2021_004_BGVC_LEED_v4_Checklist (5).pdf
PDF 57 KB Posted
- Solicitation number
- RFP-785-2200000049-1
- Issued by
- Warren County, Kentucky
About this file
This document is a LEED v4 for Building Design and Construction: New Construction and Major Renovation Project Checklist for the Bowling Green Kentucky Veterans Center project. The checklist outlines the various credits and requirements to achieve LEED certification for the project, including categories such as Location and Transportation, Sustainable Sites, Water Efficiency, Energy and Atmosphere, Materials and Resources, and Indoor Environmental Quality. The project aims to achieve certification at the required level, with specific credit targets noted. No other details about the procurement process, timeline, or contracting terms are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2021_004_BGVC_Energy Report.pdf | ||
| REQUEST FOR PROPOSALS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEED v4 for BD+C: New Construction and Major Renovation Project Checklist
Y ? N
1 Credit 1
3 0 0 16 10 0 0 13 Credit 16 Y Prereq Required
1 Credit 1 Y Prereq Required Credit 2 2 Credit 5
Credit 5 2 Credit 2
Credit 5 2 Credit 2 Credit 1 2 Credit Building Product Disclosure and Optimization - Material Ingredients 2
1 Credit 1 2 Credit 2 1 Credit Green Vehicles 1
12 3 0 Indoor Environmental Quality 16 10 0 0 10 Y Prereq Required
Y Prereq Required Y Prereq Required
1 Credit 1 2 Credit 2 2 Credit 2 2 Credit 3 1 Credit 1 1 Credit Construction Indoor Air Quality Management Plan 1 3 Credit 3 2 Credit 2 2 Credit 2 1 Credit 1 1 Credit 1 2 Credit 2
3 Credit 3
4 0 0 11 1 Credit 1 Y Prereq Required 1 Credit 1 Y Prereq Required Y Prereq Building-Level Water Metering Required 4 0 0 Innovation 6 2 Credit 2 3 Credit 5 2 Credit 6 1 Credit 1
Credit 2 Credit Water Metering 1 3 0 0 Regional Priority 4
1 Credit Regional Priority: Optimize Energy Performance 6 pts or Greater 1
12 0 0 33 1 Credit Regional Priority: Rainwater Management 3 pts 1 Y Prereq Required 1 Credit Regional Priority: Reduced Parking Footprint 1 Y Prereq Required Credit Regional Priority: Specific Credit 1 Y Prereq Required Y Prereq Required 59 3 0 TOTALS Possible Points: 110 6 Credit 6 6 Credit 18
Credit 1 Credit 2 Credit 3 Credit 1 Credit 2
Minimum Energy Performance
Fundamental Refrigerant Management
Cooling Tower Water Use
Project Name: Bowling Green Kentucky Veterans Center
Acoustic Performance Quality Views
Enhanced Indoor Air Quality Strategies Low-Emitting Materials
Indoor Air Quality Assessment Thermal Comfort
Enhanced Refrigerant Management
Optimize Energy Performance Advanced Energy Metering
Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110
Access to Quality Transit
Reduced Parking Footprint
Open Space
Site Assessment
Interior Lighting Daylight
LEED Accredited Professional Innovation
Rainwater Management
Light Pollution Reduction
Environmental Tobacco Smoke Control
Energy and Atmosphere
High Priority Site
Surrounding Density and Diverse Uses
Sustainable Sites
Building Life-Cycle Impact Reduction
Green Power and Carbon Offsets
Heat Island Reduction
Outdoor Water Use Reduction Indoor Water Use Reduction
Outdoor Water Use Reduction Indoor Water Use Reduction
Enhanced Commissioning
Building-Level Energy Metering
Water Efficiency
Fundamental Commissioning and Verification
Demand Response Renewable Energy Production
Site Development - Protect or Restore Habitat
Building Product Disclosure and Optimization - Sourcing of Raw Materials
Date: Jun 23, 2021
Location and Transportation
Sensitive Land Protection LEED for Neighborhood Development Location
Bicycle Facilities
Construction and Demolition Waste Management Planning
Materials and Resources Storage and Collection of Recyclables
Construction and Demolition Waste Management
Minimum Indoor Air Quality Performance
Building Product Disclosure and Optimization - Environmental Product Declarations
Integrative Process
Construction Activity Pollution Prevention
File details come from the government source that posted it. Updated .