2019803 Signing and Pavement marking.pdf

PDF 2 MB Posted

Attached to
CR-880 and Sam Senter Rd over SFWMD Ocean Canal
Solicitation number
IFB 360 2019803 9
Issued by
Palm Beach County, Florida

About this file

This is a signing and pavement marking plan document prepared by Palm Beach County Engineering and Public Works Department for the State of Florida, specifically for intersection improvements and bridge replacement at CR 880 and Sam Senter Road. The project involves comprehensive traffic control device installation and pavement marking along approximately 42 miles of roadway, with detailed specifications for sign placement, removal, and replacement at designated stations. The plan includes multiple sheets detailing signing and pavement marking layouts at a scale of 1"=40', with specific requirements for thermoplastic markings in various configurations including skip lines, solid lines, arrows, and diagonal lines in white and yellow. The project specifies quantities for single-post signs (12-30 square feet), multi-post signs (12-20 square feet), bridge-mounted signs, thermoplastic markings of various widths and configurations, and retroreflective pavement markers. The plan was certified by Q. Amin Ahmed, Professional Engineer #52564, and was dated August 22, 2024.

The document contains detailed pavement marking specifications requiring compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and Florida Department of Transportation standards. Responsibility for sign removal and replacement rests with the contractor, with all removed signs and supports becoming contractor property for proper disposal unless otherwise noted. The plan includes tabulated quantities for all signing and marking components, and requires that all existing pavement markings be matched at project boundaries. No specific contract pricing, set-asides, incumbents, funding sources, or bid response dates are contained within this technical design document.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PALM

B E

A C

H

YTN

U

O

C

F L

O R I

D A

CHECKED:

P R

O J

E C

T

SHEET:

OF:

PROJECT NO.

F I

E L

D B

O O

K N

O

SCALE:

APPROVED:

DRAWN:

N O

R E

V I

S I

O N

B Y

D A

T E

D R

A W I

N G N

O

D E

S I

G N F I

L E N

A M

E

PROJECT NO.

DATE:

AS SHOWN

A.A.

D.H.

PROFESSIONAL ENGINEER #52564

Florida Department of Transportation.

for the Palm Beach County Engineering Department and the State of compliance with the Design Standards and criteria in effect on this date

I hereby certify that the attached plans and design are in substantial

Q. AMIN AHMED, P.E.

CERTIFICATE OF AUTHORIZATION NO. 1978

(561) 689-7444

WEST PALM BEACH, FL. 33409

1641 WORTHINGTON ROAD, SUITE 400

R O

A D

W A

Y

K E

Y S

R D

D G

N

BOBBY POWELL

2019803

2019803

A.A.

R O A

D W

A Y P

R O D U C T

IO

N

P A L

M B

E A

C H C

O U

N T Y

8/22/24

GREGG K. WEISS

MARIA G. MARINO

MARIA SACHS

SA

M S

E N T E R R

O A

D C R A

T

CR 880 AT SAM SENTER ROAD

INTERSECTION IMPROVEMENTS AND BRIDGE REPLACEMENT

STATE OF FLORIDA

BOARD OF COUNTY COMMISSIONERS

SHEET NO. SHEET DESCRIPTION

COUNTY OF PALM BEACH

HAVE CHANGED DUE TO REPRODUCTION.

PLANS PREPARED BY:

P A

L M

BE

ACH

Y T

N U

OC

FLORID

A

DISTRICT 1

DISTRICT 2

DISTRICT 4

DISTRICT 3

DISTRICT 7DISTRICT 6

DISTRICT 5

E N

G

IN

E E R

IN

G A

N D P

U B L

IC

W

O R K S

P O B O X

W E

ST

P

A L

M B

E A

C H F

L O R

ID

A

NOTE: THE SCALE OF THESE PLANS MAY

ENGINEER OF RECORD:

MARCI WOODWARD

SARA BAXTER

S-1

S-13

MARKING PLANS

INDEX OF SIGNING AND PAVEMENT

S-13

S-4 thru S-12

S-3

S-2

S-1

GUIDE SIGN WORKSHEET

SIGNING AND PAVEMENT MARKING PLAN

GENERAL NOTES

TABULATION OF QUANTITIES

TITLE SHEET

THE CONTRACT DOCUMENTS FOR THIS PROJECT

GOVERNING SPECIFICATIONS ARE CONTAINED IN

JOEL FLORES

P

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

SIGNING\TABQSP01.DGN

S-2

TABULATION OF QUANTITIES

TOTAL

GRAND

PLAN FINAL

DESCRIPTION

SHEET NUMBERS

UNIT

TABULATION OF QUANTITIES

SHEET

THIS

TOTAL

700-1-11 AS

700-1-60 AS

700-1-13 AS

700-2-12 AS

SINGLE POST SIGN, F&I GROUND MOUNT, UP TO 12 SF

SINGLE POST SIGN, REMOVE

700-2-60 ASMULTI-POST SIGN, REMOVE

FINALPLAN

S-4

FINALPLAN

S-5

FINALPLAN

S-6

FINALPLAN

S-7

FINALPLAN

S-8

FINALPLAN

S-9

FINALPLAN

S-10

FINALPLAN

S-11

FINALPLAN FINALPLAN

711-11-141

711-11-170

711-11-224

711-11-241

711-11-125

711-16-101

711-16-201

GM

EA

LF

GM

LF

NM

NM

THERMOPLASTIC, STANDARD, WHITE, ARROW

THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONALS OR CHEVRON

THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6"

THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6"

S-12

706-1-3 EARETRO REFLECTIVE PAVEMENT MARKER

NO.

ITEM

PAY

FDOT

THERMOPLASTIC, STANDARD, WHITE, SKIP (6'-10'), 6"

THERMOPLASTIC, STANDARD, YELLOW, SKIP (6'-10'), 6"

THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE AND CROSSWALK

28 36 47 48 47 56 32 26 10 330 330

0.012 0.039 0.061 0.112 0.112

3 2 5 5

9 19 65 85 1114 293 293

0.110 0.1100.032 0.012 0.066

18 18 18

0.208

0.208

0.205

0.265

0.181

0.332

0.247

0.220

0.266

0.297

0.212

0.212

0.212

0.212

0.199

0.199

0.068

0.068

1.798 1.798

2.013 2.013

NONE

1 2 3 4 2 1 13 13

1 1 2 2

1 5 3 7 1 17 17

SINGLE POST SIGN, F&I GROUND MOUNT, 21-30 SF

MULTI-POST SIGN, F&I GROUND MOUNT, 12-20 SF 1

700-1-32 ASSINGLE POST SIGN, F&I BRIDGE MOUNT INDEX 11870/700-012, 12-20 SF 1 1 1

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

SIGNING\GNNTSP01.DGN

GENERAL NOTES

S-3

SIGNING & PAVEMENT MARKING NOTES:

GEOMETRICS NO. T-P-24.

FOR STREETS AND HIGHWAYS (LATEST EDITION) AND PALM BEACH COUNTY TYPICALS FOR PAVEMENT MARKINGS, SIGNING &

5. PAVEMENT MARKINGS AND GEOMETRICS SHALL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES

MATCH EXISTING PAVEMENT MARKINGS AT THE BEGINNING AND END OF THE PROJECT.4.

DISTANCE BETWEEN THE STRIPES. SEE FDOT STANDARD PLANS INDEX 711-001 FOR PLACEMENT OF LINE DETAILS.

THE LANE WIDTH DIMENSIONS SHOWN IN THE SIGNING AND PAVEMENT MARKING PLANS REFLECT THE NOMINAL LANE WIDTHS, NOT THE 3.

OPERATIONS. IF SIGNS ARE DAMAGED BY THE CONTRACTOR, THE SIGNS SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.

IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE AND REPLACE ALL EXISTING SIGNS THAT CONFLICT WITH CONSTRUCTION 2.

OTHERWISE NOTED ON THE PLANS.

ALL REMOVED SIGNS AND THEIR SUPPORTS BECOME THE PROPERTY OF THE CONTRACTOR TO BE DISPOSED OF PROPERLY UNLESS 1.

76 77 78 79 80 81

OH CATV 13 KV OE

OH TEL

REMOVED

TO BE

36"x36"

W1-2R

STA. 80+60

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

N

R/W LINE

CR 880

SIGNING\PLANSP01.DGN

M A

T C

H

L I N

E

S

T A

.0

STA. 76+00.00

¡ CONSTRUCTION CR 880

SFWMD R/W LINE

SFWMD R/W LINE

0 10 40

Feet

S-4

MARKING PLAN

SIGNING AND PAVEMENT

STRIPING KEY:

T = RPM BI-DIRECTIONAL WHITE/RED

S = FDP YELLOW

R = FDP WHITE

P = RPM BI-DIRECTIONAL AMBER/AMBER

N = 6" SKIP YELLOW TYP. (2' - 4')

M = 6" SKIP YELLOW TYP. (6' - 10')

L = 6" SKIP YELLOW TYP. (10' - 30')

K = 6" DOUBLE YELLOW

J = 18" SOLID YELLOW

I = 6" SOLID YELLOW

H = 6" SKIP WHITE TYP. (2' - 4')

G = 6" SKIP WHITE TYP. (6' - 10')

F = 6" SKIP WHITE TYP. (10' - 30')

E = 24" SOLID WHITE

D = 18" SOLID WHITE

C = 12" SOLID WHITE

B = 8" SOLID WHITE

A = 6" SOLID WHITE

K

P A

A

SFWMD L-13 CANAL

MATCH EXISTING

PAVEMENT MARKINGS

BEGIN SIGNING AND

82 83 84 85 86

OH CATV

13 KV OE

OH TEL

W1-8L

STA. 85+20

18"x24"

W1-8R

18"x24"

W1-8L

STA. 86+80

18"x24"

W1-8R

18"x24"

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

N

SIGNING\PLANSP02.DGN

M A

T C

H

L I N

E

S

T A

.0

M A

T C

H

L I N

E

S

T A

.0

0CR 880

¡ CONSTRUCTION CR 880

R/W LINE

SFWMD R/W LINE

SFWMD R/W LINE

0 10 40

Feet

S-5

MARKING PLAN

SIGNING AND PAVEMENT

STRIPING KEY:

T = RPM BI-DIRECTIONAL WHITE/RED

S = FDP YELLOW

R = FDP WHITE

P = RPM BI-DIRECTIONAL AMBER/AMBER

N = 6" SKIP YELLOW TYP. (2' - 4')

M = 6" SKIP YELLOW TYP. (6' - 10')

L = 6" SKIP YELLOW TYP. (10' - 30')

K = 6" DOUBLE YELLOW

J = 18" SOLID YELLOW

I = 6" SOLID YELLOW

H = 6" SKIP WHITE TYP. (2' - 4')

G = 6" SKIP WHITE TYP. (6' - 10')

F = 6" SKIP WHITE TYP. (10' - 30')

E = 24" SOLID WHITE

D = 18" SOLID WHITE

C = 12" SOLID WHITE

B = 8" SOLID WHITE

A = 6" SOLID WHITE

K

A

A

' 1

K

J

K P

P

P

SFWMD L-13 CANAL

.4

18" YELLOW DIAGONAL LINES

40' DISTANCE BETWEEN

NOTE:

90 91

13 KV OE

OH CATV

OH TEL

24" RCP

REMOVED

TO BE

REMOVED

TO BE

REMOVED

TO BE

REMOVED

TO BE

REMOVED

TO BE W1-8L

STA. 88+40

18"x24"

W1-8R

18"x24"

W1-8L

STA. 90+00

18"x24"

W1-8R

18"x24"

W1-8L

STA. 91+60

18"x24"

W1-8R

18"x24"

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

N

SIGNING\PLANSP03.DGN

M A

T C

H

L I N

E

S

T A

.0

CR 880

¡ CONSTRUCTION CR 880

R/W LINE

M A

T C

H

L I N

E

S

T A

.0

SFWMD R/W LINE

0 10 40

Feet

S-6

MARKING PLAN

SIGNING AND PAVEMENT

STRIPING KEY:

T = RPM BI-DIRECTIONAL WHITE/RED

S = FDP YELLOW

R = FDP WHITE

P = RPM BI-DIRECTIONAL AMBER/AMBER

N = 6" SKIP YELLOW TYP. (2' - 4')

M = 6" SKIP YELLOW TYP. (6' - 10')

L = 6" SKIP YELLOW TYP. (10' - 30')

K = 6" DOUBLE YELLOW

J = 18" SOLID YELLOW

I = 6" SOLID YELLOW

H = 6" SKIP WHITE TYP. (2' - 4')

G = 6" SKIP WHITE TYP. (6' - 10')

F = 6" SKIP WHITE TYP. (10' - 30')

E = 24" SOLID WHITE

D = 18" SOLID WHITE

C = 12" SOLID WHITE

B = 8" SOLID WHITE

A = 6" SOLID WHITE

A

A

K

K

M

M

P

P

P

K

R/W LINE

SFWMD

.5

R=40'

SFWMD L-13 CANAL

J

G

18" YELLOW DIAGONAL LINES

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

94 95

13 KV OE

OH CATV

OH TEL

S a m S e n te r

R d

REMOVED

TO BE

S a m S e n te r

R d

W2-2L

48"x48"

W16-8p

STA. 93+00

L

IM

IT

S P

E E

D

REMOVED

TO BE

L

IM

IT

S P

E E

D

REMOVED

TO BE

GUIDE SIGN 1

12"x60"

W1-8L

STA. 93+20

18"x24"

W1-8R

18"x24"

W1-8L

STA. 94+80

18"x24"

W1-8R

18"x24"

W1-8L

STA. 96+40

18"x24"

W1-8R

18"x24"

R2-1

30"x36"

STA. 97+00

N

M A

T C

H

L I N

E

S

T A

.0

SIGNING\PLANSP04.DGN

M A

T C

H

L I N

E

S

T A

.0

R/W LINE

CR 880

¡ CONSTRUCTION CR 880

0 10 40

Feet

MARKING PLAN

SIGNING AND PAVEMENT S-7

STRIPING KEY:

T = RPM BI-DIRECTIONAL WHITE/RED

S = FDP YELLOW

R = FDP WHITE

P = RPM BI-DIRECTIONAL AMBER/AMBER

N = 6" SKIP YELLOW TYP. (2' - 4')

M = 6" SKIP YELLOW TYP. (6' - 10')

L = 6" SKIP YELLOW TYP. (10' - 30')

K = 6" DOUBLE YELLOW

J = 18" SOLID YELLOW

I = 6" SOLID YELLOW

H = 6" SKIP WHITE TYP. (2' - 4')

G = 6" SKIP WHITE TYP. (6' - 10')

F = 6" SKIP WHITE TYP. (10' - 30')

E = 24" SOLID WHITE

D = 18" SOLID WHITE

C = 12" SOLID WHITE

B = 8" SOLID WHITE

A = 6" SOLID WHITE

'1

A

A

A

K

M K

G LEFT TURN ARROW (TYP.)

T

P

P

P

R/W LINE

SFWMD

.4

.0

.0

.0

R=40'

SFWMD L-13 CANAL

J

G

18" YELLOW DIAGONAL LINES

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

DITCH

DITCH

T/B

B/B

B/B

T/B

T/B

T/B

B/B

B/B

T/B

T/B

W/L

W/L

S/B

EOP

EOP

EOP

EOP

T/B

S/B

W/L

T/B

W/L

T/B

EOP

EOP

T/B

S/B

T/B

T/B

B/B

B/B

T/B

T/B

EO

P

EO

P

T/ B

W/ L

S/ B

S/ B

99 100 101 102

PI STA. 11+85.00

13 KV OE OH CATV

K

V

O

E

K V

O E

OH TEL

36" CMP

L

IM

IT

S P

E E

D

REMOVED

TO BE

REMOVED

TO BE

L

IM

IT

S P

E E

D

STOP

REMOVED

TO BE

STOP

REMOVED

TO BE

S a m S e n te r

R d S a m S e n te r

R d

REMOVED

TO BE

REMOVED

TO BE

REMOVED

TO BE

STA. 10+68

SAM SENTER ROAD

¡ CONSTRUCTION

CR 880

CR 880

W1-8L

STA. 98+00

18"x24"

W1-8R

18"x24"

R1-1

D3-1

36"X36"

D3-1

GUIDE SIGN 2

12"x42"

GUIDE SIGN 3

12"x30"

R2-1

30"x36"

S a m S e n te r

R d S a m S e n te r

R d

CR 880

CR 880

STA. 99+13

W1-7

24"x48"

OM1-1

18"x18"

OM1-1

18"x18"

REMOVED

TO BE

STA. 101+60

N

M A

T C

H

L I N

E

S

T A

.0

R/W LINE

CR 880

¡ CONSTRUCTION CR 880

M A

T C

H

L I N

E

S

T A

.0

SIGNING\PLANSP05.DGN

SAM SENTER ROAD

¡ CONSTRUCTION

STA. 10+00.00 =

SAM SENTER ROAD

¡ CONSTRUCTION

STA. 99+19.00

CR 880

¡ CONSTRUCTION

S A

M

S

E N

T E

R

R

O A

D

R/W LINE

SFWMD

R=85'

0 10 40

Feet

MARKING PLAN

SIGNING AND PAVEMENT S-8

STRIPING KEY:

T = RPM BI-DIRECTIONAL WHITE/RED

S = FDP YELLOW

R = FDP WHITE

P = RPM BI-DIRECTIONAL AMBER/AMBER

N = 6" SKIP YELLOW TYP. (2' - 4')

M = 6" SKIP YELLOW TYP. (6' - 10')

L = 6" SKIP YELLOW TYP. (10' - 30')

K = 6" DOUBLE YELLOW

J = 18" SOLID YELLOW

I = 6" SOLID YELLOW

H = 6" SKIP WHITE TYP. (2' - 4')

G = 6" SKIP WHITE TYP. (6' - 10')

F = 6" SKIP WHITE TYP. (10' - 30')

E = 24" SOLID WHITE

D = 18" SOLID WHITE

C = 12" SOLID WHITE

B = 8" SOLID WHITE

A = 6" SOLID WHITE

E

A

A

K

ARROW (TYP.)

LEFT TURN

A

A K

M

M

P

T A

P

P K P

K P

J

A

DISTRICT N CANAL

WATER CONTROL

HIGHLAND GLADES

.1

.0

R=85'

R=40'

SFWMD L-13 CANAL

G

G

18" YELLOW DIAGONAL LINES

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

103 104 105 106 107 108

13 KV OE OH CATV OH TEL

36"x36"

S a m S e n te r

R d

S a m S e n te r

R d

REMOVED

TO BE

W1-2L

STA. 105+40

W2-2R

48"x48"

W16-8p STA. 104+00

GUIDE SIGN 1

12"x60"

N

R/W LINE

CR 880

¡ CONSTRUCTION CR 880

M A

T C

H

L I N

E

S

T A

.0

SIGNING\PLANSP06.DGN

M A

T C

H

L I N

E

S

T A

.0

SFWMD R/W LINE

0 10 40

Feet

S-9

MARKING PLAN

SIGNING AND PAVEMENT

STRIPING KEY:

T = RPM BI-DIRECTIONAL WHITE/RED

S = FDP YELLOW

R = FDP WHITE

P = RPM BI-DIRECTIONAL AMBER/AMBER

N = 6" SKIP YELLOW TYP. (2' - 4')

M = 6" SKIP YELLOW TYP. (6' - 10')

L = 6" SKIP YELLOW TYP. (10' - 30')

K = 6" DOUBLE YELLOW

J = 18" SOLID YELLOW

I = 6" SOLID YELLOW

H = 6" SKIP WHITE TYP. (2' - 4')

G = 6" SKIP WHITE TYP. (6' - 10')

F = 6" SKIP WHITE TYP. (10' - 30')

E = 24" SOLID WHITE

D = 18" SOLID WHITE

C = 12" SOLID WHITE

B = 8" SOLID WHITE

A = 6" SOLID WHITE

A

' 1

K

J

P

P

A K

SFWMD L-13 CANAL

18" YELLOW DIAGONAL LINES

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

108 109 110 111 112 113

13 KV OE OH CATV OH TEL

N

R/W LINE

CR 880

¡ CONSTRUCTION CR 880

SIGNING\PLANSP07.DGN

M A

T C

H

L I N

E

S

T A

.0

SFWMD R/W LINE

M A

T C

H

L I N

E

S

T A

.0

0 10 40

Feet

MARKING PLAN

SIGNING AND PAVEMENT S-10

STRIPING KEY:

T = RPM BI-DIRECTIONAL WHITE/RED

S = FDP YELLOW

R = FDP WHITE

P = RPM BI-DIRECTIONAL AMBER/AMBER

N = 6" SKIP YELLOW TYP. (2' - 4')

M = 6" SKIP YELLOW TYP. (6' - 10')

L = 6" SKIP YELLOW TYP. (10' - 30')

K = 6" DOUBLE YELLOW

J = 18" SOLID YELLOW

I = 6" SOLID YELLOW

H = 6" SKIP WHITE TYP. (2' - 4')

G = 6" SKIP WHITE TYP. (6' - 10')

F = 6" SKIP WHITE TYP. (10' - 30')

E = 24" SOLID WHITE

D = 18" SOLID WHITE

C = 12" SOLID WHITE

B = 8" SOLID WHITE

A = 6" SOLID WHITE

K

J

A

A P

SFWMD L-13 CANAL

18" YELLOW DIAGONAL LINES

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

114 115 116 117 118

COM

13 KV OE OH CATV

OH TEL

N

R/W LINE

CR 880

¡ CONSTRUCTION CR 880

SIGNING\PLANSP08.DGN

M A

T C

H

L I N

E

S

T A

.0

SFWMD R/W LINE

STA. 118+85.53

0 10 40

Feet

MARKING PLAN

SIGNING AND PAVEMENT S-11

MATCH EXISTING

PAVEMENT MARKINGS

END SIGNING AND

STRIPING KEY:

T = RPM BI-DIRECTIONAL WHITE/RED

S = FDP YELLOW

R = FDP WHITE

P = RPM BI-DIRECTIONAL AMBER/AMBER

N = 6" SKIP YELLOW TYP. (2' - 4')

M = 6" SKIP YELLOW TYP. (6' - 10')

L = 6" SKIP YELLOW TYP. (10' - 30')

K = 6" DOUBLE YELLOW

J = 18" SOLID YELLOW

I = 6" SOLID YELLOW

H = 6" SKIP WHITE TYP. (2' - 4')

G = 6" SKIP WHITE TYP. (6' - 10')

F = 6" SKIP WHITE TYP. (10' - 30')

E = 24" SOLID WHITE

D = 18" SOLID WHITE

C = 12" SOLID WHITE

B = 8" SOLID WHITE

A = 6" SOLID WHITE

A

K

A P

SFWMD L-13 CANAL

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

10 11 P I

S

T A

.0

12 13 14

O H

C

A T

V

13 KV OE

13 KV OE

138 KV OE 138 KV OE

O H

T

E L

C M

P

N

R/W LINE

C R

SIGNING\PLANSP10.DGN

SAM SENTER ROAD

¡ CONSTRUCTION

STA. 10+00.00 =

SAM SENTER ROAD

¡ CONSTRUCTION

STA. 99+19.00

CR 880

¡ CONSTRUCTION

CR 880

¡ CONSTRUCTION

SAM SENTER ROAD

R/W LINE

SFWMD

R/W LINE

SFWMD

STA. 14+00.00

SLAB

APPROACH

BEGIN

STA 10+20.77

STA 10+30.77

SLAB

BEGIN APPROACH

END BRIDGE

BEGIN BRIDGE

SLAB

END APPROACH

STA 11+63.35

SLAB

APPROACH

END

STA 11+73.35

0 10 40

Feet

S-12

MARKING PLAN

SIGNING AND PAVEMENT

MATCH EXISTING

SAM SENTER ROAD

PAVEMENT MARKINGS

END SIGNING AND

STRIPING KEY:

T = RPM BI-DIRECTIONAL WHITE/RED

S = FDP YELLOW

R = FDP WHITE

P = RPM BI-DIRECTIONAL AMBER/AMBER

N = 6" SKIP YELLOW TYP. (2' - 4')

M = 6" SKIP YELLOW TYP. (6' - 10')

L = 6" SKIP YELLOW TYP. (10' - 30')

K = 6" DOUBLE YELLOW

J = 18" SOLID YELLOW

I = 6" SOLID YELLOW

H = 6" SKIP WHITE TYP. (2' - 4')

G = 6" SKIP WHITE TYP. (6' - 10')

F = 6" SKIP WHITE TYP. (10' - 30')

E = 24" SOLID WHITE

D = 18" SOLID WHITE

C = 12" SOLID WHITE

B = 8" SOLID WHITE

A = 6" SOLID WHITE

E

A

A

K

P

DISTRICT N CANAL

WATER CONTROL

HIGHLAND GLADES

S F

W M

D

L

C

A N

A L

.0

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

S-13

SIGNING\GSWKSP01.DGN

S-13

GUIDE SIGN WORKSHEET

NUMBER

OF POSTS

NUMBER

OF POSTS

NUMBER

OF POSTS

NUMBER

OF POSTS

SPACE

SPACE

COPY

SPACE

COPY

SPACE

COPY

SPACE

COPY

COPY

SPACE

SPACE

COPY

SPACE

COPY

SPACE

COPY

SPACE

COPY

COPY

COPY

SPACE

COPY

SPACE

COPY

SPACE

COPY

SPACE

COPY

SPACESPACE

SPACE

COPY

SPACE

COPY

SPACE

COPY

SPACE

COPY

COPY

SPACE

COPY COPY

SPACE

SPACE

COPY

SPACE

COPY

SYMBOL(S) X Y WID HTANGLE

SIGN NAME STATION(S)

WIDTH

HEIGHT

PANEL

LEGEND

COLOR

RADII

WIDTH

BORDER

COLOR

NUMBER

SIGN

QTY

CLEARANCE COLUMN SIZE AVERAGE

LENGTH

Edge Of Lane

HEIGHT

PANEL

LEGEND

COLOR

RADII

WIDTH

BORDER

COLOR

HEIGHT

PANEL

LEGEND

COLOR

RADII

WIDTH

BORDER

COLOR

HEIGHT

PANEL

LEGEND

COLOR

RADII

WIDTH

BORDER

COLOR

FIXTURE SPACINGNO. OF LIGHT FIXTURES PHOTOMETRIC CURVE WATT VOLTAGE FIXTURE SPACINGNO. OF LIGHT FIXTURES PHOTOMETRIC CURVE WATT VOLTAGE

FIXTURE SPACINGNO. OF LIGHT FIXTURES PHOTOMETRIC CURVE WATT VOLTAGE FIXTURE SPACINGNO. OF LIGHT FIXTURES PHOTOMETRIC CURVE WATT VOLTAGE

4" 52" 4"

5'-0"

3"

3"

3"

5"

1'-0"

BORDER

R=1.5"

TH=0.5"

6"D 4"D

5.3" 19.4" 5.3"

2'-6"

3"

3"

1'-0"

BORDER

R=1.5"

TH=0.5"

3.5" 35" 3.5"

3'-6"

3"

3"

3"

4.5"

1'-0"

BORDER

R=1.5"

TH=0.5"

6"B 4.5"B

6"B

GS 1 2

5'-0" 0.5"

93+00

1'-0" 1.5"

Black Black

Yellow

R

50.4 d

53.6

L

5.6

S a

8.7 m

13.2

19.2

25.2 e

29.9 n

34.3 t

38.4 e

41.3 r

45.6

L

43.9

105+40

GS 2 2

2'-6" 0.5"

10+68

1'-0" 1.5"

White White

Green

C

5.3

R

11.6

15.4

18.5

21.9

L

19.4

G3 3 2

3'-6" 0.5"

10+68

1'-0" 1.5"

White White

Green

R

34.4 d

36.8

L

4.1

S

3.5 a

6.6 m

9.7

13.2 e

20.1 n t

25.6 e

27.7 r

30.6

L

28.6

Keyssp01
Plansp05
2025-02-26T17:43:03-0500
Quazi A Ahmed

File details come from the government source that posted it. Updated .