This interim bridge inspection report documents the findings of an inspection of the West Fork Sulphur Creek bridge. The inspection identified widespread failure of the existing lead-based paint coating on all exposed steel components of the superstructure, including bearings, cross bracing, girders, and other elements. The report recommends full removal of the lead-based paint using shot blasting and negative pressure containment, followed by repainting of all exposed areas.
The related federal contract opportunity is a solicitation from the Department of Transportation Federal Highway Administration seeking preservation work on the West Fork Sulphur Creek bridge to address the paint issues identified in the inspection report. The solicitation number is 69056720B000013 for contract CA NPS BP LAVO 2019(1). The opportunity type is a solicitation and response dates are not provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum West Fork Sulphur Bridge Preservation.pdf | ||
| BridgeAs-BuiltDrawings.pdf | ||
| 2017_RoutineBridgeInspectionReport.pdf | ||
| IFB_West Fork.pdf | ||
| Plans_West Sulphur.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Park/Agency:
Date:
Description of Issue:
Arrival Date:
X No Yes
Date:
Signature
11/28/2018 Printed
FEDERAL LANDS HIGHWAY
INTERIM INSPECTION REPORT
Sheet No: 1 of 8
Team Leader: Benjamin Oltmann, PE
Response Team Information Team Members: B. Oltmann, F. Quinonez, J. Hensley
Paint exhibits many areas of failure, scope of repair exceeds "spot paint".
Recommendations/ Follow-up Procedures Follow up be required?:
Structure Information Structure No.:
Structure Name: WEST FORK SULPHER CREEK
Summary of interim/special access inspection utilizing Under Bridge Inspection Vehicle (Snooper).
B. OLTMANN
8400-001P NPS
7/11/2018
Recommendations:
As-builts note lead based paint. Testing of paint on bridge confirms presence of lead based paint.
7/11/2018
Incident Report Information
Goal of inspection to verify scope of full repainting and presence of lead based paint.
Reported By:
Inspection Findings:
Remove existing lead based paint to bare metal (shot blasting and full negative pressure containment required to contain lead based paint). Repaint all exposed steel on the superstructure including:
Bearings, cross bracing, girders, etc).
BENJAMIN A OLTMANN Digitally signed by BENJAMIN A OLTMANN Date: 2018.11.28 16:19:50 -08'00'
Photo 1: Downstream face of structure
Photo 2: Typical failure of costing on bottom flange main girder
Photo 3: Typical failure of coating on bottom flange, downstream girder
Photo 4: Typical failure of coating on girder web
Photo 5: Typical failure of coating, Girder B
Photo 6: Center pier
Photo 7: Typical bearing at pier, note coating failure
Photo 8: Girder splice plate, note corrosion and coating failure at connection
Photo 9: Typical deck underside view
Photo 10: Typical abutment bearing, note failed coating
Photo 11: View of underside of deck from stream channel
Photo 12: View of Under Bridge Inspection Vehicle during inspection