CR-880 and Sam Senter Rd over SFWMD Ocean Canal
Solicitation number
IFB 360 2019803 11
Issued by
Palm Beach County, Florida

About this file

This document is Part 3 of 3 of roadway plans prepared for the CR-880 and Sam Senter Road over SFWMD Ocean Canal project in Florida. The plans depict detailed engineering designs and specifications for the roadway improvements and bridge construction required to span the South Florida Water Management District (SFWMD) Ocean Canal. The document contains technical drawings, cross-sections, and construction details necessary for bidders to understand the full scope of work and project requirements. This is the final portion of a three-part set of comprehensive roadway design plans that would guide contractors in executing the project improvements at these two road locations.

The roadway plans provide the technical foundation for construction bidding and implementation. As Part 3 of the complete plan set, this document serves as a critical reference for establishing project costs, material quantities, labor requirements, and construction schedules. Contractors and engineers would use these detailed plans to prepare accurate bids, determine resource allocation, and plan project execution. The plans likely include specifications for roadway materials, drainage considerations specific to the canal crossing, structural requirements for the bridge component, and any environmental or permitting requirements associated with construction over the SFWMD canal.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .