About this file

This is a Pricing Schedule B-1 document for a 2018 fencing project that outlines labor and material costs for various fencing and site preparation services. The document details pricing structures across four primary service categories: clearing operations, post placement and replacement, new fence fabric replacement and placement, and gate installation. The clearing services are segmented by intensity level (light, medium, and heavy) for both general clearing and vegetation clearing, with pricing specified per square foot. Post placement and replacement services cover three line post sizes measured in inches (2.875", 2.375", and 1.900"), priced per each unit. Fence fabric services include multiple chain link and woven fence options at various heights (4', 6', and 8'), with additional pricing for specifications that include anti-climb features and hardware.

The gates section provides pricing for both rolling and swing gate configurations in multiple dimensions, ranging from 4' x 24' double sliding gates to 8' x 36' double rolling gates, with all units including anti-climb hardware and installation. The pricing schedule presents both labor costs per unit of measure and material costs per unit of measure as separate line items, allowing for transparent cost breakdown. The document spans two pages and provides a comprehensive bidding framework for contractors to submit pricing on clearing, post work, fencing installation, and gate installation services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING SCHEDULE B-1

CLEARING Unit of Measure Labor Cost Per UOM Material Cost

Light Clearing Per Sq. Foot

Medium Clearning Per Sq. Foot

Heavy Clearing Per Sq. Foot

Light Vegitation Clearing Per Sq. Foot

Medium Vegetation Clearing Per Sq. Foot

Heavy Vegetation Clearing Per Sq. Foot

POST PLACEMENT/REPLACMENT Unit of Measure Labor Cost Per UOM Material Cost

2.875" Line Post EA

2.375" Line Post EA

1.900" Line Post EA

NEW FENCE FABRIC REPLACMENT/PLACEMENT Unit of Measure Labor Cost Per UOM Material Cost

8' Chain Link fence EA

6' Chain Link fence EA

4' Woven Fence EA

6' Chain Link fence with anti-climb and hardware EA

8' Chain Link fence with anti-climb and hardware EA

4' Woven Fence with anti-climb hardward EA

(Continued on pae 2 Pricing Schedule B-1)

PRICING SCHEDULE B-1

GATES Unit of Measure Labor Cost Per UOM Material Cost

6'X36' (two 18' GATES) double rolling gate chain link gate with anti-climb and hardware plus installation). Set 6'x24' (two 12' gates) double rolling gate with anti-climb and hardware plus installtion Set 8'x36' (two 18' gates) double rolling gate with anti-climb and hardware plus installation) Set 8'x24' (two 12' gates) double rolling gate with anti-limb and hardware plus installation) Set 6'x5' single swing gate with anti-climb and hardware plus installation EA 8'x5' single swing gate with anti-climb and hardware plus installation EA 4'x24' double sliding gate with anti-climb and hardware plus installation Set

Sheet1