2020110 Lighting Plans.pdf

PDF 1 MB Posted

Attached to
Lyons RD N of L30 Canal to Boynton Bch Blvd
Solicitation number
IFB 360 2018503_2020110REBID 5
Issued by
Palm Beach County, Florida

About this file

Lighting Plans Summary

This document is a set of contract lighting plans prepared by Propel Engineering, LLC for Palm Beach County, Florida, detailing intersection improvements at the intersection of Lyons Road and Boynton Beach Boulevard (Project No. 2020110). The project involves the furnish and installation of one 175-watt LED cobrahead luminaire and the relocation of one complete light pole. The lighting design adheres to Florida Department of Transportation (FDOT) standards for intersection retrofit and corridor lighting, with specifications requiring an average initial illuminance of 1.5 standard/1.0 minimum foot candles for horizontal and vertical foot candles at the intersection, and a uniformity ratio not to exceed 4:1 average to minimum and 10:1 maximum to minimum. The design accommodates a 160 miles per hour design wind speed and utilizes 3000K correlated color temperature. The project is located in Palm Beach County, Florida, and engineering certification was provided by Gregg K. Weiss, P.E. (FL Registration No. 92997), with plan approval dated November 7, 2025.

The lighting calculations demonstrate compliance with FDOT standards across all intersection and crosswalk areas. The main intersection (Lyons Road and Boynton Beach Boulevard) achieved an average illuminance of 1.63 foot candles with a uniformity ratio of 2.72 average to minimum and 8.67 maximum to minimum. The four crosswalks (eastbound, westbound, southbound, and northbound) each met design criteria with average illuminances ranging from 1.53 to 2.08 foot candles and uniformity ratios between 1.09 and 1.39 average to minimum. The project includes coordination with existing Florida Power and Light (FPL) light poles, with several designated to remain, be retrofitted in FDOT Project 439844-1, or be relocated as necessary. The plan sheets were prepared under Florida Administrative Code Rule 61G15-23.004 and represent the official digitally signed and sealed record of the project design.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROADWAY PRODUCTION

HCAEB

M L

A P

FLORID

A

Y T

N U

OC

Shuvo

F

P r o j e c t s P r o p e l-

E n g

(H

L y o n s

B o y n t o n

B c h li g h t in g

K E

Y S

L T .d g n

3:38:46 PM

OF:

SHEET:

DATE:

APPROVED:

SCALE:

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

By Date

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

RevisionsNo.

Seal:

GOVERNING STANDARD PLANS:

GOVERNING STANDARD SPECIFICATIONS:

F

P r o j e c t s P r o p e l-

E n g

(H

L y o n s

B o y n t o n

B c h li g h t in g

K E

Y S

L T .d g n

2020110

PROJECT NO.

DS

PROPEL ENGINEERING, LLC.

FLORIDA BUSINESS CERT. NO. 31050

APPROVED BY:

DATE:

P.E. NO.: FL REGISTRATION NO. 92997

PHONE (561) 866-5730

SHEET DESCRIPTIONSHEET NO.

STATE OF FLORIDA

COUNTY OF PALM BEACH

DISTRICT 1

DISTRICT 6

DISTRICT 4

DISTRICT 2 DISTRICT 3

DISTRICT 5

DISTRICT 7

CONTRACT PLANS COMPONENTS

ENGINEER'S CERTIFICATION

I HEREBY CERTIFY THAT THE ATTACHED PLANS AND DESIGN

ARE IN SUBSTANTIAL COMPLIANCE WITH THE DESIGN STANDARDS

AND CRITERIA IN EFFECT ON THIS DATE FOR PALM BEACH COUNTY

ENGINEERING DEPARTMENT AND THE STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION.

WEST PALM BEACH, FLORIDA 33411

PROJECT NO. 2020110

MARIA G. MARINO

BOARD OF COUNTY COMMISSIONERS

the following website: http://www.fdot.gov/design/standardplans

Standard Plans for Road Construction and associated IRs are available at and Bridge Construction and applicable Interim Revisions (IRs).

Florida Department of Transportation, FY2024-25 Standard Plans for Road

INTERSECTION IMPROVEMENTS

2711 N VISTA PARKWAY., SUITE NO. B-7

N.T.S.

MARCI WOODWARD

provisions for this project.

FY 2024-25 and supplements thereto if noted in the special

State of Florida Department of Transportation Standard Specifications, INTERSECTION IMPROVEMENTS

CHECKED: DS

DRAWN: IA

LYONS RD. AND BOYNTON BEACH BLVD

KEY SHEET

lyons rd. and boynton beach blvd.

T-1

L-4

TS 46015

100% SUBMITTAL

GREGG K. WEISS

P.E.# 92997

(MAYOR)

(VICE MAYOR)

SARA BAXTER BOBBY POWELL, JR

JOEL G FLORES

MARIA SACHS

11/7/2025

11/7/2025

11/7/2025

T H

E

O F

F I

C I

A L

R

C O

D

T

I

S

E E

T

E C

T R

O N

C

G I

T A

L

Y

G N

N

A L

U

D

L E

G

A

C

LIGHTING PLANS

INDEX OF LIGHTING PLANS

SPECIFIC PURPOSE/TOPOGRAPHIC SURVEY (FOR INFORMATION ONLY)

LIGHTING PLANS

SIGNALIZATION PLANS

SIGNING AND PAVEMENT MARKING PLANS

ROADWAY PLANS

L-1 KEY SHEET

T-2 TABULATION OF QUANTITIES

L-3 - L-4 LIGHTING PLANS

DILNAHAR H SHUVO, P.E.

DILNAHAR H SHUVO

TABULATION OF QUANTITIES

L-2

TABULATION OF QUANTITIES

NO.

ITEM

PAY

DESCRIPTION UNIT

L-3

SHEET

TOTAL THIS

TOTAL

GRAND

PLAN FINAL PLAN FINAL PLAN FINAL

715 11 211 L1 Furnish and Install 175 Watt LED Cobrahead Luminaire EA 1 1 1

715 68000 LIGHT POLE COMPLETE, RELOCATE EA 1 1 1

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

11/7/2025Shuvo

F

P r o j e c t s P r o p e l-

E n g

(H

L y o n s

B o y n t o n

B c h li g h t in g

T A

B Q

L T .d g n

3:38:47 PM

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

P.E# 92997

DILNAHAR H SHUVO

2020110

PROJECT NO.

L-4

LYONS RD. AND BOYNTON BEACH BLVD

INTERSECTION IMPROVEMENTS

N.T.S.SCALE:

APPROVED:DS

DRAWN: IA

CHECKED: DS

DATE:11/7/2025 TABULATION OF QUANTITIES

L-2

TABULATION OF QUANTITIES

NO.

ITEM

PAY

DESCRIPTION UNIT

L-3

SHEET

TOTAL THIS

TOTAL

GRAND

PLAN FINAL PLAN FINAL PLAN FINAL

715 11 211 L1 Furnish and Install 175 Watt LED Cobrahead Luminaire EA 1 1 1

715 68000 LIGHT POLE COMPLETE, RELOCATE EA 1 1 1

W A T E R

S A

N

W A T E R

W A T E R

G A S

S D

S D

W A T E R

20.44 20.41

19.96

LYONS ROAD

£ SURVEY 30 31 32 33278 279

L

L-7

L-7

L-4

L-4

L-4R

L-3

L-3

L-3

L-8

L-8

L-8R

L

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

11/7/2025Shuvo

F

P r o j e c t s P r o p e l-

E n g

(H

L y o n s

B o y n t o n

B c h li g h t in g P

L A

N L T .d g

3:38:48 PM

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

P.E# 92997

DILNAHAR H SHUVO

2020110

PROJECT NO.

L-4

LYONS RD. AND BOYNTON BEACH BLVD

INTERSECTION IMPROVEMENTS

LIGHTING PLAN

N.T.S.SCALE:

APPROVED:DS

DRAWN: IA

CHECKED: DS

DATE:11/7/2025

M A

T C

H

L I N

E

S

T A

.0

LYONS RD

LYONS RD

L-24 CANAL

L.W.D.D.

85.52' ROW

L.W.D.D. L-24 CANAL

98.52' ROW

L

C

A N

A L

L .W .D .D

TS 46015

E=921462.90

N=798368.45

(BOYNTON BEACH BLVD.)

£ SURVEY LYONS ROAD

STA. 279+31.45, 3.57' LT

£ SURVEY LYONS ROAD =

STA.30+00.00,

EXIST R/W

EXIST R/W LINE

EXIST R/W LINE

EXIST R/W LINE

£ SURVEY LYONS ROAD

EXIST R/W LINE

(ORB 1585)

21' R/W

EXIST R/W LINE

B L

V

B

Y N

T O

N

B

E A

PROPOSED R/W LINE

10 40

Feet

TO REMAIN

PROPOSED IN FDOT PROJECT 439844-1

FPL LIGHT POLE

TO REMAIN

RETROFITTED IN FDOT PROJECT 439844-1

EXISTING FPL LIGHT POLE

TO REMAIN

EXISTING FPL LIGHT POLE

TO REMAIN

PROPOSED IN FDOT PROJECT 439844-1

FPL LIGHT POLE

TO REMAIN

PROPOSED IN FDOT PROJECT 439844-1

FPL LIGHT POLE

TO REMAIN

EXISTING FPL LIGHT POLE

TO REMAIN

EXISTING FPL LIGHT POLE

TO REMAIN

RETROFITTED IN FDOT PROJECT 439844-1

EXISTING FPL LIGHT POLE

EXIST R/W LINE

EXIST R/W LINE

AT STA 31+69.64, 77.20' (LT)

TO RELOCATE AND RETROFITTED WITH ATB2_P40X_MVOLT_R4_3K

FPL LIGHT POLE PROPOSED IN FDOT PROJECT 439844-1

TO REMAIN

RETROFITTED IN FDOT PROJECT 439844-1

EXISTING FPL LIGHT POLE

B L

V

B

Y N

T O

N

B

E A

L-3

1 EA715-68000

715-11-211-L1 1 EA

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

11/7/2025Shuvo

F

P r o j e c t s P r o p e l-

E n g

(H

L y o n s

B o y n t o n

B c h li g h t in g P

L D

T L T .d g

3:38:48 PM

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

P.E# 92997

DILNAHAR H SHUVO

2020110

PROJECT NO.

L-4

LYONS RD. AND BOYNTON BEACH BLVD

INTERSECTION IMPROVEMENTS

LIGHTING PLAN

N.T.S.SCALE:

APPROVED:DS

DRAWN: IA

CHECKED: DS

DATE:11/7/2025

DESIGN CRITERIA

FDOT INTERSECTION RETROFIT

AVERAGE INITIAL ILLUMINANCE (H.F.C) 1.5 STD/1.0 MIN FOOT CANDLES

AVERAGE INITIAL ILLUMINANCE (V.F.C) 1.5 STD/1.0 MIN FOOT CANDLES

UNIFORMITY RATIO AVG./MIN. 4:1 OR LESS

MAX./MIN. 10:1 OR LESS

DESIGN WIND SPEED 160 MPH

FDOT CORRIDOR LIGHTING

AVERAGE INITIAL ILLUMINANCE (H.F.C) 1.0 - 1.5 FOOT CANDLES

AVERAGE INITIAL ILLUMINANCE (V.F.C) N/A

UNIFORMITY RATIO AVG./MIN. 4:1 OR LESS

MAX./MIN. 10:1 OR LESS

DESIGN WIND SPEED 160 MPH

CORRELTED COLOR TEMPERATURE

≤50 MPH 3000K

L-4

Calculation Summary

Label CalcType Units Avg Max Min Avg/Min Max/Min

LYONS RD & BOYNTON BEACH BLVD INTERSECTION Illuminance Fc 1.63 5.2 0.60 2.72 8.67

EASTBOUND CROSSWALK ON BOYNTON BEACH BLVD Illuminance Fc 1.53 1.9 1.10 1.39 1.73

WESTBOUND CROSSWALK ON BOYNTON BEACH BLVD Illuminance Fc 1.85 2.0 1.50 1.23 1.33

SOUTHBOUND CROSSWALK ON LYONS RD Illuminance Fc 2.08 2.2 1.90 1.09 1.16

NORTHBOUND CROSSWALK ON LYONS RD Illuminance Fc 1.79 1.9 1.40 1.28 1.36

File details come from the government source that posted it. Updated .