This solicitation is for a construction contract to construct MQ-9 Shops Launch and Recovery at Wheeler Sacks Army Airfield located at Fort Drum, New York. The project magnitude is estimated between $500,000 and $1,000,000. This action is being solicited as a 100% total small business set-aside, with a NAICS Code of 236210 and size standard of $45 million in average annual revenue for the past three years. Interested parties are encouraged to attend the pre-bid conference and site visit. The solicitation and any notices or amendments will be posted at SAM.gov. Award will be made to the responsible bidder submitting the most advantageous bid based on price and price-related factors. Funding is not currently available but is expected to be appropriated by September 30, 2023. This project has been identified as a priority for award if funds become available within the awardable price range. No contract will be awarded until funds are appropriated.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FPBB162002 Bid Abstract.pdf | ||
| W50S8N23B00030005.pdf | ||
| W50S8N23B00030004.pdf | ||
| W50S8N23B0003 Questions and Answers.pdf | ||
| W50S8N23B00030003.pdf | ||
| W50S8N23B00030002.pdf | ||
| W50S8N23B00030001.pdf | ||
| 2021-08-27_FPBB162002-B-3_Specs_Clean.pdf | ||
| W50S8N23B0003 FPBB162002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Drum Military Reservation C o n t r a c t D r a w i n g s F o r
Fort Drum, New York June 2021
Client Logo
FPBB162002
Construct MQ-9 Shops Launch & Recovery Element
NEW YORK AIR NATIONAL GUARD
B-2 SUBMITTAL
PROJECT LOCATION MAP
PROJECT VICINITY MAP
PROJECT SITE
PROJECT SITE
Contract No. W9133L-15-D-0004 Task Order No. W50S8N20F0014 HDR Project No. 10256943
B-3 SUBMITTAL
August 2021
1" = 30'
G-001
SHEET INDEX
FPBB162002
I N D E X O F D R A W I N G S
GENERAL
G-000 COVER SHEET
G-001 SHEET INDEX
G-002 LEGEND
DEMOLITION
X-101 DEMOLITION PLAN & ELEVATION
X-102 EXISTING SITE UTILITY DEMOLITION PLAN
CIVIL
C-101 SITE ACCESS, STAGING & HAUL ROUTE
C-102 EXISTING CONDITIONS
C-103 SITE PLAN AND SOIL EROSION & SEDIMENT CONTROL PLAN
C-501 SITE AND SE&SC DETAILS
STRUCTURAL
S-100 STRUCTURAL NOTES
S-101 FOUNDATION PLAN
S-501 TYPICAL CONCRETE DETAILS
S-502 FOUNDATION DETAILS
ARCHITECTURAL
A-101 FLOOR PLAN
A-102 REFLECTED CEILING PLAN
A-103 FURNITURE LAYOUT
A-104 ROOF PLAN
A-201 PROPOSED BUILDING ELEVATIONS
A-301 PROPOSED BUILDING SECTIONS
A-401 ENLARGED RESTROOM FLOOR PLAN
A-501 WALL SECTIONS AND DETAILS
A-502 PLAN DETAILS
A-503 PLAN DETAILS
A-601 PARTITION, DOOR AND FINISH SCHEDULES
A-602 BREAKROOM COUNTER ELEVATIONS AND DETAILS
MECHANICAL
M-101 MECHANICAL FLOOR PLAN
M-201 MECHANICAL SECTIONS
M-301 MECHANICAL SCHEDULES
M-401 MECHANICAL DETAILS
M-402 MECHANICAL DETAILS
M-403 MECHANICAL DETAILS
PLUMBING
P-101 DOMESTIC WATER PLUMBING FLOOR PLAN
P-102 SANITARY PLUMBING FLOOR PLAN
P-301 PLUMBING SCHEDULES
FIRE PROTECTION
F-100 FIRE PROTECTION NOTES & LEGEND
F-101 FIRE PROTECTION & FIRE ALARM FLOOR PLAN
ELECTRICAL
E-001 ELECTRICAL NOTES & LEGEND
E-101 POWER PLAN
E-102 LIGHTING PLAN
E-501 ELECTRICAL DETAILS
TELECOMMUNICATIONS
ET-101 TELECOMMUNICATIONS PLAN
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
Civil
G-002
LEGEND & GENERAL NOTES
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
EXISTING SANITARY SEWER SERVICE LINE
EXISTING SANITARY SEWER MAIN
EXISTING UNDERGROUND ELECTRIC
EXISTING UNDERGROUND COMMUNICATION LINE
EXISTING PROPANE GAS LINE
EXISTING FIRE DEPARTMENT CONNECTION LINE
EXISTING GAS LINE
EXISTING STORM DRAINAGE LINE
EXISTING WATER SERVICE
EXISTING SANITARY MANHOLE
EXISTING MONITORING WELL
EXISTING ELECTRICAL VAULT
EXISTING WATER VALVE
EXISTING HYDRANT
EXISTING TRANSFORMER
EXISTING COMMUNICATION MANHOLE
EXISTING COMMUNICATION VAULT
EXISTING STORMWATER MANHOLE
EXISITNG BOLLARD
PROPOSED SANITARY SEWER SERVICE LINE
PROPOSED SANITARY SEWER CLEANOUT
PROPOSED SILT FENCE
PROPOSED SIDEWALK
SS
SF SF SF
GENERAL NOTES:
CIVIL NOTES:
1. IF PAVEMENT REMOVAL IS REQUIRED TO CONSTRUCT BUILDING ADDITION,
REMOVAL SHALL BE PERFORMED BY SAW CUT. EXTEND REMOVAL LINES TO
INCLUDE ANY ADJOINING BROKEN OR DETERIORATING PAVEMENT.
2. ALL DEMOLITION RUBBLE, DEBRIS, AND EXCESS SOILS SHALL BE PROMPTLY
REMOVED FROM THE SITE. STOCKPILED MATERIALS SHALL BE PLACED IN
APPROVED LOCATIONS WITHOUT INTERFERING WITH OTHER CONTRACTOR
WORK, OR WITH EXISTING DRAINAGE.
3. ALL SHORING AND TEMPORARY BRACING IS THE CONTRACTOR'S
RESPONSIBILITY.
4. STRIP AND STOCKPILE SUFFICIENT EXISTING ORGANIC TOPSOILS FOR
RESPREADING AS REQUIRED ON DISTURBED AND REGRADED AREAS TO BE
ESTABLISHED AS LAWN AND FOR REPAIR OF EXISTING LAWNS ASSOCIATED
WITH STOCKPILE/LAYDOWN AREA.
5. ALL FILL/BACKFILL OF EXCAVATIONS AND VOIDS RESULTING FROM
REMOVALS AND RELATED WORK UNDER PROPOSED OR REPLACEMENT
PAVING AREAS SHALL ONLY BE COARSE AGGREGATE FILL OR SUBBASE
MATERIAL THOROUGHLY COMPACTED IN ACCORDANCE WITH THE TECHNICAL
SPECIFICATIONS OR SITE GEOTECH REPORT.
6. PROTECT ALL FACILITIES AND IMPROVEMENTS ON AND ADJOINING THE
PROPERTY WITH ARE NOT SPECIFICALLY IDENTIFIED FOR REMOVAL. VERIFY
LOCATIONS AND DEPTHS OF ALL SUBSURFACE UTILITIES TO REMAIN PRIOR
TO ANY ADJACENT REMOVAL AND EXCAVATION WORK.
7. ALL EXISTING FEATURES SHALL REMAIN UNLESS OTHERWISE NOTED. IF THE
CONTRACTOR DAMAGES ANY OF THE EXISTING ON-SITE FACILITIES TO
REMAIN, WHETHER SHOWN ON THE PLANS OR NOT, THE CONTRACTOR SHALL
REPAIR AND/OR REPLACE SUCH ITEMS AT HIS OWN EXPENSE AND ASSUME
ALL RESPONSIBILITY FOR SUCH DAMAGE WITHOUT ANY ADDITIONAL COST TO
THE OWNER. REPLACEMENT MATERIAL SHALL BE SAME QUALITY AND
QUANTITY AS ORIGINAL.
8. ALL NON-PAVED AREAS ARE TO BE LAWN UNLESS OTHERWISE NOTED.
9. CONTRACTOR SHALL BLEND NEW WORK SMOOTHLY AND EVENLY WITH
ADJACENT EXISTING LINES AND GRADES.
10. WATER FOR FIRE PROTECTION WILL BE PROVIDED THROUGH CONNECTIONS
FROM THE ADJACENT MECHANICAL ROOM. ELECTRICAL AND
TELECOMMUNICATIONS CONNECTIONS WILL BE MADE THROUGH
CONNECTIONS FROM THE ADJACENT ELECTRICAL ROOM. REFER TO THE
MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL PLANS.
11. EISA 438 IS NOT APPLICABLE TO THIS PROJECT SINCE THE PROPOSED
BUILDING FOOTPRINT DOES NOT EXCEED 5,000 SQUARE FEET. THE ORIGINAL
DESIGN OF THE MQ-9 LRE & HANGAR INCLUDED THE PROPOSED ADDITION AS
AN OPTION THAT WAS NOT EXECUTED, BUT ACCOUNTED FOR THE
IMPERVIOUS AREA OF THE ADDITION IN THE STORMWATER MANAGEMENT
DESIGN AT THE TIME.
12. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN
ALL REQUIRED EXCAVATION PERMITS, AS REFERENCED IN THE FORT DRUM
PUBLIC WORKS EXCAVATION PERMIT POLICY.
13. THE CONTRACTOR SHALL ADHERE TO THE FORT DRUM PUBLIC WORKS
AS-BUILT REQUIREMENTS WITH UTILITY STANDARDS.
ARCHITECTURAL NOTES:
1. THE ADDITION'S EXTERIOR METAL BUILDING ENVELOPE, INCLUDING
FENESTRATION AND TRIM SHALL MATCH THE COLOR, STYLE AND PATTERN
OF EXISTING ADJACENT CONSTRUCTION. CONTRACTOR SHALL FIELD VERIFY
PRIOR TO BID.
2. THE ADDITION'S METAL ROOFING AND SNOW GUARDS SHALL MATCH THE
EXISTING ADJACENT UTILITY ROOMS IN HEIGHT, SLOPE, PATTERN, COLOR
AND FINISH. CONTRACTOR SHALL FIELD VERIFY PRIOR TO BID.
3. THE CONTRACTOR SHALL ASSURE THAT THE FOLLOWING BUILDING
COMPONENTS ARE PROVIDED AND COORDINATED BY THE METAL BUILDING
FABRICATOR:
A. A CONTINUOUS AIR BARRIER IN COMPLIANCE WITH THESE
SPECIFICATIONS.
B. BUILDING FENESTRATION FEATURES COMPLIANT WITH THESE
SPECIFICATIONS (DOORS AND WINDOWS).
C. A PREFABRICATED ROOF PANEL SYSTEM PROVIDING A CONTINUOUS
THERMAL BARRIER.
D. COORDINATE PRIMARY STEEL FRAMING WITH GIRTS AND SUB-GIRTS AS
NEEDED TO ASSURE THAT THE ROOF LINES LINE UP AND ALL ROOFING
COMPONENTS ARE ANCHORED TO THE STRUCTURE.
E. A PREFABRICATED WALL PANEL SYSTEM TO PROVIDE A CONTINUOUS
THERMAL BARRIER.
F. WALL TO WALL, ROOF TO ROOF, AND ROOF TO WALL EXPANSION
JOINTS.
SHOULD THE CONTRACTOR DETERMINE TO ADDRESS ANY OF THE ABOVE
DIRECTLY, PROVISION AND COORDINATION OF THESE ITEMS WILL FALL ON
THE CONTRACTOR AND SHALL BE AT NO ADDITIONAL COST TO THE
GOVERNMENT.
4. ALL SIGNAGE SHALL COMPLY WITH THE FT DRUM SUPPLEMENT 420-1 SIGN
REGULATION.
A. ALL ROOMS SHALL BE PROVIDED WITH A ROOM NUMBER SIGN IN
COMPLIANCE WITH FD SUPL. 420.1. COORDINATE ROOM NUMBERS
WITH FT. DRUM PUBLIC WORKS.
B. ALL ROOMS SHALL BE PROVIDED WITH A ROOM IDENTIFICATION SIGN
IN COMPLIANCE WITH FD SUPL. 420-1
C. INTERIOR SIGNAGE SHALL BE IN COMPLIANCE WITH UFC 3-120-01
(THE FD STANDARD DESCRIBES THE SIZE AND MATERIAL FOR THE
ROOM NUMBER AND ROOM IDENTIFICATION SIGNS)
D. EXTERIOR SAFETY SIGNS SHALL COMPLY WITH AR 385-30, SAFETY
COLOR MARKINGS AND SIGNS
FIRE PROTECTION NOTES:
1. A 1 HOUR FIRE SEPARATION SHALL BE MAINTAINED BETWEEN THE EXISTING
HANGER AND THE NEW ADDITION. THE COILING VEHICLE ACCESS DOOR
SHALL BE A 45 MINUTE FIRE SHUTTER PROVIDED WITH A FUSIBLE LINK. THE
PERSONNEL DOOR SHALL BE FIRE PROOF SELF CLOSING WITH A 45 MINUTE
RATING.
ABBREVIATIONS:
A, AMP AMPERE
ACI AMERICAN CONCRETE INSTITUTE
AFF ABOVE FINISHED FLOOR
AIC AMPS INTERRUPTING CAPACITY
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
AWG AMERICAN WIRE GAGE
CFM CUBIC FEET PER MINUTE
CKT CIRCUIT
DOD DEPARTMENT OF DEFENSE
EF EXHAUST FAN
FC FOOT-CANDLES
FDECU FIELD DEPLOYABLE ENVIRONMENTAL CONTROL UNITS
FTU FLIGHT TRAINING UNIT
GC GENERAL CONTRACTOR
GND GROUND
GPM GALLONS PER MINUTE
GWB GYPSUM WALL BOARD
HDPE HIGH-DENSITY POLYETHYLENE
HVAC HEATING, VENTILATING, AND AIR CONDITIONG
KSI KILOPOUND PER SQUARE INCH
KVA KILOVOLT AMPERES
KW KILOWATT
LED LIGHT-EMITTING DIODE
LRE LAUNCH AND RECOVERY ELEMENT
LRFD LOAD AND RESISTANCE FACTOR DESIGN
LTG, LTS LIGHTING
MEP MECHANICAL, ELECTRICAL, AND PLUMBING
MGCS MOBILE GROUND CONTROL STATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
OCP OVER CURRENT PROTECTION
PSF POUND PER SQUARE FOOT
PSI POUND PER SQUARE INCH
PVC POLYVINYL CHLORIDE
RGS RIGID GALVANIZED STEEL
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS'
NATIONAL ASSOCIATION
TOS TOP OF SLAB
UFC UNIFIED FACILITIES CRITERIA
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
VA VOLT AMPERE
VIF VERIFY IN FIELD
HANGAR
HANGAR
11"
16'-2"3'-10"
3'-10"
3'-8"
1'-7"9'-7"
REMOVE EXIST. WALL TO CREATE
3'-4" W x 7'-2" OPENING, TYP.
REMOVE EXIST. METAL
WALL PANEL, TYP.
3'-4"3'-4"3'-4"
SUPR. ROOM
FIRE
1'-8"4'-4"
1' -5
'-5
4'-0" 9'-2" 4'-0" 1'-5" 4'-0"3'-3"
4"
TYP.
1'-0"
42'-10"
11"
REMOVE EXIST. METAL
WALL PANEL, TYP.
EXISTING METAL
PANEL FACADE
REMOVE EXISTING
METAL WALL PANEL, TYP.
CDF E
CDF E
X-101
DEMOLITION PLAN AND ELEVATION
FPBB162002
2 DEMOLITION FLOOR PLAN
SCALE: 1/4" = 1'-0"
NORTH
0 4' 8'2'
NOTE:
* REMOVE METAL WALL PANEL.
1 DEMOLITION - SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
0 4' 8'2'
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
PROPOSED AREA OF
CONSTRUCTION
LIMITS
1" = 30'
X-102
EXISTING SITE UTILITY DEMOLITION PLAN
FPBB162002
1 EXISTING SITE UTILITY DEMOLITION PLAN
SCALE: 1" = 30'
NORTH
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
GENERAL NOTES:
1. PROPOSED AREA OF CONSTRUCTION LIMITS CONSISTS
PRIMARILY OF GRASS COVER. SOME DEMOLITION OF THE
EXISTING HANGAR WILL BE NECESSARY TO COMPLETE
CONSTRUCTION. REFER TO SHEET X-101 FOR THE EXISTING
HANGAR DEMOLITION PLAN & ELEVATION.
2. UTILITY, SURFACE, AND TOPOGRAPHIC SURVEY HAVE NOT
BEEN PERFORMED IN CONJUNCTION WITH THIS DESIGN. THE
UTILITY AND TOPOGRAPHIC DATA SHOWN ON THIS SHEET HAVE
BEEN RE-USED FROM PREVIOUS PLANS:
A. TOPOGRAPHY, SUB-SURFACE UTILITIES, AND ABOVE
GROUND FEATURES ARE TAKEN FROM THE "OVERALL SITE
GRADING, DRAINAGE, AND SWPPP PLAN & BLOWUP DETAIL"
SHEET C-102 FROM THE MQ-9 FLIGHT TRAINING UNIT HANGER
PROJECT #FPBB129050 (FY14), SHEET DATED 07-07-14.
B. TOPOGRAPHY SHOWN IS A COMBINATION OF SURVEYED
TOPOGRAPHY AND PROPOSED CONTOURS TAKEN FROM THE
AFOREMENTIONED SHEET C-102. THE SURVEYED
TOPOGRAPHY PORTION WAS PERFORMED BY BEARDSLEY
DESIGN ASSOCIATES, L.S., P.C. THERESA BOONVILLE ROME,
NY DATED 4/29/2010. ADDITIONAL SURVEY AND
TOPOGRAPHIC INFORMATION PROVIDED BY LAFAVE, WHITE &
MCGIVERN, L.S., DATED 6/5/2014.
3. BASED ON NOTE #1, EXISTING CONDITIONS UTILITY DATA
SHOWN ON THIS SHEET MAY BE INCOMPLETE OR INCORRECT.
OWNER AND A/E DO NOT CONFIRM THE COMPLETENESS OR
ACCURACY OF THE INFORMATION SHOWN. CONTRACTOR SHALL
PERFORM TOPOGRAPHIC AND UTILITY SURVEY PRIOR TO THE
START OF CONSTRUCTION TO VERIFY LOCATIONS, ELEVATIONS
AND INVERTS OF ALL EXISTING FEATURES, ABOVE AND BELOW
GROUND.
KEY NOTES:
REMOVE SANITARY SEWER SERVICE TO ALLOW FOR
NEW SANITARY SERVICE CONNECTION1
1" = 30'
C-101
SITE ACCESS, STAGING & HAUL ROUTE
FPBB162002
1 SITE ACCESS, STAGING & HAUL ROUTE
SCALE: 1" = 30'
NORTH
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
KEY NOTES:
MAIN ENTRANCE TO
CONSTRUCTION SITE
2 CONSTRUCTION LIMITS = 2,400 SF
3 TEMPORARY STAGING/LAYDOWN
AREA = 2,300 SF
4 CONTRACTOR ACCESS/
HAUL ROUTE
5 PROPOSED BUILDING LOCATION
GENERAL NOTES:
1. UTILITY, SURFACE, AND TOPOGRAPHIC SURVEY
HAVE NOT BEEN PERFORMED IN CONJUNCTION
WITH THIS DESIGN. THE UTILITY AND TOPOGRAPHIC
DATA SHOWN ON THIS SHEET HAVE BEEN RE-USED
FROM PREVIOUS PLANS:
A. TOPOGRAPHY, SUB-SURFACE UTILITIES, AND
ABOVE GROUND FEATURES ARE TAKEN FROM
THE "OVERALL SITE GRADING, DRAINAGE, AND
SWPPP PLAN & BLOWUP DETAIL" SHEET C-102
FROM THE MQ-9 FLIGHT TRAINING UNIT HANGER
PROJECT #FPBB129050 (FY14), SHEET DATED
07-07-14.
2. BASED ON NOTE #1, EXISTING CONDITIONS
UTILITY DATA SHOWN ON THIS SHEET MAY BE
INCOMPLETE OR INCORRECT. OWNER AND A/E DO
NOT CONFIRM THE COMPLETENESS OR ACCURACY
OF THE INFORMATION SHOWN. CONTRACTOR
SHALL PERFORM TOPOGRAPHIC AND UTILITY
SURVEY PRIOR TO THE START OF CONSTRUCTION
TO VERIFY LOCATIONS, ELEVATIONS AND INVERTS
OF ALL EXISTING FEATURES, ABOVE AND BELOW
GROUND. CONTRACTOR TO NOTIFY COR IN THE
EVENT THAT SUBSEQUENT SURVEY REVEALS
ADDITIONAL UTILITY CONFLICTS.
C-102
EXISTING CONDITIONS
FPBB162002
1 EXISTING CONDITIONS
SCALE: 1" = 30'
NORTH
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
GENERAL NOTES:
1. UTILITY, SURFACE, AND TOPOGRAPHIC SURVEY
HAVE NOT BEEN PERFORMED IN CONJUNCTION
WITH THIS DESIGN. THE UTILITY AND TOPOGRAPHIC
DATA SHOWN ON THIS SHEET HAVE BEEN RE-USED
FROM PREVIOUS PLANS:
A. TOPOGRAPHY, SUB-SURFACE UTILITIES, AND
ABOVE GROUND FEATURES ARE TAKEN FROM
THE "OVERALL SITE GRADING, DRAINAGE, AND
SWPPP PLAN & BLOWUP DETAIL" SHEET C-102
FROM THE MQ-9 FLIGHT TRAINING UNIT HANGER
PROJECT #FPBB129050 (FY14), SHEET DATED
07-07-14.
B. TOPOGRAPHY SHOWN IS A COMBINATION OF
SURVEYED TOPOGRAPHY AND PROPOSED
CONTOURS TAKEN FROM THE AFOREMENTIONED
SHEET C-102. THE SURVEYED TOPOGRAPHY
PORTION WAS PERFORMED BY BEARDSLEY
DESIGN ASSOCIATES, L.S., P.C. THERESA
BOONVILLE ROME, NY DATED 4/29/2010.
ADDITIONAL SURVEY AND TOPOGRAPHIC
INFORMATION PROVIDED BY LAFAVE, WHITE &
MCGIVERN, L.S., DATED 6/5/2014.
2. BASED ON NOTE #1, EXISTING CONDITIONS
UTILITY DATA SHOWN ON THIS SHEET MAY BE
INCOMPLETE OR INCORRECT. OWNER AND A/E DO
NOT CONFIRM THE COMPLETENESS OR ACCURACY
OF THE INFORMATION SHOWN. CONTRACTOR
SHALL PERFORM TOPOGRAPHIC AND UTILITY
SURVEY PRIOR TO THE START OF CONSTRUCTION
TO VERIFY LOCATIONS, ELEVATIONS AND INVERTS
OF ALL EXISTING FEATURES, ABOVE AND BELOW
GROUND. CONTRACTOR TO NOTIFY COR IN THE
EVENT THAT SUBSEQUENT SURVEY REVEALS
ADDITIONAL UTILITY CONFLICTS.
EXTERIOR CLEANOUT -
CONNECT TO EXISTING
4" PVC SANITARY LINE
APPROX. INV = 693.50
10 LF - 4" PVC
REFER TO PLUMBING
PLANS FOR INTERIOR
PLUMBING
PROPOSED 6' WIDE
SIDEWALK - 180 SF
FPBB162002
MQ-9 SHOPS
L&RE
TEMPORARY
STOCKPILE &
LAYDOWN AREA
SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SFSFSFSFSFSFSFSFSFSFSF
SF
SF
SF
SF
TEMPORARY
STOCKPILE
STABILIZED
CONSTRUCTION
ENTRANCE
SF
SF
SF
SF
SF
SF
SF
SF
1" = 20'
C-103
SEDIMENT & EROSION CONTROL PLAN
SITE PLAN AND
FPBB162002
NORTH
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
GENERAL NOTES:
1. UTILITY, SURFACE, AND TOPOGRAPHIC SURVEY HAVE NOT BEEN
PERFORMED IN CONJUNCTION WITH THIS DESIGN. THE UTILITY
AND TOPOGRAPHIC DATA SHOWN ON THIS SHEET HAVE BEEN
RE-USED FROM PREVIOUS PLANS:
A. TOPOGRAPHY, SUB-SURFACE UTILITIES, AND ABOVE GROUND
FEATURES ARE TAKEN FROM THE "OVERALL SITE GRADING,
DRAINAGE, AND SWPPP PLAN & BLOWUP DETAIL" SHEET C-102
FROM THE MQ-9 FLIGHT TRAINING UNIT HANGER PROJECT
#FPBB129050 (FY14), SHEET DATED 07-07-14.
B. TOPOGRAPHY SHOWN IS A COMBINATION OF SURVEYED
TOPOGRAPHY AND PROPOSED CONTOURS TAKEN FROM THE
AFOREMENTIONED SHEET C-102. THE SURVEYED TOPOGRAPHY
PORTION WAS PERFORMED BY BEARDSLEY DESIGN
ASSOCIATES, L.S., P.C. THERESA BOONVILLE ROME, NY DATED
4/29/2010. ADDITIONAL SURVEY AND TOPOGRAPHIC
INFORMATION PROVIDED BY LAFAVE, WHITE & MCGIVERN, L.S.,
DATED 6/5/2014.
2. BASED ON NOTE #1, EXISTING CONDITIONS UTILITY DATA SHOWN
ON THIS SHEET MAY BE INCOMPLETE OR INCORRECT. OWNER AND
A/E DO NOT CONFIRM THE COMPLETENESS OR ACCURACY OF THE
INFORMATION SHOWN. CONTRACTOR SHALL PERFORM
TOPOGRAPHIC AND UTILITY SURVEY PRIOR TO THE START OF
CONSTRUCTION TO VERIFY LOCATIONS, ELEVATIONS AND INVERTS
OF ALL EXISTING FEATURES, ABOVE AND BELOW GROUND.
CONTRACTOR TO NOTIFY COR IN THE EVENT THAT SUBSEQUENT
SURVEY REVEALS ADDITIONAL UTILITY CONFLICTS.
SEE DETAIL
C-501
SITE AND SE&SC DETAILS
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
SILT FENCE DETAIL
NOT TO SCALE8
STABILIZED CONSTRUCTION
ENTRANCE DETAIL
NOT TO SCALE9
SIDEWALK DETAIL
NOT TO SCALE6
ASPHALT & SIDEWALK JOINT DETAIL
NOT TO SCALE7
ASPHALT PAVEMENT EDGE DETAIL
NOT TO SCALE3
ASPHALT PAVEMENT DETAIL
NOT TO SCALE4
NOTES:
1. ALL DEPTHS OF PAVEMENT AND STONE ARE AFTER COMPACTION.
2. PROVIDE TACK COAT BETWEEN ASPHALT PAVEMENT LIFTS AND ALONG
INTERFACE BETWEEN ASPHALT PAVEMENT AND STRUCTURES.
NOTES:
1. PROVIDE 14" WIDE CONTROL JOINTS TOOLED OR SAWN, 1-1/2" DEPTH AT
SPACING EQUAL TO WIDTH OF SIDEWALK.
2. PROVIDE 12" WIDE EXPANSION JOINTS, FILLER AS SPECIFIED - RECESS AT 14"
FILL WITH SEALANT. EXPANSION JOINT SPACING NOT TO EXCEED 30'0" IN ANY
DIRECTION AND AT CONTACT WITH WALLS, DOORS, OR OTHER VERTICAL
SURFACES.
3. PROVIDE STIFF BROOM FINISH PERPENDICULAR TO DIRECTION OF TRAFFIC
PIPE BEDDING DETAIL
NOT TO SCALE5
NOTES:
1. FOR EXCAVATION AND BEDDING MATERIAL, REFER TO EARTHWORK
SPECIFICATION.
PIPE UTILITY TRENCH DETAIL
NOT TO SCALE1
NOTES:
1. TRENCH DEPTHS, WIDTHS, SHEETING, SHORING, BRACING AND CUTBACK
SLOPES TO BE DETERMINED BY THE CONTRACTOR AND SHALL COMPLY WITH OSHA,
NEW YORK STATE DEPARTMENT OF LABOR, NEW YORK STATE INDUSTRIAL CODE
AND ALL OTHER APPLICABLE SAFETY STANDARDS.
2. PROVIDE TRACER WIRE 1'-0" ABOVE OUTSIDE DIAMETER OF UTILITY AND
DETECTABLE WARNING TAPE 1'-6" BELOW FINISHED GRADE.
3. PROVIDE TRACER WIRE TEST BOX EVERY 500 FEET EITHER FLUSH OR POLE
MOUNTED.
TYPICAL EXTERIOR CLEANOUT DETAIL
NOT TO SCALE2
SYMBOL
CONSTRUCTION SPECIFICATIONS
SILT FENCE
U.S. DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE
WOVEN WIRE FENCE
(MIN. 14 1/2 GAUGE
W/ MAX. 6" MESH
SPACING)
36" MIN. LENGTH FENCE
POSTS DRIVEN MIN. 16"
INTO GROUND.
HEIGHT OF FILTER
= 16" MIN.
8" MIN.
FLO
W
10' MAX. C. TO C.
5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN
4. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUIVALENT.
FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION.
FENCE SHALL BE WOVEN WIRE, 12 1/2 GAUGE, 6" MAXIMUM MESH OPENING.
2. FILTER CLOTH TO BE TO BE FASTENED SECURELY TO WOVEN WIRE
3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-
LAPPED BY SIX INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHER FILTER X,
OR STAPLES. POSTS SHALL BE STEEL EITHER "T" OR "U" TYPE OR HARDWOOD.
1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES
"BULGES" DEVELOP IN THE SILT FENCE.
MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT.
UNDISTURBED GROUND
EMBED FILTER CLOTH
A MIN. OF 6" IN GROUND.
4"
16"MIN.
WOVEN WIRE FENCE (MIN. 14 1/2
GAUGE W/ MAX. 6" MESH SPACING)
WITH FILTER CLOTH
36" MIN. FENCE POST
FLOW
COMPACTED SOIL
20"MIN.
PERSPECTIVE VIEW
SECTION VIEW
SYMBOL
CONSTRUCTION SPECIFICATIONS
STABILIZED
CONSTRUCTION
ENTRANCE
U.S. DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH
STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE.
8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON A AREA STABILIZED WITH
MUST BE REMOVED IMMEDIATELY.
SEDIMENT SPILLED, DROPPED, WASHED OR TRACTED ONTO PUBLIC RIGHTS-OF-WAY
PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL
7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL
IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED.
STRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS
6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CON-
5. FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING
POINTS WHERE INGRESS OR EGRESS OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE
4. WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT
2. LENGTH - NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT WHERE
1. STONE SIZE - USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
A 30 FOOT MINIMUM LENGTH WOULD APPLY).
3. THICKNESS - NOT LESS THAN SIX (6) INCHES.
ENTRANCE TO SITE.
RAIN.
OF STONE.
3' 5:1
PLAN VIEW
PROFILE
EXISTING
GROUND
FILTER
CLOTH
EXISTING
PAVEMENT
MOUNTABLE BERM
(OPTIONAL)
EXISTING
PAVEMENT
10'MIN.
10'MIN.
12'MIN.
50'MIN.
6"MIN.
EXISTING
GROUND
50'MIN.
12'MIN.
08/27/21
VITREOUS CHINAC_TOILETSKINGSTONK-4329
H G
E D
42'-6"
'-1
10'-3"
VESTIBULE
ROOM
BRIEFING
33'-8"
6'-0" 15'-0"
'-8
6'
-0
'-1
9'-10"
9'-1"
OFFICE
OPEN
AREA
118A
BREAK
RESTROOM
UNISEX
7'-10"
CORRIDOR
118B
5.1
18'-10" 20'-0"
3' -6
'-6
C
D1
W1
120A 120B
W1
W1
W1
W1
E1
B
5.2
'-0
VITREOUS CHINA
C_TOILETSKINGSTONK-4329
1'-8"
3'-0"2'-4"
11"
RESTROOM
MEN'S
HANGAR
7' -7
'-7
'-1
'-2
10'-8" 34'-7"
A-101
FLOOR PLAN
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
1 FIRST FLOOR PLAN
SCALE: 1/4" = 1'-0"
NORTH
0 4' 8'2'
A-201
A-201
A-301
A-301
A-502
A-502
A-401
KEY NOTES:
1/2 INCH WIDE WALL TO WALL EXPANSION JOINT BY METAL BUILDING
FABRICATOR SIMILAR TO SMACNA ARCHITECTURAL SHEET METAL MANUAL
(7TH EDITION) FIGURE 5-7. PROVIDE SHOP DRAWING
PARTITION SCHEDULE:
ALL STUDS AND FURRING CHANNELS SHALL BE SPACED AT 16 INCHES OC UNLESS OTHERWISE NOTED.
PROVIDE VINYL BASE WITH TYPE A THROUGH D PARTITIONS.
PROVIDE CERAMIC TILE BASE WITH LATRINE PARTITIONS.
TYPE A - SHAFT WALL PARTITION USING A 6 INCH C-H STUD, A 1 INCH SHAFT LINER, AND 5/8 INCH FIRE
RATED GWB. THE PARTITION SHALL EXTEND TO THE UNDERSIDE OF THE METAL DECK.
TYPE B - GWB PARTITION: 3-1/2 INCH METAL STUDS WITH 5/8 INCH GWB ON BOTH SIDES
B1: NOT USED
B2: GWB TERMINATES 1'-0" ABOVE CEILING
TYPE C - GWB FURRING AT EXTERIOR WALL:
C1 : FULL HEIGHT: NOT USED
C2 : TERMINATION ABOVE CEILING: 5/8 INCH GWB SECURED TO 3-5/8" METAL STUDS NESTED
BETWEEN GIRTS AND EXTENDING ONE FOOT ABOVE CEILING
TYPE D - GWB FURRING
D1: 1-1/2 INCH HAT CHANNEL SECURED TO EXISTING CMU WITH 5/8" FIRE RESISTANT GWB
TERMINATING 1'-0" ABOVE CEILING
D3: 2-1/2 METAL STUD WITH 5/8 INCH GWB EXTENDING FULL HEIGHT
TYPE E - LATRINE PARTITIONS
E1: 3-1/2 INCH METAL STUDS WITH TILE BACKER BOARD TO FULL HEIGHT AND CT ON ONE SIDE
AND MOISTURE RESISTANT GWB ON THE OTHER. PROVIDE SOUND ATTENUATION INSULATION
E2: 3-1/2 INCH METAL STUDS WITH TILE BACKER BOARD TO 4 FT AFF AND WITH MOISTURE
RESISTANT GWB TO 1 FOOT ABOVE CEILING AND CT WAINSCOT ON LATRINE SIDE AND
MOISTURE RESISTANT GWB ON THE OTHER
E3: (2) 3-1/2 INCH METAL STUD CHASE WALL WITH TILE BACKER BOARD TO 4 FT AFF AND WITH
MOISTURE RESISTANT GWB TO 1 FOOT ABOVE CEILING AND CT WAINSCOT BOTH SIDES
E4: (2) 3-1/2 INCH METAL STUD CHASE WALL WITH TILE BACKER BOARD AND CT EXTENDING 1
FOOT ABOVE CEILING ON ONE SIDE. MOISTURE RESISTANT GWB TO EXTEND TO ONE FOOT
ABOVE CEILING ON ONE SIDE
E5: 3-1/2 INCH METAL STUD WALL WITH TILE BACKER BOARD EXTENDING 1 FOOT ABOVE CEILING
ON ONE SIDE AND TERMINATED AT 4 FOOT AFF ON OTHER SIDE. MOISTURE RESISTANT GWB
TO EXTEND TO ONE FOOT ABOVE CEILING ON ONE SIDE. CT TO FULL HEIGHT ON ONE SIDE
AND CT WAINSCOT ON THE OTHER
E6: 2-1/2 INCH METAL STUD WALL WITH TILE BACKER BOARD TO AND CT WAINSCOT TO A HEIGHT
OF 4 FT AND MOISTURE RESISTANT GWB TO TERMINATE 1'-0" AFF. SINGLE SIDED
E7: 1-1/2 INCH HAT CHANNEL SECURED TO EXISTING CMU WALL. PROVIDE TILE BACKER BOARD
TO AND CT WAINSCOT TO A HEIGHT OF 4 FT AND MOISTURE RESISTANT GWB TO EXTEND FULL
HEIGHT TO CEILING
PROVIDE 1/2 INCH SOFT JOINT, PREFORMED COMPRESSIBLE CONTROL JOINT
WITH COMPATIBLE SEALANT. EMSEAL OR EQUAL
1/2 INCH WIDE FLOOR TO FLOOR EXPANSION JOINT, REFER TO SMACNA
ARCHITECTURAL SHEET METAL MANUAL FIGURE 5-8B. PROVIDE SHOP DRAWING
COLUMN ENCASED IN GWB
RELOCATE EXISTING SINK AND EYEWASH FROM CURRENT LOCATION
(OUTSIDE TEMPORARY LATRINE)
EXISTING 8 INCH CMU 5
END OF EXISTING MASONRY WALL
8 INCHES
1 SIMILAR
8" T
YP
A-502
A-502
A-502
E5
E1
E2E3
E7
E6
E5
E1
A
D3
C2
E4
SUPR. ROOM
FIRE
ROOM
ELEC.
ROOM
MECH.
ROOM
COMM.
HANGAR
H G
E D
5.1
C
5.2
HANGAR
VESTIBULE
40 SQFT
ROOM
205 SQFT
BRIEFING
OFFICE
1,056 SQFT
OPEN
RESTROOM
97 SQFT
UNISEX
RESTROOM
125 SQFT
MEN'S
CORRIDOR
60 SQFT
A-102
REFLECTED CEILING PLAN
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
1 REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
NORTH
0 4' 8'2'
AR-201
AR-201
A-301
A-301
GWB IN
LATRINES
CEILING 10'-0" AFF
FIRE
ROOM
ELEC.
ROOM
MECH.
ROOM
COMM.
HANGAR
VITREOUS CHINAC_TOILETSKINGSTONK-4329
H G
E D
VESTIBULE
ROOM
BRIEFING
OFFICE
OPEN
AREA
118A
BREAK
RESTROOM
UNISEX
OIC
WORKSTATION
CORRIDOR
118B
5.1
C
5.2
VITREOUS CHINA
C_TOILETSKINGSTONK-4329
RESTROOM
MEN'S
HANGAR
A-103
FURNITURE LAYOUT
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
1 FIRST FLOOR PLAN
SCALE: 1/4" = 1'-0"
NORTH
0 4' 8'2'
ALL FURNITURE AND THE REFRIGERATOR ARE NIC
43'-1"
SL
O
PE
:1
H G F E.1 D.1
PRE-ENGINEERED
STANDING SEAM
METAL ROOF TO
MATCH EXISTING
ADJACENT IN SLOPE
AND FINISH
F.1
5.1
EXISTING SNOW GUARD
EXISTING ROOF
A-104
ROOF PLAN
FPBB162002
1 ROOF PLAN
SCALE: 1/4" = 1'-0"
NORTH
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
0 4' 8'2'
AR-201
AR-201
KEY NOTES:
1/2 INCH WIDE ROOF TO WALL EXPANSION JOINT BY METAL BUILDING
MANUFACTURER, REFER TO SMACNA ARCHITECTURAL SHEET METAL
MANUAL FIGURE 5-6 SIMILAR
ROOF TO ROOF EXPANSION JOINT BY METAL BUILDING FABRICATOR.
REFER TO SMACNA ARCHITECTURAL SHEET METAL MANUAL FIGURE
5-5. PROVIDE SHOP DRAWING
PROVIDE CONTINUOUS SNOW GUARD TO MATCH EXISTING ADJACENT
PRODUCT IN SIZE, STYLE, LOCATION AND FINISH
MECHANICAL VENT THROUGH ROOF, FLASHING BY METAL BUILDING FABRICATOR.
PROVIDE SHOP DRAWING
MATCH HEIGHT, SLOPE AND FINISH OF EXISTING ADJACENT ROOF.
2 5
F.1 D.1G F E.1
ROOF TO ROOF
EXPANSION JOINT
EXISTING ROOF
EXPANSION JOINT
AND CLOSURE
'-1
0"
PRE ENGINEERED
METAL SIDING TO
MATCH EXISTING
ADJACENT
PRE-ENGINEERED
METAL ROOF TO
MATCH EXISTING
ADJACENT IN SLOPE
AND FINISH
12"
2"
'-1
0"
5.1
PRE ENGINEERED
METAL SIDING TO
MATCH EXISTING
ADJACENT
FACE OF EXISTING
HANGAR WALL
A-201
PROPOSED BUILDING ELEVATIONS
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
1 SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
0 4' 8'2'
2 EAST ELEVATION
SCALE: 1/4" = 1'-0"
0 4' 8'2'
A-301
A-301
KEY NOTES:
1/2 INCH WIDE WALL TO WALL EXPANSION JOINT BY METAL BUILDING
FABRICATOR SIMILAR TO SMACNA ARCHITECTURAL SHEET METAL MANUAL
(7TH EDITION) FIGURE 5-7. PROVIDE SHOP DRAWING
1/2 INCH WIDE ROOF TO WALL EXPANSION JOINT BY METAL BUILDING
MANUFACTURER, REFER TO SMACNA ARCHITECTURAL SHEET METAL
MANUAL FIGURE 5-6 SIMILAR
ROOF TO ROOF EXPANSION JOINT BY METAL BUILDING FABRICATOR.
REFER TO SMACNA ARCHITECTURAL SHEET METAL MANUAL FIGURE
5-5. PROVIDE SHOP DRAWING
PROVIDE CONTINUOUS SNOW GUARD TO MATCH EXISTING ADJACENT
PRODUCT IN SIZE, STYLE, LOCATION AND FINISH
MATCH HEIGHT, SLOPE AND FINISH OF EXISTING ADJACENT ROOF.
3 5
5 SIMILAR
7' -2
REFER TO A-601 FOR WINDOW DETAILS
VIF
VIF
7' -2
Tectonic Copyright 2007
EXISTING
MQ-9 LRE
AND HANGAR
12"
2"
T.O. FIRST FLOOR
EL. 698'-10"
T.O. STEEL (EXISTING)
EL. 739'-4"
ALIGN W/ EXIST. STRUCTURE BEYOND
EL. 722'-2"
T.O. EX EXTERIOR WALL AND
T.O. NEW EXTERIOR WALL
EL. 713'-7" VIF
'-9
'-4
METAL STANDING
SEAM ROOF
EXISTING METAL
PANEL FACADE
8' -7
FOUNDATION WALL
AND FOOTING
SLAB ON GRADE
SEE STRUCTURAL
AND MECHANICAL
FOR ADDITIONAL
INFORMATION
'-0
OPEN
OFFICE
BREAK AREA
SUSPENDED CEILING
AND SUPPORTS
5.17
FOOTING BEYOND
FIRE
RATED
DOOR
EXPANSION JOINT
EXISTING CMU WALL,
1 HOUR RATED PARTITION
DOUBLE
ANGLE LINTEL
(2) 3.5' X 4" X
1/2" WITH
MINIMUM 4
INCH
BEARING ON
EACH SIDE AT
EACH NEW
OPENING
10 MIL POLYETHYLENE
AIR BARRIER EXPOSED
1' -0
TY
P.GWB EXTEND 1'
OVER CEILING
3 INCHES OF
CONTINUOUS RIGID
INSULATION AND
VAPOR BARRIER
5.2
PRE-ENGINEERED
METAL PANEL FACADE
1" RIGID INSULATION
9" FIBERGLASS BATT
INSULATION, R-30 MIN.
GIRT BY METAL BDLG.
MANUFACTURER'S
DESIGN TO MEET NYS
WIND LOADING
5/8" GWB ON 3-5/8"
METAL STUDS AND
RUNNER NESTED
BETWEEN GIRTS. GWB
TERMINTES AT 1'-0" AFF
TWO (2) LAYERS 1 12"
RIGID INSULATION
F F.1 E.1 D.1
OPEN
OFFICE
'-0
STANDING SEAM METAL
ROOF
PREFORMED INSULATED
METAL ROOF PANELS (R-20)
12" FIBERGLASS BATT
INSULATION, FACED
BETWEEN PURLINS (R-30)
STEEL COLUMN
BEYOND
FACE OF EXISTING
BUILDING
EXPANSION JOINT
SUSPENDED CEILING
AND SUPPORTS
FOOTING BEYOND
CORRIDOR
BREAK AREA
VINYL INSULATION
COVER AND AIR BARRIER
1' -0
TY
P. GWB EXTEND 1'
OVER CEILING
3 INCHES OF
CONTINUOUS RIGID
INSULATION AND
VAPOR BARRIER
A-301
PROPOSED BUILDING SECTIONS
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
1 BUILDING SECTION 1
SCALE: 1/4" = 1'-0"
0 4' 8'2'
2 BUILDING SECTIONS 2
SCALE: 1/4" = 1'-0"
0 4' 8'2'
A-301
A-301
A-501
A-501
A-501
KEY NOTES:
1/2 INCH WIDE FLOOR TO FLOOR EXPANSION JOINT, REFER TO SMACNA
ARCHITECTURAL SHEET METAL MANUAL FIGURE 5-8B. PROVIDE SHOP DRAWING
1/2 INCH WIDE ROOF TO WALL EXPANSION JOINT BY METAL BUILDING
MANUFACTURER, REFER TO SMACNA ARCHITECTURAL SHEET METAL
MANUAL FIGURE 5-6 SIMILAR
COLUMN ENCASED IN GWB
MATCH HEIGHT, SLOPE AND FINISH OF EXISTING ADJACENT ROOF.
ALL FURNITURE IS NIC
3 3
VITREOUS CHINAC_TOILETSKINGSTONK-4329
E1
VITREOUS CHINA
C_TOILETS KINGSTON K-4329
A-401
ENLARGED RESTROOM
FLOOR PLAN
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
A-101
SCALE:: 1/2"=1'-0"
ENLARGED FLOOR PLAN
RESTROOM
UNISEXRESTROOM
MEN'S
C
9'-5"
8'-7" 1'-8"
3' -8
1"
3' -0
1"
3' -0
5"
3' -0
2'-10" 5'-9"
5'-0"
2'-6" 3'-0" 6"3'-4"
4' -4
5"
3' -0
OFFICE
OPEN
HANGAR
0 42
SCALE IN FEET
A-401
24 FD
A-401
FD
11 3
FD
FD
BULLNOSE
TILE
6 WITH CT WAINSCOT
A-401
SCALE:: 1/2"=1'-0"
MEN'S RESTROOM SECTION
A-401
SCALE:: 1/2"=1'-0"
MEN'S RESTROOM SECTION
A-401
SCALE:: 1/2"=1'-0"
MEN'S RESTROOM SECTION
A-401
SCALE:: 1/2"=1'-0"
MEN'S RESTROOM SECTION
A-401
SCALE:: 1/2"=1'-0"
UNISEX RESTROOM SECTION
A-401
SCALE:: 1/2"=1'-0"
UNISEX RESTROOM SECTION
A-401
SCALE:: 1/2"=1'-0"
UNISEX RESTROOM SECTION
A-401
SCALE:: 1/2"=1'-0"
UNISEX RESTROOM SECTION
TOILET ACCESSORY SCHEDULE
SYMBOL ITEM # REMARKS
1 A5080 PAPER TOWEL DISPENSER, SS, SURFACE MOUNTED
2 A4995 SOAP DISPENSER, WALL MOUNTED
3 A5090 SANITARY NAPKIN DISPOSAL, SS, SURFACE MOUNTED
4 A5200 TOILET PAPER DISPENSE, SS, 2 ROLL,
SURFACE MOUNTED
5 A5109 GRAB BAR, SS
6 A5110 GRAB BAR, SS, SHOWER USE
7 A5145 GARMENT HOOK, DOUBLE, SS, SURFACE MOUNTED
8 A5030 MIRROR WITHOUT SHELF
9 A5030 SIMILAR MIRROR - ACCESSIBLE
10 SEE PLUMBING WATER CLOSET
11 SEE PLUMBING LAVATORY
12 SEE PLUMBING URINAL
13 A5170 SHOWER ROD WITH CURTAIN AND HOOKS
14 SEE PLUMBING SHOWER HEAD / MIXING VALVE
GYPSUM BOARD SOFFIT
4' -0
" T
YP
2' -1
0" T
YP
1' -7
" T
YP
2' -1
0" T
YP
2' -1
0" T
YP
1' -7
" T
YP
LAVATORY DEPTH
17" MIN
NOTE: EQUIPMENT
PERMITTED IN SHADED
AREA.
LINE OF 30"X48"
CLEARANCE
8" MIN
(KNEE)
AT BOTTOM
11" MIN (KNEE)
AT TOP
CLEAR SPACE
17' MIN TO
25" MAX
LAVATORY CLEARANCE
CLEAR FLOOR SPACE AT
LAVATORY
48" MIN CLEAR SPACE
17" MIN TO
25" MAX
TO
B.O
. R
EFLEC
TIVE SU
R
FAC
E
3'-2" M
IN
TO
3'-4" M
AX
2'-10" M
AX. (T.O
LAV)
2' - 3" M
IN
. (KN
EE) (TO
E)
9" M
IN
30" M
IN
TO
FIN
ISH
W
ALL
1'-3" M
IN
A-401
SCALE:: 1"=1'-0"
ACCESSIBLE LAVATORY FRONT APPROACH
A-501
WALL SECTIONS AND DETAILS
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
A-301
SCALE:: 3/4"=1'-0"
WALL SECTION 0 1
SCALE IN FEET
A-301
SCALE:: 3/4"=1'-0"
WALL SECTION 0 1
SCALE IN FEET
A-301
SCALE:: 3/4"=1'-0"
WALL SECTION 0 1
SCALE IN FEET
A-503
A-503
4' -6
A-503
A-503
A-503
METAL STUDS NESTED BETWEEN
GIRTS WITH GWB FINISH.
SEE PARTITION SCHEDULE.
T.O. EXISTING AND NEW
WALL. EL 713'-7" VIF,
ALIGN WITH ADJACENT
3' -0
5'
-0
2' -0
PROVIDE MINI BLINDS.
SEE SPEC.
ACOUSTIC TILE CEILING AND
SUSPENSION SUPPORT
SYSTEMS PER SPECS.
SOLID SURFACE
COMPOSITE WINDOW
STOOL. SEE SPEC.
VAPOR BARRIER
2'-0"
3 INCH RIGID
INSULATION FOR 2 FT
AROUND PERMITER
7' -0
3'
-0
B.O. EXIST. STRUCTURE
EL. 722'-2" VIF
T.O. NEW EXTERIOR WALL
ALIGN WITH EXIST. ADJACENT BUILDING
FIRST FLOOR
EL. 698'-10"
A-502
PLAN DETAILS
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
A-101
SCALE:: 1"=1'-0"
PLAN DETAIL 2'1'0
SCALE IN FEET
A-101
SCALE:: 1"=1'-0"
PLAN DETAIL 2'1'0
SCALE IN FEET
F1
5.2
A-101
SCALE:: 1"=1'-0"
PLAN DETAIL 2'1'0
SCALE IN FEET
F1
A-101
SCALE:: 1"=1'-0"
PLAN DETAIL 2'1'0
SCALE IN FEET
5.1
D1
F1
D1
A-101
SCALE:: 1"=1'-0"
PLAN DETAIL 2'1'0
SCALE IN FEET
2'-2"
1EXPANSION JOINT2
TYPE A PARTITION
BETWEEN EXISTING
COLUMN D AND NEW
COLUMN D.1FIRE RATED DOOR
AND FRAME
PROVIDE GASKETED SADDLE AT
FIRE RATED DOORS (TYP.)
SEE SPEC. PROVIDE SADDLE
THAT SPANS EXPANSION JOINT
WITHOUT RESTRICTING
SEE PLAN FOR
PARTITIONS
SCHEDULE
EX{PANSION JOINT.
SEE KEYNOTES 2 AND 3
1/2 INCH
PROVIDE EXPANSION JOINT.
SEE KEYNOTE 1
2'-2"
EXISTING CONSTRUCTION
EXISTING CMU WALL IS
BEING RELIED UPON
FOR FIRE RATING. VIF
2-1/2" METAL
STUDS WITH FULL
HEIGHT GWB.
PARTITION TYPE D3
A-503
PLAN DETAILS
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
A-501
SCALE: 1"=1'-0"
SECTION DETAIL 2'1'0
SCALE IN FEET
A-501
SCALE: 1"=1'-0"
SECTION DETAIL 2'1'0
SCALE IN FEET A-501
SCALE: 1"=1'-0"
SECTION DETAIL 2'1'0
SCALE IN FEET
JAMB TRIM
D.1
METAL WALL PANEL BY
PRE-ENGINEERED METAL
BUILDING MANUFACTURER
1" THERMAX
FIBERGLASS BATT
NSULATION MIN. R-30
2 LAYERS 2" RIGID
INSULATION, MIN. R-20
FASTENED TO B-DECK
VAPOR BARRIER
B-DECK
PERLIN
METAL FLASHING
WEATHERHEAD FASTENER
@ 12" O.C. TAPE SEALANT
MFR. STANDARD
RAKE FLASHING
METAL WALL PANEL BY
PRE-ENGINEERED METAL
BUILDING MANUFACTURER
1" THERMAX
METAL FLASHING
PERLIN
5/8" GWB, REFER TO PARTITION TYPE 'C'
FIBERGLASS BATT
INSULATION MIN. R-30
STANDING SEAM
METAL ROOF, TYP.
CONCRETE FOUNDATION,
SEE STRUCTURAL DWGS.
CONCRETE FOOTING,
SEE STRUCTURAL DWGS.
GRADE
4" RESILIENT BASE
STEEL COLUMN AND BEAM,
SEE STRUC. DWGS.
K
METAL ROOF TO MATCH EXISTING
ADJACENT CONSTRUCTION,
SECURE TO STRUCTURE, TYP.
2 LAYERS 2" RIGID
INSULATION, MIN. R-20
FASTENED TO B-DECK
VAPOR BARRIER
FIBERGLASS BATT
INSULATION MIN. R-30
SEALANT
SOFFIT PANEL
P. T. WOOD BLOCKING
EAVE STRUT
GABLE EAVE
FLASHING
STEEL COLUMN AND BEAM BEYOND
(BY PRE- ENGINEERED METAL BLDG.
MANUFACTURER)
A-501
SCALE: 1"=1'-0"
SECTION DETAIL 2'1'0
SCALE IN FEET A-501
SCALE: 1"=1'-0"
SECTION DETAIL 2'1'0
SCALE IN FEET
5.1
METAL CLOSURE
PREFORMED
COMPRESSIBLE
JOINT SEALER,
SEE KEYNOTE 2
EXISTING MASONRY
WALL TO REMAIN
1/2 INCH WIDE ROOF TO WALL
EXPANSION JOINT BY METAL
BUILDING FABRICATOR,
SEE KEYNOTE 4
1-1/2 INCH FURRING
WITH FR GWB, SEE
PARTITION SCHEDULE
FOR FINISH
EXISTING CMU WALL
DOUBLE ANGLE LINTEL (2) 3.5" X 4" X 1/2" WITH
4 INCH MINIMUM BEARING ON EACH SIDE
FIRE RATED DOOR AND FRAME
VCT FLOORING
VAPOR BARRIER
3 INCHES CONTINUOUS
RIGID INSULATION
6" M
IN
DOOR SCHEDULE
DOOR
NO.
RM. NO. ROOM NAME INT./
EXT.
DOOR FRAME FIRE
RATING
HDWR.
SET (d)
REMARKS
DOOR
TYPE DOOR MAT.
DOOR
FINISH
DOOR
WIDTH
DOOR
HEIGHT THICK.
OPENING NOMINAL SIZE
FRAME
TYPE
FRAME
MAT.
FRAME
FINISH
GLASS
TYPE
DETAILS
WIDTH HEIGHT JAMB HEAD SADDLE
116 116 MEN'S RESTROOM INT FK HM PT-1 3'-0" 7'-0" 1 3/4" 3'-4" 7'-4" SF HM PT-1 - - - - 45 MIN HW #3 (d) REFER TO SPECIFICATION SECTION 08 71 00.
117 117 UNISEX RESTROOM INT FK HM PT-1 3'-0" 7'-0" 1 3/4" 3'-4" 7'-4" SF HM PT-1 - - - - 45 MIN HW #4
118 118 OPEN OFFICE INT F HM PT-1 3'-0" 7'-0" 1 3/4" 3'-4" 7'-4" SF HM PT-1 - - - - 45 MIN HW #1
119 119 BRIEFING ROOM INT F HM PT-1 3'-0" 7'-0" 1 3/4" 3'-4" 7'-2" SF HM PT-1 - - - - 0 HR HW #5
120A 120 VESTIBULE INT FK HM PT-1 3'-0" 7'-0" 1 3/4" 3'-4" 7'-2" SF HM PT-1 - - - - 0 HR HW #3
120B 120 VESTIBULE EXT FK HM PT-1 3'-0" 7'-0" 1 3/4" 3'-4" 7'-2" SF HM PT-1 - - - - 0 HR HW #2
LIST OF ABBREVIATIONS
DOOR TYPES FRAME TYPES MATERIAL TYPES FINISH TYPES EXAMPLE: FV1K =
FLUSH/ONE VISION PANEL/KICK PLATE
F FLUSH DOOR BL BORROWED LIGHT ALUM ALUMINUM PT PAINTED
K
KICK PLATE
SF SINGLE FRAME GALV GALVANIZED PT-1 WHITE - TO MATCH
EXISTING
R
FIRE RATED
DF DOUBLE FRAME HM HOLLOW METAL PT-2 GRAY - TO MATCH
EXISTING
ST STORE FRONT SL SIDELIGHT WD WOOD
V VISION PANEL T TRANSOM ABOVE
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
8" CMU
GROUT SOLID
STEEL LINTELS
SCHEDULED DOOR
SEALANT
HOLLOW
METAL FRAME
GROUT SOLID
SEALANT
8" CMU
SEALANT
SCHEDULED
DOOR
HOLLOW METAL FRAME
GROUT SOLID
SEALANT
EQ.
A-601
EQ.
6'-0"
3' -0
3'
-1 0" 5' -0
2"
'-0
A-601
A-601
A-601
BATT
8" GWB
3 58" METAL STUD
BOX BEAM
SEALANT
HOLLOW
METAL FRAME
INSULATION
8" GWB
SEALANT
SCHEDULED DOOR
SEALANT
BATT
INSULATION
8" GWB
3 58" METAL STUD
8" GWB
SCHEDULED
DOOR
SEALANT
HOLLOW
METAL FRAME
A-601
SCALE: 1"=1'-0"
JAMB DETAIL 2'1'0
SCALE IN FEET
A-601
SCALE: 1"=1'-0"
HEAD DETAIL 2'1'0
SCALE IN FEET
METAL PANEL
1' -0
/- 2"
4-1/2" +/-
6" FRAME
INSULATE JAMB
2"
1'-0"
A-601
SCALE: 3"=1'-0"
JAMB DETAIL 2/3'1/3'0
SCALE IN FEET A-601
SCALE: 3"=1'-0"
HEAD DETAIL 2/3'1/3'0
SCALE IN FEETA-601
SCALE: 1/4"=1'-0"
WINDOW TYPES 8'4'0
SCALE IN FEETA-601
SCALE: 3"=1'-0"
HEAD DETAIL 2/3'1/3'0
SCALE IN FEET
A-601
SCALE: 3"=1'-0"
JAMB DETAIL 2/3'1/3'0
SCALE IN FEET
A-601
SCALE: 3"=1'-0"
SILL DETAIL 2/3'1/3'0
SCALE IN FEET
FULL DEPTH
SEALANT
1" PARTICLE
BOARD STOOL
WITH P.LAM
FINISH SCHEDULED
WINDOW
SILL FLASHING
P.T. WOOD
BLOCKING
SILL PERLIN
BATT
INSULATION
METAL PANEL
8" GWB 1" THERMAX CI
WINDOW
FLASHING TRIM
SILL TRIM
3"
A-601
SCALE: 3"=1'-0"
MULLION DETAIL 2/3'1/3'0
SCALE IN FEET A-601
SCALE: 3"=1'-0"
JAMB DETAIL 2/3'1/3'0
SCALE IN FEET A-601
SCALE: 3"=1'-0"
HEAD DETAIL 2/3'1/3'0
SCALE IN FEET
SCHEDULED WINDOW
(MULLION)
JAMB TRIM
BATT
INSULATION
METAL PANEL
1" THERMAX CI
SHIM
BACKER-ROD & SEALANT
SHEDULED WINDOW
8" GWB
JAMB PERLIN
8" GWB
BATT
INSULATION
METAL PANEL
HEADER PERLIN 1" THERMAX CI
HEADER TRIM
SCHEDULED WINDOW BACKER-ROD
& SEALANT
SHIM
MINI BLINDS
A-601
PARTITION, DOOR AND FINISH SCHEDULES
FPBB162002
A-602
BREAKROOM COUNTER ELEVATIONS & DETAILS
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
GWB (PAINT)
3' -0
4"
'-0
2'
-0
CMU (PAINT)
FIRE EXTINGUISHER
9' -0
9' -0
3' -3
7' -3
2'-0"
7"
2" PARTICLE BOARD
HARDWOOD RAILS
& STRETCHERS
(TYP.)
4" PARTICLEBOARD
W/ PLAS. LAMINATE
BACK
HARDWOOD RAILS
& STRETCHERS
(TYP.)
8"
1'-81 4"
4" 1"
3-1/2" WIRE PULLS
PLASTIC LAM.
COVER GLUED
TO 34" PARTICLE-
BOARD EACH SIDE
4' VINYL BASE
BY G.C.
G.C. TO PROVIDE ALL
BLOCKING
3 4" HIGH DENSITY
PARTICLEBOARD
W/ BASEBOARD
SEE ROOM FINISH SCH.
FOR DETAILS
W/ 4" BACKSPLASH
& PLASTIC LAMINATE
FOR SINK SIZE
SEE PLUMBING
DRAWINGS
SINK SET- BACK
4" PARTICLE BOARD
W/ PLASTIC LAMINATE
4" x 11
2" WOOD
BEVELED EDGE4"
4" 2'
-6 1 2"
3' -0
4" HIGH DENSITY
PARTICLE BOARD
W/ PLASTIC LAMINATE
BACK
HARDWOOD RAILS &
STRETCHERS (TYP.)
ADJUSTABLE SHELF
4" HIGH DENSITY
PARTICLE BOARD
W/ P. LAM. EA. SIDE
K&V STANDARDS
W/ SHELF CLIPS
HARDWOOD RAILS &
STRETCHERS (TYP.)
G.C. TO PROVIDE ALL
BLOCKING
3"
1'-11"
DOOR, 34" PARTICLE
BOARD, PLASTIC
LAMINATE FINISH
EACH SIDE
4" BACKSPLASH,
4" HIGH DENSITY
PARTICLE BOARD
W/ PLASTIC LAMINATE
2'-0" 3
4" HIGH DENSITY PARTICLE
BOARD W/ PLASTIC LAMINATE
4" x 11
2" HARDWOOD
BEVELED EDGE
2" WIRE PULLS
TOEKICK, 3 4" HIGH DENSITY
PARTICLE BOARD, FINISH W/
CORRESPONDING FLOOR FINISH
BASE (BY G.C.), SEE ROOM
FINISH SCHEDULE.
4" 2'
-8
3' -0
4" HIGH DENSITY PARTICLE
HARDWOOD RAILS &
STRETCHER (TYP.)
4" HIGH DENSITY
PARTICLE BOARD
W/ PLASTIC LAMINATE
BACK
BOARD W/ PLASTIC LAM.
DOOR, 34" PARTICLE
BOARD, PLASTIC
LAMINATE FINISH
EACH SIDE
K&V STANDARDS
W/ SHELF CLIPS
ADJUSTABLE SHELF 34" HIGH
DENSITY PARTICLE BOARD
W/ PLASTIC LAMINATE EA.
SIDE
4" HIGH DENSITY PARTICLE
HARDWOOD RAILS &
STRETCHER (TYP.)
BOARD W/ PLASTIC LAM.
2" WIRE PULLS
A-602
SCALE: 1/4"=1'-0"
BREAKROOM COUNTER 8'4'0
SCALE IN FEET A-602
SCALE: 1"=1'-0"
SINK BASE CABINET SECTION 2'1'0
SCALE IN FEET
A-602
SCALE: 1"=1'-0"
BASE CABINET SECTION 2'1'0
SCALE IN FEET A-602
SCALE: 1"=1'-0"
WALL CABINET SECTION 2'1'0
SCALE IN FEET
FIRE
ROOM
ELEC.
ROOM
MECH.
ROOM
COMM.
HANGAR
VITREOUS CHINAC_TOILETSKINGSTONK-4329
H G
E D
VESTIBULE
ROOM
BRIEFING
OFFICE
OPEN
AREA
118A
BREAK
RESTROOM
UNISEX
CORRIDOR
118B
5.1
C
5.2
VITREOUS CHINA
C_TOILETSKINGSTONK-4329
RESTROOM
MEN'S
HANGAR
AC-1
5/8" GAS REFRIG. LINE
3/8" LIQUID REFRIG. LINE
EF-1
EA-1
8x6
75 CFM
EA-1
8x6
150 CFM
RL-1CONNECT 1" RWS AND
RWR LINES TO EXISTING
RL-3
4" RWS AND RWR DN
4" RWS AND
RWR DN
EA-1
8x6
75 CFM
3/4" RWS
3/4" RWR
4" RWS AND
RWR DN
RL-2
1" RWS
1" RWR
8"OA DUCT
200 CFM UP THRU ROOF
T
THERMOSTAT
TO FC-1
T THERMOSTAT
TO AHU-1
24"x12" LOUVER IN DOOR
175 CFM
12"x12" LOUVER IN DOOR
25 CFM
AH
U
-1
X1
VESTIBULE
40 SQFT
ROOM
205 SQFT
BRIEFING
OFFICE
1,056 SQFT
OPEN
RESTROOM
97 SQFT
UNISEX
RESTROOM
125 SQFT
MEN'S
CORRIDOR
60 SQFT
T
THERMOSTAT
TO RL-3
T
THERMOSTAT
TO RL-2
SA-1
24x24
150 CFM
SA-1
24x24
150 CFM
SA-1
24x24
150 CFM
SA-1
24x24
150 CFM
SA-1
24x24
150 CFM
SA-1
24x24
150 CFM
SA-1
24x24
150 CFM
SA-1
24x24
150 CFM
SA-1
24x24
150 CFM
SA-1
24x24
150 CFM
VD
SA-1
24x24
100 CFM
RA-1
24x24
650 CFM (TYP. OF 2)
10" DIA
RA-1
24x24
300 CFM CU-1
VD
10X10
VD
X1
VD
VD
8" DIA
8" DIA
VD
6" DIA
VD
10X10
VD
8" DIA
VD
8" DIA
VD
8" D
IA
VD
8" D
IA
VD
10" DIA
VD
8" D
IA
M-101
MECHANICAL FLOOR PLAN
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
1 FIRST FLOOR PLAN
SCALE: 1/4" = 1'-0"
NORTH
0 4' 8'2'
GENERAL NOTES:
1. CONDENSATE SHALL BE PUMPED TO THE SAME LOCATION
AS THE AIR CONDENSING UNIT AND TERMINATE AT A
SPLASH BLOCK.
2. RL-1 WILL SERVE THE FOLLOWING AREAS: OPEN OFFICE,
RL-2 WILL SERVE THE FOLLOWING AREAS: BRIEFING ROOM,
VESTIBULE, RL-3 WILL SERVE THE FOLLOWING AREAS: MEN'S
RESTROOM, UNISEX RESTROOM
SEQUENCE OF OPERATIONS:
AIR HANDLING UNIT (AHU-1)
RUN CONDITIONS - SCHEDULED:
THE UNIT SHALL RUN ACCORDING TO A USER DEFINABLE TIME
SCHEDULE IN THE FOLLOWING MODES:
· OCCUPIED MODE:
THE UNIT SHALL MAINTAIN A 76°F (ADJ.) COOLING SETPOINT
ZONE SETPOINT ADJUST:
THE OCCUPANT SHALL BE ABLE TO ADJUST THE ZONE
TEMPERATURE AT THE ZONE SENSOR.
FAN:
THE FAN SHALL RUN ANYTIME THE UNIT IS COMMANDED TO RUN,
UNLESS SHUTDOWN ON SAFETIES. WHEN THE FAN IS
COMMANDED TO RUN, THE OUTDOOR AIR DAMPER WILL BE
COMMANDED TO OPEN. WHEN THE FAN IS COMMANDED OFF,
THE OUTSIDE AIR DAMPER WILL BE COMMANDED TO CLOSE.
RADIANT FLOOR HEATING
RUN CONDITIONS SCHEDULED:
THE RADIANT FLOOR HEATING SHALL RUN ACCORDING TO A
USER DEFINABLE TIME SCHEDULE IN THE FOLLOWING MODES:
- OCCUPIED MODE
THE RADIANT FLOOR HEATING SYSTEM SHALL MAINTAIN A 70º
(ADJ.) HEATING SETPOINT.
THREE-WAY CONTROL VALVE:
ON A CALL FOR HEATING BY THE SPACE SENSOR, OPEN THE
THREE-WAY VALVE. ONCE SPACE TEMPERATURE SETPOINT IS
REACHED, CLOSE THE HEATING CONTROL VALVE. UPON FAIRE
OF THE SYSTEM TO MAINTAIN SPACE TEMPERATURE, SIGNAL AN
ALARM AT THE FORT DRUM HEAT SHOW OWS.
Architectural
Mechanical 8/27/2021
PRE-ENGINEERED
METAL PANEL FACADE
1" RIGID INSULATION
9" FIBERGLASS BATT
INSULATION, R-30 MIN.
GIRT BY METAL BDLG.
MANUFACTURER'S
DESIGN TO MEET NYS
WIND LOADING
5/8" GWB ON 3-5/8"
METAL STUDS AND
RUNNER NESTED
BETWEEN GIRTS. GWB
TERMINTES AT 1'-0" AFF
TWO (2) LAYERS 1 12"
RIGID INSULATION
F F.1 E.1 D.1
OPEN
OFFICE
'-0
STANDING SEAM METAL
ROOF
PREFORMED INSULATED
METAL ROOF PANELS (R-20)
12" FIBERGLASS BATT
INSULATION, FACED
BETWEEN PURLINS (R-30)
STEEL COLUMN
BEYOND
FACE OF EXISTING
BUILDING
EXPANSION JOINT
FOOTING BEYOND
CORRIDOR
BREAK AREA
VINYL INSULATION
COVER AND AIR BARRIER
1' -0
TY
P.
3 INCHES OF
CONTINUOUS RIGID
INSULATION AND
VAPOR BARRIER
Tectonic Copyright 2007
T.O. FIRST FLOOR
EL. 698'-10"
ALIGN W/ EXIST. STRUCTURE BEYOND
EL. 722'-2"
T.O. EX EXTERIOR WALL AND
T.O. NEW EXTERIOR WALL
EL. 713'-7" VIF
SA-1
24x24
150 CFM
8"dia 10x10
8"dia
14x20
AHU-1
8"dia
SA-1
24x24
150 CFM
SA-1
24x24
150 CFM
8"dia
CU-1
SA-1
24x24
150 CFM
8"dia10"dia
M-201
MECHANICAL SECTIONS
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
1 SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
0 4' 8'2'
A-301
Architectural
M-301
MECHANICAL SCHEDULES
FPBB162002
B
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2" FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
FPBB162002 CONSTRUCT MQ-9 SHOPS LAUNCH
AND RECOVERY ELEMENT
FORT DRUM MILITARY RESERVATION, NY
ANTHONY BROZIER
10256943
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MEP
FIRE PROTECTION
CYBERSECURITY
B-3 SUBMISSION27 AUG 20213
B-2 SUBMISSION8 JUN 20212
B-1 SUBMISSION20 APR 20211
A. BROZIER
J. JAECKEL
A. STANISCIA
I. DENHOLM
D. SPENCER
E. SHOWALTER
J. MONFORTON
Architectural
NOT TO SCALE
NONE
NOT TO SCALE
NONE
NONE
NONE
ROOF CONSTRUCTION
INSULATED ROOF
CURB (REFER TO
SPECIFICATION)
SECURE DUCT TO CURB 10
GA. SCREWS AT 12" CC
(MINIMUM 2 PER SIDE)
10 GA. SCREWS AT 12"
C.C (MINIMUM 2 PER
SIDE).
MOTORIZED BACKDRAFT
DAMPER (SECURE DAMPER
TO CURB IF FAN IS NOT
DUCTED)
EXHAUST FAN
SECURE DUCT TO ROOF
CONSTRUCTION OR
CURB (AIR TIGHT)
NONE
4"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .