/ mailto:kluckk@co.portage.wi.us mailto:schultzc@co.portage.wi.us
Wisconsin Page 5 of 13 disqualify your bid. The County encourages all bidders to print their submission double-sided to save paper
7. Method of Award Award(s) shall be made on the basis of the lowest per item line or total price from a responsive, responsible bidder who meets specifications. Timeliness of project completion may be considered when making this award.
8. Bidder/Contractor Qualifications To be eligible for a contract award, you must be qualified and able to provide the following:
8.1 Bidder must supply references of three firms to which similar service has been provided during the past three years to a comparable-sized institution or company. If contacted, all of those references must verify that a high level of satisfaction was provided. Use Attachment B to list references.
8.2 Bidder must be in similar business for the past five (5) years.
8.3 Bidder must provide a statement of their Warranty Policy on any service or parts they may provide.
8.4 Awarded contractor must provide Purchasing a Certificate of Insurance and maintain the minimum limits specified for the term of the contract. All policies must be issued with a 30-day cancellation notice, by an insurance company licensed to do business in the State of Wisconsin, with a minimum AM Best rating of A1, and signed by an authorized agent.
Maintain worker's compensation insurance as required by Wisconsin Statutes, for all employees engaged in the work.
Maintain commercial general liability, bodily injury and property damage insurance against any claim(s) which might occur in carrying out this agreement/contract. Minimum coverage shall be one million dollars ($1,000,000) general liability for bodily injury and property damage including products liability and completed operations. Provide motor vehicle insurance for all owned, non-owned and hired vehicles that are used in carrying out this contract. Minimum coverage shall be one million dollars ($1,000,000) per occurrence combined single limit for automobile liability and property damage.
9. Specifications The following specifications are minimum acceptable requirements. When specific manufacturer and model numbers are used, they are to establish a design, type of construction, quality, functional capability and/or performance level desired unless otherwise specified. When alternates are bid/proposed, they must be identified by manufacturer, stock number, and such other information necessary to establish equivalency. The County of Portage shall be the sole judge of equivalency. Failure to provide product specifications and information may disqualify your bid. Any attachments, documents, price lists, etc. to support your bid, must include the bid number.
Bid specifications may not be revised without an official written addendum issued by Purchasing.
See ATTACHMENT E for the minimum acceptable specifications for products desired.
Wisconsin Page 6 of 13
Project Completion and Penalties for Incomplete Work
Completion of all work shall be required by 08/01/2021. Failure to be able to meet this completion requirement shall disqualify your bid. Failure to complete the project by this date, absent any weather delays or delays caused by the County, shall result in a reduction of payment by $100 per day not completed.
10. On-Site Service In carrying out the scope of this contract, the Contractor shall be required to perform services on County property. Bidders must include all transportation and insurance charges.
Failure to include these costs may disqualify your bid.
11. Subcontracting or Third Party Payments All subcontracting shall be pre-approved upon award by the County before any work begins.
Subcontractors must abide by all terms and conditions of the contract. The prime contractor shall be responsible for all subcontractor(s) work and payment.
12. Firm prices Prices must remain firm for 60 calendar days after bid opening. Prices established may be lowered due to general market conditions.
13. Invoicing Requirements The County’s terms are to pay or reject invoices within 30 days of receipt. Before payment is made, it also must verify that all invoiced charges are correct as per this contract. Only properly submitted invoices shall be officially received for payment. Thus, your prompt payment requires that your invoices be clear and complete in conformity with the instructions below.
All invoices must be itemized showing:
a. purchase order number d. complete product description as
b. vendor name stated on your bid.
c. remit to address e. prices per the contract
The original invoice must be sent to the bill-to address shown on the Purchase Order.
14. Contract Cancellation This Contract may be terminated by either party under the following conditions:
14.1 The County may terminate the contract at any time at its sole discretion by delivering 30 days written notice to the Contractor.
If the problem is service performance, Contractor will be warned either verbally or in writing of unsatisfactory performance and intent to cancel this contract. Contractor will be given a period of time to ‘cure’ the performance. If the performance does not improve, Contractor will be given 3 days written notice that the contract will be cancelled.
Upon termination, the County’s liability will be limited to the pro rata cost of the services performed as of the date of termination.
Wisconsin Page 7 of 13
14.2 In the event the Contractor terminates the contract, for any reason whatsoever, it will require written certified letter notification delivered to the Purchasing Department not less than 60 days prior to said termination. The Contractor will, in turn, refund the County, within 30 days of said termination, all payments made hereunder by the County to the Contractor for work not completed.
14.3 If at any time the Contractor’s performance threatens the health and/or safety of the County or the public, the County has the right to cancel and terminate the contract without notice.
14.4 If the Contractor fails to maintain and keep in force the insurance as required, the County has the right to cancel and terminate the contract without notice.
15. Appeals Process Notices of intent to protest and protests must be made in writing. Protestors should make their protests as specific as possible and should identify Wisconsin Statutes or Portage County Ordinance provisions that are alleged to have been violated.
The written notice of intent to protest the intent to award a contract must be filed with Chris Schultz, Procurement Director, Portage County Wisconsin, 1462 Strongs Ave, Stevens Point, WI 54481, and received in his office no later than five (5) working days after the notice of intent to award is issued.
The written protest must be received in his office no later than ten (10) working days after the notice of intent to award is issued.
The decision of the Procurement Director may be appealed to the Corporation Counsel Office within (5) working days of issuance. The appeal must allege a violation of a Wisconsin Statute or a Portage County Ordinance provision.
16. Special Conditions of this Bid
16.1 CHANGES IN THE WORK
No changes in the work may be made by the Contractor without having prior approval of the County. The County may at any time, without invalidating the Contract and without Notice to Sureties, order changes in the Work by written Change Order or Field Order. Such changes may include additions and/or deletions.
16.2 WARRANTY
A two-year warranty for defective workmanship and/or replacement of defective products/materials of the contract is required in addition to any warranties provided automatically by the manufacturers of the products/materials. Provide documentation of manufacturers’ warranties to the County.
16.3 EQUIPMENT AND/OR MATERIALS ON SITE
The successful bidder or an authorized representative must be present to accept delivery at the job site of all equipment and material shipments that are part of the contract. It shall be the contractor’s responsibility to assume all liability for any equipment or materials delivered to the job site. Delivery of any equipment or materials any day ‘before’ work will proceed must be coordinated with the County. The Contractor is responsible for the security and safety of equipment or materials onsite.
Wisconsin Page 8 of 13
Attachment A
Signature and Authority Affidavit Form
BIDDING COMPANY NAME: __________________________________________________________
FEIN (Federal Employer ID Number) OR Social Security # (if Sole Proprietorship)
Address: __________________________________________________________________________
City _____________________________ State ________ Zip + 4 _______________________
Number of years in Business _______
Name the person to contact for questions concerning this bid.
Name ___________________________ Title _______________________________
Phone ( ) _______________________ Toll Free Phone ( ) __________________________
Fax ( ) _______________________ Email Address ____________________________
In signing this bid, we also certify that we have not, either directly or indirectly, entered into any agreement or participated in any collusion or otherwise taken any action in restraint of free competition; that no attempt has been made to induce any other person or firm to submit or not to submit a bid; that this bid has been independently arrived at without collusion with any other bidder, competitor or potential competitor; that this bid has not been knowingly disclosed prior to the opening of bids to any other bidder or competitor; that the above statement is accurate under penalty of perjury.
The undersigned, having familiarized themselves with the conditions affecting the cost of the work, having read completely the specifications, hereby proposes to perform everything required and to provide and furnish labor, materials, equipment, tools and all other services and supplies necessary to produce in a complete and workmanlike manner all of the materials or products described in the specifications relating to this Bid.
I further certify that I have carefully examined the bid documents and all terms herein, and site where the work is to be done and have no agreements to prevent the completion of said work.
Signature Title
Name (type or print) Date
This firm herby acknowledges receipt / review of the following addendum(s) (If any)
Addendum #_____ Addendum #_____Addendum #_____Addendum #_____
Wisconsin Page 9 of 13
Attachment B
References
Vendor: _______________________________________________________________________
Provide company name, address, contact person, telephone number, and appropriate information on the product(s) and/or service(s) provided to customers similar to those requested in this solicitation document.
Potential subcontractors cannot be references. Any subcontractor arrangement for the completion of this work shall be listed on a separate page.
Company Name: _________________________________________________________________________
Address (include Zip + 4) _____________________________________________________________________
Contact Person: _____________________________________ Phone No. __________________________
E-Mail Address: ___________________________________________________________________________
Product(s) Used and/or Service(s) Provided: _____________________________________________________
Company Name: _________________________________________________________________________
Address (include Zip + 4) _____________________________________________________________________
Contact Person: _____________________________________ Phone No. __________________________
E-Mail Address: ___________________________________________________________________________
Product(s) Used and/or Service(s) Provided: _____________________________________________________
Company Name: _________________________________________________________________________
Address (include Zip + 4) _____________________________________________________________________
Contact Person: _____________________________________ Phone No. __________________________
E-Mail Address: ___________________________________________________________________________
Product(s) Used and/or Service(s) Provided: _____________________________________________________
Company Name: _________________________________________________________________________
Address (include Zip + 4) _____________________________________________________________________
Contact Person: _____________________________________ Phone No. __________________________
E-Mail Address: ___________________________________________________________________________
Product(s) Used and/or Service(s) Provided: _____________________________________________________
Wisconsin Page 10 of 13
Attachment C
Bid Offer Form
Vendor:______________________________________________________________
Line # Description Price Lead time of materials needed to complete
Completion date
1 Salt Shed #1 and Brine Room Roof Replacement
2 Salt Shed #1 Brine Room Steel Siding
3 Price per shingle for repair to Salt Shed #2 (estimated quantity of 100)
Line # Description Price Per SF/FT 4 Provide price per square foot on replacement of rotten roof sheathing.
This includes removal and disposal of old sheeting and replacing it with new plywood sheeting. All additional work will be approved by Portage County Highway and quoted in writing before work can begin.
5 Provide price to replace any rotten gable trim. Pricing shall include removal, disposal, and replacement of new wood. (Price Per Foot) All additional work will be approved by Portage County Highway and quoted in writing before work can begin.
6 Provide price to replace any rotten plywood siding on the Brine room exterior before sheeting with steel. Pricing shall include removal, disposal, and replacement. (Price Per Square Foot) All additional work will be approved by Portage County Highway and quoted in writing before work can begin.
Warranty information is included? Yes_____ No______
An original and one copy of all required forms are included in the submittal? Yes_____ No______
Portage County is exempt from Federal Excise and Wisconsin Sales Taxes, 77.54(9a). WI Stats.
Portage County’s CES number is ES 43251.
Wisconsin Page 11 of 13
Attachment D
STANDARD TERMS AND CONDITIONS
1.0 SPECIFICATIONS: The specifications in this request are the minimum acceptable. When specific manufacturer and model numbers are used, they are to establish a design, type of construction, quality, functional capability and/or performance level desired, unless otherwise specified. When alternates are bid/proposed, they must be identified by manufacturer, stock number, and such other information necessary to establish an acceptable equivalency. The County shall be the sole and final judge of equivalency.
2.0 HOW TO AMEND A REQUEST FOR BID, PROPOSAL OR QUOTE:
2.1 Public Works Projects are subject to Wis Stats 66.0901(5): If a person submits a bid or proposal for the performance of public work under any public contract to be let by a municipality and the bidder claims that a mistake, omission or error has been made in preparing the bid, the bidder shall, before the bids are opened, make known the fact that an error, omission or mistake has been made. If the bidder makes this fact known, the bid shall be returned to the bidder unopened and the bidder may not bid upon the public contract unless it is re-advertised and relet upon the re-advertisement. If a bidder makes an error, omission or mistake and discovers it after the bids are opened, the bidder shall immediately and without delay give written notice and make known the fact of the mistake, omission or error which has been committed and submit to the municipality clear and satisfactory evidence of the mistake, omission or error and that it was not caused by any careless act or omission on the bidder's part in the exercise of ordinary care in examining the plans or specifications and in conforming with the provisions of this section. If the discovery and notice of a mistake, omission or error causes a forfeiture, the bidder may not recover the moneys or certified check forfeited as liquidated damages unless it is proven before a court of competent jurisdiction in an action brought for the recovery of the amount forfeited, that in making the mistake, error or omission the bidder was free from carelessness, negligence or inexcusable neglect.
2.2 Non-Public Work Projects: After a Request for Bid/Proposal/Quote has been filed with the Portage County Purchasing
Department, the responder may submit an amended response BEFORE THE DUE DATE AND TIME set in the request. All the conditions and provisions of the original Bid/Proposal/Quote will be in effect. No submittals or amendments will be accepted after the due date and time of the request. This does not preclude the County from requesting additional information and/or clarification.
3.0 DEVIATIONS AND EXCEPTIONS: Deviations and exceptions from original text, terms, conditions, or specifications shall be described fully, on the bidder's/proposer's letterhead, signed, and attached to the request. In the absence of such statement, the bid/proposal shall be accepted as in strict compliance with all terms, conditions, and specifications and the bidders/proposers shall be held liable.
4.0 QUALITY: Unless otherwise indicated in the request, all material shall be new, newest model year, and free from defects.
Items which are used, demonstrators, obsolete, seconds, or which have been discontinued are unacceptable without prior written approval by the County.
5.0 QUANTITIES: The quantities shown on this request are based on estimated needs. The County reserves the right to increase or decrease quantities to meet actual needs.
6.0 DELIVERY: Deliveries shall be F.O.B. destination freight prepaid and included unless otherwise specified.
7.0 PRICING AND DISCOUNT: The County qualifies for governmental discounts. Unit prices shall reflect these discounts.
7.1 Unit prices shown on the bid/proposal or contract shall be the price per unit of sale (e.g., gal., cs., doz., ea.) as stated on the request or contract. For any given item, the quantity multiplied by the unit price shall establish the extended price; the unit price shall govern in the bid/proposal evaluation.
7.2 Prices established in continuing agreements and term contracts may be lowered due to general market conditions.
Wisconsin Page 12 of 13
8.0 RESPONSES TO REMAIN OPEN: Responses must remain open and will be deemed to be open and subject to acceptance until awarding of the bid/proposal is finalized, or a minimum of sixty (60) days unless otherwise specified.
9.0 ACCEPTANCE-REJECTION: The County reserves the right to accept or reject any or all bids/proposals, to waive any technicality in any bid/proposal submitted, request clarification of any bid/proposal, award a bid/proposal that is not the lowest price, and to accept any part of a bid/proposal as deemed to be in the best interests of the County.
10.0 GUARANTEED DELIVERY: Failure of the Contractor to adhere to delivery schedules as specified or to promptly replace rejected materials shall render the Contractor liable for all costs in excess of the contract price when alternate procurement is necessary. Excess costs shall include the administrative costs and other costs attributable to the delay.
11.0 CONTRACT AND EXECUTION OF CONTRACT: Unless otherwise specified in the bid/proposal, the successful responder agrees to enter into a contract, a copy of which will be on file in the office of the Portage County Purchasing Department. Contractor shall and will well and truly execute and perform this contract under the terms applicable to the satisfaction of the County, and shall promptly make payment to each and every person or party entitled thereto of all the claims for work or labor performed and materials furnished in the performance of this contract.
12.0 ENTIRE AGREEMENT: These Standard Terms and Conditions shall apply to any contract or order awarded as a result of this request except where special requirements are stated elsewhere in the request; in such cases, the special requirements shall apply. Further, the written contract and/or order with referenced parts and attachments shall constitute the entire agreement and no other terms and conditions in any document, acceptance, or acknowledgment shall be effective or binding unless expressly agreed to in writing by the County.
13.0 APPLICABLE LAW AND COMPLIANCE: This contract shall be governed under the laws of the State of Wisconsin. The
Contractor shall at all times comply with and observe all federal and state laws, local laws, ordinances, and regulations which are in effect during the period of this contract and which in any manner affect the work or its conduct. The County reserves the right to cancel this contract if the contractor fails to follow the requirements of s. 77.66, Wis. Stats., and related statutes regarding certification for collection of sales and use tax. The County also reserves the right to cancel this contract with any state or federally debarred contractor or a contractor that is presently identified on the list of parties excluded from federal procurement and non-procurement contracts.
14.0 LICENSES AND PERMITS: Contractor shall have and/or provide any and all licenses and permits required to perform the work specified and furnish proof of such licensing authorization and permits with their bids if required.
15.0 ASSIGNMENT: No right or duty in whole or in part of the Contractor under this contract may be assigned or delegated without the prior written consent of the County.
16.0 NONEXCLUSIVE CONTRACT: Unless otherwise stated, the County reserves the right to purchase work or materials outside of this contract.
17.0 NONDISCRIMINATION & AFFIRMATIVE ACTION: In connection with the performance of work under this contract, the
Contractor agrees not to discriminate against any employee or applicant for employment because of age, race, religion, color, handicap, sex, physical condition, developmental disability as defined in s. 51.01(5), Wis. Stats., sexual orientation, gender identity and gender expression, or national origin. This provision shall include, but not be limited to, the following:
employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.
18.0 INDEPENDENT CAPACITY: The parties hereto agree that the contractor, its officers, agents, and employees, in the performance of this agreement shall act in the capacity of an independent contractor and not as an officer, employee, or agent of the County. The contractor agrees to take such steps as may be necessary to ensure that each subcontractor of the contractor will be deemed to be an independent contractor and will not be considered or permitted to be an agent, servant, joint venturer, or partner of the County.
Wisconsin Page 13 of 13
19.0 SAFETY REQUIREMENTS: All materials, equipment, and supplies provided to the County must comply fully with all safety requirements as set forth by the Wisconsin Administrative Code and all applicable OSHA Standards.
20.0 WARRANTY: Unless otherwise specifically stated, equipment purchased as a result of this request shall be warranted against defects by the Contractor for one (1) year from date of receipt. The equipment manufacturer's standard warranty shall apply as a minimum and must be honored by the Contractor.
21.0 INSURANCE RESPONSIBILITY: If insurance is required, satisfactory proof of the existence and carriage of such insurance of the kinds and limits specified will be required.
22.0 CANCELLATION: The County reserves the right to cancel any contract in whole or in part without penalty due to non-appropriation of funds or for failure of the contractor to comply with terms, conditions, and specifications of this contract.
23.0 VENDOR TAX DELINQUENCY: Vendors who have a delinquent Portage County tax liability may have their payments offset by the County.
24.0 OPEN RECORDS: Both parties understand that the County is bound by the Wisconsin Public Records Law, and as such, responses and contracts are subject to and conditioned on the provisions of the law. Contractor acknowledges that it is obligated to assist the County in retaining and producing records that are subject to Wisconsin Public Records Law, and that the failure to do so shall constitute a material breach of the contract, and that the Contractor must defend and hold the County harmless from liability under that law. Except as otherwise authorized, those records shall be maintained for a period of seven (7) years after receipt of final payment under the contract.
25.0 MATERIAL SAFETY DATA SHEET: If any item(s) on an order(s) resulting from this award(s) is a hazardous chemical, as defined under 29CFR 1910.1200, the Contractor shall provide one (1) copy of a Material Safety Data Sheet for each item with the shipped container(s) and one (1) copy with the invoice(s).
26.0 ADVERTISING AND NEWS RELEASES: Reference to or use of the County, any of its departments, officials, or employees, for commercial promotion is prohibited. News releases pertaining to this procurement shall not be made without prior approval of the County. Release of broadcast e-mails pertaining to this procurement shall not be made without prior written authorization of the County.
27.0 HOLD HARMLESS: The Contractor will indemnify, pay the cost of defense including attorney’s fees, and save harmless the County and all of its officers, agents and employees from all suits, actions, or claims of any character brought for or on account of any injuries or damages received by any persons or property resulting from the operations of the contractor, or of any of its contractors, in prosecuting work under this agreement.
28.0 FOREIGN CORPORATION: A foreign corporation (any corporation other than a Wisconsin corporation) which becomes a party to this contract is required to conform to all the requirements of Chapter 180, Wis. Stats., relating to a foreign corporation and must possess a certificate of authority from the Wisconsin Department of Financial Institutions, unless the corporation is transacting business in interstate commerce or is otherwise exempt from the requirement of obtaining a certificate of authority. Any foreign corporation which desires to apply for a certificate of authority should contact the Department of Financial Institutions, Division of Corporation, P. O. Box 7846, Madison, WI 53707-7846; telephone (608) 261- 7577.
29.0 FORCE MAJEURE: Neither party shall be in default by reason of any failure in performance of this contract in accordance with reasonable control and without fault or negligence on their part. Such causes may include, but are not restricted to, acts of nature or the public enemy, acts of the government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes and unusually severe weather, but in every case the failure to perform such must be beyond the reasonable control and without the fault or negligence of the party.
Salt shed #1 and Brine Room Roof Replacement Contractors will go over the existing shingles to save on removal, disposal, and new underlayment cost.
New steel panel installation shall meet a 60 MPH wind rating.
Sky light panels along the top edge shall be removed and sheeted with plywood before new steel roofing is installed.
Steel shall be an Master Rib 29 gauge panel made by Union Corrugating Company (headquarters at 701 South King Street, Fayetteville, NC 28301, 888-685-7663, www.unioncorrugating.com) or equal.
Panels shall be made from high strength steel and coated with a Anti-corrosion AZ50 Galvalume coating with a 25 year warranty or equal.
Panels shall have an factory-applied Siliconized Modified Polyester (SMP) paint finish with a 45 year warranty or equal.
Color shall be selected from the manufacturer’s standard color options by the owner once the project is awarded.
Panels shall carry a minimum 45 year warranty.
If a alternative steel roofing is used in the bid price, the bidder must supply all product specifications and warranties with the sealed bid.
2021-08 ATTACHMENT E - SPECIFICATIONS
Drawings have been provided as a approximant reference. All contractors shall field verify dimensions prior to bidding and / or ordering.
Due to the stored Commodity in both sheds once work is started the successful vendor shall stay on site until completion. Repairs to shed 2 and the roof replacement of shed 1 can be split into 2 different projects if the availability of materials will cause a delay of shed 1 work.
Portage County Highway Salt Shed Roofing, Siding, and Repairs (2021)
Portage County Highway will be accepting bids for a roof replacement on the Salt Shed (#1),repairs to Salt Shed (#2), and siding of the brine production building located at 850 Cubbie Ln., Plover WI 54467.
Pricing should include all equipment and lifts needed to complete the following work and all work shall be completed by no later then August 1st 2021. The selected contractor must also be able to provide a written 2 year warranty for workmanship on all work.
Both salt sheds were designed and built by Advance Storage Technologies in the late 1980's and early 1990's. Advance Storage Technologies which designs and builds salt storage building through out the United States has helped Portage County put together the below specification with their recommendations of design and products.
New steel gable trim shall be installed on both ends. Color shall be selected from the manufacturer’s standard color options by the owner once the project is awarded. All current wooden gable trim that is rotten or weathered shall be approved and replaced at an additional cost provided below.
Full roof warranty including paint, galvalume, wind rating, and workmanship shall be provided at the jobs completion by the contractor to Portage County Highway. Final payment will not be paid until this is delivered.
All work shall be preformed in compliance with OSHA standards
Salt shed #1 Brine Room Siding Repairs and Replacement The awarded contractor will go over the existing exterior with the below specified product. Any rotten or weathered areas shall be approved and replaced at the per square foot rate quoted below.
The awarded vendor shall install a ice and water barrier to the bottom 3' of the brine rooms exterior and wrap the entire exterior with Tyvek house wrap.
Steel shall be an Master Rib 29 gauge panel made by Union Corrugating Company (headquarters at 701 South King Street, Fayetteville, NC 28301, 888-685-7663, www.unioncorrugating.com) or equal.
5 1/8"matching steel corner trim shall be used to seal the corners from all weather.
The overhead and service door shall be wrapped from weather to complete a maintenance free exterior.
Panels shall be made from high strength steel and coated with a Anti-corrosion AZ50 Galvalume coating with a 25 year warranty or equal.
Panels shall have an factory-applied Siliconized Modified Polyester (SMP) paint finish with a 45 year warranty or equal.
Color shall be selected from the selected manufacturer’s standard color options by the owner.
Panels shall carry a minimum 45 year warranty.
If a alternative steel siding is used in the bid price, the bidder must supply all product specifications and warranties with the sealed bid.
All work shall be preformed in compliance with OSHA standards.
Salt shed #2 Roof Repairs Contractors shall repair all disturbed shingles on Salt Shed #2 with Certain Teed Hatteras High Wind type shingles. (Color = Outer Banks 3158X AR) The successful vendor shall hand seal all newly installed shingles in addition to the self seal strips already on the shingles.
The successful vendor shall replace about 10' of skylight on the west side of Salt Shed #2 (Sky light material will be provided By Portage County Highway).
All work shall be preformed in compliance with OSHA standards.
Did you attend the required pre bid meeting on 2/16/2021 at 10 a.m.
I
800 Plover Road, Plover, WI
FRONT
Drawings have been provided as an approximant reference. All contractors shall field verify dimensions prior to bidding and/ or ordering
[f· l:.3::-6''.�(.'.':---·
I /;i f
II .//
-,"!!·1/, 1· ,, /;,·::> ./ IJ- I 1:7 ),,_\(,
_.,,.,,,_,,'1,,\
/; I //,./ �
·¼;, ! �/;/' ;: ✓t, ,, ! "( /' f
� ·c _ _:·_ --- ..: ccc::::::c..lS'.1''... .. _
.:1.1P i''::·.
.•.I - • r
I!
.1
.I w+• i m l'!C -- 22'1f' -- :•:.::_· ::.:.lQ_'.J.Q_'�·:::. - .. _,:; -
"""'1 1.�"1 t uu fKoUf
:::::-...:..:.:.==-=---21.' . .10'.c'· = ·c.===
·---- -·-·· ··-·13' •\" -·-·· ,._, __ I ii
I i
;,J �:! 111·fn
HI�
1-1-J' 3"-:::::
rowtdby � HOVER
[;:ryp �,l�_.j
I fo
WA;Jl�
-___:lS'J"-
1t ji'
1l
'.9 2020 HOVER lni:, All rfghl5 rosorvod, This documqn\ and lh11 lmngos, mousurnmonl dalil, formal nnd contonts Mo tho &)(cluslvo prop1uty of HOVER. HOVER Is !ho roglsterod trndumnrk or Hover hie. All othor brnnds, product$ und company n,1mes manUonQd hernln rn11y be tr.idornarks or roglsletod trndern11rks of their 1ospocUvo ho1do,s.
�15ho�1�l�!\��1t����l 1��1:������nr��f s�5o�f !�� b� �::, 1��i�r,[;����;·r��iie���
E q�1:1����:C�Pn��11 c��°i:lo't��1� s 5s�7�n�bn11 :,r ;;i1����0,b?� 11p�.r, l���1�;�?i�;b;�,' lniplla d , nrls[ng by l!IIV or rml!fl
ATTACHMENT F
| 2021-08 Bid Document |
| 1. General Information and Scope |
| 2. Mandatory Pre-Bid Site Visit |
| 3. Questions |
| 4. Method of Bid |
| 5. Bid Submission |
| 6. Bid Response Requirements |
| 7. Method of Award |
| 8. Bidder/Contractor Qualifications |
| 9. Specifications |
| 10. On-Site Service |
| 11. Subcontracting or Third Party Payments |
| 12. Firm prices |
| 13. Invoicing Requirements |
| 14. Contract Cancellation |
| 15. Appeals Process |
| 16. Special Conditions of this Bid |
| 2021-08 ATTACHMENT E - Specifications |
| 2021 Spec |
2021-08 ATTACHMENT F - Drawing
File details come from the government source that posted it. Updated .