Summary of IFQ Package for Northeast Health Building Automation System Upgrade
This is an Invitation for Quote/Bid document issued by Palm Beach County's Capital Improvements Division for the upgrade of a Building Automation System (BAS) at Northeast Health located at 825 Avenue P., Riviera Beach, Florida. The project, numbered 2021-047606, involves furnishing all labor, equipment, materials, permits, and professional services necessary to upgrade the existing BAS to connect with Palm Beach County's ALC (Automatic Level Control) platform. Scope of work includes replacing Trane controllers with BACnet ALC controllers on rooftop units, VAVs (approximately 23 units), fan-powered boxes (approximately 15 units), the chiller system, and chiller pumps; installing new Building Management System server interface hardware and web-based control software; providing system graphics and thermographic floor plans; and delivering operation and maintenance manuals with a one-year warranty on parts and labor. A mandatory pre-bid conference is scheduled for January 26, 2023, at 10:00 a.m. at the project site. Sealed bids are due February 16, 2023, by 2:00 p.m. at the Capital Improvements Division office. The contractor must substantially complete the work within 250 calendar days from the notice to proceed, with liquidated damages of $120 per day for failure to meet the deadline.
Bidders must be qualified contractors under Palm Beach County's Annual Contract - Low Voltage and must submit qualification applications at least ten days before the bid due date. Bids of $200,000 or more require bid security equal to five percent of the bid amount and a public construction bond equal to 100 percent of the contract value. The project is subject to Palm Beach County's Equal Business Opportunity (EBO) Program requirements, including SBE sheltered market provisions for work orders of $100,000 or less and a ten percent price preference for certified SBE bidders on single-trade contracts. Contractors must submit EBO Schedules 1 and 2 documenting all subcontractors and S/M/WBE participation. The solicitation applies two Affirmative Procurement Initiatives: SBE Sheltered Market for Small Construction Contracts and SBE Price Preference for Single Trade Construction. All bidders must comply with the County's Commercial Nondiscrimination Policy and disclose any instances of discrimination within the past four years. Employees must pass a Critical Facilities Background Check prior to commencing work. The contractor shall be responsible for all site preparation, temporary protection, material submittals for approval, installation per manufacturer specifications and applicable codes, final cleanup, and obtaining a Certificate of Occupancy or Completion before final payment processing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2021-047606 Ad for Project Quotes (NonFederal).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR QUOTE/BID
ANNUAL CONTRACT
DATE: 01/07/2023
SENT TO: Qualified Contractors
On the Annual Contract - Low Voltage
SENT FROM: Capital Improvements Division
CONTACT: Brian McNamara, Facilities Systems Project Manager
PHONE: (561)233-0266
PROJECT NAME: Northeast Health - Building Automation System
Upgrade
PROJECT NUMBER: 2021-047606
Mandatory Pre-Bid Conference. There will be a Mandatory Pre-Bid Meeting at
Northeast Health Department (meeting at main entrance), located at 825 Ave P., Riviera Beach, FL at 10:00 a.m. on January 26, 2023. The purpose of this pre-bid meeting will be to review the requirements for the project described in this Invitation for Quote/Bid. The work is to be done under the terms and conditions of Palm
Beach County’s Annual Contract – Low Voltage as supplemented by this
Invitation for Quote/Bid. You must attend this meeting if you intend to bid this work.
Questions must be e-mailed to FDO-CID-Bids@pbcgov.org at least seven (7) calendar days prior to the bid due date. Only questions received in writing will be responded to regarding this Invitation for Quote/Bid.
Form Rev. 11/30/22 Invitation for Quote/Bid - NonFederal mailto:FDO-CID-Bids@pbcgov.org
Submitting the Quote/Bid Package
The Quote/Bid Package must be enclosed in a sealed opaque envelope. The envelope must be addressed as follows:
Northeast Health - Building Automation System Upgrade
Project Number: 2021-047606
Capital Improvements Division
2633 Vista Parkway
West Palm Beach, Florida 33411
Attention: Bid Submissions
No responsibility will be attached to the Owner for premature opening of or failure to open a quote/bid not properly identified. If the quote/bid is sent by mail, the sealed envelope must be enclosed in a separate mailing with the notation "SEALED QUOTE/BID ENCLOSED" on the face thereof.
PROJECT NAME: Northeast Health - Building Automation System Upgrade
PROJECT NO.: 2021-047606
*DUE: February 16, 2023 by 2:00 p.m.
* The Quotes/Bids received by this time will be opened at a public meeting at the below address.
RETURN TO: Capital Improvements Division
2633 Vista Parkway
West Palm Beach, FL 33411
Qualification of Contractors. In order to submit a quote/bid in response to this IFQ/B, a contractor must be qualified under the Annual Contract - Low Voltage. A contractor may obtain a Qualification Application for this Annual Contract by sending an email with the
Project #, Prequalification: Annual Contract - Low Voltage in the subject line to: FDO-CID-
Bids@pbcgov.org or call (561) 233-0261. Qualification applications may also be downloaded from the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService. The contractor must submit the Qualification
Application at least 10 days before the Quote/Bid Due Date in order for its quote/bid to be considered.
https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService
1. SCOPE OF WORK: This Quote/Bid is to furnish all material, labor, supervision, permits and supplies necessary and reasonably incidental to upgrade Building Automation System (BAS) per the project requirements provided by Capital Improvements Division in this Invitation for Quote/Bid on Attachment
“C” and all exhibits and addenda thereto. Work is to be done under the terms and conditions of Palm
Beach County’s Annual Contract - Low Voltage, and pursuant to the conditions of the Work Order, both of which are incorporated into the Contract Documents by reference.
2. SCHEDULE OF TIME FOR COMPLETION. The time of completion for this Project will be as follows: The Contractor must substantially complete the work within two hundred fifty (250) calendar days from notice to proceed.
3. LIQUIDATED DAMAGES. Liquidated Damages are $120/day for failure to achieve certification of
Substantial Completion within the Work Order time or approved extension thereof.
4. BID SECURITY AND PUBLIC CONSTRUCTION BOND. Bid Security and Public Construction
Bond are required for this Project in accordance with Section 5.2 of the Instructions to Bidders of the Annual
Contract as follows:
Bid Security. If Bid is $200,000 or over, this Bid must be accompanied by a Bid Security (in the form of, at Bidder's option, cashier's check, certified check, money order or Bid Bond in favor of the County) in the amount of at least five percent (5%) of the bid price, see Section 5.2.2 of the
Instructions to Bidders of the Annual Contract for detailed requirements regarding Bid Security.
Public Construction Bond. If Bid is $200,000 or over (or if cumulative open work orders are
$200,000 or over), then prior to execution of a Work Order, and not later than fourteen (14) calendar days after notification from Owner, the successful Bidder must furnish a Public
Construction Bond in the amount of 100% of the Work Order and Guarantee, see Section 5.2.3 of the Instructions to Bidders of the Annual Contract for detailed requirements regarding the Public
Construction Bond and Guarantee.
5. Equal Business Opportunity Program. Section 5.3 of the Instruction to Bidders of the Annual Contract sets out the requirements of the County’s Equal Business Opportunity Program. All Bidders are required to submit with their bid the appropriate EBO Program schedules. EBO Schedules to be submitted with the quote/bid are as follows:
a) Schedule 1 - List of All Proposed Subcontractors, including S/M/WBE Participation. A completed Schedule 1 shall list the prime and names of all subcontractors, including S/M/WBE subcontractors, intended to be used in performance of the Work Order, if awarded. This schedule shall also be used if an S/M/WBE prime bidder is performing any work and/or using any subcontractors.
b) Schedule(s) 2 - Letter(s) of Intent to Perform as a Subcontractor, including S/M/WBE Subcontractors. A Schedule 2 for each subcontractor, including each S/M/WBE subcontractor, listed on Schedule 1, shall be completed and executed by the proposed subcontractor. The type of Work to be performed by each subcontractor and the dollar value or percentage shall also be specified. Additional copies may be made as needed. A completed Schedule 2 is a binding agreement between the prime contractor and the subcontractor and should be treated as such.
Attachment “A” identifies the affirmative procurement initiatives (APIs) applicable to this Invitation for Quote/Bid.
If Bidder is unable to comply with the API requirements (Attachment “A” hereto), such Bidder shall submit a request for a waiver or partial waiver at least (7) days prior to the quote/bid due date If
Bidder requests a waiver from an API from the Office of EBO at least 7 days prior to the quote/bid due date, then the quote/bid due date will be extended pending the outcome of a waiver request.
Additionally, if the waiver is granted, the solicitation will be amended accordingly and the due date extended again.
6. Addendum. Any interpretation, clarification, correction, or change of the Bidding Documents will be made only by Addendum. The Department will send written instructions regarding discrepancies, omissions or unclear intents to all Bidders who are Qualified Contractors with an
Annual Contract. For projects $100,000 and over all Addendum to a solicitation will also be posted under the applicable solicitation on the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService. Interpretations, corrections or changes to the Bidding Documents made in any other manner will not be binding, and Bidders shall not rely upon such interpretations, corrections and changes. Prior to submission of its
Bid/Quote, each Bidder must ascertain that it has received all Addenda issued. The Bidder must acknowledge receipt of each individual Addendum at the time of issuance and final receipt of all
Addenda by completing the acknowledgment space provided on the Addendum Form. Failure to acknowledge receipt may result in rejection of a bid/quote.
7. Failure to Provide the Required Documents after Notification of Award. If after Notification of award from the County, the successful Bidder does not provide within 14 Days of Notification the signed
Work Order, the Public Construction Bond and Guarantee (when required), and the required certificates of insurance, the County may: 1. Call in the bid security when provided; 2. Cancel the notification of recommended award and award the project to the next responsive, responsible low bidder; 3. Terminate this Annual Contract for cause; 4. Suspend or debar the Bidder from bidding on future projects for a period of two (2) years, in accordance with the Palm Beach County Purchasing Ordinance; and/or 5. Pursue any and all remedies available against the Bidder for damages resulting from its failure to enter into a Work
Order and provide all required documents within 14 Days after notification.
8. CONTRACT AMENDMENTS. The Annual Contract is amended as follows: NONE
Form Rev. 10/18/21 Bid Form - NonFederal
BID FORM
PROJECT NAME: Northeast Health - Building Automation System Upgrade
IN ORDER TO BE DEEMED RESPONSIVE TO THIS INVITATION FOR QUOTE/BID,
THE QUOTE/BID PACKAGE MUST CONTAIN:
a) This Quote/Bid Form completed and executed.
b) EBO Schedules 1 and 2 completed and executed.
c) Bid Security. (If the bid is $200,000 or more).
d) Signed Addenda, if any issued
THE FOLLOWING MUST BE COMPLETED AND SIGNED BY CONTRACTOR
1. TOTAL QUOTE/BID AMOUNT $
Written amount
2. Bidder commits to achieving the APIs applicable to this solicitation as designated on Attachment
A and as submitted on its EBO Schedules 1 and 2.
3. Is the Bidder a Palm Beach County certified S/M/WBE? Yes No
4. Commercial Non-Discrimination Certification. The undersigned Bidder hereby certifies and agrees that the following information is correct: In preparing its response to this Solicitation, the
Bidder has considered all proposals submitted from qualified, potential Subcontractors and suppliers, and has not engaged in "discrimination" as defined in the County’s Commercial
Nondiscrimination Policy as set forth in Resolution 2017-1770 as amended, to wit: discrimination in the solicitation, selection or commercial treatment of any Subcontractor, vendor, supplier or commercial customer on the basis of race, color, national origin, religion, ancestry, sex, age, marital status, familial status, sexual orientation, gender identity or expression, disability, or genetic information, or on the basis of any otherwise unlawful use of characteristics regarding the vendor's, supplier's or commercial customer's employees or owners; provided that nothing in this policy shall be construed to prohibit or limit otherwise lawful efforts to remedy the effects of discrimination that have occurred or are occurring in the County’s relevant marketplace of Palm
Beach County. Without limiting the foregoing, "discrimination" also includes retaliating against any person or other entity for reporting any incident of "discrimination." Without limiting any other provision of the solicitation, it is understood and agreed that, if this certification is false, such false certification will constitute grounds for the County to reject the bid submitted by the Bidder for this Solicitation, and to terminate any contract awarded based on the response. As part of its bid, the Bidder shall provide to the County a list of all instances within the immediate past four (4) years where there has been a final adjudicated determination in a legal or administrative proceeding in the State of Florida that the Bidder discriminated against its Subcontractors, vendors, suppliers or commercial customers, and a description of the status or resolution of that complaint, including any remedial action taken. As a condition of submitting a bid to the County, the Bidder agrees to comply with the County’s Commercial Nondiscrimination Policy as described in Resolution 2017-
1770 as amended.
Form Rev. 10/18/21 Bid Form - NonFederal
5. The Bidder shall be bound by the terms of its Bid for a period of one hundred twenty (120) calendar days from the date of the bid opening and may not withdraw its Bid within that time period.
If the County issues a Notification from Owner within the above 120-Day period, then the Bidder will be bound by the Bid as submitted. If the County fails to issue a Notification from Owner to the successful Bidder within the above identified 120-Day period, the successful bidder will not be required to honor its bid unless otherwise agreed to by both parties. County anticipates, but does not guarantee, the award of a Work Order and written notice to proceed within ninety (90) calendar days of Notification from Owner, absent the filing of a timely bid protest.
6. It is agreed that the undersigned has received all addenda complete as issued by the County and that related costs are included in the bid submitted. The undersigned acknowledges receipt of said addenda as follows:
Addendum # dated Addendum # dated
Addendum # dated Addendum # dated
The undersigned has included the signed addenda, if issued, in its bid package.
7. The undersigned does hereby declare that the Bid covers all expenses of every kind incidental to the completion of said Work in accordance with the Contract Documents, including all claims that may arise through damages or other causes whatsoever. The undersigned does hereby declare that it shall make no claim on account of any variation from any estimate in the quantities of Work to be done, nor on account of any misunderstanding or misconception of the nature of the Work to be done or the grounds, subsurface conditions, or place where the Work is to be done.
QUOTE/BID PROVIDED BY:
Contractor Firm Name
Date Signature
Print Name and Title
Quote/Bid Must Contain Original Signatures. No Copies or Emailed/Faxed Quotes/Bids Will
Be Accepted
OEBO SCHEDULE 1
SOLICITATION/PROJECT/BID NAME: Northeast Health - Building Automation System Upgrade SOLICITATION/PROJECT/BID NO.: 2021-047606 _
SOLICITATION OPENING/SUBMITTAL DATE: COUNTY DEPARTMENT: _
Section A PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY THE PRIME CONTRACTOR/CONSULTANT* ON THE PROJECT:
NAME OF PRIME RESPONDENT/BIDDER: ADDRESS: _
CONTACT PERSON: PHONE NO.: E-MAIL:
PRIME’S DOLLAR AMOUNT OR PERCENTAGE OF WORK: Non-SBE MBE WBE SBE
Section B PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY ALL SUBCONTRACTORS/SUBCONSULTANTS ON THE PROJECT BELOW:
Subcontractor/Sub consultant Name DIRECTION: List Firm Name, Address, & Provide PBC Vendor ID#. (https://www.pbcgov.org/pbcvendors)
(Check all Applicable Categories)
MBE WBE SBE
Non-SBE Minority Women Small
Business Business Business
Black
DOLLAR AMOUNT OR PERCENTAGE OF WORK
Hispanic Women Caucasian Asian
Other
1.
2.
3.
4.
5.
(Please use additional sheets if necessary)
Total Bid/Offer Price $
Total
Total Certified S/M/WBE Participation $
I hereby certify that the above information is accurate to the best of my knowledge: _
Name & Authorized Signature Title
Note: 1. The amount listed on this form for a Subcontractor/sub consultant must be supported by price or percentage listed on the properly executed Schedule 2 or attached signed proposal.
2. Only those firms certified by Palm Beach County at the time of solicitation opening or due date are eligible to meet the established OEBO Affirmative Procurement Initiative (API). Please check the applicable box and list the dollar amount or percentage under the appropriate demographic category.
3. Modification of this form is not permitted and will be rejected upon submittal.
REVISED 06/30/2022
*SMWBE Primes must include their percentage or dollar amount in the Total Participation line under section B.
http://www.pbcgov.org/pbcvendors) http://www.pbcgov.org/pbcvendors)
OEBO LETTER OF INTENT – SCHEDULE 2
A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. The Schedule 2 shall contain bolded language indicating that by signing the Schedule 2, both parties recognize this Schedule as a binding document. All Subcontractors/subconsultants, including any tiered Subcontractors/subconsultants, must properly execute this document. Each properly executed Schedule 2 must be submitted with the bid/proposal.
SOLICITATION/PROJECT NUMBER: 2021-047606
SOLICITATION/PROJECT NAME: Northeast Health - Building Automation System Upgrade
Prime Contractor: Subcontractor:
(Check box(s) that apply)
SBE WBE MBE M/WBE Non-S/M/WBE Date of Palm Beach County Certification (if applicable): _.
The undersigned affirms they are the following (select one from each column if applicable):
Column 1 Column 2 Column 3
Male Female African-American/Black Asian American Caucasian American Supplier
Hispanic American Native American
S/M/WBE PARTICIPATION – S/M/WBE Primes must document all work to be performed by their own work force on this form. Failure to submit a properly executed Schedule 2 for any S/M/WBE participation may result in that participation not being counted. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. S/M/WBE credit will only be given for the areas in which the S/M/WBE is certified. A detailed proposal may be attached to a properly executed Schedule 2.
Line
Item
Item Description Unit Price Quantity/
Units
Contingencies/
Allowances
Total Price/Percentage
The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:
Print Name of Prime Print Name of Subcontractor/subconsultant
By: By:
Authorized Signature Authorized Signature
Print Name Print Name
Title Title
Date: Date: _
Revised 09/17/2019
If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.
Price or Percentage:
Name of 2nd/3rd tier Subcontractor/subconsultant
Form Rev. 10/18/21 Attachment A for Asphalt, Demolition, Electrical, Flooring, HVAC, Low Voltage, Painting and
Weatherproofing, Roofing
ATTACHMENT “A”
(for Asphalt, Demolition, Electrical, Flooring, HVAC, Low Voltage, Painting and Weatherproofing, Roofing)
AFFIRMATIVE PROCUREMENT INITIATIVES (APIs) FOR CONSTRUCTION
PROCUREMENT
The API(s) approved for this project are selected below by ☒. Fillable pdfs of all EBO forms can be found on the OEBO website at http://discover.pbcgov.org/oebo/Pages/Compliance-
Programs.aspx. Also, see the EBO Ordinance and Countywide PPM CW-O-043 for further information on APIs.
__X__ SBE Sheltered Market for Small Construction Contracts
Under this contract, Work Orders $100,000 and below are reserved for competition among only certified SBEs. Small prime construction contracts (single trade or multi-trade) valued at or below $100,000 may be reserved for sheltered market competition where only certified SBEs are eligible to submit bids or quotes.
__X__ SBE Price Preference For Single Trade Construction
The work orders under this contract shall be awarded to the lowest, responsive, responsible bidder unless a certified SBE’s bid is within ten percent (10%) of the lowest non-SBE bid, in which case the award shall be made to the certified SBE bidder. Construction contracts where there are no opportunities for subcontracting (i.e.
single trade), may include a provision requiring awards of the contract to be made to the lowest responsive, responsible respondent or bidder unless a certified SBE’s bid is within ten (10) percent of the lowest non-small business bid, in which case the award shall be made to the certified small business bidder submitting the lowest responsive, responsible bid at the price that it bid.
http://discover.pbcgov.org/oebo/Pages/Compliance-Programs.aspx http://discover.pbcgov.org/oebo/Pages/Compliance-Programs.aspx
IFQ/B ATTACHMENT B
Include Attachment B if bid is $200,000 or more
DATE:
BID BOND
STATE OF FLORIDA
COUNTY OF PALM BEACH
KNOW ALL MEN BY THESE PRESENTS: That we, (hereinafter called "Principal"), and
(hereinafter called "Surety") are held and firmly bound unto Palm Beach County, a Political Subdivision in the State of Florida, by and through its Board of
County Commissioners, (hereinafter called "County") in the sum of
Dollars,($ ), (which sum is at least 5% of the bid price), lawful money of the United States of America, for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly be these presents;
WHEREAS, the "Principal" contemplates submitting or has submitted a bid to the Board of County
Commissioners, Palm Beach County, Florida, for furnishing and paying for all necessary labor materials, equipment, machinery, tools, apparatus, services, all state workmen's compensation and unemployment compensation taxes incurred in the performance of the Contract, means of transportation for and complete
Construction of: Northeast Health - Building Automation System Upgrade, Project Number 2021-
047606, in the County of Palm Beach, State of Florida; and
WHEREAS, it was a condition precedent to the submission of said bid that a certified check cashier's check, money order or bid bond in the amount of five percent (5%) of the base bid be submitted with said bid as a guarantee that the bidder would, if given a Notification from Owner, enter into a written contract with the
County, and furnish a public construction bond in an amount equal to one hundred (100%) of the total
Contract, within fourteen (14) consecutive calendar days after the County issues the Notification from
Owner.
NOW THEREFORE, THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, if the bid of the "Principal" herein is accepted and said "Principal", within fourteen (14) consecutive calendar days after written notice being given of such acceptance, (i) enter into a written contract with the County and (ii) furnishes a public construction contract bond in the amount equal to one hundred percent (100%) of the total contract amount and in a form satisfactory to the County, then this obligation shall be void. If the
Principal fails to complete (i) and (ii) above, the sum herein stated shall be due and payable to the "County", and the "Surety" herein agrees to pay said sum immediately upon demand of the "County", in good and lawful money of the United States of America, as liquidated damages for failure of said "Principal".
Bid Bond Must Contain Original Signatures. No Copies Will Be Accepted.
DATE:
IN WITNESS WHEREOF, the said as "Principal" herein, has caused these presents to be signed in its name, by its
, and attested by its under the corporate seal, and the said as "Surety" herein, has caused these presents to be signed in its name, by its
, and attested by its corporate Seal, this day of , A.D., 20 .
ATTEST:
Print Name
TITLE:
(SEAL)
(Contractor Firm Name)
By:
(Signature)
Print Name and Title:
ATTEST:
Print Name
TITLE:
(SEAL)
(Surety Name)
By:
(Signature)
Print Name and Title:
Bid Bond Must Contain Original Signatures. No Copies Will Be Accepted.
CAPITAL IMPROVEMENTS DIVISION
IFQ/B ATTACHMENT C
PROJECT REQUIREMENTS
Annual Contract - Low Voltage
Contact: Brian McNamara, Facilities Systems Project Manager Phone: (561)233-0266 Project Title: Northeast Health - Building Automation System Upgrade Project #: 2021-047606 Project Location: 825 Ave P., Riviera Beach, FL
1. GENERAL
a. The work covered by this Request for Quote consists of the furnishing of all labor, equipment, devices, tools, materials, transportation, professional services, supervision, drawings, permitting, and all miscellaneous requirements to perform all operations necessary to accomplish the work set forth below and shall be considered part of the Scope of Work.
b. Please reference the Annual Contract – Low Voltage for additional requirements.
c. Work to be completed during the hours of 7:00 a.m. to 5:00 p.m., Monday through
Friday.
d. Contractor shall contact the Project Manager, within seventy-two (72) hours of notice to proceed to establish scheduling, etc. required for project implementation.
e. Work to be completed within two hundred fifty (250) calendar days from notice to proceed. Permit application, if required, is to be submitted by Contractor within five
(5) days of “Notice to Proceed” and due diligence exercised to address all Building Department comments.
f. Liquidated damages will accrue in the amount of $120 per day.
g. The Contractor will provide a Certificate of Occupancy or Certificate of Completion, as appropriate, obtained from the proper Building official, prior to processing of final payment.
h. Contractor is responsible for obtaining all measurements during the site inspection.
2. SCOPE OF WORK
To furnish all equipment, tools, machinery, materials, supplies, labor, supervision, and permits necessary to upgrade Building Automation System (BAS) per the project requirements provided below:
a. Contractor to include the following upon completion:
1. Operation & Maintenance manuals
2. One (1) year warrantee on parts and labor
b. Clarification:
1. Does not include any fire alarm modules or detectors
2. Does not include interlock wiring or monitoring of fire / smoke dampers
3. Customer to provide network drop and static IP as needed.
c. Not Included:
1. All dampers (unless noted otherwise in scope below)
2. Fire / Smoke dampers and actuators
3. Fire / Smoke damper wiring
4. Smoke control system
5. Programmable lighting panels
6. Site cleanup crew participation
7. Liquidated damages
8. Starters and VFD’s
9. Wiring of any voltage greater than 24v
d. HVAC Controls Scope of Work
1. Connect to Palm Beach Counties existing ALC Platform
2. Provide thermographic floor plans
3. A deficiency report will be conducted upon completion of the project. A report will be provided with pricing to replace any failed devices.
4. New Building Management System server interface hardware as required
5. New Automated Logic Web-CTRL software
6. System Graphics
7. Floor plan graphics with equipment locations
8. System graphics
e. Trane - Field furnished and installed (All end devices, wiring, and conduit to be reused where deemed acceptable)
1. Connect to existing chiller interface
2. Replace existing Trane Universal Controller (UC) controller with a Building
3. Automation and Control networks (BACnet) Automatic Level Control (ALC) controller for chiller Start/Stop, status, and alarm points.
f. Rooftop Unit 1 - Field furnished and installed (All end devices, wiring, and conduit to be reused where deemed acceptable)
1. Remove existing Trane MP Controller and replace with a BAC-net ALC controller
2. Existing points being connected to include:
3. VFD start/stop, status, fault and speed
4. Differential pressure transmitter
5. CHW valve control
6. Outside air damper control
7. Return air damper control
8. Supply air temperature
9. Return air temperature
10. Outside air temperature
11. Cooling coil leaving temperature
12. Outside air flow
13. Space humidity sensor
14. CO2 sensor
15. Filter status
16. Duct static
17. High static switch
18. Associated EF-1A start/stop and status
19. New enclosure with transformer
g. Rooftop Unit 2 - Field furnished and installed (All end devices, wiring, and
1. Remove existing Trane MP Controller and replace with a BACnet ALC controller
2. Existing points being connected to include:
3. VFD start/stop, status, fault and speed
4. Differential pressure transmitter
5. CHW valve control
6. Outside air damper control
7. Return air damper control
8. Supply air temperature
9. Return air temperature
10. Outside air temperature
11. Cooling coil leaving temperature
12. Outside air flow
13. Space humidity sensor
14. CO2 sensor
15. Filter status
16. Duct static
17. High static switch
18. Associated EF-2A start/stop and status
19. New enclosure with transformer
h. VAVs (typical of 23) - Field furnished and installed (All end devices, wiring, and conduit to be reused where deemed acceptable)
1. Replace existing controller with a new BACnet ALC controller
2. Connect to existing damper actuator
3. Existing points being connected to include:
4. Space sensor
5. Electric heat control
6. Discharge temperature sensor
i. Fan Powered Boxes (typical of 15) - Field furnished and installed (All end devices, wiring, and conduit to be reused where deemed acceptable)
1. Replace existing controller with a new BACnet ALC controller
2. Existing points being connected to include:
3. Space sensor
4. Electric heat control
5. Discharge temperature sensor
j. Trane Chiller - Field furnished and installed (All end devices, wiring, and
1. Replace existing Trane UC controller with a new BACnet ALC controller
2. Existing points being connected to include:
3. Chilled water reset
4. Chiller alarm
5. Chiller enable/disable
6. BAC-net connection to chiller
7. New enclosure with transformer
k. Chiller Pumps - Field furnished and installed (All end devices, wiring, and
1. Replace existing Trane MP Controller with a new BAC-net ALC controller
2. New enclosure with transformer
3. SUBMITTALS
All submittals shall be sent to the Project Manager for approval. This includes, but is not limited to, products to be used, methods of installation and requests for information and/or clarification. All submittals must be made by the Contractor and must include all details necessary for the Project Manager and Palm Beach County to make any necessary determinations. A transmittal form must be included which clearly requests data or information and deviations from the contract requirements for which approval is being requested. Failure to provide sufficient information will result in the rejection of the submittal. Where the specifications do not specify a brand name product or where a substitution of a product is not specifically prohibited, the Contractor shall submit their selected products for approval by the Project Manager. Such submittals shall include as much detail, and in a format, as required by the Project Manager, so as to allow the Project Manager to evaluate the proposed substitution.
4. MATERIALS
a. All material shall meet or exceed Florida Building Code and product submittals shall be reviewed and approved by the Owner’s Representative prior to ordering.
b. Materials shall be delivered in their original, unopened packages, and protected from exposure to the elements. Damaged or deteriorated materials shall not be used.
5. TEMPORARY PROTECTION
The Contractor shall protect all workers, staff and the general public from injury. The Contractor shall coordinate and schedule all work with the Project Manager.
6. PROJECT CONDITIONS
Contractor is to coordinate all space and security requirements with the Project Manager. A construction schedule shall be submitted for review and approval prior to pre-construction meeting, including a start date, substantial completion date, and work plan defining which openings will be scheduled on what day. The Contractor shall conduct all work so as to cause the least interference possible with the normal activities of the operations of the facility and surrounding areas. Any damage caused by Contractor (including landscaping and irrigation) shall be the responsibility of the Contractor to repair and return to its original state.
7. PREPARATION
It shall be the responsibility of the Contractor to prep the site at the construction locations.
8. EXAMINATION
Report to the Project Manager, in writing, any imperfections, unacceptable conditions and/or corrections required to be made before commencing work. Any items not identified, documented and reported to PBC in writing, will become part of the contractors’ scope. All other items identified in writing, if approved, shall result in a change order.
9. INSTALLATION
All materials shall be installed in strict accordance with Manufacturer’s written instructions and recommendations. All work shall be done in conformance with applicable Federal, State and Local codes, and established standards.
10. WARRANTY
Contractor warrants all equipment, materials and labor furnished or performed against defects in design, materials and workmanship for a period of twelve (12) months from substantial completion.
11. CLEAN UP
Remove all waste materials, tools and equipment from job site daily. Thoroughly clean the entire job area prior to requesting final inspection. All existing equipment to be Disposed of following all federal, state & local guidelines.
12. SECURITY
All bidders must have badged employees as identified below prior to commencement of work.
This project is subject to: [X] Critical Facilities Background Check
[ ] CJI Facilities Background Check [ ] No Background Check
| Check Box1: Off |
| Date_2: |
| Title_2: |
| Print Name_2: |
| By_2: |
| Print Name of Subcontractorsubconsultant: |
| Price or Percentage: |
| Date: |
| Title: |
| Print Name: |
| By: |
| Print Name of Prime: |
| Name of 2nd3rd tier Subcontractorsubconsultant: |
| at the following total price or percentage: |
| Total PricePercentageRow6: |
| Contingencies AllowancesRow6: |
| Quantity UnitsRow6: |
| Unit PriceRow6: |
| Item DescriptionRow6: |
| Line ItemRow6: |
| Total PricePercentageRow5: |
| Contingencies AllowancesRow5: |
| Quantity UnitsRow5: |
| Unit PriceRow5: |
| Item DescriptionRow5: |
| Line ItemRow5: |
| Total PricePercentageRow4: |
| Contingencies AllowancesRow4: |
| Quantity UnitsRow4: |
| Unit PriceRow4: |
| Item DescriptionRow4: |
| Line ItemRow4: |
| Total PricePercentageRow3: |
| Contingencies AllowancesRow3: |
| Quantity UnitsRow3: |
| Unit PriceRow3: |
| Item DescriptionRow3: |
| Line ItemRow3: |
| Total PricePercentageRow2: |
| Contingencies AllowancesRow2: |
| Quantity UnitsRow2: |
| Unit PriceRow2: |
| Item DescriptionRow2: |
| Line ItemRow2: |
| Total PricePercentageRow1: |
| Contingencies AllowancesRow1: |
| Quantity UnitsRow1: |
| Unit PriceRow1: |
| Item DescriptionRow1: |
| Line ItemRow1: |
| Date of Palm Beach County Certification if applicable: |
| Subcontractor: |
| Prime Contractor: |
| SOLICITATIONPROJECT NAME: |
| SOLICITATIONPROJECT NUMBER: |
| Text16: |
| Text15: |
| Total Bid Price: |
| Text10: |
| 4: |
| 0: |
| 1: |
| 4: |
| 3: |
| 2: |
| 1: |
| 0: |
0:
| 4: |
| 3: |
| 2: |
| 1: |
| 3: |
| 4: |
| 3: |
| 2: |
| 1: |
| 0: |
| 2: |
| 4: |
| 3: |
| 2: |
| 1: |
| 0: |
| 1: |
| 4: |
| 3: |
| 2: |
| 1: |
| 0: |
| 0: |
| 4: |
| 3: |
| 2: |
| 1: |
| 0: |
| Text9: |
| 4: |
| 3: |
| 2: |
| 1: |
| 0: |
| Text8: |
| Text6: |
| Text7: |
| Text5: |
| Text4: |
| Text3: |
| NAME OF PRIME RESPONDENTBIDDER: |
| Text2: |
| Project Name: |
File details come from the government source that posted it. Updated .