This is a Bridge Preservation Report prepared by CDM Smith and Capital District Transportation Committee (CDTC), serving as the Metropolitan Planning Organization for the Capital District of New York State, covering locally owned bridges in Albany, Rensselaer, Saratoga, and Schenectady Counties, as well as the Cities of Albany and Schenectady. The study inventoried and assessed 377 locally owned bridges to identify preservation candidates and develop cost-effective repair and maintenance strategies aligned with the New York State Department of Transportation's "Preservation First" initiative. The report documents comprehensive bridge condition assessments based on 2019 and 2020 NYSDOT Bridge Inspection Reports, identifies work strategies for 290 bridges with deteriorated elements, and provides programming schedules categorized as Immediate, 2-Year, 5-Year, and 10-Year timeframes. CDM Smith conducted selective in-depth field visits to bridges in Albany, Saratoga, and Schenectady Counties and their municipalities to verify condition assessments and confirm recommended work strategies, resulting in updated cost estimates and identification of site-specific construction considerations.

The study categorized bridges into five work strategies: Full Replacement (29 bridges at approximately $2.0 million each), Major Rehabilitation (29 bridges at approximately $1.0 million each), Minor Rehabilitation (116 bridges at approximately $500,000 each), Element Specific Repairs (116 bridges at approximately $200,000 each), and Preventative Maintenance. Total projected funding needs to address preservation and repair costs for 274 locally owned bridges requiring work is approximately $168 million, with preservation-only projects representing approximately $110 million. The report identified 75 at-risk bridges requiring immediate attention and developed a searchable spreadsheet database with bridge fact sheets to support CDTC's infrastructure management planning and programming decisions for inclusion in the Transportation Improvement Plan (TIP). The conceptual construction costs were based on 2019/2020 NYSDOT unit cost data and recent bid information from the Capital District, with recommendations that material costs may increase approximately 10 percent from historical pricing due to post-pandemic inflation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE PRESERVATION REPORT

Identification of Bridge Preservation Candidates, Treatments, and Costs for Locally Owned Capital

District Bridges August 2021

Capital District Transportation

Committee i Document Code

Table of Contents

Introduction Background Bridge Information Bridge Condition Bridge Work Strategies Evaluation of “At-Risk” Bridges Programming Schedule Conceptual Construction Cost Conceptual Construction Cost Projections In-Depth Bridge Assessments Evaluation Results Condition Rating Updates Summary

Appendices

Appendix A – Cost Estimate Template Appendix B – Study Guidelines Appendix C – Enhanced Bridge Data Spreadsheet Appendix D – In-Depth Inspection Reports Appendix E – Estimated Service Life Appendix F – Condition Rating Calculation

Capital District Local Bridge Preservation Study

INTRODUCTION

The Capital District Transportation Committee (CDTC) serves as the Metropolitan Planning Organization (MPO) for the Capital District of New York State. As the region’s MPO, CDTC carries out federal requirements for cooperative transportation planning and programming through implementation of its New Visions 2050 Regional Transportation Plan. The New Visions 2050 plan prioritizes preservation of transportation infrastructure and has identified local bridges as a key network element for further study and investment.

The approach to addressing bridge deficiencies throughout New York State shifted from routine replacement to bridge preservation with the passage of the federal highway funding law MAP-21 and adoption of the New York State Department of Transportation’s (NYSDOT) “Preservation First” strategy. Federal and State policies now emphasize the optimization of the existing infrastructure through cost-effective preventive and corrective maintenance activities. This strategy of performing less expensive and shorter life cycle repairs will continue for the foreseeable future due to diminished infrastructure funding at all levels of government.

CDTC commissioned this study of the region’s locally owned bridges in order to identify candidates that could benefit from timely preservation strategies. This report chronicles the methods and results from the review of 377 locally owned bridges in Albany, Rensselaer, Saratoga, and Schenectady Counties as well as the Cities of Albany and Schenectady.

BACKGROUND

There are 377 bridges within the CDTC’s jurisdiction that are owned and maintained by local municipalities (counties, cities, towns, and villages). According to 2019 and 2020 NYSDOT Bridge Inspection Reports, approximately 189 of the 377 locally owned bridges are either structurally deficient (81) or functionally obsolete (108). The Federal Highway Administration (FHWA) defines bridges as structurally deficient if significant load carrying elements are found to be in poor or worse condition due to deterioration, or the bridge has inadequate load carrying capacity.

A bridge which does not meet current standards for managing traffic volume is considered functionally obsolete. In addition, 14 bridges are closed to all traffic and 1 bridge was closed due to construction during the most recent biennial inspection.

CDM Smith conducted a similar study to this one in 2015. In October 2020, CDTC again contracted with CDM Smith to assist in the evaluation of the region’s locally owned bridges and to develop work strategies for selected bridges. CDM Smith’s evaluation is intended to help CDTC develop a strategic approach to managing infrastructure work for locally owned bridges in its planning area. The format of the 2015 study was used to help identify and prioritize local bridge preservation projects. However, the evaluation methods were updated for the 2020 study to reflect changes to AASHTO and NYSDOT element inspection methods.

BRIDGE INFORMATION

CDM Smith utilized current bridge condition and inventory data from NYSDOT’s Bridge Safety Inspection program as the basis for this study. NYSDOT provided access to the 2019 and 2020 data via their Bridge Data Information System (BDIS) and the associated bridge inspection reports generated by their biennial inspection program. The NYSDOT inventory data was transferred to a spreadsheet and combined with the information developed during CDTC's 2015 Local Bridge Preservation Study, prior year bridge data records, and the preservation recommendations developed by CDM Smith to create an updated, sortable local bridge data worksheet.

Prior to the 2016 Inspection cycle, NYSDOT changed the inspection method from a 1-7 rating system to condition states. The current system uses element quantities in the ratings. For instance, primary members are rated based on a per foot basis. If 2 feet of the end of a single beam is in poor condition, the inspector assigns a rating of CS-3 for 2 linear feet. If the rest of the primary members are in good condition, the inspector assigns a CS-1 rating for the remainder of the total length of the primary members. The condition states are defined as follows:

Condition State

Condition Type

General Condition Guideline

CS-1 Good That portion of the element that has either no deterioration or the deterioration is insignificant to the management of the element, meaning that portion of the element has no condition based preventive maintenance needs or repairs. Areas of an element that have received long lasting structural repairs that restore the full capacity of the element with an expected life equal to the original element may be coded as good condition.

CS-2 Fair That portion of the element that has minor deficiencies that signify a progression of the deterioration process. This portion of the element may need condition based preventive maintenance. Areas of the element that have received repairs that improve the element, but the repair is not considered equal to the original member may be coded as fair.

CS-3 Poor That portion of the element that has advanced deterioration but does not warrant structural review. This portion of the element may need condition based preventative maintenance or other remedial action.

CS-4 Severe That portion of the element that warrants a structural review to determine the effect on strength or serviceability of the element or bridge; OR a structural review has been completed and the defects impact strength or serviceability of the element or bridge; OR a condition where that portion of the element is no longer effective for its intended purpose.

CS-5 Unknown That portion of the element not assessable due to lack of access.

The previous system for inspecting bridge included a 1-9 element rating. For instance, if the primary member conditions existed above, the inspector would assign a rating to the element based on the overall condition of the girder system. Several elements were previously rated on a “worst of” condition. For instance, if 4 bearings are in good condition and 1 bearing was in poor condition, the inspector would assign a rating based on the bearing. The 1-9 rating system is defined as follows:

Condition Rating

General Condition Guideline

9 Condition and/or existence unknown 8 Not applicable/element does not exist

7 New condition or no deterioration 6 Used to shade between ratings of 5 and 7 5 Minor deterioration but functioning as originally designed 4 Used to shade between ratings of 3 and 5 3 Serious deterioration or not functioning as originally designed 2 Used to shade between ratings of 1 and 3

1 Totally deteriorated or in failed condition

Currently, NYSDOT still uses the Condition Ratings of 1-7 to calculate the Computed Condition Rating (CCR) for each bridge. The general calculation is the same as it was prior to 2016, but NYSDOT has developed a system to convert the current Condition States, based on percentages of deteriorated elements, to the 1-7 rating system before entering this data into the CCR formula.

Attempts have been made to obtain the conversion from NYSDOT to no avail. CDTC and CDM Smith worked collaboratively to attempt to replicate the NYSDOT CCR. The formula that was develops is within approx. 20% of the NYSDOT values.

BRIDGE CONDITION

CDM Smith conducted the assessment process by making a thorough review of the bridge inspection reports, combined with selective site visits, to evaluate the bridges in the study area.

Next, the type of preservation treatment and timing was identified for each bridge. The evaluation lead to development of a list of bridges requiring repair for each county. This list was not based solely on the General Recommendation or Computed Condition Ratings in the bridge inspection reports. Bridges were instead prioritized using engineering judgment regarding the existing condition of individual bridge components.

The first phase of the evaluation involved a review of existing structural conditions. The information contained within the NYSDOT Bridge Inspection Reports were reviewed for all locally owned bridges within Albany, Rensselaer, Saratoga, and Schenectady Counties as well the Cities of Albany and Schenectady. CDM Smith also reviewed the bridge inventory information available from NYSDOT’s BDIS database.

BRIDGE WORK STRATEGIES

The bridge inspection reports and other information were used to develop a repair work strategy for all bridges with individual elements rated CS-3 or lower. Work strategies include:

Full Replacement Major Rehabilitation Minor Rehabilitation Element Specific Repair Preventative Maintenance

The Major Rehabilitation strategy can be further subdivided into a Superstructure Replacement and Deck Replacement repair treatment categories. Element Specific Repair and Preventative Maintenance strategies can also be subdivided into several treatment categories such as Paint – Complete, Replace Bearings, Concrete Patch Repairs, etc. Refer to Appendix A for a detailed list of repair treatments.

Full Replacement A Full Replacement strategy involves the replacement of the superstructure and substructures of the bridge because the substructures are deteriorated beyond repair, cause a constriction of the stream channel and have associated significant scour problems, and/or other factors. It was assumed that all bridges with a Computed Condition Rating of 3.5 or less would require full replacement.

Major Rehabilitation A Major Rehabilitation strategy consists of the replacement of the deck and/or primary members because they are beyond repair due to deterioration, damage, age or other factors.

Minor Rehabilitation A Minor Rehabilitation strategy includes limited repair of structural elements and repair or replacement of non-structural elements. The repair of these specific items should raise the Computed Condition Rating above a 5.5.

Element Specific Repair An Element Specific Repair strategy consists of limited repair to structural or non-structural elements. The repair of these specific items should raise the Computed Condition Rating above a 5.5.

Preventative Maintenance A Preventative Maintenance Strategy consists primarily of preventive maintenance measures which can be taken to minimize potential future damage and/or deterioration of the bridge.

All the selected bridges were evaluated using a set of guidelines developed during the review process. The guidelines are intended to provide a uniform standard so that all bridges are evaluated on the same basis. The guidelines were updated based on the new condition state ratings as needed. The review guidelines are included in Appendix B.

Several factors were used to determine the work strategy for each bridge in the study. Factors such as the number of deteriorated elements, type of element, significance or extent of deterioration, and the reviewer’s engineering judgement were used to develop a work strategy.

- Bridge Replacement: A bridge with four (4) or more structural elements, such as structural deck, primary members and abutment stem, rated CS-3 or lower

- Superstructure Replacement (Major Rehabilitation): A bridge with poor structural deck and primary member ratings but with substructures in fair to good condition and no significant scour concerns

- Deck Replacement (Major Rehabilitation): A bridge with a poor structural deck rating, but primary members and substructures in fair to good condition

- Minor Rehabilitation: Recommended for a bridge where there were three or four specific elements which required repair. The specific elements generally were non-structural deficiencies or limited structural repairs such as performing structural repairs to a girder end.

- Element Specific: Recommended for a bridge requiring only one or two specific elements which needed repair. As with the minor rehabilitation work strategy, specific elements were generally non-structural deficiencies or limited structural repairs. Element specific repair recommendations which would outlast the structure as a whole were avoided.

- Preventative Maintenance: Recommended for a bridge which had one or two elements in fair condition. This work strategy was also assigned to a bridge when a preventative maintenance measure, such as sealing the deck, could safeguard a bridge in good condition.

EVALUATION OF “AT‐RISK” BRIDGES

The evaluation also included a review of bridges considered to be “at-risk” for requiring immediate repair or replacement. At-risk bridges are defined as bridges with a Red or Yellow Condition Flag. Red Condition Flags are issued during biennial safety inspections and indicate that there is a primary structural component of the bridge which has failed or has the potential to fail before the next biennial bridge inspection. Yellow Condition Flags are issued during biennial safety inspections and indicate that there is a primary structural component of the bridge which has the potential to become a Red Condition Flag before the next biennial bridge inspection.

In addition, bridges with prestressed concrete primary members rated CS-3 or lower or bridge that have been posted for loads were defined as at-risk. Any bridge the reviewer deemed to have a significant structural problem which poses an imminent risk of closure or capacity reduction was also included as an at-risk bridge.

Computed condition rating criteria for at-risk bridges varied by owner as follows:

- Schenectady County and City of Schenectady:

Computed Condition Rating < 6.0

- Albany County, City of Albany and Saratoga County: Computed Condition Rating < 5.0

- Rensselaer County:

Computed Condition Rating < 4.0

1 ≤ CCR < 4 4 ≤ CCR < 5 5 ≤ CCR < 6 6 ≤ CCR

Computed Condition Rating

2015 2020

The City of Schenectady requested that BIN 2203110 be defined as an at-risk bridge. At-risk bridges are specifically identified in the enhanced bridge data spreadsheet. A total of 75 at-risk bridges were identified during the evaluation. A work strategy and program timing were also developed for all at-risk bridges.

PROGRAMMING SCHEDULE

A recommended program timing or schedule was assigned to each bridge during the evaluation.

The timing indicates the period within which the work strategy for the bridge should be undertaken in order to achieve the greatest benefit from the preservation strategy. Program timing categories include Immediate, 2 years, 5 years, and 10 years. The indicated timing is based on the severity of deterioration, the significance of the deterioration in regard to the overall structure, acceleration of deterioration, and the reviewer’s engineering judgment. Bridges with major structural elements which rate CS-3 or less generally require repairs within 2 years. As an example, a bridge with a primary member condition rating of CS-3 would warrant repair sooner than a bridge with a non-structural element condition rating of CS-3. There is also the possibility that certain types of deterioration will accelerate if left untreated. For instance, when an inspection report notes significant increased scour since the last inspection at a wingwall which lacks stone fill protection. Left untreated, the wingwall footing can quickly become undermined and potentially fail during a flood event. The placement of stone fill at the wingwall would alleviate the situation. A bridge in good condition may have a recommended preventative maintenance work strategy to be implemented immediately to prolong the service life of the structure. A bridge with structural elements in fair condition and/or severely deteriorated non-structural elements would warrant repair within 5 years. Bridges in good condition may not require repair of an element until 10 years.

In some instances, the structure as a whole may be on the borderline of poor condition and near the end of its service life, and not warrant repair at all. The structure would be left as is and replaced in 10 years after the remaining service life has been spent. Program timing should be weighed carefully when considering prioritization of projects.

From the list of 75 at-risk bridges, each Owner chose which bridges they wished to have CDM Smith perform in-depth field visits on. The in-depth visits consisted of verification of the extent of repairs required, confirm the findings from the previous Biennial Inspection Report, identify any additional areas requiring repairs, confirm the work strategy, review the initial cost estimate, and identify site specific conditions which may influence construction and the related costs. Site specific conditions included utilities, Right-of-Way, adjacent residences or business, wetlands or endangered species in the vicinity of the bridge, etc.

CONCEPTUAL CONSTRUCTION COST

A 2020 conceptual construction cost was developed for each bridge which had an in-depth inspection performed. Costs for work strategies and repair treatments were determined based on 2019/2020 NYSDOT unit cost data available on NYSDOT’s website and bid information CDM Smith collected on recent projects within the Capital District. The pricing information available for this study was generated prior to the COVID pandemic. Therefore, based on recent bid pricing increases observed to date during the 2021 construction season, material costs can be expected to increase by approximately 10% above the historic bid pricing used for the in-depth work strategies. Rehabilitation/repair work item cost guidelines were developed from the bid pricing data for various types of work to streamline development of individual bridge conceptual construction cost estimates. The cost guidelines are included in Appendix A. These guidelines ensure that costs for work strategies and treatments are applied uniformly and consistently over the evaluation study group.

Work strategy and repair treatment costs are generally based on a 32-foot-wide bridge with a span of up to 100 feet. These bridge dimensions were selected as they represent a typical bridge size among the population of locally owned Capital District bridges. The conceptual cost is modified if the bridge has multiple spans, a significantly larger span or width, and/or higher traffic volume. A cost for work zone traffic control and working over a railroad (where applicable) are also included in the guidelines. Costs for engineering design, construction inspection, inflation to the year of construction, significant environmental mitigation efforts, and right-of-way acquisition are also included in the 2020 conceptual construction cost for each bridge.

CONCEPTUAL CONSTRUCTION COST PROJECTIONS

This study did not include development of individual construction cost estimates for repair work strategies for every locally owned bridge requiring repairs. Instead, the study focused on providing a higher level of detail for the bridges selected for in-depth assessment. To support CDTC’s goal of identifying total bridge preservation program costs for locally owned bridges, CDM Smith utilized the conceptual construction costs developed from the in-depth assessments to develop projected average construction costs for each type of bridge preservation work strategy, as follows:

- Full Replacement - $2.0M

- Major Rehabilitation - $1M

- Minor Rehabilitation - $500k

- Element Specific Repairs $200k

These average project construction costs can be used by CDTC to determine projected total program funding needs to address the deterioration of the full locally owned bridge inventory. It should be understood that the projected average construction costs are based on a small sample size of projects evaluated as part of the in-depth assessments, and do not include engineering design or right of way acquisition costs.

Using this approach, the total funding need to address replacement and repair costs for the 274 locally owned bridges requiring repair is approximately $168M, with bridge preservation-only projects making up approximately $110M of this total. By comparison with the 2015 Local Bridge Preservation Study, projected bridge preservation-only costs have increased

$0 $20 $40 $60 $80

Replace Cost

Major Rehab Cost

Minor Rehab Cost

Element Specific Repair

Cost

M ill io ns

Costs by approximately $30M (was $80.5M in 2015). This increase in total repair cost is attributed in part to the more detailed bridge element condition information that results from the AASHTO Element-level inspection methods now being used by NYSDOT to document bridge conditions.

IN‐DEPTH BRIDGE ASSESSMENTS

For the second phase of the evaluation, CDM Smith completed site visits on a select sampling of bridges within Albany and Schenectady Counties and the Cities of Albany and Schenectady to further refine the scope of work for each priority bridge. South Col Engineering completed site visits on a select sampling of bridges within Saratoga County. The purpose of the In-Depth field visits was to confirm the work strategies for the individual bridges, determine any additional areas requiring repairs, review the environmental, Right-of-Way and other impacts which could affect the construction activities and the subsequent construction costs. Final evaluation results were verified or updated based on the field reviews. Field note summaries and photo logs are included in Appendix F of this report.

ALBANY COUNTY

Field visits were made to five (5) bridges in Albany County. The bridges that were evaluated included BINs 3301020, 3301040, 3301500, 3301580 and 3302920. Tony Fernandez from Albany County joined CDM Smith for the field visit at each County Owned bridge. A construction cost estimate and field review sheet were created for BIN 2256840, owned by the City of Albany, but no field visit was conducted due to confined space entry being required. The field visits resulted in the following additional work:

- BIN 3301020: replacement of the non-ratable joints at both abutments

- BIN 3301040: clean scuppers on bridge deck, replace bottom rail of bridge rail, seal longitudinal joint along bottom of both curbs, repoint masonry joints at wingwalls and headwalls

- BIN 3301500: additional substructure repairs, joint replacement not required (Photo 1)

- BIN 3301580: additional deck repairs, approach asphalt pavement reconstruction

- BIN 3302920: replace bridge rail at both fascias

Photo 1: BIN 3301500 - Looking Towards Left Across Top of Begin Joint

Photo 2: BIN 3301580 – Looking Towards Left at End Right (Other Locations Similar)

RENSSELAER COUNTY

No bridges slated for in-depth evaluation were identified by Rensselaer County.

SARATOGA COUNTY

Field visits were made to six (6) bridges in Saratoga County. The bridges that were evaluated include BIN 2202830, 2202970, 3304210, 3304520, 3304560 and 3304790. No County representative joined South Col Engineering for the field visits at these bridges. The field visits resulted in the following additional work:

- BIN 2202830: additional substructure repairs

- BIN 2202970: approach sidewalk repairs, approach asphalt pavement reconstruction, additional substructure repairs

- BIN 3304210: reset curbs on both bridge fascias, approach guide rail replacement

- BIN 3304520: additional substructure repairs

- BIN 3304560: superstructure replacement (Refer to Photo 3), substructure repairs, stream bank armoring

- BIN 3304790: additional superstructure and substructure repairs (Refer to Photo 4), stream bank armoring, approach rail replacement, wearing surface replacement, approach slab reconstruction

Photo 3: BIN 3304560 – Looking Towards End Left at Right Face of Girder 6

Photo 4: BIN 3304790 – Looking Towards End at Underside of Stone Masonry Arch (Steel Plate Arch in Background)

SCHENECTADY COUNTY

Field visits were made to one (1) bridge in Schenectady County and one (1) bridge in the City of Schenectady. The bridges that were evaluated include BIN 2203110 in the City of Schenectady and BIN 3050510 in Schenectady County. Chris Wallen from the City of Schenectady accompanied CDM Smith during the field visit for BIN 2203110. Paul Sheldon from Schenectady County joined

CDM Smith for the field visit to BIN 3050510. The field visits resulted in the following additional work:

- BIN 2203110: no additional work

- BIN 3050510: additional substructure repairs, removal of large trees from stream channel

Photo 5: BIN 2203110 - End Diaphragm at Begin Abutment – Holes in Web

Photo 6: BIN 3050510 – Looking Right From Bridge at Downstream Channel

EVALUATION RESULTS

The results of the evaluation have been tabulated and presented in spreadsheet format in order to document the bridge management recommendations. The spreadsheet is intended to present evaluation information in sufficient detail to aid the CDTC Planning Committee in identifying and prioritizing projects for inclusion in their funding program. The spreadsheet contains basic information such as BIN, location and description of the bridge, AADT and current condition rating along with evaluation information such as recommended work strategy and repair treatments, 2020 conceptual cost for the in-depth bridges which had a field visit, and program timing. The spreadsheet is easily searchable and can be sorted by any category desired. A print of the enhanced bridge data spreadsheet is included in Appendix C. The spreadsheet also has the ability for the user to create bridge fact sheets for each bridge they select which includes only the most pertinent information for each bridge in a different format that can be more easily presented to the general public. The needs and recommendations of a particular bridge can be easily ascertained by referring to its respective bridge fact sheet. Sample bridge fact sheets are included in Appendix E. These documents will assist the CDTC in developing a strategic approach to manage infrastructure work for locally owned bridges that is consistent with NYSDOT’s Preservation First strategy. It will also serve as a communication tool to clearly present the recommendations to municipalities and the public in the CDTC’s planning area.

A recommended work strategy was determined for all 290 bridges in the study group which had elements with a CS-3 or CS-4 rating during the most recent biennial inspection. Refer to the Bridge Work Strategy section for the methodology of classifying work strategies. All the bridges were reviewed between December 2020 to March 2021 based on 2019 and 2020 biennial inspection reports. Federal aid eligible and NHS bridges were given first priority for review during the evaluation. The following summarizes the work strategies:

- Closed to Traffic or have not been inspected under the NYSDOT inspection program within the past 6 years and were excluded from further analysis – 21

- Currently on the TIP and scheduled for repair or replacement and were excluded from further analysis – 17

- Replacement or Non-Preservation work strategy recommended: 29

- Major Rehabilitation: 29 (16 superstructure replacements and 13 deck replacements)

- Minor Rehabilitation: 116

- Element Specific: 116

Refer also to Figure 2. See Appendix D for additional tables which breakdown the number of bridges in relation to Federal Aid status.

Full Replacement

Major Rehabilitation

Minor Rehabilitation

Element Specific

Work Strategy

The bulk of the bridges are recommended for programing within 2 to 5 years. A recommendation for immediate repair was given to 17 bridges. A 2-year repair period is recommended for 53 bridges, a 5-year repair period is recommended for 105 bridges, and 116 bridges are recommended for a 10-year repair period.

Due to changes in the inspection methods between the 2015 and 2020 studies, several bridges require additional work that could not be thoroughly identified during the 2015 study. For instance, if a deck previously had 1% of its area spalled, it could potentially have been rated ‘5’ which would require no note or photo in the inspection report. However, with the new condition state rating system, that 1% of deck is identified and documented. Subsequently, that work is included even though conditions may have existed during the previous study.

The 2020 conceptual construction costs were estimated for the bridges that in-depth varied greatly for each work strategy. The Replacement work strategy ranges in cost between $0.30 and $4.3 million. The cost ranged from $0.60 to $2.0 million for the Major Rehabilitation work strategy. The Minor Rehabilitation work strategy ranges from $0.10 to $1.2 million. The Element Specific work strategy ranges in cost between $0.30 and $1.1 million. The cost ranged from $0.03 to $0.6 million for the Preventative Maintenance work strategy.

See Appendix D for a more detailed breakdown of the results based on Federal Aid eligibility in table form.

CONDITION RATING UPDATES

CDTC requested that we try to replicate the Computed Condition Rating (CCR) which NYSDOT uses to evaluate the health of their bridges. The general calculation is the same as it was prior to 2016, but NYSDOT has developed a system to convert the current Condition States, based on percentages of deteriorated elements, to the 1-7 rating system before entering this data into the CCR formula. Attempts have been made to obtain the conversion from NYSDOT to no avail. CDTC and CDM Smith worked collaboratively to attempt to replicate the NYSDOT CCR. The formula that was develops is within approx. 20% of the NYSDOT values. The calculations are included in the spreadsheet. Increased CCR is often used to perform a cost-benefit analysis and determine which bridges with the Owner’s population should be targeted for replacements, rehabilitations, or other work. As an example, a bridge undergoing bearing replacement would be assumed to have its abutment and/or pier bearing ratings increased to CS-1 reflecting their new condition after the project is complete. The worksheet incorporates the updated rating into the CCR calculation and provides the predicted condition rating based on the planned repairs. In this manor, CDTC will be able to see the direct impact of future repairs on targeted bridge candidates based on the current rating system. See Appendix F additional information.

Immediate 2 Years 5 Years 10 Years

Program Schedule

SUMMARY

The purpose of this study is to assess the condition of the 377 local bridges in CDTC’s jurisdiction and provide recommendations on potential preservation strategies that will assist the CDTC in making programming decisions when selecting bridge preservation projects for inclusion in the CDTC TIP. The primary focus of the study is to develop a work strategy, programming schedule and estimated construction cost for the 290 bridges with elements rated CS-3 or CS-4. The condition assessment is based on the latest NYSDOT Bridge Inspection Reports. The bridges were sorted into four (4) work strategies consisting of Replacement, Major Rehabilitation, Minor Rehabilitation and Element Specific. Programming consists of an Immediate, 2-Year, 5-Year or 10- Year schedule. Selective site visits were made to a few bridges in each county to verify their condition and confirm the recommended work strategy.

The results of the evaluation have been tabulated and presented in spreadsheet format in order to document the bridge management recommendations. The spreadsheet contains basic information about the bridges along with the study results. The bridge fact sheets include only the most pertinent information for each bridge in a different format that can be more easily presented to the general public. The study determined that 40% of the bridges fall into the Element Specific work strategy and 40% fall into the Minor Rehabilitation work strategy. Most (40%) of the bridges are recommended for a 10-Year programing schedule.

Appendix A

QUANTITY COST

202.120001 Removing Existing Superstructures LS $75,000.00 0 $0

202.19 Removal of Substructures CY $250.00 0 $0

202.2201 Removal of Steel Supported Structural Slabs (With Shear Connectors) ‐ Type A SF $35.00 0 $0

202.2202 Removal of Steel Supported Structural Slabs (With Shear Connectors) ‐ Type B SF $30.00 0 $0

202.2301 Removal of Steel Supported Structural Slabs (Without Shear Connectors) ‐ Type A SF $30.00 0 $0

202.2302 Removal of Steel Supported Structural Slabs (Without Shear Connectors) ‐ Type B SF $25.00 0 $0

202.24 Removal of Concrete Superstructure Supported Concrete Slabs (With Shear Connectors) SF $25.00 0 $0

202.25 Removal of Concrete Superstructure Supported Concrete Slabs (Without Shear Connectors) SF $20.00 0 $0

204.02 Controlled Low Strength Material (CLSM) (No Fly Ash) CY $200.00 0 $0

402.098304 9.5 F3 Top Course HMA, 80 Series Compaction TON $200.00 0 $0

490.30 Miscellaneous Cold Milling of Bituminous Concrete SY $12.00 0 $0

553.010001 Cofferdam (Type 1) EA $18,000.00 0 $0

553.020002 Cofferdam (Type 2) EA $18,000.00 0 $0

555.09 Concrete for Structures, Class HP CY $1,200.00 0 $0

557.0109 Superstructure Slab with Integral Wearing Surface ‐ Bottom Formwork Required ‐ Type 9 Friction SY $390.00 0 $0

557.0509 Superstructure Slab with Integral Wearing Surface ‐ Bottom Formwork Not Required ‐ Type 9 Friction SY $300.00 0 $0

557.2009 Structural Approach Slab with Integral Wearing Surface ‐ Type 9 Friction SY $275.00 0 $0

559.16960118 Protective Sealing of Structural Concrete SF $1.50 0 $0

559.17960118 Protective Sealing of Structural Concrete for Existing Bridge Decks SF $2.50 0 $0

560.01 Dimension Stone Masonry SF $150.00 0 $0

560.09 Tuck Pointing SF $60.00 0 $0

560.40000008 Repair Stone Masonry SF $200.00 0 $0

563.02 Prestressed Concrete Box Beam Units SF $85.00 0 $0

563.03 Prestressed Concrete Hollow Slab Units SF $210.00 0 $0

564.510001 Structural Steel LB $6.00 0 $0

564.75020004 Structural Steel Repair, Type II EA $18,000.00 0 $0

564.75030004 Structural Steel Repair, Type III EA $6,000.00 0 $0

564.75040004 Structural Steel Repair, Type IV EA $4,000.00 0 $0

565.2023 Type E.B. Fixed Bearing (112 to 168 Kips) EA $3,500.00 0 $0

565.2033 Type E.B. Expansion Bearing (112 to 168 Kips) EA $3,500.00 0 $0

564.46000009 Resetting of Existing Bearings EA $800.00 0 $0

567.60 Armorless Bridge Joint LF $220.00 0 $0

568.51 Steel Bridge Rail (Four‐Rail) LF $165.00 0 $0

568.70 Transition Bridge Railing LF $150.00 0 $0

570.150001 Class A Containment LS $120,000.00 0 $0

570.160001 Class B Containment LS $60,000.00 0 $0

573.010001 Structural Steel Painting Field Applied ‐ Total Removal LS $180,000.00 0 $0

574.020001 Structural Steel Painting: Overcoating LS $90,000.00 0 $0

574.030001 Structural Steel Painting: Localized SF $50.00 0 $0

576.03210011 Cleaning Scuppers EA $250.00 0 $0

578.120901 Overlay Concrete, Class E ‐ Type 9 Friction SF $6.00 0 $0

578.130001 Slab Reconstruction Concrete, Class D or E SF $12.00 0 $0

580.01 Removal of Structural Concrete CY $2,500.00 0 $0

580.04 Removal of Concrete Approach Slab SF $8.00 0 $0

581.01 Removal of Bituminous Concrete Overlay (Bridge) SF $2.50 0 $0

581.02 Removal of Cement Concrete Overlay (Bridge) SF $1.25 0 $0

582.05 Removal of Structural Concrete ‐ Replacement with Class A Concrete CY $6,500.00 0 $0

582.06 Removal of Structural Concrete ‐ Replacement with Class D Concrete SF $200.00 0 $0

582.07 Removal of Structural Concrete ‐ Replacement with Vertical and Overhead Patching Material SF $120.00 0 $0

585.01 Structural Lifting Operations ‐ Type A EA $6,500.00 0 $0

586.0201 Drilling and Grouting Bolts or Reinforcing Bars EA $50.00 0 $0

587.01 Bridge Railing Removal and Disposal LF $60.00 0 $0

588.02010109 Rehabilitation of Bridge Joint Systems ‐ Repair Type XX LF $270.00 0 $0

595.50000018 Sheet‐Applied Waterproofing Membrane SF $5.00 0 $0

606.10 Box Beam Guide Railing LF $60.00 0 $0

606.120201 Box Beam Guide Railing End Assembly Type IIA EA $1,800.00 0 $0

606.71 Removing & Disposing Corrugated Beam Guide Railing LF $6.00 0 $0

619.01 Basic Workzone Traffic Control LS $18,000.00 0 $0

620.05 Stone Filling (Heavy) CY $95.00 0 $0

621.02 Cleaning Culverts With Span of More Than 50 in. LF $60.00 0 $0

621.05 Clean, Grade and Shape Existing Roadside Section LF $30.00 0 $0

625.01 Survey Operations LS $7,500.00 0 $0

637.11 Engineer's Field Office ‐ Type 1 MO $1,800.00 0 $0

641.91010011 Maintenance Cleaning and Washing of Bridges EA $5,500.00 0 $0

Subtotal 1 $0

697.03 Field Change Payment (FCP) DC $1.00 0 $0

Subtotal 2 $0

699.040001 Mobilization (4%) LS $0 1 $0

Subtotal 3 $0

Contingency (25%) LS $0 1 $0

ROW LS $0 1 $0

Design Fees LS $0 1 $0

Construction Inspection LS $0 1 $0

PRELIMINARY ENGINEER'S ESTIMATE (TYPE OF WORK)

ITEM DESCRIPTION UNITS UNIT COST

BIN XXXXXXX

TOTAL

Rehabilitation of:

FEATURE CARRIED

Over

FEATURE CROSSED

TOWN

COUNTY

TOTAL ESTIMATED BRIDGE COSTS: $0

Total: $0

TOTAL ESTIMATED CONSTRUCTION COSTS: $0

Appendix B

CDTC BRIDGE STUDY GUIDELINES

General work strategy guidelines used to determine the repairs for the bridges include:

‐ Placement of stone fill was recommended for bridges where the stone fill was washed away or when lacking stone fill. The placement timeframe was based on the existing scour/undermining damage, existing structural flags, and the progression of further damage.

‐ Paint total removal with a Class A containment system was recommended for bridges with >25% Paint Element Ratings of CS‐3 or CS‐4. A paint overcoat with Class B containment system was recommended for bridges with <25% Paint Element Ratings of CS‐3 or CS‐4. Localized painting with a Class B containment system was generally recommended on bridges where the joints were leaking and the paint failed at only the beam ends.

‐ Joint replacement within a 2‐year period was recommended for any bridge with actively leaking deck joints.

‐ Replacement of the asphalt wearing surface was recommended where the asphalt pavement had not been replaced recently and was cracked and/or raveling.

‐ A recommendation to seal the deck within a 2‐year period was given to concrete decks with integral wearing surfaces which were cracked or were constructed between >10 years ago.

Appendix C

BIN County Political Unit Primary Owner

Maintenance

Responsibility

Primary

Year

Built

Year of Last

Major

Rehabilitation

2020 In‐Depth Work Strategy Preservation

Eligible Treatment 1

2020 Conceptual

Construction Cost TIP Funding

Program

Schedule

(years)

Comments

1038660 1 ‐ County 1 ‐ ALBANY 0187 ‐ Town of COLONIE 30 ‐ County 30 ‐ County 2002 8888 Minor Rehab 5 Yrs

1053380 1 ‐ County 1 ‐ ALBANY 2001 ‐ City of ALBANY 42 ‐ City 42 ‐ City 1968 2008 Element Specific 10 Yrs

1054320 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 72 ‐ Other 1965 8888 Full Replacement 2 Yrs CCR < 4.0

1071940 5 ‐ County 5 ‐ SARATOGA 2029 ‐ City of MECHANICVILLE 42 ‐ City 42 ‐ City 1982 2016 Element Specific 10 Yrs

2000170 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 42 ‐ City 1886 1989 Minor Rehab 5 Yrs Bank protection (concrete wall) repair

2000930 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 42 ‐ City 1934 8888 Minor Rehab 5 Yrs

2000940 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 42 ‐ City 1875 8888 Element Specific 10 Yrs Remove fallen log from stream

2024650 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 42 ‐ City 1985 8888 Minor Rehab 5 Yrs

2024660 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 42 ‐ City 1875 8888 Full Replacement 2 Yrs CCR < 3.5

2025330 4 ‐ County 4 ‐ RENSSELAER 2047 ‐ City of RENSSELAER 42 ‐ City 42 ‐ City 1929 1985 Minor Rehab 5 Yrs

2200130 1 ‐ County 1 ‐ ALBANY 0068 ‐ Town of BERNE 40 ‐ Town 40 ‐ Town 1978 2010 Element Specific 10 Yrs

2200140 1 ‐ County 1 ‐ ALBANY 0581 ‐ Town of NEW SCOTLAND 40 ‐ Town 40 ‐ Town 2014 8888 No Work Needed N/A

2200210 1 ‐ County 1 ‐ ALBANY 0071 ‐ Town of BETHLEHEM 30 ‐ County 30 ‐ County 2014 8888 Element Specific 10 Yrs

2200270 1 ‐ County 1 ‐ ALBANY 2001 ‐ City of ALBANY 42 ‐ City 42 ‐ City 1980 2018 Element Specific 10 Yrs

2200300 1 ‐ County 1 ‐ ALBANY 2001 ‐ City of ALBANY 42 ‐ City 42 ‐ City 1905 8888 Closed Yes N/A

2200390 1 ‐ County 1 ‐ ALBANY 2009 ‐ City of COHOES 42 ‐ City 42 ‐ City 2010 8888 Element Specific 10 Yrs

2200460 1 ‐ County 1 ‐ ALBANY 2009 ‐ City of COHOES 42 ‐ City 42 ‐ City 1994 8888 Minor Rehab 5 Yrs

2200470 1 ‐ County 1 ‐ ALBANY 2009 ‐ City of COHOES 42 ‐ City 42 ‐ City 1986 8888 Element Specific 10 Yrs

2201460 4 ‐ County 4 ‐ RENSSELAER 0067 ‐ Town of BERLIN 40 ‐ Town 40 ‐ Town 1975 8888 Minor Rehab Immediate YSF Abutment UM

2201470 4 ‐ County 4 ‐ RENSSELAER 0067 ‐ Town of BERLIN 40 ‐ Town 40 ‐ Town 1940 8888 Full Replacement Immediate YSF Cracked Welds (Truss), CCR < 4.0 and PL = 10T

2201480 4 ‐ County 4 ‐ RENSSELAER 0067 ‐ Town of BERLIN 40 ‐ Town 40 ‐ Town 1935 1991 Minor Rehab Immediate YSF Begin Abutment UM, YSF End Abutment UM

2201490 4 ‐ County 4 ‐ RENSSELAER 0067 ‐ Town of BERLIN 30 ‐ County 30 ‐ County 2015 8888 No Work Needed N/A

2201530 4 ‐ County 4 ‐ RENSSELAER 0099 ‐ Town of BRUNSWICK 40 ‐ Town 40 ‐ Town 2012 8888 No Work Needed N/A

2201540 4 ‐ County 4 ‐ RENSSELAER 0099 ‐ Town of BRUNSWICK 30 ‐ County 30 ‐ County 1990 8888 Minor Rehab 5 Yrs

2201550 4 ‐ County 4 ‐ RENSSELAER 0099 ‐ Town of BRUNSWICK 40 ‐ Town 40 ‐ Town 1940 8888 Full Replacement 2 Yrs CCR < 4.0

2201560 4 ‐ County 4 ‐ RENSSELAER 0099 ‐ Town of BRUNSWICK 40 ‐ Town 40 ‐ Town 2015 8888 Element Specific 10 Yrs

2201570 4 ‐ County 4 ‐ RENSSELAER 0249 ‐ Town of EAST GREENBUSH 40 ‐ Town 40 ‐ Town 1938 1991 Full Replacement Immediate YSF Web SL, CCR < 4.0 and PL = 18T

2201620 4 ‐ County 4 ‐ RENSSELAER 0398 ‐ Town of HOOSICK 40 ‐ Town 40 ‐ Town 2014 8888 Element Specific 10 Yrs

2201630 4 ‐ County 4 ‐ RENSSELAER 0398 ‐ Town of HOOSICK 40 ‐ Town 40 ‐ Town 2003 8888 Element Specific 10 Yrs

2201640 4 ‐ County 4 ‐ RENSSELAER 0398 ‐ Town of HOOSICK 40 ‐ Town 40 ‐ Town 2010 8888 Element Specific 10 Yrs

2201650 4 ‐ County 4 ‐ RENSSELAER 0398 ‐ Town of HOOSICK 40 ‐ Town 40 ‐ Town 1920 1990 Full Replacement Immediate RSF Load Posting, YSF Stringer Web SL, YSF Stringer Flange SL, YSF Abutment UM, CCR < 4.0 and PL = 15T

2201660 4 ‐ County 4 ‐ RENSSELAER 0398 ‐ Town of HOOSICK 40 ‐ Town 40 ‐ Town 1900 8888 Closed Yes N/A

2201670 4 ‐ County 4 ‐ RENSSELAER 0595 ‐ Town of NORTH GREENBUSH 40 ‐ Town 40 ‐ Town 2013 8888 Element Specific 10 Yrs

2201680 4 ‐ County 4 ‐ RENSSELAER 0656 ‐ Town of PETERSBURG 40 ‐ Town 40 ‐ Town 1948 8888 Minor Rehab 5 Yrs

2201700 4 ‐ County 4 ‐ RENSSELAER 0656 ‐ Town of PETERSBURG 40 ‐ Town 40 ‐ Town 1922 8888 Closed N/A Jack arch

2201710 4 ‐ County 4 ‐ RENSSELAER 0656 ‐ Town of PETERSBURG 40 ‐ Town 40 ‐ Town 1947 1989 Major Rehab Superstructure Replacement 2 Yrs CCR < 4.0

2201720 4 ‐ County 4 ‐ RENSSELAER 0656 ‐ Town of PETERSBURG 40 ‐ Town 40 ‐ Town 1948 8888 Minor Rehab 5 Yrs Remove fallen tree from stream, CCR < 4.0

2201730 4 ‐ County 4 ‐ RENSSELAER 0656 ‐ Town of PETERSBURG 40 ‐ Town 40 ‐ Town 1985 8888 Minor Rehab 5 Yrs PS Box Beams Rated CS‐3/CS‐4

2201740 4 ‐ County 4 ‐ RENSSELAER 0656 ‐ Town of PETERSBURG 40 ‐ Town 40 ‐ Town 2016 8888 No Work Needed N/A

2201760 4 ‐ County 4 ‐ RENSSELAER 0656 ‐ Town of PETERSBURG 40 ‐ Town 40 ‐ Town 1988 8888 Minor Rehab 5 Yrs Steel culvert repair, bank protection (concrete lagging) replacement

2201770 4 ‐ County 4 ‐ RENSSELAER 0670 ‐ Town of PITTSTOWN 40 ‐ Town 40 ‐ Town 1960 8888 Major Rehab Superstructure Replacement 2 Yrs Superstructure replacement, replace pedestals

2201780 4 ‐ County 4 ‐ RENSSELAER 0670 ‐ Town of PITTSTOWN 40 ‐ Town 40 ‐ Town 1910 2016 Full Replacement 2 Yrs CCR < 4.0

2201790 4 ‐ County 4 ‐ RENSSELAER 0670 ‐ Town of PITTSTOWN 40 ‐ Town 40 ‐ Town 1910 2014 Minor Rehab 5 Yrs

2201800 4 ‐ County 4 ‐ RENSSELAER 1238 ‐ Village of HOOSICK FALLS 40 ‐ Town 40 ‐ Town 2004 8888 Element Specific 10 Yrs

2201820 4 ‐ County 4 ‐ RENSSELAER 0741 ‐ Town of SAND LAKE 40 ‐ Town 40 ‐ Town 1920 8888 Full Replacement Yes 2 Yrs CCR < 3.5

2201840 4 ‐ County 4 ‐ RENSSELAER 0670 ‐ Town of PITTSTOWN 40 ‐ Town 40 ‐ Town 1950 1998 Full Replacement 2 Yrs CCR < 3.5, YSF Web SL

2201850 4 ‐ County 4 ‐ RENSSELAER 0670 ‐ Town of PITTSTOWN 40 ‐ Town 40 ‐ Town 1991 8888 Element Specific 10 Yrs Headwall repair

2201860 4 ‐ County 4 ‐ RENSSELAER 0656 ‐ Town of PETERSBURG 30 ‐ County 30 ‐ County 1927 8888 Full Replacement 2 Yrs CCR < 3.5, Jack arch

2201870 4 ‐ County 4 ‐ RENSSELAER 1575 ‐ Village of EAST NASSAU 40 ‐ Town 40 ‐ Town 1950 8888 Full Replacement 2 Yrs CCR < 3.5

2201880 4 ‐ County 4 ‐ RENSSELAER 0676 ‐ Town of POESTENKILL 40 ‐ Town 40 ‐ Town 2006 8888 No Work Needed N/A

2201890 4 ‐ County 4 ‐ RENSSELAER 0676 ‐ Town of POESTENKILL 40 ‐ Town 40 ‐ Town 1985 8888 Minor Rehab 5 Yrs PS Box Beams Rated CS‐3/CS‐4

2201900 4 ‐ County 4 ‐ RENSSELAER 0676 ‐ Town of POESTENKILL 40 ‐ Town 40 ‐ Town 2005 8888 Minor Rehab 5 Yrs Bank protection (masonry wall) reconstruction

2201910 4 ‐ County 4 ‐ RENSSELAER 0676 ‐ Town of POESTENKILL 40 ‐ Town 40 ‐ Town 2006 8888 Element Specific 10 Yrs

2201920 4 ‐ County 4 ‐ RENSSELAER 0249 ‐ Town of EAST GREENBUSH 40 ‐ Town 40 ‐ Town 1986 8888 Element Specific 10 Yrs

2201960 4 ‐ County 4 ‐ RENSSELAER 0741 ‐ Town of SAND LAKE 40 ‐ Town 40 ‐ Town 1950 8888 Full Replacement 2 Yrs CCR < 4.0 and PL = 15T

2201980 4 ‐ County 4 ‐ RENSSELAER 0741 ‐ Town of SAND LAKE 40 ‐ Town 40 ‐ Town 1938 8888 Major Rehab Superstructure Replacement Immediate YSF Void in Footing Concrete and CCR < 4.0, Jack arch

2201990 4 ‐ County 4 ‐ RENSSELAER 0741 ‐ Town of SAND LAKE 40 ‐ Town 40 ‐ Town 1950 1995 Minor Rehab 5 Yrs

2202000 4 ‐ County 4 ‐ RENSSELAER 0741 ‐ Town of SAND LAKE 40 ‐ Town 40 ‐ Town 1950 8888 Full Replacement 2 Yrs PL = 10T

2202010 4 ‐ County 4 ‐ RENSSELAER 0753 ‐ Town of SCHODACK 40 ‐ Town 40 ‐ Town 1940 8888 Full Replacement 2 Yrs CCR < 3.5

2202020 4 ‐ County 4 ‐ RENSSELAER 0753 ‐ Town of SCHODACK 40 ‐ Town 40 ‐ Town 1988 8888 Element Specific 10 Yrs

2202070 4 ‐ County 4 ‐ RENSSELAER 0753 ‐ Town of SCHODACK 40 ‐ Town 40 ‐ Town 1985 8888 Element Specific 10 Yrs

2202080 4 ‐ County 4 ‐ RENSSELAER 0804 ‐ Town of STEPHENTOWN 40 ‐ Town 40 ‐ Town 1931 8888 Major Rehab Superstructure Replacement 2 Yrs PL = 10T, Jack arch

2202090 4 ‐ County 4 ‐ RENSSELAER 0804 ‐ Town of STEPHENTOWN 40 ‐ Town 40 ‐ Town 1939 2020 Minor Rehab 5 Yrs

2202100 4 ‐ County 4 ‐ RENSSELAER 0804 ‐ Town of STEPHENTOWN 40 ‐ Town 40 ‐ Town 1936 8888 Major Rehab Superstructure Replacement 2 Yrs Jack arch

2202110 4 ‐ County 4 ‐ RENSSELAER 0804 ‐ Town of STEPHENTOWN 40 ‐ Town 40 ‐ Town 1950 8888 Major Rehab Superstructure Replacement 2 Yrs CCR < 4.0

2202120 4 ‐ County 4 ‐ RENSSELAER 0804 ‐ Town of STEPHENTOWN 40 ‐ Town 40 ‐ Town 1947 8888 Closed N/A

2202140 4 ‐ County 4 ‐ RENSSELAER 0804 ‐ Town of STEPHENTOWN 40 ‐ Town 40 ‐ Town 1912 1989 Minor Rehab 5 Yrs Selective stringer and floorbeam replacement, YSF Stringer Web SL and CCR < 4.0

2202160 4 ‐ County 4 ‐ RENSSELAER 0804 ‐ Town of STEPHENTOWN 40 ‐ Town 40 ‐ Town 1947 1992 Minor Rehab 5 Yrs Slective stringer replacement, YSF Stringer Web SL and CCR < 4.0

2202190 4 ‐ County 4 ‐ RENSSELAER 2047 ‐ City of RENSSELAER 42 ‐ City 42 ‐ City 1940 1987 Minor Rehab 5 Yrs Remove fallen log from stream

2202200 4 ‐ County 4 ‐ RENSSELAER 2047 ‐ City of RENSSELAER 42 ‐ City 42 ‐ City 1929 8888 On 2019‐2024 TIP N/A

2202220 4 ‐ County 4 ‐ RENSSELAER 2047 ‐ City of RENSSELAER 42 ‐ City 42 ‐ City 1975 2012 Element Specific 10 Yrs

2202240 4 ‐ County 4 ‐ RENSSELAER 2047 ‐ City of RENSSELAER 42 ‐ City 42 ‐ City 1997 8888 Element Specific 10 Yrs

2202250 4 ‐ County 4 ‐ RENSSELAER 2047 ‐ City of RENSSELAER 42 ‐ City 42 ‐ City 1986 8888 Element Specific 10 Yrs

2202260 4 ‐ County 4 ‐ RENSSELAER 2047 ‐ City of RENSSELAER 42 ‐ City 42 ‐ City 1940 1986 Major Rehab Deck Replacement 2 Yrs Bank protection (concrete wall and steel sheet piles) reconstruction

2202270 4 ‐ County 4 ‐ RENSSELAER 2047 ‐ City of RENSSELAER 42 ‐ City 42 ‐ City 1997 8888 Element Specific 10 Yrs

2202280 4 ‐ County 4 ‐ RENSSELAER 2047 ‐ City of RENSSELAER 42 ‐ City 42 ‐ City 1935 8888 Full Replacement 2 Yrs CCR < 3.5

2202290 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 42 ‐ City 1980 8888 On 2019‐2024 TIP N/A YSF PS Box Beams and Rated CS‐3/CS‐4

2202330 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 42 ‐ City 1900 8888 Full Replacement 2 Yrs CCR < 3.5

2202340 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 42 ‐ City 1930 1989 Minor Rehab 5 Yrs

2202370 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 42 ‐ City 2015 8888 Element Specific 10 Yrs

2202460 4 ‐ County 4 ‐ RENSSELAER 2057 ‐ City of TROY 42 ‐ City 42 ‐ City 1960 8888 Element Specific 10 Yrs Steel culvert repair

2202550 5 ‐ County 5 ‐ SARATOGA 0049 ‐ Town of BALLSTON 40 ‐ Town 40 ‐ Town 1925 1995 Major Rehab Deck Replacement 2 Yrs Secondary member repairs, CCR < 5.0

2202570 5 ‐ County 5 ‐ SARATOGA 0174 ‐ Town of CLIFTON PARK 30 ‐ County 30 ‐ County 1974 8888 On 2019‐2024 TIP N/A CCR < 5.0

2202580 5 ‐ County 5 ‐ SARATOGA 0360 ‐ Town of HALFMOON 30 ‐ County 30 ‐ County 2003 8888 No Work Needed N/A

2202600 5 ‐ County 5 ‐ SARATOGA 0200 ‐ Town of CORINTH 30 ‐ County 30 ‐ County 1980 8888 Element Specific 10 Yrs

2202630 5 ‐ County 5 ‐ SARATOGA 0220 ‐ Town of DAY 30 ‐ County 30 ‐ County 2001 8888 Element Specific 10 Yrs

2202640 5 ‐ County 5 ‐ SARATOGA 0255 ‐ Town of EDINBURG 40 ‐ Town 40 ‐ Town 1986 8888 Full Replacement 2 Yrs CCR < 3.5

2202670 5 ‐ County 5 ‐ SARATOGA 0255 ‐ Town of EDINBURG 40 ‐ Town 40 ‐ Town 1932 8888 On 2019‐2024 TIP Immediate RSF Web SL (Inactive), YSF Bottom Flange SL, CCR < 5.0 and PL = 16

2202690 5 ‐ County 5 ‐ SARATOGA 0314 ‐ Town of GALWAY 30 ‐ County 30 ‐ County 1973 8888 Minor Rehab 5 Yrs CCR < 5.0

2202700 5 ‐ County 5 ‐ SARATOGA 0314 ‐ Town of GALWAY 30 ‐ County 30 ‐ County 1974 8888 Element…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .