This is Addendum 1 to Request for Bid #2021-08 issued by Portage County, Wisconsin for Highway Salt Shed Roofing, Siding & Repairs, dated February 23, 2021. The addendum provides clarifications and revisions to the original bid solicitation for roofing replacement on Salt Shed #1, repairs to Salt Shed #2, and siding work on the brine production building located at 850 Cubbie Lane, Plover, Wisconsin. Key project specifications clarified in the addendum include: Portage County Highway will be responsible for removing and reinstalling two exterior electrical control panels and all lighting fixtures on the brine room; gable vents on both the North and South ends of the brine room building shall be replaced; one-inch by three-inch wood spacers (sleepers) must be installed between existing asphalt shingles and new steel roofing every two feet on center, with all associated material and labor costs included in the roof bid price; steel siding on the brine room will be installed along the asphalt driveway after the County removes approximately six inches of blacktop around the perimeter to allow for ice and water shielding and flashing installation; existing soffit will remain unchanged; and steel siding will only cover the T-111 area of the brine room, while the bottom 11 feet 8 inches of the main shed with bracing will remain unaltered.
The addendum does not specify pricing terms, set-asides, bid response dates, bid due dates, site visit requirements, bidder conference details, or contract award and term information. No funding amounts, sources, or incumbent contractor information is provided in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2021-08 Bid Document Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
******End Addendum 1******
RFB #2021-08 Highway Salt Shed Roofing, Siding & Repairs
ADDENDUM 1
February 23, 2021
The following changes are hereby added to and made part of Bid #2021-08 Questions, Answers, Clarifications and Revisions:
Q. Who is responsible for removing the electrical control panels and lighting on the exterior of the brine room?
A. Portage County Highway will remove and reinstall the 2 electrical control panels and all lighting fixtures on the exterior of the brine room.
Q. Does Portage County want the gable vents on the brine room exterior replaced?
A. Yes, the gable vents shall be replaced on both the North and South ends of the building.
Q. Does Portage County want a wood spacer (sleeper) between the existing shingles and new steel roof?
A. Yes, it will be required to install a 1 ½” X 3 ½” spacer between the existing asphalt shingles and the new steel roofing. The spacers shall be installed every 2’ on center. All cost including material and labor shall be included in the bid price of the roof.
Q. How would Portage County like the steel siding on the brine room ran along the black top driveway?
A. Portage County will cut out and remove approximately 6”s of black top around the perimeter of the brine room which will allow the contractor to both run the ice and water and a barrier / flashing to the bottom of the siding.
Q. Does Portage county want the existing soffit replaced?
A. The current soffit will remain as is.
Q. Does the bottom 11’-8” of the main building and angle braces get covered with metal or is it just the T-111 that gets covered with metal siding?
A. Only the area with T-111 which is the brine room will be covered with steel siding. The bottom 11’ 8” of the shed with the bracing will remain as is.
The following changes are hereby added to and made part of Bid #2021-08