This document is a Lighting Analysis prepared by Propel Engineering, LLC for Palm Beach County Engineering and Public Works Department on Project No. 2018503, covering roadway lighting design for Lyons Road from the L-30 Canal to Boynton Beach Boulevard in Florida. The lighting analysis consists of multiple illumination plan sheets (numbered 1-22) that detail lighting pole locations, light distribution patterns, and luminance measurements across the project corridor. The analysis covers approximately 82 miles of roadway segments, with 55 proposed lighting poles strategically positioned along northbound and southbound approaches. The project is governed by FDOT Roadway & Traffic Design Standards for FY 2025-26, and the analysis was completed and dated October 20, 2025, with professional engineer Majharul Alam, PE #61600, approving the design. The document indicates that certain existing luminaires are designated to remain in place at specific locations throughout the corridor.
The lighting analysis includes detailed photometric data presented in tabular and graphical formats on each sheet, showing illuminance values (measured in foot-candles) at various points along the roadway to ensure compliance with design standards for nighttime visibility and safety. The analysis addresses lighting requirements for both travel lanes and adjacent areas, with particular attention to intersections and transitions between road sections. The document references coordination with multiple utility and infrastructure systems, including water management districts (L-30, L-28, L-27, and L-29 canals), sanitary sewer lines, gas lines, and electrical systems that cross or run parallel to Lyons Road. No specific pricing information, contract terms, bid deadlines, or set-aside requirements are identified within this technical design document.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROADWAY PRODUCTION
T-12
PROPEL ENGINEERING, LLC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g
K E
Y S
L T .d g n
1:40:11 PM
ENGINEERING AND PUBLIC WORKS
PALM BEACH COUNTY
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
HCAEB
M L
A P
FLORID
A
Y T
N U
OC
STATE OF FLORIDA
COUNTY OF PALM BEACH
BOARD OF COUNTY COMMISSIONERS
DISTRICT 1
DISTRICT 2
GREGG K. WEISS
DISTRICT 3
DISTRICT 5
DISTRICT 7
PROJECT NO. 2018503
GOVERNING STANDARDS:
MARIA G. MARINO
MARIA SACHS
100% SUBMITTAL
COVER SHEET
LYONS ROAD
DISTRICT 4
MARCI WOODWARD
SARA BAXTER
N OF L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
FOR THIS PROJECT.
GOVERNING SPECIFICATIONS ARE CONTAINED IN THE CONTRACT DOCUMENTS
FOR THIS PROJECT.
AND SUPPLEMENTS AND ALL PROVISIONS THERETO NOTED IN THE CONTRACT
THE FDOT ROADWAY & TRAFFIC DEISGN STANDARDS FY 2025-26
LIGHTING DESIGN
JOEL G. FLORES
BOBBY POWELL JR.
MAYOR
DISTRICT 6
VICE MAYOR
N
10 40
Feet
ROADWAY PRODUCTION
U
U U
S A
N
U U
U
U
U
W A T E R
N P
W
N P
W
N P
W
N P
W
L-30 TO GOLDEN CRES DR NB
L-30 TO GOLDEN CRES DR SB
STA 120+14.03; 52.60' (LT)
POLE NO. 1
LYONS RD
L .W .D .D
L
C
A N
A L
£ SURVEY AND ¡ CONST LYONS ROAD
117 118 119 120 121 122
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:13 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
Feet
ROADWAY PRODUCTION
W A T E R
W A T E R
W A T E R
W A T E R
U
U
N0°23'30"W
L-30 TO GOLDEN CRES DR NB
L-30 TO GOLDEN CRES DR SB
STA 122+21.38; 46.00' (RT)
POLE NO. 2
STA 124+76.07; 50.00' (LT)
POLE NO. 3
STA 126+61.62; 54.29' (RT)
POLE NO. 4
LYONS RD
£ SURVEY AND ¡ CONST LYONS ROAD
¡ CONST LYONS ROAD
122 123 124 125 126 127 525 526 527
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:14 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
S A
N
W A T E R W
A T E R
G A S
U
U
W A T E R
W A T E R
L-30 TO GOLDEN CRES DR NB
L-30 TO GOLDEN CRES DR SB
GOLDEN CRES DR TO BLUE MOUNTAIN WAY NB
GOLDEN CRES DR TO BLUE MOUNTAIN WAY SB
STA 131+37.97; 56.92' (LT)
POLE NO. 5
STA 132+94.51; 54.37' (RT)
POLE NO. 6
LYONS RD
R I D
G E
R
D
A P
P A
L A
C H I A
C R
E S
R
D
G O
L D
E
£ SURVEY LYONS ROAD
EXISTING LUMINIARE TO REMAIN
EXISTING LUMINAIRE TO REMAIN
EXISTING LUMINAIRE TO REMAIN
EXISTING LUMINAIRE TO REMAIN
128 129 130
132 133
528 529 530
532 533
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:15 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
S A
N
S A
N
W A T E R
W A T E R
GOLDEN CRES DR TO BLUE MOUNTAIN WAY NB
GOLDEN CRES DR TO BLUE MOUNTAIN WAY SB
STA 135+07.00; 49.50' (LT)
POLE NO. 7
STA 136+54.92; 59.25' (RT)
POLE NO. 8
STA 138+70.11; 52.50' (LT)
POLE NO. 9
LYONS RD £ SURVEY LYONS ROAD
134 135 136 137 138 534 535 536 537 538
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:16 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
S D
S D
S D
ROADWAY PRODUCTION
W A T E R W A T E R
U U
W A T E R
S D
S D
S D
W A
T E
R
18.51
GOLDEN CRES DR TO BLUE MOUNTAIN WAY NB
GOLDEN CRES DR TO BLUE MOUNTAIN WAY SB
STA 140+71.32; 54.69' (RT)
POLE NO. 10
STA 144+42.64; 71.79' (LT)
POLE NO. 12
LYONS RD
F L
A V
O R
P I C
T
R
D
L
C
A N
A L
L .W .D .D
£ SURVEY LYONS ROAD
STA 142+41.96; 68.77' (LT)
POLE NO. 11
139 140 141
142 143 144
539 540 541 542 543 544
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:17 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
S D
S D
S D
S D
ROADWAY PRODUCTION
S D
S D S
D
GOLDEN CRES DR TO BLUE MOUNTAIN WAY NB
GOLDEN CRES DR TO BLUE MOUNTAIN WAY SB
STA 147+87.62; 67.00' (LT)
POLE NO. 14
LYONS RD
£ SURVEY LYONS ROAD
145+61.58; 51.54' (RT)
POLE NO. 13
145 146 147 148 149 150
545 546 547 548 549 550
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:19 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
18.3818.40
18.90
18.68
18.45
18.75
ROADWAY PRODUCTION
W A T E R
W A T E R
W A T E R
S A
N
E L
E C
GOLDEN CRES DR TO BLUE MOUNTAIN WAY NB
GOLDEN CRES DR TO BLUE MOUNTAIN WAY SB
STA 150+11.65; 46.40' (RT)
POLE NO. 15
STA 152+12.66; 70.76' (LT)
POLE NO. 16
STA 154+11.62; 53.59' (RT)
POLE NO. 17
LYONS RD
£ SURVEY LYONS ROAD
150 151 152 153 154 155
550 551 552 553 554 555
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:20 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
W A T E
RGOLDEN CRES DR TO BLUE MOUNTAIN WAY NB
GOLDEN CRES DR TO BLUE MOUNTAIN WAY SB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 156+37.67; 70.22' (LT)
POLE NO. 18
LYONS RD
M O
U N
T A I
W
Y
B L
U
EXISTING LUMINAIRE TO REMAIN
EXISTING LUMINAIRE TO REMAIN
EXISTING LUMINAIRE TO REMAIN
156 157 158 159 160 161
556 557 558 559 560 561
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:21 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
E L
E C
S A
N
S A
N
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 163+61.72; 53.74' (RT)
POLE NO. 20
STA 165+75.40; 71.13' (LT)
POLE NO. 21
LYONS RD £ SURVEY LYONS ROAD
STA 161+61.30.00; 67.30' (LT)
POLE NO. 19
162 163 164
165 166
562 563 564 565 566
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:23 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
M H
M H
M H
ROADWAY PRODUCTION
W A T E R
S A
N
W A T E R
W A T E R
10.7766
10.8393
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 167+73.77; 53.04' (RT)
POLE NO. 22
STA 169+59.56; 67.17' (LT)
POLE NO. 23
STA 171+85.75; 53.76' (RT)
POLE NO. 24
LYONS RD
L
C
A N
A L
L .W .D .D
£ SURVEY LYONS ROAD167 168 169 170 171 172
567 568 569 570
GAS
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:24 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 173+82.80; 54.15' (LT)
POLE NO. 25
STA 175+87.30; 54.06' (RT)
POLE NO. 26
STA 177+86.54; 53.85' (LT)
POLE NO. 27
LYONS RD
£ SURVEY LYONS ROAD
173 174 175 176 177 178
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:26 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
S A
N
E L
E C
W A T E R
W A T E R
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 179+61.64; 54.12' (RT)
POLE NO. 28
STA 181+62.55; 54.96' (LT)
POLE NO. 29
LYONS RD £ SURVEY LYONS ROAD
£ SURVEY LYONS ROAD
178 179 180 181 182 183
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:27 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
S A
N
S A
N
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 184+70.82; 54.25' (RT)
POLE NO. 31
STA 187+00.00; 54.00' (LT)
POLE NO. 32
STA 188+61.73; 54.78' (RT)
POLE NO. 33
LYONS RD
P A
L M
D
L E
STA 183+80.00; 54.96' (LT)
POLE NO. 30
184 185 186 187 188 189
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:29 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
S D
ROADWAY PRODUCTION
S D
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 190+76.01; 54.24' (LT)
POLE NO. 34
STA 192+86.77; 51.70' (RT)
POLE NO. 35
LYONS RD £ SURVEY LYONS ROAD
190 191 192 193 194
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:30 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
S A
N
W A T E R
S A
N W A T E R
W A T E R
W A T E R
S A
N
W A
T E
R
W A
T E
R
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 194+87.58; 52.76' (LT)
POLE NO. 36
STA 196+64.76; 54.61' (RT)
POLE NO. 37
POLE NO. 38
STA 198+87.69; 54.21' (LT)
LYONS RD
L
C
A N
A L
L .W .D .D
£ SURVEY LYONS ROAD
195 196 197 198 199 200
WATER
AT L-27 CANAL (150 LF)
RUN UNDER BOX CULVERT
PBC ITS 2-2" CONDUITS
630-2-12
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:32 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
S D
ROADWAY PRODUCTION
S D
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 200+86.80; 50.86' (RT)
POLE NO. 39
POLE NO. 40
STA 202+87.58; 54.07' (LT)
STA. 204+86.79; 52.94' (RT)
POLE NO. 41
LYONS RD
£ SURVEY LYONS ROAD
201 202 203 204 205 206
GAS
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:33 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
S A
N
W A T E R
W A T E R
S A
N
S A
N
S A
N
W A T E R
W A T E R
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 207+12.68; 53.87' (LT)
POLE NO. 42
STA 208+36.80; 54.02' (RT)
POLE NO. 43
STA 209+66.59; 52.84' (LT)
POLE NO. 44
LYONS RD
L A
K
D
A D
O W
206 207 208 209 210 211
WATER GAS
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:34 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
S D
ROADWAY PRODUCTION
S D
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 211+66.70; 65.00' (LT)
POLE NO. 45
STA 213+61.83; 51.68' (RT)
POLE NO. 46
LYONS RD £ SURVEY LYONS ROAD
STA 215+87.64; 52.59' (LT)
POLE NO. 47
212 213 214 215 216 217
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:35 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 217+86.81; 54.10' (RT)
POLE NO. 48
STA 220+12.67; 54.08' (LT)
POLE NO. 49
STA 222+36.83; 54.49' (RT)
POLE NO. 50
LYONS RD
£ SURVEY LYONS ROAD
218 219 220 221 222
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:37 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
ROADWAY PRODUCTION
S A
N
W A T E R
S A
N
W A T E R
W A T E R
W A T E R
S A
N
W A
T E
R
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 226+64.63; 53.78' (RT)
POLE NO. 52
LYONS RD
L
C
A N
.W .D .D
£ SURVEY LYONS ROAD
STA 224+79.80; 53.78' (LT)
POLE NO. 51
223 224 225 226 227 228
GAS
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:38 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
S D
ROADWAY PRODUCTION
S D
BLUE MOUNTAIN WAY TO LAKE ROYAL RD NB
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
STA 228+81.68; 50.75' (LT)
POLE NO. 53
STA 230+84.04; 53.92' (RT)
POLE NO. 54
STA 232+79.69; 54.14' (LT)
POLE NO. 55
LYONS RD
£ SURVEY LYONS ROAD
229 230 231 232 233 234
PROPEL ENGINEERING, INC.
WEST PALM BEACH, FLORIDA 33411
2711 N VISTA PARKWAY, SUITE B-7
FLORIDA BUSINESS CERT. NO. 31050
PHONE (561) 866-5730
10/20/2025Shuvo
F
P r o j e c t s P r o p e l-
E n g
(H
L y o n s
R d li g h t in g P
L A
N L T .d g
1:40:39 PM
P.O. BOX 21229, WEST PALM BEACH, FLORIDA
P A
L M
BE
ACH
Y T
N U
OC
F L
ORID
A
Seal:
Revisions DateNo. By
OF:
SHEET:
P.E# 61600
MAJHARUL ALAM, PE
2018503
PROJECT NO.
LYONS ROAD
L.W.D.D. L-30 CANAL TO BOYNTON BEACH BLVD.
LIGHTING ANALYSIS
N.T.S.SCALE:
APPROVED:MA
DRAWN: DS
CHECKED: IA
DATE:10/20/2025
.0
.0
Feet
S D
ROADWAY PRODUCTION
W A T E R
S D
W A T E R
W A T E R
S A
N
W A T E R
W A T E R
S A
N
S A
N
W A T E R
W A T E R
W A T E R
E L
E C
BLUE MOUNTAIN WAY TO LAKE ROYAL RD SB
File details come from the government source that posted it. Updated .