2018-30 Addendum 1.pdf

PDF 197 KB Posted

Attached to
Portage County Resurfacing of Tomorrow River State Trail
Solicitation number
2018-30
Issued by
Pierce County, Wisconsin

About this file

This is Addendum 1 to Request for Bid #2018-30 issued by Portage County, Wisconsin for the resurfacing of the Tomorrow River State Trail located in eastern Portage County between Plover, WI and the Portage County/Waupaca County line. The addendum, dated August 13, 2018, provides material specifications and compaction requirements for the trail resurfacing project. The material is specified as packed, crushed aggregate limestone screenings with a final thickness of 4 inches, with 100 percent of the material passing a 3/8 inch screen and finely graded down to a No. 200 screen.

The addendum establishes compaction standards requiring that the finished trail surface be compacted to a density sufficient to prevent bicyclists from sinking into the surface or leaving ruts during use. These specifications supersede or clarify Section 9.2 and 9.2.1 of the original bid documents for RFB #2018-30. No pricing, set-asides, award dates, contract terms, or other financial terms are addressed in this addendum document.

View the file

Other files

File Type Posted
2018-30 Bid Documents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFB #2018-30 Resurfacing of the Tomorrow River State Trail

ADDENDUM 1

8/13/2018

The following changes are hereby added to and made part of Bid #2018-30 Questions, Answers, Clarifications and Revisions:

Revision and Addition to Section 9 Specifications:

9.2- Material is to be a final thickness of 4”. Material is to be packed, crushed aggregate limestone screenings with 100% passing a 3/8” screen and finely graded down to a No. 200 screen.

9.2.1- Compacting of the finished trail surface shall be so bicyclists can ride on the trail without sinking in and/or leaving a rut.

*******End of Addendum 1********

File details come from the government source that posted it. Updated .