This draft solicitation is for a firm fixed price construction contract to perform the USAID Second Interim Measures for Dioxin Remediation at Bien Hoa Airbase Area in Vietnam. The estimated value of the base bid is between $12-18 million. The period of performance is approximately 20 months from award.

The solicitation is being issued by the United States Agency for International Development in Vietnam. Both US and Vietnamese firms are eligible to compete. The work includes clearing and removal of vegetation, excavation and removal of contaminated soil and sediment, backfilling and compaction, road construction and repairs, fencing installation, and treatment of water from excavation dewatering. The pre-bid conference is tentatively scheduled for August with questions due by a certain date. Bids are due in September with award anticipated shortly after. Attendance at the mandatory pre-bid conference is required to submit a bid.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT

SECOND INTERIM MEASURES (IM2)

Bid Item No.

Bid Item Description Units Quantity Unit Price Total Amount

00.01 Mobilization (Maximum of 5% of the Subtotal) LS 1

00.02 Temporary Erosion and Sediment Control LS 1

00.03 Environmental Monitoring and Mitigation LS 1

00.04 Health and Safety Including PPE and Blood Monitoring LS 1

00.05 Traffic Control LS 1

00.06 Decontamination LS 1

10.01 Temporary Fencing LS 1

10.02 Clearing and Removal of Vegetation m2 92,331

10.03 Remove and Stockpile Topsoil m2 88,150

10.04 General Excavation, Fill, and Compaction m3 15,504

10.05 Fill and Compact Base with Imported Soil m3 67,256

10.06 Fill and Compact Enbankment with Imported Soil m3 26,377

10.07 Geotextile Fabric m2 40,050

10.08 HDPE Liner m2 30,400

10.09 Cast in Place Concrete, Including Reinforcing for Berm Lining LM 1,060

10.10 Cast in Place Concrete, Including Reinforcing for Ditch Lining (A) LM 490

10.11 Cast in Place Concrete, Including Reinforcing for Ditch Lining (B) LM 180

10.12 Precast Concrete Anchors LS 1

10.13 Precast Concrete Drainage Structures LS 1

10.14 Rip Rap for Toe of Berm LM 1,090

10.15 Monitoring Wells EA 4

10.16 Pumping Tests LS 1

10.17 Security Fencing LM 1,250

10.18 Control Gate LS 1

10.19 Concrete Access Road, Including Subgrade Compaction, Subbase, and Base LM 53

10.20 Temporary Access Road LM 250

10.21 Field Office LS 1

20.01 Temporary Fencing LS 1

20.02 Prepare Existing Storage Area Base LS 1

20.03 Cut Existing Berm for Leveling m3 75

20.04 Fill Portions of Existing Berm m3 225

20.05 Fill for Drainage Grading m3 110

20.06 Cast in Place Concrete Berm Leveling m3 60

20.07 Precast Concrete Blocks LS 1

20.08 HDPE Liner m2 8,700

20.09 Cable System for Anchoring HDPE Liner LS 1

20.10 Monitoring Wells EA 2

20.11 Pumping Tests LS 1

00 GENERAL

10 LONG TERM STORAGE AREA (LTSA)

20 HIGH CONCENTRATION TEMPORARY STORAGE (HCTS)

SECOND INTERIM MEASURES (IM2)

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT BID FORM

Bid Item No.

Bid Item Description Units Quantity Unit Price Total Amount

30.01 Temporary Fencing LS 1

30.02 Removal of Structures and Obstructions, Including Transport and Disposal LS 1

30.03 Clearing and Removal of Vegetation m2 76,089

30.04 Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement of Low Concentration Soil m3 40,813

30.05 Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement of Low Concentration Sediment m3 1,771

30.06 Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement of High Concentration Soil m3 14,371

30.07 Backfilling and Compaction m3 71,739

30.08 Topsoil m2 33,334

30.09 Seeding and Mulching m2 76,089

30.10 Roadway Subgrade Compaction m2 3,118

30.11 Roadway Subbase m3 804

30.12 Roadway Base m3 804

30.13 Roadway Asphalt m2 3,118

30.14 Plastic Pavement Striping (4" width) (Thermoplastic 90 Mil) LS 1

30.15 Permanent Pavement Markings for Speed Reduction (Rumble Strips) LS 1

30.16 Hauling Road Maintenance, Patching, Passing Areas, Widening LS 1

40.01 Off-base Fencing LM 1,567

40.02 Off-base Gates EA 4

50.01 Removal, Transport, and Disposal of Road Base and Surface LS 1

50.02 Roadway Subgrade Compaction m2 3,220

50.03 Roadway Subbase and Compaction m3 644

50.04 Roadway Base and Compaction m3 644

50.05 Roadway Asphalt m2 3,220

50.06 Plastic Pavement Striping (4" width) (Thermoplastic 90 Mil) LS 1

50.07 Permanent Pavement Markings for Speed Reduction (Rumble Strips) LS 1

60.01 $500,000.00

70.01 Treatment of Water from Excavation Dewatering m3

5,000

70.02 Treatment of Water from Soil and Sediment Dewatering m3 20,000

SUBTOTAL

60 DAY WORK

Total Day Works

TOTAL BASE BID (SUBTOTAL + DAY WORK)

70 SUPPLEMENTARY BID ITEMS

30 DIG AND HAUL

40 FENCING

50 ACCESS ROAD

SECOND INTERIM MEASURES (IM2)

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA PROJECT BID FORM