This is a Scope of Work document for the City of Jackson Community Development Department in Michigan related to roofing repairs at 2014 Woodsum Street. The project involves stripping and installing a new roof and gutters for a program-qualified homeowner. The work requires contractors to possess proper licensing, Sam.gov registration completion prior to bid submission, and acquisition of any required permits. The project will be awarded to the qualified lowest bidder through a competitive sealed bid process.
The project specifications detail roofing system removal and replacement along with gutter installation as part of the City of Jackson's home repair program for eligible homeowners. Interested bidders must demonstrate compliance with registration and licensing requirements before submission. Award will be made based on bid competitiveness and contractor qualifications, with the understanding that selected contractors must secure all necessary permits before commencing work on the property.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2014_Woodsum_St_-_New_Roof_and_Gutters.pdf | ||
| Labor_and_Material_Payment_Bond.pdf | ||
| CDBG_Additional_Forms.pdf | ||
| All_Services_Sample_Contract_.docx | DOCX document | |
| Performance_Bond.pdf | ||
| Maintenance_and_Guarantee_Bond.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Write-Up
R05 - ROOF - STRIP AND INSTALL
* EXHIBIT 1 *
Dated: 6/23/2026
CUSTOMER INFORMATION
House Repair 2014 Woodsum St., Jackson, MI 49203
PREPARED BY
sharrison@cityofjackson.org
* NOTE *
THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF
1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT
2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP
Location: Unassigned
| General Requirements |
| Quantity |
| Units |
| Total |
1 - R05 - ROOF - STRIP AND INSTALL
(Specification ID:1.05000 )
Sq
* PERMIT REQUIRED *
Strip existing roof, removing all shingles and felt. Make repairs to the existing roof framing where required to provide adequate strength and a true and level surface. Install 7/16” oriented-strand board sheathing to cover all areas of roof deck. Just before proceeding, sweep roof thoroughly to remove all debris. Install ice shield at all lower roof edges. Ice shield shall extend at least 24" inside the interior surface of the exterior wall line of the building, in accordance with the Michigan Building Code. Install new 15% asphalt saturated felt according to manufacturer's directions. Furnish and install new roofing material of a color as selected by owner, must be architectural style. Installation shall include metal drip and rake edge, two layers of 90# roll valley or metal valley in all valleys. Reflash chimney, plumbing vents, and vertical walls with appropriate neoprene boots and metal step flashing where possible. Install ventilation units sufficient to vent all areas of attic. Ridge venting when used shall cover the full length of the roof ridge. Installation of all materials shall follow manufacturer's printed instructions and G.S. 1.
Contractor is responsible for final measurement.
The rear lower roof is below a 3/12 pitch after striping the current materials and re-sheeting the area a modified roofing material or a rubber roof shall be installed. All work according to manufactures instructions. Install of a new facia board, painted will need to be installed.
Approximately 20 squares on all Elevations New roofing material type shall be architectural shingles Manufacturer: __________ Color Name/Number: __________ Contractor's Initials: ____________________ Owner's Initials: __________ Rehab Initials: ________
2 - G08 - GUTTERWORK
(Specification ID:1.08000 )
LF
Furnish and install gutter and downspout. Replacements shall match existing as to materials, finish, shape and size. Do not mix galvanized with copper or aluminum. Where replacements are of a complete system or side of a system having no cross connections with sections not to be replaced, used baked pre-enameled aluminum, 5-inch K-type in standard colors. Minimum thickness of aluminum shall be .027 inches for troughs and fittings. Use one or a combination of strap hangers, spike and ferrules or fascia hangers. Space hangers and slip joint connectors per manufacturer's instructions. Maximum spacing of hangers shall be 48 inches OC for galvanized and 30 inches for aluminum. Use only recommended gutter seal and rivets or screws at all joints. All work, whether a complete new system or a partial replacement, shall have the system with a pitch of not less than 1 inch in 16 feet. Divert the water away from the foundation using appropriate extensions and/or concrete splash blocks. All work to conform to code and G.S. 4a.
Contractor responsible for final measurements.
Downspouts shall be the commercial size.
Approximately 150 linear feet of gutter on all elevation(s).
Approximately 50 linear feet of downspout on all elevations
Subtotal for General Requirements
Total
Prepared By: sharrison@cityofjackson.org on 6/23/2026
OWNER ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.
| x_________________________ | __________ | |
| Owner: | Date |
CONTRACTOR ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.
| x_________________________ | __________ | |
| Contractor | Date |
| x____________________________ | __________ | |
| Construction Specialist | Date |