2020-01-24 Addendum 1.pdf
PDF 370 KB Posted
- Attached to
- Cosmetology Exterior Renovation
- Solicitation number
- RFP GIS 200000000718 2
- Issued by
- Genesee County, Michigan
About this file
This is Addendum No. 1 to the contract documents for the Genesee Intermediate School District (GISD) Cosmetology Buildings project located at 5081 Torrey Road, Flint, Michigan. The addendum was issued on January 24, 2020, by Mayottegroup Architects, the project architect, and incorporates clarifications and modifications to the original contract documents. A pre-bid meeting was held on January 16, 2020, with an attendee sign-in sheet included as reference. The addendum specifies that new attic insulation must provide an R-value of R-49 with no existing insulation present, and the contractor is required to provide and install one new attic access panel in each building as indicated on the project drawings.
The addendum contains general administrative provisions directing all bidders to reference the included pre-bid meeting sign-in sheet and clarifying technical specifications for the insulation and attic access components. Additional attachments and documentation can be obtained via email from Matt McGaughey, Project Architect, at mcgaughey@mayottearchitects.com. The addendum takes precedence over the original contract documents and serves to ensure all bidders have uniform understanding of the project requirements prior to submitting proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2020-01-08 GISD Cosmetology - Request.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1
1 o f 1
Addendum No. 1 2019-045 Genesee Intermediate School District (GISD) Cosmetology Buildings
Addendum to Contract Documents For:
Client:
Genesee Intermediate School District 2413 West Maple Avenue Flint, Michigan 48507
Project:
GISD Cosmetology Buildings 5081 Torrey Road Flint, Michigan 48507
Architect:
Mayottegroup Architects 6240 West Mount Hope Lansing, Michigan 48917
PURPOSE: This addendum is issued to amplify, clarify, and modify the original contract documents and shall take precedence over them.
DATE ISSUED: January 24, 2020
ATTACHMENTS: Pre-bid Meeting sign-in sheet, dated January 16, 2020
To All Bidders
GENERAL
Item 1 The pre-bid meeting sign-in sheet is included for reference.
Item 2 The new attic insulation is to provide an R-value of R-49. There is no existing insulation in the attic.
Item 3 The Contractor is to provide and install (1) new attic access panel in each building where indicated on the drawings.
Item 4 Attachments indicated above can be obtained via e-mail from
MAYOTTEgroup Architects. E-mail contact Matt McGaughey, Project Architect: mcgaughey@mayottearchitects.com
END OF ADDENDUM NO. 1
mailto:mcgaughey@mayottearchitects.com
Accessibility Report
Filename:
2020-01-24 Addendum No 1.pdf
Report created by:
Organization:
[Enter personal and organization information through the Preferences > Identity dialog.]
Summary
The checker found no problems in this document.
Needs manual check: 0
Passed manually: 2
Failed manually: 0
Skipped: 1
Passed: 29
Failed: 0
Detailed Report
Document
Rule Name Status Description
Accessibility permission flag Passed Accessibility permission flag must be set
Image-only PDF Passed Document is not image-only PDF
Tagged PDF Passed Document is tagged PDF
Logical Reading Order Passed manually Document structure provides a logical reading order
Primary language Passed Text language is specified
Title Passed Document title is showing in title bar
Bookmarks Passed Bookmarks are present in large documents
Color contrast Passed manually Document has appropriate color contrast
Page Content
Rule Name Status Description
Tagged content Passed All page content is tagged
Tagged annotations Passed All annotations are tagged
Tab order Passed Tab order is consistent with structure order
Character encoding Passed Reliable character encoding is provided
Tagged multimedia Passed All multimedia objects are tagged
Screen flicker Passed Page will not cause screen flicker
Scripts Passed No inaccessible scripts
Timed responses Passed Page does not require timed responses
Navigation links Passed Navigation links are not repetitive
Forms
Rule Name Status Description
Tagged form fields Passed All form fields are tagged
Field descriptions Passed All form fields have description
Alternate Text
Rule Name Status Description
Figures alternate text Passed Figures require alternate text
Nested alternate text Passed Alternate text that will never be read
Associated with content Passed Alternate text must be associated with some content
Hides annotation Passed Alternate text should not hide annotation
Other elements alternate text Passed Other elements that require alternate text
Tables
Rule Name Status Description
Rows Passed TR must be a child of Table, THead, TBody, or TFoot
TH and TD Passed TH and TD must be children of TR
Headers Passed Tables should have headers
Regularity Passed Tables must contain the same number of columns in each row and rows in each column
Summary Skipped Tables must have a summary
Lists
Rule Name Status Description
List items Passed LI must be a child of L
Lbl and LBody Passed Lbl and LBody must be children of LI
Headings
Rule Name Status Description
Appropriate nesting Passed Appropriate nesting
Back to Top
File details come from the government source that posted it. Updated .