This document contains a past performance relevancy matrix and information on a solicitation for Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services in the Midwest Region. The solicitation is seeking proposals for environmental remediation and restoration services at multiple sites on installations or formerly used defense sites. Offerors will be evaluated based on their past performance delivering accurate and timely documents, reports, and plans; complying with health, safety and environmental regulations; implementing RCRA and CERCLA processes; coordinating with regulatory agencies and stakeholders; applying data analysis; and monitoring and optimizing remediation systems. The solicitation is open to all responsible sources, with proposals due by February 18, 2020. The Department of the Air Force Materiel Command Installation Contracting Agency will award contracts for one base year and four option years.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region, newest first.
File Type Posted
20200501_FA890320R0015_BECOS_Midwest_Section_M_Amendment_01.docx DOCX document
20200501_Midwest TO2 Price Model_Amendment_01.xlsx XLSX spreadsheet
TO 2 PWS Attch 1 Midwest Base Site List BECOS_Amendment_01.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00150001 SF 30.pdf PDF
20200203_FA890320R0015_Midwest_BECOS_Section_M v4.docx DOCX document
OH20190001 25Oct2019 Statewide Heavy.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Grissom Base Specific Req Midwest BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Midwest BECOS vf1.pdf PDF
TO 2 PWS Midwest BECOS vf3.docx DOCX document
TO 2 PWS Attch 2 Newark Base Spec Req Midwest BECOS vf2.docx DOCX document
OH20190096 22Nov2019 Pickaway Building.pdf PDF
20201217_Compensation Plan Model.xlsx XLSX spreadsheet
MI20190048 1Nov2019 Marquette Heavy.pdf PDF
MO20190001 8Nov2019 Statewide Missouri.pdf PDF
TO 2 PWS Attch 1 Midwest Base Site List BECOS vf9.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Midwest BECOS vf1.pdf PDF
MI20190135 1Nov2019 Marquette Building.pdf PDF
MO20190038 8Nov2019 Cass Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN) Midwest BECOS vf1.pdf PDF
IDIQ PWS Attch 4 Midwest Perf Obj Def and Req BECOS vf2.docx DOCX document
TO 1 CDRLs Exhibit A B Midwest BECOS vf1.docx DOCX document
OH20190093 25Oct2019 Montgomery Building.pdf PDF
IDIQ PWS Attch 3 Midwest Del Rev Process BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 General Mitchell Base Spec Req Midwest BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Midwest BECOS vf1.pdf PDF
IL20190002 6Dec2019 Champaign Building.pdf PDF
MI20190042 27Sep2019 Heavy Iosco.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Midwest BECOS vf1.pdf PDF
MI20190116 1Nov2019 Delta Building.pdf PDF
MI20190047 1Nov2019 Delta Heavy.pdf PDF
20200203_FA890320R0015_BECOS_Midwest_Section_L v5.docx DOCX document
IDIQ PWS Midwest BECOS vf4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Midwest BECOS vf1.pdf PDF
IDIQ PWS Attch 1 Midwest Base Site List BECOS vf6.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Midwest BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Wurts Base Spec Req Midwest BECOS vf3.docx DOCX document
WI20190001 13Dec2019 Milwaukee Building.pdf PDF
TO 2 PWS Attch 2 OHare Base Spec Req Midwest BECOS vf2.docx DOCX document
OH20190078 22Nov2019 Franklin Building.pdf PDF
WI20190015 13Dec2019 Statewide Heavy.pdf PDF
20200131_FA890320R0015_BECOS_Relevancy_PPQ v2.docx DOCX document
Solicitation FA890320R0015 Midwest.pdf PDF
20200122_Midwest FFP FBLR Tables.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Rickenbacker Base Spec Req Midwest BECOS vf2.docx DOCX document
IN20190002 1Nov2019 Cass Building.pdf PDF
TO 2 PWS Attch 2 KI Sawyer Base Spec Req Midwest BECOS vf2.docx DOCX document
MI20190126 25Oct2019 Building Iosco.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Midwest BECOS vf1.pdf PDF
TO 2 CDRLs Exhibit A B Midwest BECOS vf1.docx DOCX document
Show all 50

BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Midwest Region has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8903-20-R-0015

Midwest Region Past Performance Relevancy Matrix

1. Program Management and Quality Assurance

Very Relevant To be considered very relevant, Past Performance (PP) experience is demonstrated in 3 or more of the 5 criteria below.

Relevant To be considered relevant, Past Performance (PP) experience is demonstrated in 2 out of the 5 criteria below.

Somewhat Relevant To be considered somewhat relevant, Past Performance (PP) experience is demonstrated in 1 out of the 5 criteria below.

Not Relevant To be considered not relevant, no Past Performance (PP) experience is demonstrated in any of the 5 criteria below.

A. Experience providing documents, technical plans, and reports that were accurate, timely and complete and demonstrated quality. (did not require excessive revision) B. Experience performing site work in compliance with required and applicable regulations. (such as, health and safety, ARARs, environmental, OSHA, state, federal, professional certifications and registrations) C. Experience performing record of decision, decision documents, feasibility studies and / or conceptual site models preparation and amendments timely, as required, and IAW regulation.

D. Experience implementing RCRA processes and / or CERCLA processes IAW regulation and protective of Human Health and the Environment (an "exceptional or very good" represents completion of combined actions / interrelated pieces of the entire the RCRA and / or CERCLA process).

E. Experience working with state regulatory processes IAW regulation and protective of Human Health and the Environment.

2. Regulatory Interaction and Stakeholder Coordination

Very Relevant To be considered very relevant, Past Performance (PP) experience is demonstrated in 3 or more of the 5 criteria below.

Relevant To be considered relevant, Past Performance (PP) experience is demonstrated in 2 out of the 5 criteria below.

Somewhat Relevant To be considered somewhat relevant, Past Performance (PP) experience is demonstrated in 1 out of the 5 criteria below.

Not Relevant To be considered not relevant, no Past Performance (PP) experience is demonstrated in any of the 5 criteria below.

A. Experience working proactively and collaboratively with the Government and engaging regulatory agencies well in order to achieve goals such as project and / or performance objectives, reduced Life Cycle Costs, modification of remedies and decision documents.

B. Experience implementing and / or facilitating Community Involvement, addressing challenging stakeholders and / or collaborating with community stakeholders in such instances as public events, meetings and during work related to Site Closeout, Restoration Advisory Boards, and / or additional outreach.

C. Experience transitioning work well, providing all the required documents (such as GIS, mapping, records, and plans) to coordinate contract closeout and assist the incoming contractor successfully without major issues.

D. Experience performing an effort that required work on multiple remediation disciplines with more than (5) five sites on installations or former installations. (able to coordinate work on multiple sites and areas well) E. Experience managing environmental restoration activities on property with multiple owners / stakeholders. (such as local redevelopment authorities, private entities, federal agencies and municipalities)

3. Analysis and Data Management

Very Relevant To be considered very relevant, Past Performance (PP) experience is demonstrated in 3 or more of the 5 criteria below.

Relevant To be considered relevant, Past Performance (PP) experience is demonstrated in 2 out of the 5 criteria below.

Somewhat Relevant To be considered somewhat relevant, Past Performance (PP) experience is demonstrated in 1 out of the 5 criteria below.

Not Relevant To be considered not relevant, no Past Performance (PP) experience is demonstrated in any of the 5 criteria below.

A. Experience providing reports (such as, work plans and conceptual site models) that demonstrate knowledge and technical acumen in Environmental Remediation and / or Restoration.

B. Experience applying an innovative approach in order to accelerate site closeout at a site.

C. Experience exhibiting technical acumen in assessing, analyzing, and validating data. (quality data analysis and integrity in sampling data) D. Experience designing, installing, operating, maintaining, and / or optimizing remediation systems, such as, a pump and treat system in a manner that ensures maintenance of the selected remedy.

E. Experience consistently monitoring the current remedy progress and / or tracking site progress issues, communicating progress / metrics, and reporting on achievement of cleanup goals and performance objectives. (organized and clear metrics / reporting)