This is a comprehensive roadway construction design document prepared by Propel Engineering, LLC for Palm Beach County's Engineering and Public Works Department, detailing the Lyons Road project extending from the L-30 Canal to Boynton Beach Boulevard (Project No. 2018503). The document comprises detailed engineering plans including roadway drainage structures, cross-sections, box culvert extensions, and canal cross-sections with specific technical specifications. The project involves the construction and modification of drainage infrastructure, including 12-inch polyvinyl chloride (PVC) pipes, various sized reinforced concrete pipe (RCP) systems, curb inlets of multiple types, yard drains, and a 10-foot by 6-foot box culvert extension totaling 38 linear feet. The plans are digitally signed and sealed by Professional Engineer Majharul Alam (P.E. #61600) and are dated March 9, 2026, with horizontal scale of 1 inch equals 20 feet and vertical scale of 1 inch equals 10 feet.

The technical specifications detailed throughout the document include numerous utility accommodations and relocations for existing infrastructure such as Florida Power & Light (FPL) electrical lines, AT&T fiber optic cables (BFOC), Comcast cable television (BTV), and various drainage systems. The project delineates multiple construction segments with specific elevation requirements, slope percentages ranging from 0.61 percent to 8.85 percent, and minimum pipe cover requirements of 3 feet. The drainage design incorporates permeable edge drains (PE GM), discharge pipes with varying diameters, and concrete aprons for yard drains. Cross-section drawings depict right-of-way lines, existing and proposed utilities, and embankment configurations across the project corridor, with detailed notes regarding clearance distances between utility installations and inlet structures to prevent conflicts during construction.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROADWAY PRODUCTION

T H

E

O F

F I

C I

A L

R

C O

D

I

S

E E

T

E C

T R

O N

C

G I

T A

L

Y

G N

N

A L

U

D

L E

G

A

C

Q

P r o j e c t s

L y o n s

R d d r a in a g e

D R

X S

R D

.d g n

3/9/2026MohammadKhan 9:00:09 AM

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

P.E# 61600

MAJHARUL ALAM, PE

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:3/9/2026 ROADWAY DRAINAGE STRUCTURES

R

W

L I N

E

R

W

L I N

E

EXIST 18" RCP

S-33 S-32

EXIST 18" RCP

3.90%1.94%3.55% 1.82%

TO S-34

16" PVC WM (D)

12" FM (D)

PROP. 2-2" ITS CONDUIT (PBC)

1:3

EL 18.62

1:

EL 18.58

EOP EL 18.52

INDEX NO. 425-021, 425-01

CONST CURB INLET TYPE P-5 TOP (PARTIAL)

MODIFY EXIST. DBI

STA. 227+92.00 (46.00' LT TO EOP)

EOP EL 18.48

INDEX NO. 425-021, 425-01

CONST CURB INLET TYPE P-5 TOP (PARTIAL)

MODIFY EXIST. DBI

STA. 227+92.00 (46.00' RT TO EOP)

6" PE GM (D)

1:

3 1:3

R

W

L I N

E

R

W

L I N

E

TO X-167

EXIST 18" RCP

S-35

S-34

EXIST 30" RCP

EXIST 18" RCP

FROM S-32

BE-23KV (FPL)

12" FM (D)

PROP. 2-2" ITS CONDUIT (PBC)

BFOC (AT&T)

1:3

EL 17.86

S-35A

FL 14.65 (LT) (CORE DRILL)

EOP EL 17.82

INDEX NO. 425-021, 425-01

CONST CURB INLET TYPE P-6 TOP (PARTIAL)

MODIFY EXIST. DBI

STA. 230+18.00 (46.00' LT TO EOP)

1:

EL 17.96

S-34A

FL 14.45 (RT) (CORE DRILL)

EOP EL 17.75

INDEX NO. 425-021, 425-01

CONST CURB INLET TYPE P-6 TOP (PARTIAL)

MODIFY EXIST. DBI

STA. 230+18.00 (44.96' RT TO EOP)

4.68% 1.60% 2.36% 4.88%

12" PVC PIPE

12" PVC PIPE

FL 14.50 (LT)

GRATE EL. 17.96

W/ CONC. APRON

CONST. YARD DRAIN (12" DIA.)

INDEX NO. 425-060

STA. 230+18.00 (52.82' RT)

FL 14.70 (RT)

GRATE EL. 17.86

W/ CONC. APRON

CONST. YARD DRAIN (12" DIA.)

INDEX NO. 425-060

STA. 230+18.00 (52.12' LT)

1:

3 1:3

PROP. INLET AND PIPE)

TO AVOID CONFLICT WITH

(TO BE RELOCATED

(REFER TO TH83)

16" DIP WM (B)

6" GM AND S-35A INLET IS 7.91')

(HORIZONTAL CLEARANCE BETWEEN

(TO REMAIN) (REFER TO TH135)

6" PE GM (B)

CATV & INLET S-35A IS 5.96')

(HORIZONTAL CLEARANCE BETWEEN

(REFER TO TH410) (TO REMAIN)

CABLE BTV (COMCAST)

00 2020 4040 6060 8080 100100 120120 140140

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

227+92.00

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

34 34

230+18.00

1" = 10' Vertical

1" = 20' Horizontal

S-32

S-33

S-34

£ SURVEY AND ¡ CONST. LYONS ROAD

£ SURVEY AND ¡ CONST. LYONS ROAD

S-35

S-34A

S-35A

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

Q

P r o j e c t s

L y o n s

R d d r a in a g e

D R

X S

R D

.d g n

3/9/2026MohammadKhan 9:00:09 AM

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

P.E# 61600

MAJHARUL ALAM, PE

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:3/9/2026 ROADWAY DRAINAGE STRUCTURES

16" DIP FM (D)

BE-23KV (FPL)

0.5'' BFOC (AT&T)

2-2'' PVC ITS CONDUIT

1:3

S-37A S-36A

12" PVC PIPE

S-37

S-36

12" PVC PIPE

TO X-177

4.83% 3.42% 3.18%

EXIST 18" RCP

EXIST 36" RCP

R

W

L I N

E

R

W

L I N

E

1:

FL 14.87 (RT) (CORE DRILL) (EAST WALL)

EOP EL 18.19

INDEX NO. 425-021, 425-01

CONST CURB INLET TYPE P-6 TOP (PARTIAL)

MODIFY EXIST. CURB INLET

STA. 254+19.00 (46.00' RT TO EOP)

FL 14.62 (RT)

GRATE EL. 18.17

W/ CONC. APRON

CONST. YARD DRAIN (12" DIA.)

INDEX NO. 425-060

STA. 254+19.00 (51.50' LT)

FL 14.91 (LT)

GRATE EL. 18.37

W/ CONC. APRON

CONST. YARD DRAIN (12" DIA.)

INDEX NO. 425-060

STA. 254+19.00 (52.00' RT)

FL 14.57 (LT) (CORE DRILL) (WEST WALL)

EOP EL 18.04

INDEX NO. 425-021, 425-01

CONST CURB INLET TYPE P-6 TOP (PARTIAL)

MODIFY EXIST. CURB INLET

STA. 254+19.00 (45.98' LT TO EOP)

1:

3 1:3

EL 18.17

PROP. INLET AND PIPE)

TO AVOID CONFLICT WITH

(TO BE RELOCATED

(REFER TO TH84)

16" DIP WM (B)

6" GM AND S-37A INLET IS 7.77')

(HORIZONTAL CLEARANCE BETWEEN

(TO REMAIN) (REFER TO TH136)

6" PE GM (B)

CATV & INLET S-37A IS 6.87')

(HORIZONTAL CLEARANCE BETWEEN

(REFER TO TH411) (TO REMAIN)

CABLE BTV (COMCAST)

16" DIP FM (D)

BE-23KV (FPL)

0.5'' BFOC (AT&T)

2-2'' PVC ITS CONDUIT

1:3

S-39A

S-39

S-38

S-38A

X-177FROM

X-180

EXIST 36" RCP

EXIST 42" RCP

R

W

L I N

E

R

W

L I N

E

EXIST 18" RCP

12" PVC PIPE

12" PVC PIPE

FL 14.67 (LT) (CORE DRILL) (WEST WALL)

EOP EL 18.15

INDEX NO. 425-021, 425-01

CONST CURB INLET TYPE P-6 TOP (PARTIAL)

MODIFY EXIST. CURB INLET

STA. 260+18.00 (46.00' LT TO EOP)

TO

1:

FL 14.72 (RT)

GRATE EL. 18.38

W/ CONC. APRON

CONST. YARD DRAIN (12" DIA.)

INDEX NO. 425-060

STA. 260+18.00 (51.25' LT)

FL 14.98 (LT)

GRATE EL. 18.24

W/ CONC. APRON

CONST. YARD DRAIN (12" DIA.)

INDEX NO. 425-060

STA. 260+19.00 (52.50' RT)

FL 14.94 (RT) (CORE DRILL) (EAST WALL)

EOP EL 18.25 (EXIS.T)

INDEX NO. 425-021, 425-01

MODIFY EXIST. CURB INLET TYPE P-6 TOP (PARTIAL)

STA. 260+19.00 (46.01' RT TO EOP)

1:31:

EL 18.38

PROP. INLET AND PIPE)

TO AVOID CONFLICT WITH

(TO BE RELOCATED

(REFER TO TH85)

16" DIP WM (B)

PROP. INLET AND PIPE)

TO AVOID CONFLICT WITH

(TO BE RELOCATED

(REFER TO TH85A)

3" PVC IRRIGATION PIPE (B)

6" GM AND S-39A INLET IS 7.50')

(HORIZONTAL CLEARANCE BETWEEN

(TO REMAIN) (REFER TO TH137)

6" PE GM (B)

CATV & INLET S-39A IS 6.40')

(HORIZONTAL CLEARANCE BETWEEN

(REFER TO TH412) (TO REMAIN)

CABLE BTV (COMCAST)

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

254+19.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

260+18.00

1" = 10' Vertical

1" = 20' Horizontal

S-39A

S-39

260+19.00

S-38

S-38A

S-37

S-37A

S-36

S-36A

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

Q

P r o j e c t s

L y o n s

R d d r a in a g e

D R

X S

R D

.d g n

3/9/2026MohammadKhan 9:00:09 AM

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

P.E# 61600

MAJHARUL ALAM, PE

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:3/9/2026 ROADWAY DRAINAGE STRUCTURES

16" DIP FM (D)

CABLE BTV (COMCAST)

BE-23KV (FPL)

1:3

R

W

L I N

E

S-40A

FL 14.58 (LT) (CORE DRILL) (WEST WALL)

EOP EL 18.18

INDEX NO. 425-021, 425-01

CONST CURB INLET TYPE P-6 TOP (PARTIAL)

MODIFY EXIST. CURB INLET

STA. 266+18.00 (46.00' LT TO EOP)

S-40

EXIST 18" RCP

12" PVC PIPE

X-181TO

FL 14.63 (RT)

GRATE EL. 18.29

W/ CONC. APRON

CONST. YARD DRAIN (12" DIA.)

INDEX NO. 425-060

STA. 266+18.00 (51.50' LT)

1:

PROP. INLET AND PIPE)

TO AVOID CONFLICT WITH

(TO BE RELOCATED

(REFER TO TH86)

16" DIP WM (B)

EL 18.29

6" GM AND S-40A INLET IS 7.30')

(HORIZONTAL CLEARANCE BETWEEN

(TO REMAIN) (REFER TO TH138)

6" PE GM (B)

(TO REMAIN) (REFER TO TH306)

(2)-0.5'' BFOC (AT&T)

INSTALL FPL BE MIN. 1' AWAY FROM INLET

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

266+18.00

1" = 10' Vertical

1" = 20' Horizontal

S-40A

S-40

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

Q

P r o j e c t s

L y o n s

R d d r a in a g e

R D

X S

R D

B o x

C u lv e r t .d g n

3/9/2026MohammadKhan 9:00:13 AM

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

P.E# 61600

MAJHARUL ALAM, PE

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:3/9/2026 BOX CULVERT EXTENSION DETAILS

6' 11' 11' 11' 11' 6.01'

2.22%

6" PE GM (D)

16" DIP RWM (D) 12" PVC FM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

(1) 4" CONDUIT BFOC (D) (AT&T)

BE (D) (FPL)

E O

P

E

L

.6

E O

P

E

L

.5

E O

P

E

L

.9

18' 9.87'

4'

8' 2'

.1

E L

.9

38'

10'x6' BOX CULVERT

E L

.8

25'

RIP-RAP

EXIS.T FL 10.49

1.5%

PROP. RIP RAP L-28 CANAL

L-28 CANAL

2.19 % 4.28% 22.15

2'

BOX CULVERT DETAILS AT STA 569+94.89

FDOT INDEX 400-289

CULVERT EXTENSION

CONNECTION FOR CONC. BOX

HEAD WALLS, TOP & BOTTOM SLABS.

BY DOWELING INTO THE EXISTING

EXTENDED PER FDOT INDEX 400-289

(EXISTING BOX CULVERT TO BE

(38 LF EXTENDED)

PROP BOX CULVERT (10'X6')

SLOPE 22:1

EL 19.90

STAIGHT ENDWALL

FL EL 10.5

00 2020 4040 6060 8080 100100 120120 140140

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

V

Regular Exc. Embankment

V AA

Q

P r o j e c t s

L y o n s

R d d r a in a g e

R D

X S

R D

B o x

C u lv e r t .d g n

MohammadKhan 9:00:13 AM

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

¡ OF BOX CULVERT

¡ OF BOX CULVERT

CANAL CROSS SECTIONS

85'

50' (PLATTED ROAD) (FEE)5' (EASEMENT)

(T R

A C

T

L I N

E

30' (FEE)

85'

50' (PLATTED ROAD) (FEE)5' (EASEMENT)

(T R

A C

T

L I N

E

30' (FEE)

S O

U T

H

R

W

L I N

E S

O U

T H

R

W

L I N

E

N O

R T

H

R

W

L I N

E

15' 10' 15'

EL 20.5

TOP OF BANK

EL 20.5

TOP OF BANK

:1 .5

:1 .5

1:20

15'25'

ELEV=10.5

CANAL BOTTOM

WITH RIP RAP (TYP.)

CANAL SLOPE

ELEV=14.50 NAVD88

MAINTAINED

1:20

50' (PLATTED ROAD) (FEE)5' (EASEMENT)

(T R

A C

T

L I N

E

30' (FEE)

S O

U T

H

R

W

L I N

E

85'

50' (PLATTED ROAD) (FEE)5' (EASEMENT)

(T R

A C

T

L I N

E

30' (FEE)

S O

U T

H

R

W

L I N

E

N O

R T

H

R

W

L I N

E

EL 20.5

TOP OF BANK

1:20

25' 15'

:1 .5

WITH RIP RAP (TYP.)

CANAL SLOPE

ELEV=10.5

CANAL BOTTOM ELEV=14.50 NAVD88

MAINTAINED

:1 .5

1:20

EL 20.5

TOP OF BANK

15'15'10'

00 2020 4040 6060 8080 100100 120120 140140

1" = 10' Vertical

1" = 20' Horizontal

65 4

4.4142

0+99.25

1+12.00

133.4 12.4

V AA

Q

P r o j e c t s

L y o n s

R d d r a in a g e

R D

X S

R D

B o x

C u lv e r t .d g

MohammadKhan 9:00:13 AM

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

¡ OF BOX CULVERT

¡ OF BOX CULVERT

CANAL CROSS SECTIONS

85'

50' (PLATTED ROAD) (FEE)5' (EASEMENT)

(T R

A C

T

L I N

E

30' (FEE)

S O

U T

H

R

W

L I N

E

N O

R T

H

R

W

L I N

E

EL 20.5

TOP OF BANK

1:20

25' 15'

:1 .5

WITH RIP RAP (TYP.)

CANAL SLOPE

ELEV=10.5

CANAL BOTTOM ELEV=14.50 NAVD88

MAINTAINED

:1 .5

1:20

EL 20.5

TOP OF BANK

15'15'10'

E L

.4

S O

U T

H

R

W

L I N

E

N O

R T

H

R

W

L I

(T

A

C T

L I N

E

P L

A T

L I N

E

85'

5' (EASEMENT) 50' (PLATTED ROAD) (FEE) 30' (FEE)

(10'X6')

¡ OF BOX CULVERT

29.21'

(T R

A C

T

L I N

E

INVERT 10.5

BOX CULVERT (10'X6')

1:20

ELEV=14.50 NAVD88

MAINTAINED

WITH RIP RAP (TYP.)

CANAL SLOPE

:1 .5

EL 20.5

TOP OF BANK

1:20

EL 20.5

TOP OF BANK

1:20

15'15'10'15'25'

:1 .5

3.0

1+23.00

1+24.77

160.10

204.5 225.5

V AA

Q

P r o j e c t s

L y o n s

R d d r a in a g e

R D

X S

R D

B o x

C u lv e r t .d g

MohammadKhan 9:00:14 AM

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

¡ OF BOX CULVERT

¡ OF BOX CULVERT

CANAL CROSS SECTIONS

BOX CULVERT EXTENSION

CANAL FILLED DUE TO

N O

R T

H

R

W

L I N

E

5' (EASEMENT)

85'

50' (PLATTED ROAD) (FEE)

S O

U T

H

R

W

L I N

E

(T R

A C

T

L I N

E

30' (FEE)

EL 21.00

SIDEWALK

PROPOSED

WALL

REMOVE BARRIER

276.9

1+62.00

10.1

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

MohammadKhan 9:00:35 AM

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

21.91

12'11'

2.53%

5.55' 4.74'

16" DIP RWM (D)

6" PE GM (D)

8" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

16" DIP WM (D)

16" DIP RWM (D)

6" PE GM (D)

8" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

16" DIP WM (D)

(2) 0.5" BFOC (D) (AT&T)

39.08' 36.89'

E O

P

E

L

.4

E O

P

E

L

.5

1.37'1.37'

R

W

L I N

E

R

W

L I N

E

21.11

13.64'14.05'

1.84% 2.44%

6' 14.58'

1:

1:3

EL 18.91

1:4 1:

EL 19.61

16" DIP RWM (D)

8" PVC FM (D)

16" DIP WM (D)

(2) (0.5") BFOC (D) (AT&T)

(2)-2" PVC ITS CONDUIT (D)

33.84' 23.66'

E O

P

E

L

.6

E O

P

E

L

.3

3.12'3.12'

.6

(TO BE DEEPENED TO MAKE MIN, 3' COVER)

TOP ELEVATION OF GM=16.27)

AT STA 121+48.14, 30.20 LT

(REFER TO TH100

6" PE GM (B)

.9

00 2020 4040 6060 8080 100100 120120 140140

20 20

22 22

24 24

26 26

28 28

30 30

32 32

120+00.00

20 20

22 22

24 24

26 26

28 28

30 30

32 32

121+00.00

1" = 10' Vertical

1" = 20' Horizontal

£ SURVEY AND ¡ CONST. LYONS ROAD

£ SURVEY AND ¡ CONST. LYONS ROAD

0.9

33.4 0.1

132 1

64 0

STA 121+00.00

SEGMENT 01

BEGIN SWALE (RT)

STA 121+00.00

SEGMENT 01

BEGIN SWALE (LT)

STA 120+90.00

TO MAKE MIN. 3' COVER.

BEGIN DEEPENING 6" GM

STA 120+50.00.

TO MAKE MIN. 3' COVER.

BEGIN DEEPENING 16" DIP RWM

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

MohammadKhan 9:01:10 AM

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.33

2.09 %

15.28'

1.92 %

16.06'6' 6'4.86'

EL 18.21

1:4 1:

EL 18.24

16" DIP RWM (D)

8" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

16" DIP WM (D)

(2) (0.5") BFOC (D) (AT&T)

BTV (D) (COMCAST)

28.86'30.07'

E O

P

E

L

.7

E O

P

E

L

.8

4.86'

1:3

1:

.7

(TO BE DEEPENED TO MAKE MIN, 3' COVER)

TOP ELEVATION OF GM=16.27)

AT STA 121+48.14, 30.20 LT

(REFER TO TH100

6" PE GM (B)

.9

R

W

L I N

E

R

W

L I N

E

20.54

3.16 % 2.66 %

18.15'6' 6'17.06'6.54'

EL 17.91

1:4 1:

EL 17.79

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

(2) (0.5") BFOC (D) (AT&T)

BTV (D) (COMCAST)

EXIST 18" RCP

16" DIP RWM (D)

8" PVC FM (D)

26.31' 25.49'

E O

P

E

L

.3

E O

P

E

L

.4

6.46'

1:3 1:

TOP ELEVATION OF GM=13.93)

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

.5

.7

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

122+00.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

123+00.00

1" = 10' Vertical

1" = 20' Horizontal

£ SURVEY AND ¡ CONST. LYONS ROAD

£ SURVEY AND ¡ CONST. LYONS ROAD

37.8 0.5

34.4 0.7

129 5

16 16

16 16

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.21

2.59 %

20.55'6' 7.89' 18.66' 6'

2.54 %

EL 17.63

1:4 1:

EL 17.58

16" DIP RWM (D)

8" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

EXIST 18" RCP

16" DIP WM (D)

(2) (0.5") BFOC (D) (AT&T)

BTV (D) (COMCAST)

22.1'22.56' E

O P

E

L

.0

E O

P

E

L

.1

8.24'

1:3 1:

.7

(TO BE DEEPENED TO MAKE MIN, 3' COVER)

TOP ELEVATION OF GM=13.93)

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

3.56 %

.5

R

W

L I N

E

R

W

L I N

E

20.34

21.41' 11' 11' 6' 11'8.65'

1.22'

2.46 % 2.52 %

3.67 %

EL 17.70

16" DIP RWM (D)

8" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

EXIST 18" RCP

16" DIP WM (D)

(2) (0.5") BFOC (D) (AT&T)

BTV (D) (COMCAST)

18.8' 6.61'

E O

P

E

L

.9

E O

P

E

L

.2

E O

P

E

L

.7

8.52'7.79

1:3 1:

.3

TOP ELEVATION OF GM=13.93)

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

3.85 %

.4

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

124+00.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

525+00.00

1" = 10' Vertical

1" = 20' Horizontal

£ SURVEY AND ¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

£ SURVEY AND ¡ CONST. LYONS ROAD

35.5 2.2

39.9 1.5

155 6

16 16

16 16

STA 524+80.00

SEGMENT 01

END SWALE (RT)

STA 524+90.00.

TO MAKE MIN. 3' COVER.

END DEEPENING 6" GM

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.26

11'10.31'6' 6.72' 11' 11' 6' 11'

3.62 %

3.02 %

11.04'

2.95 %

6.26'

3.83 %

EL 17.96

16" DIP RWM (D)

8" PVC FM (D)

BE (D) (FPL)

16" DIP WM (D)

(1) (0.5") BFOC (D) (AT&T)

BE (D) (FPL)

EXIST. 18" RCP

(1) (0.5") BFOC (D) (AT&T)

(COMCAST)

BTV (D)

CONDUIT (D)

(2)-2" PVC ITS

15.04' 5.78'

E O

P

E

L

.1

E O

P

E

L

.9

0.86'

1:3 1:

.1

TOP ELEVATION OF GM=13.93)

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

.2

R

W

L I N

E

R

W

L I N

E

20.58

11' 7.37' 11' 11' 11'6'11'

2.93 % 3.00 %3.74 %

11.84' 11.92'

2.90 %

16" DIP RWM (D) 8" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

BE (D) (FPL)

BE (D) (FPL)

(1) (4") FLEX BFOC (D) (AT&T)

16" DIP WM (D)

(1) (0.5") BFOC (D) (AT&T)

BTV (D) (COMCAST)

14.52' 4.97'

0.39'

E O

P

E

L

.3

E O

P

E

L

.3

1:3 1:

.8

E L

.8

TOP ELEVATION OF GM=13.93)

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

526+00.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

527+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

43.6 1.7

45.8

143 7

16 16

16 16

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

21.34

11' 11.9' 11' 11' 6' 11'

3.03 %

11'6'8'

3.08 %

16" DIP RWM (D)

6" PE GM (D)

8" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

(1) (4") FLEX BFOC (D) (AT&T)

16" DIP WM (D)

BTV (D) (COMCAST)

BE (D) (FPL)

BE (D) (FPL)

(AT&T)

(1) (0.5") BFOC (D)

12.1' 4.1'

1.75'

E O

P

E

L

.6

E O

P

E

L

.6

7.15'

R

W

L I N

E

R

W

L I N

E

21.06

11' 11'11'11'6' 6'

16" DIP RWM (D)

6" PE GM (D)

8" PVC FM (D)

(1) (4") FLEX BFOC (D) (AT&T)

16" DIP WM (D)

BTV (D) (COMCAST)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(AT&T)

(1) (0.5") BFOC (D)

19.85' 14.32'14.7'7.13'

00 2020 4040 6060 8080 100100 120120 140140

20 20

22 22

24 24

26 26

28 28

30 30

32 32

528+00.00

20 20

22 22

24 24

26 26

28 28

30 30

32 32

529+00.00

1" = 10' Vertical

1" = 20' Horizontal

APPALACHIAN RIDGE RD

GOLDEN CREST DR

¡ CONST. LYONS ROAD

£ SURVEY AND ¡ CONST. LYONS ROAD

31.3 0.8

24 2

0 0

58 1

STA 527+20.00

SEGMENT 01

END SWALE (LT)

STA 527+20.00.

TO MAKE MIN. 3' COVER.

END DEEPENING 16" DIP RWM

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

21.13

11' 11' 6'11' 11.8'7.5'11'6'10.06' 3.85'

2.26 %

16" DIP RWM (D)

6" PE GM (D)

8" PVC FM (D)

16" DIP WM (D)

BE (D) (FPL)

BTV (D) (COMCAST)

(2)-2" PVC ITS CONDUIT (D)

(1) (4") FLEX BFOC (D) (AT&T)

9.54' 9.75'3.5'

R

W

L I N

E

R

W

L I N

E

20.75

11' 11' 12.14' 11' 11' 6'7.5'

2.10% 3.48%

6'10.05' 2.87'

2.38 %

EL 19.28

1:4 1:

16" DIP RWM (D)

6" PE GM (D)

8" PVC FM (D)

16" DIP WM (D)

BTV (D) (COMCAST)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") FLEX BFOC (D) (AT&T)

9.3' 10.64'3.5'

E O

P

E

L

.6

E O

P

E

L

.3

00 2020 4040 6060 8080 100100 120120 140140

20 20

22 22

24 24

26 26

28 28

30 30

32 32

530+00.00

20 20

22 22

24 24

26 26

28 28

30 30

32 32

531+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

12.9 1.2

30.9 2.4

81 7

STA 530+95.00

SEGMENT 01

BEGIN SWALE (RT)

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.44

2.67 %

12.57' 11' 11' 6'

4.27 %

3.5'11'11'6'10.32'

2.62 %

EL 18.15

1:4 1:

16" DIP RWM (D)

6" PE GM (D)

8" PVC FM (D)

(1) (4") FLEX BFOC (D) (AT&T)

16" DIP WM (D)

BTV (D) (COMCAST)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

8.77' 13.34'

E O

P

E

L

.0

E O

P

E

L

.8

7.5'

R

W

L I N

E

R

W

L I N

E

20.34

2.52 %

8.12' 11' 11' 5.99' 11' 11' 6'

4.17 %

2.21

2.32%

2.20 %

EL 18.35

1:41:

1:3 1:

EL 18.51

16" DIP RWM (D)

10" PVC FM (D)

(1) (4") FLEX BFOC (D) (AT&T)

EXIST 24" RCP

16" DIP WM (D)

BE (D) (FPL)

BTV (D) (COMCAST)

(2)-2" PVC ITS CONDUIT (D)

14.32'16.02'

4'

16.07'

E O

P

E

L

.1

E O

P

E

L

.2

E O

P

E

L

.9

.4

TOP ELEVATION OF GM=15.97)

AT STA 539+24.14, 51.61 LT

REFER TO TH125

TOP ELEVATION OF GM=13.93

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

532+00.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

533+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD¡ CONST. LYONS ROAD

24.1 7.5

38.0 7.2

141 31

16 16

16 16

STA 533+00.00

SEGMENT 01

BEGIN SWALE (LT)

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

MohammadKhan 9:01:11 AM

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.533.00 %

6' 11' 11' 9.94' 11' 11' 6'

2.93 %

3.80 %

3.80 %

EL 18.51

1:4 1:

31:3

1:

EL 18.50

16" DIP RWM (D)

10" PVC FM (D)

(1) (4") FLEX BFOC (D) (AT&T)

EXIST 24" RCP

16" DIP WM (D)

BE (D) (FPL)

BTV (D) (COMCAST)

(2)-2" PVC ITS CONDUIT (D)

16.14' 16.52'16.24' E

O P

E

L

.4

E O

P

E

L

.2

E O

P

E

L

.2

4'

.3

TOP ELEVATION OF GM=15.97)

AT STA 539+24.14, 51.61 LT

REFER TO TH125

TOP ELEVATION OF GM=13.93

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

R

W

L I N

E

R

W

L I N

E

20.66

6' 11' 11' 11.38' 11' 11' 6'

3.39%

2.73 %

3.00% 3.09%

EL 18.45

1:4 1:

31:3 1:

EL 18.65

16" DIP RWM (D)

10" PVC FM (D)

EXIST 18" RCP

16" DIP WM (D)

BTV (D) (COMCAST)

BE (D) (FPL)

(2)-2" PVC ITS CONDUIT (D)

(1) (4") FLEX BFOC (D) (AT&T)

14.16' 18.95'

E O

P

E

L

.5

E O

P

E

L

.5

E O

P

E

L

.4

16.5'

.3

TOP ELEVATION OF GM=15.97)

AT STA 539+24.14, 51.61 LT

REFER TO TH125

TOP ELEVATION OF GM=13.93

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

534+00.00

20 20

22 22

24 24

26 26

28 28

30 30

32 32

535+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

37.9 9.7

33.0 15.6

118 51

16 16

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.45

6' 11' 11' 11' 6'11'

3.53% 3.39% 3.39%

2.23 %

EL 18.19

1:4 1:

31:3 1:

EL 18.60

16" DIP RWM (D)

10" PVC FM (D)

(1) (4") FLEX BFOC (D) (AT&T)

EXIST 18" RCP

16" DIP WM (D)

BTV (D) (COMCAST)

BE (D) (FPL)

CONDUIT (D)

(2)-2" PVC ITS

12.16' 19.54'17.33'12.48'

E O

P

E

L

.3

E O

P

E

L

.5

E O

P

E

L

.4

E O

P

E

L

.2

TOP ELEVATION OF GM=15.97)

AT STA 539+24.14, 51.61 LT

REFER TO TH125

TOP ELEVATION OF GM=13.93

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

.1

R

W

L I N

E

R

W

L I N

E

20.22

2.44 %

6' 11' 11' 11' 11' 6'

3.52% 3.58% 2.34%2.23 %

EL 17.67

1:4 1:

31:3 1:

EL 18.37

16" DIP RWM (D) 10" PVC FM (D)

16" DIP WM (D)

BTV (D) (COMCAST)

BE (D) (FPL)

(2)-2" PVC ITS CONDUIT (D)

EXIST 24" RCP

(1) (4") FLEX BFOC (D) (AT&T)

10.52' 19.6'

E O

P

E

L

.0

E O

P

E

L

.2

E O

P

E

L

.1

E O

P

E

L

.9

18.17'13.22'

4'

TOP ELEVATION OF GM=15.97)

AT STA 539+24.14, 51.61 LT

REFER TO TH125

TOP ELEVATION OF GM=13.93

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

.7

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

536+00.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

537+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

30.6 12.1

27.6

131 26

16 16

16 16

11.1

STA 536+20.00.

TO MAKE MIN. 3' COVER.

BEGIN DEEPENING 6" GM

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.46

1.92 %

11' 11' 11' 11' 6'6'

3.78 %

11.97'

EL 17.86

1:4 1:

10" PVC FM (D)

16" DIP WM (D)

BE (D) (FPL)

BTV (D) (COMCAST)

(2)-2" PVC ITS CONDUIT (D)

EXIST 24" RCP

(1) (4") FLEX BFOC (D) (AT&T)

16" DIP RWM (B)

10.85' 31.67'

E O

P

E

L

.2

E O

P

E

L

.3

E O

P

E

L

.1

12.57' 7.05'

8.85% 2.96%

TOP ELEVATION OF GM=15.97)

AT STA 539+24.14, 51.61 LT

REFER TO TH125

TOP ELEVATION OF GM=13.93

AT STA 525+82.93, 34.35 LT

(REFER TO TH101

6" PE GM (B)

.3

E L

.2

R

W

L I N

E

R

W

L I N

E

20.85 3.00 %

2.37 %

11' 11' 11.93' 11' 11'6'

2.43 %

12.25' 6'

EL 18.20

1:4 1:

31:

EL 19.00

16" DIP RWM (B)

6" PE GM (D)

10" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

16" DIP WM (D)

BE (D) (FPL)

BTV (D) (COMCAST)

EXIST. 18" RCP

(1) (4") FLEX BFOC (D) (AT&T)

9.98' 31.74'

E O

P

E

L

.6

E O

P

E

L

.5

E O

P

E

L

.4

7.61'

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

538+00.00

20 20

22 22

24 24

26 26

28 28

30 30

32 32

539+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

43.1 2.7

110 13

16 16

29.2

STA 538+40.00

SEGMENT 01

BEGIN SWALE (LT)

STA 537+40.00

SEGMENT 01

END SWALE (LT)

STA 537+20.00.

TO MAKE MIN. 3' COVER.

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

21.14

11' 11' 11' 11' 6'

2.11 % 3.00 %

6' 12.15'

3.84 % 1:4 1:

31:

EL 18.52

EL 19.26

16" DIP RWM (B)

10" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

BTV (D) (COMCAST)

(1) (4") BFOC (D) (AT&T)

16" DIP WM (D)

BE (D) (FPL)

31.8'9.71'

E O

P

E

L

.0

E O

P

E

L

.9

E O

P

E

L

.8

8.55'11.29'

TOP ELEVATION OF GM=9.20)

AT STA 542+42.92, 55.55 LT

REFER TO TH102

TOP ELEVATION OF GM=15.97

AT STA 539+24.14, 51.61 LT

(REFER TO TH125

6" PE GM (B)

R

W

L I N

E

R

W

L I N

E

20.90

8.44'11'11'11'10.66'11'11'7.32'

1:4 1:

EL 20.57

1.15 %

6" PE GM (D)

10" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

BTV (D) (COMCAST)

BE (D) (FPL)

16" DIP WM (D)

(1) (4") BFOC (D) (AT&T)

16" DIP RWM (D)

49.75' 55.28'

E O

P

E

L

.2

E O

P

E

L

.3

10.53'

00 2020 4040 6060 8080 100100 120120 140140

20 20

22 22

24 24

26 26

28 28

30 30

32 32

540+00.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

32 32

541+00.00

1" = 10' Vertical

1" = 20' Horizontal

FLAVOR PICT RD

FLAVOR PICT RD

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

30.4 2.8

5.8 0.1

55 0

67 5

16 16

STA 540+90.00

SEGMENT 01

END SWALE (RT)

STA 540+50.00

SEGMENT 01

END SWALE (LT)

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

20.95

0.61 %

11'11'10.7'11'11'6' 6' 11.54'17.29'

16" DIP RWM (D)

6" PE GM (D)

10" PVC FM (D)

16" DIP WM (D)

BTV (D) (COMCAST)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

20.95

E O

P

E

L

.6

21.69'

20.78

11' 11' 10.76' 11.24' 10.28' 11' 11' 6'6'11.2'

1.42 %

1.30 %

16" DIP RWM (D)

6" PE GM (D)

10" PVC FM (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

BTV (D) (COMCAST)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

EXIST 18" RCP

E O

P

E

L

.3

00 2020 4040 6060 8080 100100 120120 140140

20 20

22 22

24 24

26 26

542+00.00

20 20

22 22

24 24

26 26

28 28

30 30

32 32

543+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

23.7 0.0

20.4 2.8

82 5

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.53

11' 11' 10.81' 11.19' 8.75' 11'

3.00 %

11' 6'11.28' 6'

2.58 % 2.28 %

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

BTV (D) (COMCAST)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

16" DIP RWM (D)

6" PE GM (D)

10" PVC FM (D)

EXIST 18" RCP

EXIST 18" RCP

12.6' 14.34'

E O

P

E

L

.4

E O

P

E

L

.9

E O

P

E

L

.7

R

W

L I N

E

R

W

L I N

E

20.27

10.86' 11.14' 7.22'

3.00 %

11' 11' 6'11'11'6'11.25'

2.67 % 2.55 %

1:

EL 18.29

6" PE GM (D)

10" PVC FM (D)

16" DIP RWM (D)

BTV (D) (COMCAST)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

EXIST 18" RCP

EXIST 18" RCP

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

12.54' 16.12'

E O

P

E

L

.4

1:4

00 2020 4040 6060 8080 100100 120120 140140

22 22

24 24

26 26

28 28

30 30

32 32

544+00.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

545+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

37.0 1.8

34.3 6.9

119 21

16 16

STA 544+50.00

SEGMENT 02

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

MohammadKhan 9:01:12 AM

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.08

8.53'

3.00 %

11' 11' 6'11'11'6'9.21' 3.74'

1.90 % 2.71 %

1:

EL 17.81

6" PE GM (D) 10" PVC FM (D)

(1) (4") BFOC (D) (AT&T)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

EXIST 18" RCP

16" DIP RWM (D) BE (D) (FPL)

BTV (D) (COMCAST)

13.04' 17.91'

E O

P

E

L

.1

16.87'

R

W

L I N

E

R

W

L I N

E

19.89

11' 11' 13.3' 11' 11'

3.00 %

6'6'

3.47%

3.59 % 2.56 %

1:3 1:

1:

EL 17.61

EL 17.71

10" PVC FM (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

16" DIP RWM (D)

EXIST 18" RCP EXIST 18" RCP

BTV (D) (COMCAST)

20.41' 19.69'

E O

P

E

L

.6

E O

P

E

L

.9

16.06'

1:4

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

REFER TO TH126

TOP ELEVATION OF GM=9.20

AT STA 542+42.92, 55.55 LT

(REFER TO TH102

6" PE GM (B)

.2

.8

00 2020 4040 6060 8080 100100 120120 140140

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

546+00.00

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

547+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

29.9 4.4

47.4 14.7

186 49

STA 546+50.00

SEGMENT 02

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

19.73

3.00 %

11'6' 11' 14.33' 11' 11' 6'

3.88%

3.40 % 2.74 %

1:3 1:

1:

EL 17.18

EL 17.64

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

BTV (D) (COMCAST)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

10" PVC FM (D)

16" DIP RWM (D)

EXIST 18" RCP

EXIST 18" RCP

18.57' 21.48'

E O

P

E

L

.6

E O

P

E

L

.4

15.25'

1:4

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

REFER TO TH126

TOP ELEVATION OF GM=9.20

AT STA 542+42.92, 55.55 LT

(REFER TO TH102

6" PE GM (B)

.2

.4

R

W

L I N

E

R

W

L I N

E

19.56

6' 11' 11' 15.35' 11' 11' 6'

3.82%3.70% 3.70%

3.92 % 3.17 %

1:

EL 16.93EL 16.83

1:3

10" PVC FM (D)

16" DIP RWM (D) 16" DIP WM (D)

BTV (D) (COMCAST)

BE (D) (FPL)

(2)-2" PVC ITS CONDUIT (D)

(1) (4") BFOC (D) (AT&T)

16.73' 23.26'

E O

P

E

L

.1

E O

P

E

L

.3

E O

P

E

L

.3

14.44'

1:

4 1:4

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

REFER TO TH126

TOP ELEVATION OF GM=9.20

AT STA 542+42.92, 55.55 LT

(REFER TO TH102

6" PE GM (B)

.7

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

548+00.00

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

549+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

53.1

27.7 3.5

133 30

16 16

STA 548+30.00.

TO MAKE MIN. 3' COVER.

BEGIN DEEPENING 6" GM

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

19.72

6' 11' 11' 16.38' 11' 11' 6'

3.23% 3.09% 4.05%

3.08 % 2.17 %

1:3 1:

1:

EL 17.23EL 17.27

10" PVC FM (D)

16" DIP RWM (D)

(2)-2" PVC ITS CONDUIT (D)

16" DIP WM (D)

BE (D) (FPL)

BTV (D) (COMCAST)

(1) (4") BFOC (D) (AT&T)

14.89' 25.05'

E O

P

E

L

.4

E O

P

E

L

.6

E O

P

E

L

.6

13.63'

1:4

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

REFER TO TH126

TOP ELEVATION OF GM=9.20

AT STA 542+42.92, 55.55 LT

(REFER TO TH102

6" PE GM (B)

.8

R

W

L I N

E

R

W

L I N

E

20.02

6' 11' 11' 17.41' 22' 6'

3.74%3.00%

3.27 % 2.83 %

1:3 1:

1:

EL 17.51

EL 17.58

16" DIP RWM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BTV (D) (COMCAST)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

10" PVC FM (D)

13.05' 26.83'

E O

P

E

L

.6

E O

P

E

L

.8

E O

P

E

L

.8

12.82'

1:4

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

REFER TO TH126

TOP ELEVATION OF GM=9.20

AT STA 542+42.92, 55.55 LT

(REFER TO TH102

6" PE GM (B)

.6

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

550+00.00

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

551+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

44.3 12.7

40.4 16.5

154 46

16 16

12 12

STA 550+80.00.

TO MAKE MIN. 3' COVER.

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.29

6' 11' 11' 17.48' 11' 17'

2.91%3.01%

3.15 %

3.46 %

1:3 1:

1:

EL 17.58

EL 18.05

16" DIP RWM (D)

16" DIP WM (D)

BTV (D) (COMCAST)

BE (D) (FPL)

10" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

(1) (4") BFOC (D) (AT&T)

12.13' 28.61' E

O P

E

L

.9

E O

P

E

L

.1

E O

P

E

L

.0

12.04'

4' 4'

1:4

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

REFER TO TH126

TOP ELEVATION OF GM=9.20

AT STA 542+42.92, 55.55 LT

(REFER TO TH102

6" PE GM (B)

.0

R

W

L I N

E

R

W

L I N

E

20.22

6' 11' 11' 16.72' 11' 11' 6'

4.06%4.10%

2.74 %

1:3 1:

1:

EL 17.43

EL 17.95

16" DIP RWM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BTV (D) (COMCAST)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

10" PVC FM (D)

12.03' 30.4'

E O

P

E

L

.7

E O

P

E

L

.0

E O

P

E

L

.0

11.28'

4'

1:4

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

REFER TO TH126

TOP ELEVATION OF GM=9.20

AT STA 542+42.92, 55.55 LT

(REFER TO TH102

6" PE GM (B)

.9

00 2020 4040 6060 8080 100100 120120 140140

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

552+00.00

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

553+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

42.5 8.5

41.4 6.9

154 25

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.01

6' 11' 11' 15.95' 11' 11' 6'

3.98%3.31%

2.72 %

1:3 1:

1:

EL 17.37

EL 17.70

16" DIP RWM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BTV (D) (COMCAST) BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

10" PVC FM (D)

11.94' 32.18'

E O

P

E

L

.8

E O

P

E

L

.5

10.52'

4'

1:4

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

REFER TO TH126

TOP ELEVATION OF GM=9.20

AT STA 542+42.92, 55.55 LT

(REFER TO TH102

6" PE GM (B)

.9

R

W

L I N

E

R

W

L I N

E

20.00

6' 11' 11' 13.78' 9.18' 11' 11' 15.84'

1.07%3.86%

2.26 %

1:3 1:

1:

EL 17.09EL 17.28

16" DIP RWM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BTV (D) (COMCAST)

BE (D) (FPL)

10" PVC FM (D)

(1) (4") BFOC (D) (AT&T)

11.84' 24.12'

4'

E O

P

E

L

.2

E O

P

E

L

.4

1.98'

1:4

.4

TOP ELEVATION OF GM=13.78)

AT STA 556+49.87, 50.25 LT

REFER TO TH106

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

(REFER TO TH126

6" PE GM (B)

00 2020 4040 6060 8080 100100 120120 140140

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

554+00.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

555+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

41.9 6.4

38.7 7.3

144 19

16 16

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

MohammadKhan 9:01:13 AM

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

19.89

6' 11' 11' 14' 9.13' 11' 11' 5' 11'

3.43%

1.92 %

1:3 1:

EL 17.58

16" DIP RWM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

10" PVC FM (D)

BTV (D) (COMCAST)

11.75' 24.16'

4'

1.87'

E O

P

E

L

.4

E O

P

E

L

.3

.8

TOP ELEVATION OF GM=13.78)

AT STA 556+496.87, 50.25 LT

REFER TO TH106

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

(REFER TO TH126

6" PE GM (B)

R

W

L I N

E

R

W

L I N

E

20.17

6' 11' 11' 14.22' 9.24' 11' 11' 5' 11'

3.29%

2.26 %

1:

16" DIP RWM (D)

6" PE GM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

10" PVC FM (D)

BTV (D) (COMCAST)

11.58' 24.2'

4'

1.76'

E O

P

E

L

.9

E O

P

E

L

.7

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

556+00.00

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

557+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

39.1 2.7

35.1 1.3

65 2

16 16

16 16

STA 556+20.00

SEGMENT 02

END SWALE (LT)

STA 555+80.00

SEGMENT 02

END SWALE (RT)

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.00

14.43'11'11'6' 11' 11' 5' 23.41'9.35'

16" DIP RWM (D)

6" PE GM (D)

12" PVC FM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

BTV (D) (COMCAST)

11.32' 11.83'

E O

P

E

L

.0

1.65'

R

W

L I N

E

R

W

L I N

E

20.00

6' 11' 11' 15.86'

2.99%

11' 11' 5' 19.05'

16" DIP RWM (D)

6" PE GM (D)

12" PVC FM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

BTV (D) (COMCAST)

11.73' 14.54'

E O

P

E

L

.8

10.82'

00 2020 4040 6060 8080 100100 120120 140140

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

558+00.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

559+00.00

1" = 10' Vertical

1" = 20' Horizontal

BLUE MOUNTAIN AVE

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

0.1 0.0

15.3

78 9

29 6

16 16

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.06

11' 11' 11' 11' 11'

3.03 %

6' 6' 5.11'

2.28 %

1:3 1:

EL 17.64

16" DIP RWM (D)

12" PVC FM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

BTV (D) (COMCAST)

12.19' 25.82'

4'

E O

P

E

L

.4

11.48'5.40'

.5

TOP ELEVATION OF GM=14.05)

AT STA 561+50.49, 55.88 LT

REFER TO TH127

TOP ELEVATION OF GM=13.78)

AT STA 556+49.87, 50.25 LT

(REFER TO TH106

6" PE GM (B)

R

W

L I N

E

R

W

L I N

E

19.69

6' 11' 11' 11' 11' 11' 6'

3.18% 2.77%

2.78 % 3.96%

1:

4 1:

EL 17.12EL 17.34

16" DIP RWM (D)

12" PVC FM (D) 16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

BTV (D) (COMCAST)

12.65' 29.28'

4'

E O

P

E

L

.1

E O

P

E

L

.3

E O

P

E

L

.5

E O

P

E

L

.3

12.08'6.04'

1:41:3

TOP ELEVATION OF GM=14.05)

AT STA 561+50.49, 55.88 LT

REFER TO TH127

TOP ELEVATION OF GM=13.78)

AT STA 555+50.27, 54.22 LT

(REFER TO TH126

6" PE GM (B)

.3

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

560+00.00

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

561+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

27.0 2.1

41.2 5.6

162 23

STA 560+50.00

SEGMENT 02

BEGIN SWALE (RT)

STA 559+90.00

SEGMENT 02

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

19.74

6' 11' 11' 11' 6.61' 11' 11' 6'

3.00 %

3.86 % 3.33%1:3 1:

4 1:

EL 17.17

EL 16.97

16" DIP RWM (D)

12" PVC FM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

EXIST. 24" RCP

13.1' 27.62'

4'

E O

P

E

L

.3

E O

P

E

L

.1

E O

P

E

L

.1

12.68'

1:4

BTV (D) (COMCAST)

.0

TOP ELEVATION OF GM=14.05)

AT STA 561+50.49, 55.88 LT

(REFER TO TH127

6" PE GM (B)

R

W

L I N

E

R

W

L I N

E

19.76

6' 11' 11' 11' 11' 6'

3.00% 2.93%

4.04 %

3.19%1:3 1:

1:

EL 17.63EL 17.27

16" DIP RWM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

EXIST. 24" RCP

12" PVC FM (D)

1:4

14.14' 25.96'

4'

E O

P

E

L

.4

E O

P

E

L

.6

E O

P

E

L

.6

E O

P

E

L

.4

12.99'17.92'

TOP ELEVATION OF GM=14.05)

AT STA 561+50.49, 55.88 LT

(REFER TO TH127

6" PE GM (B)

.2

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

562+00.00

18 18

20 20

22 22

24 24

26 26

28 28

30 30

563+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

46.3 6.9

46.2 5.3

170 24

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.13

6' 11' 11' 17.94' 11' 11'

3.14% 2.81%

6'

3.85 %

3.48 %1:3 1:

1:

EL 17.70EL 17.57

16" DIP RWM (D)

12" PVC FM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

EXIST. 24" RCP

15.8' 24.3'

4'

E O

P

E

L

.7

E O

P

E

L

.9

E O

P

E

L

.9

E O

P

E

L

.7

12.97'

1:4

TOP ELEVATION OF GM=14.05)

AT STA 561+50.49, 55.88 LT

(REFER TO TH127

6" PE GM (B)

.3

R

W

L I N

E

R

W

L I N

E

20.32

6' 11' 11' 11' 11' 6'

3.02% 3.67%

3.68 %

1:3 1:

1:

EL 18.17EL 18.02

16" DIP RWM (D)

12" PVC FM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

EXIST. 24" RCP

17.46' 22.65'

4'

E O

P

E

L

.0

E O

P

E

L

.1

12.97'17.94'

1:4

TOP ELEVATION OF GM=14.05)

AT STA 561+50.49, 55.88 LT

(REFER TO TH127

6" PE GM (B)

.6

00 2020 4040 6060 8080 100100 120120 140140

18 18

20 20

22 22

24 24

26 26

28 28

30 30

564+00.00

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

565+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

45.7 7.6

34.5 11.6

134 36

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

20.64

6' 11' 11' 11' 11' 6'

3.00 % 3.58%

3.48 %

1:3 1:

1:

EL 18.54EL 18.32

16" DIP RWM (D)

12" PVC FM (D)

16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

EXIST. 24" RCP

19.12' 20.99'

4'

E O

P

E

L

.4

E O

P

E

L

.3

12.96'17.95'

1:4

TOP ELEVATION OF GM=14.05)

AT STA 561+50.49, 55.88 LT

(REFER TO TH127

6" PE GM (B)

.5

R

W

L I N

E

R

W

L I N

E

21.12

6' 11' 11' 17.96' 11' 11' 6'

3.00 % 3.39%

3.39 %

1:3 1:

1:

EL 18.38

EL 18.62

16" DIP RWM (D)

12" PVC FM (D) 16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

20.77' 19.33'

4'

E O

P

E

L

.6

E O

P

E

L

.7

E

O P

E

L

.7

12.95'

1:4

.8

TOP ELEVATION OF GM=18.70)

AT STA 569+68.28, 41.45 LT

REFER TO TH110

TOP ELEVATION OF GM=14.05)

AT STA 561+50.49, 55.88 LT

(REFER TO TH127

6" PE GM (B)

00 2020 4040 6060 8080 100100 120120 140140

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

566+00.00

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

567+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

37.8 7.6

23.5 19.2

106 54

STA 566+50.00.

TO MAKE MIN. 3' COVER.

BEGIN RELOCATING/DEEPENING 6" GM

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

MohammadKhan 9:01:14 AM

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

R

W

L I N

E

R

W

L I N

E

21.30

6' 11' 11' 11' 11' 6'

3.00% 2.97% 3.18%

3.41 %

1:3 1:

1:

EL 19.20

EL 18.84

16" DIP RWM (D)

12" PVC FM (D) 16" DIP WM (D)

(2)-2" PVC ITS CONDUIT (D)

BE (D) (FPL)

(1) (4") BFOC (D) (AT&T)

22.44' 17.67'

4'

E O

P

E

L

.0

E O

P

E

L

.1

E O

P

E

L

.9

12.94'17.97'

1:4

TOP ELEVATION OF GM=18.70)

AT STA 569+68.28, 41.45 LT

REFER TO TH110

TOP ELEVATION OF GM=14.05)

AT STA 561+50.49, 55.88 LT

(REFER TO TH127

6" PE GM (B)

.1

00 2020 4040 6060 8080 100100 120120 140140

16 16

18 18

20 20

22 22

24 24

26 26

28 28

30 30

568+00.00

1" = 10' Vertical

1" = 20' Horizontal

¡ CONST. LYONS ROAD

¡ CONST. LYONS ROAD

33.8 10.2

123 31

STA 568+40.00

SEGMENT 02

END SWALE (RT)

V AA

Q

P r o j e c t s

L y o n s

R d r o a d w a y

R D

X S

R D

.d g

MohammadKhan 9:01:21 AM

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

Seal:

Revisions DateNo. By

OF:

SHEET:

2018503

PROJECT NO.

LYONS ROAD

L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.

CROSS SECTIONS

H. 1''=20'

V. 1''=10'SCALE:

APPROVED:MA

DRAWN: EM

CHECKED: JJV

DATE:P.E# 61600

MAJHARUL ALAM, PE

3/9/2026

3/9/2026

T

F I

C I

C O

E E

T

E C

T R

O N

G I

T A

L

G N

A L

D

L E

G

A

C

PROPEL ENGINEERING, LLC.

WEST PALM BEACH, FLORIDA 33411

2711 N VISTA PARKWAY, SUITE B-7

FLORIDA BUSINESS CERT. NO. 31050

PHONE (561) 866-5730

21.84

R

W

L I N

E

6' 11' 11' 17.99' 11' 11' 6'

3.45% 3.00%

3.50%

2.08 %

R

W

L I N

E

1:

EL 19.11

16" DIP RWM (D)

12" PVC FM (D)

(2)-2" PVC ITS CONDUIT (D)

16" DIP WM (D)

BE (D) (FPL)

(1) 4" CONDUIT BFOC (D) (AT&T)

24.08' 17.3'

E O

P

E

L

.2

E O

P

E

L

.4

E O

P

E

L

.5

11.63'

4'

.4

TOP ELEVATION OF GM=14.75)

AT STA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .