2013-Change Order Notice V.25.1 .pdf

PDF 1 MB Posted

Attached to
Change Order Notice I-25-2013 Tri-State Tollway (I-294) Drainage Improvements at 75th St Interchng
Solicitation number
27-557THA-ENGCO-B-54317
Issued by
Illinois

About this file

This is a Change Order Notice for the Illinois Tri-State Tollway (I-294) Drainage Improvements project at 75th Street Interchange. The document pertains to modifications to an existing contract for drainage improvements along the I-294 corridor. The project involves enhancements to the drainage infrastructure at the 75th Street interchange to address drainage-related issues and improve overall system performance. This change order represents the first amendment to the original contract and is not a new solicitation but rather a notice of modifications to terms, scope, or pricing of the existing agreement.

The change order document details contractual modifications necessary to complete the drainage improvement work at the specified interchange location. Key information regarding cost adjustments, schedule modifications, or scope changes would be contained within the change order specifics. As a first amendment, this notice informs the incumbent contractor and relevant parties of the approved changes to the original contract terms, ensuring all parties operate under the modified agreement conditions going forward.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: THA - Toll Highway Authority
ProcurementTitle: 1st Amendment I-25-2013 Tri-State Tollway (I-294) Drainage Improvements at 75th Street Interchange Mile Post 21.7 to Mile Post 21.9
BBREFNO.: 27-557THA-ENGCO-B-54317
thedetails: This construction contract was advertised on 2/27/25, BidBuy #25-557THA-ENGCO-B-46665. Bids were received on 4/10/25. The contract was awarded by the Tollway Board to Martinez Frogs, Inc. on 5/15/25 via board resolution 23011 in the amount of $3,288,237.25. The contract is set to expire on 11/1/26. Due to additional work that was required to correct some unexpected slope bank erosion, a six-month amendment is needed to complete project closeout activities prior to the expiration date. No additional funds are required.
CheckBox1: 1
CheckBox2: 1

File details come from the government source that posted it. Updated .