20-d-5081 KO SIGNED.pdf

PDF 372 KB Posted

Attached to
Job Order Contracts (JOC) Region B Federal contract opportunity
Solicitation number
19R1011
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Job Order Contracts (JOC) Region B, newest first.
File Type Posted
20-D-5079-BKC Signed.pdf PDF
20-D-5080 DRL KO signed.pdf PDF
20-D-5082 JTC SIGNED.docx DOCX document
20-d-5078.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011295482

a. This acquisition is restricted to 8(a) certif ied business concerns. See executive summary for additional infomation.

b. The assigned North American Industry Classification Standards (NAICS) code is 236220, "Commercial and Institutional Building Construction" w ith a Small Business size standard of $36.5 million.

c. This Job Order Contract (JOC) is to be based on a general Specification(s) of Work (SOW) further defined in individual Task Orders.

d. Locations various Region B facilities are in the states of Connecticut, New Jersey, New York (Long Island side), and Pennsylvania.

e. Attachments:

Attachment 1: Region B Pricing Workbook

Attachment 2: Region Map

Attachment 3: Past Performance Questionnaire

Attachment 4: Seed Project Specification of Work

Attachment 5: Seed Project Davis Bacon Wage Determination

Attachment 6: Seed Project Submission Sample Format

Attachment 7: Seed Project Site Map

Exhibit A1 Contract Data Requirements List (CDRL) - Quality Assurance Plan

Exhibit A2 Contract Data Requirements List (CDRL) - Safety Plan

THERESA ECKSTEIN 609-562-2437

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

28-Sep-2020

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________16 May 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

W15QKN20D5081

7. ISSUED BY CODE

US ARMY CONTRACTING COMMAND

5418 S. SCOTT PLAZA

JOINT BASE MDL NJ 08640

W15QKN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W15QKN19R10110005 53

See Item 7

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE

6WWU7

FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

SEE SCHEDULE

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

$22,751,408.00

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR

M.C. DODD CONSTRUCTION, LLC

THOMAS PASCUZZO

1380 FLESHMAN MILL RD

NEW OXFORD PA 17350-9431

15. TELEPHONE NO. (Include area code)

7274844399

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract. REF: W15QKN-19-R-1011

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print) Sharon Wilson-Emmons / Contracting Officer

TEL: 609-562-6405 EMAIL: sharon.wilson-emmons.civ@mail.mil

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY 28-Sep-2020

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENTX

(M ust be fully completed by offeror)OFFER

W15QKN20D5081

Section SF 30 - Block 14 Continuation Page (SF 30)

CONTRACT ADMINISTRATION

This requirement is set aside for 8(a) contractors under SBA Requirement No. 0358/18/804505/01

The Ordering Period will be a period of 12 months.

Ordering Period One: 29 September 2020 through 28 September 2021 Ordering Period Two: 29 September 2021 through 28 September 2022 Ordering Period Three: 29 September 2022 through 28 September 2023 Ordering Period Four: 29 September 2023 through 28 September 2024 Ordering Period Five: 29 September 2024 through 28 September 2025

Inquiries concerning all contractual actions after award shall be directed first to the Contract Administrator on the INDIVIDUAL TASK ORDER. In the absence of the Contract Administrator, please contact the Contracting Officer. CHANGES: The Contract Administrator will incorporate all changes and other administrative actions to the contract as directed and authorized by the Contracting Officer.

Contract Administrator (will be assigned on individual task orders)

Contracting Officer

Name: Sharon Wilson-Emmons Phone: 609-562-6405 Email: Sharon.Wilson-emmons.civ@mail.mil

Government Point of Contact

General Engineer/Regional Facilities Operations Specialist/Contracting Officer’s Representative Will be assigned per task order.

Place of Performance Will be assigned per task order.

Contractor

MC Dodd Construction, LLC.

Attn: Thomas Pascuzzo 1380 Fleshman Mill Road New Oxford, PA 17350-9431 Telephone: 727-484-4399 Email: TD@mcdodd.com

Attachments:

Contract Data Requirement List

A001 Quality System Plan Dtd. Jan. 9, 2019

A002 Contractors Safety Plan Dtd. Jan 9, 2019

Attachment 1 – Pricing Workbook - MCDodd Co-Efficient sheet

Attachment 2 – Contractor cost breakdown worksheet

Section 00 00 00 - Procurement and Contracting Requirements

EXECUTIVE SUMMARY

Executive Summary Narrative

1. Introduction: The U.S. Army Contracting Command - New Jersey, Fort Dix, New Jersey, on behalf of the 99th Readiness Division, Directorate of Public Works has a requirement for a Job Order Contract (JOC) for construction project(s) used to acquire real property repair, maintenance, minor construction, and/or asbestos abatement. Under this contract, task orders will be placed primarily for general building renovation, road and pavement repair, and general environmental work. This work includes, but is not limited to, incidental new minor construction, excavation, plumbing, demolition, electrical, structural, mechanical, concrete work, and environmental remedial work. It has been determined that competition will be limited to 8(a) firms located within the geographical area serviced by the Connecticut, New Jersey, Pennsylvania, and New York Small Business Administration District Offices, and other 8(a) construction firms with a bona fide place of business within the geographical competitive areas and the assigned NAICS code. All other 8(a) Business Development Participants are deemed ineligible to submit offers.

2. Contracting Strategy: The acquisition approach is to award up to five Firm Fixed Price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ) contract(s) to the offeror(s) that are determined to represent Best Value to the Government, utilizing the Lowest Priced Technically Acceptable source selection methodology. For proposal instructions and submittal information, see section entitled Instructions to Offerors and for the basis for award, see section entitled Evaluation Factors for Award.

3. Contract Type: This will be a five (5) year FFP IDIQ type contract. Task Orders will be issued in accordance with FAR 16.505 Ordering. Task Orders will set forth the requirements for Delivery Schedules, Inspection/Acceptance, etc. See clauses entitled, "Ordering" DFARS 252.216-7006 (May 2011), "Order Limitations" FAR 52.216-19 (Oct 1995); and, "Indefinite Quantity" FAR 52.216-22 (Oct 1995). It is the Government’s unilateral right to withdraw a proposed job or order, before or after receipt of contractor’s proposal, but prior to award.

4. Minimum/Maximum Requirement: Pursuant to FAR 16.504(a) (2), the contract(s) will have a guaranteed minimum requirement of $20,000 to be awarded concurrently with the basic contract and will satisfy the Government’s requirement for the 5-year ordering period. The estimated contract ceiling is established at $22,751.408.00. The estimated magnitude in accordance with FAR Subpart 36.204 is more than $10 million. The minimum dollar value of each task order is $2,000.00. The maximum dollar value of each task order project is $2 million.

5. Block 11 is not applicable to the IDIQ contract and therefore not completed. Block 12.a is referring to bonds required at task order level when applicable. An offer guarantee is not required with the IDIQ proposal as shown in block 13.B., however FAR clause 52.228-1 is included but is referring to a guarantee at task order level when applicable.

6. Bonding. Contract line item numbers (CLINs) 1002 and corresponding future ordering period CLINs will not be priced at the IDIQ contract level. Bonding on individual task orders will be limited to actual amount paid after receipt of proof of payment. Offerors shall not propose bonding prices for the total ceiling of the IDIQ contract.

Offerors shall propose bonding costs, if applicable, for the seed project.

7. Wage Determinations: Davis-Bacon Act wage determinations will be incorporated into the Requests for Task Order Proposal at task order level after contract award and resultant task orders. The seed project Davis-Bacon wage determination is included at attachment 5. Wage determinations may be viewed at https://www.wdol.gov/.

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1001 4,413,773.16 Job $1.00 $4,413,773.16 JOC District B - Ordering Period One

FFP

Job Order Contract for Maintenance, Repair and Minor Construction Projects for the 99th Readiness Division (RD) for various facilities in Connecticut, New Jersey, Pennsylvania, and New York in accordance with the incorporated Statement of Work. The co-efficients relative to this instant contract are as stated in **ATTACHMENT 1, Pricing Workbook ** FOB: Destination

PURCHASE REQUEST NUMBER: 0011295482

PSC CD: Z1AA

NET AMT $4,413,773.16

1002 136,508.44 Job $1.00 $136,508.44 Bonding- Ordering Period One

FFP

Bonding Ordering Period One. Bonding will not be priced at the Indefinite Delivery/Indefinite Quantity (IDIQ) contract level. Offerors shall not propose bonding prices for the IDIQ contract. Bonding only applicable to Task Order level.

The contractor will only be paid for the actual cost.

FOB: Destination

NET AMT $136,508.44

1003 1 Each NSP Contract Data Requirements List (CDRL)

FFP

Contract Data Requirements List (CDRL) -Ordering Period 1. Exhibit A1- Contract Data Requirements List-Quality Assurance Plan. Exhibit A2 -Contract Data Requirements List-Safety Plan. Submission of data in accordance with the CDRL is a requirement for the contract, but shall not be separately priced.

NET AMT

2001 4,413,773.16 Job $1.00 $4,413,773.16 JOC District B - Ordering Period Two

FFP

Job Order Contract for Maintenance, Repair and Minor Construction Projects for the 99th Readiness Division (RD) for various facilities in Connecticut, New Jersey, Pennsylvania, and New York in accordance with the incorporated Statement of Work. The co-efficients relative to this instant contract are as stated in **ATTACHMENT 1, Pricing Workbook **

2002 136,508.44 Job $1.00 $136,508.44 Bonding- Ordering Period Two

Bonding Ordering Period Two. Bonding will not be priced at the Indefinite

2003 1 Each NSP Contract Data Requirements List (CDRL)

FFP

Contract Data Requirements List (CDRL) -Ordering Period 1. Exhibit A1- Contract Data Requirements List-Quality Assurance Plan. Exhibit A2 -Contract Data Requirements List-Safety Plan. Submission of data in accordance with the CDRL is a requirement for the contract, but shall not be separately priced.

3001 4,413,773.16 Job $1.00 $4,413,773.16 JOC District B - Ordering Period Three

FFP

Job Order Contract for Maintenance, Repair and Minor Construction Projects for the 99th Readiness Division (RD) for various facilities in Connecticut, New Jersey, Pennsylvania, and New York in accordance with the incorporated Statement of Work. The co-efficients relative to this instant contract are as stated in **ATTACHMENT 1, Pricing Workbook **

3002 136,508.44 Job $1.00 $136,508.44 Bonding- Ordering Period Three

Bonding Ordering Period Three. Bonding will not be priced at the Indefinite

3003 1 Each NSP Contract Data Requirements List (CDRL)

FFP

Contract Data Requirements List (CDRL) -Ordering Period 1. Exhibit A1- Contract Data Requirements List-Quality Assurance Plan. Exhibit A2 -Contract Data Requirements List-Safety Plan. Submission of data in accordance with the CDRL is a requirement for the contract, but shall not be separately priced.

4001 4,413,773.16 Job $1.00 $4,413,773.16 JOC District B - Ordering Period Four

FFP

Job Order Contract for Maintenance, Repair and Minor Construction Projects for the 99th Readiness Division (RD) for various facilities in Connecticut, New Jersey, Pennsylvania, and New York in accordance with the incorporated Statement of Work. The co-efficients relative to this instant contract are as stated in **ATTACHMENT 1, Pricing Workbook **

4002 136,508.44 Job $1.00 $136,508.44 Bonding- Ordering Period Four

Bonding Ordering Period Four. Bonding will not be priced at the Indefinite

4003 1 Each NSP Contract Data Requirements List (CDRL)

FFP

Contract Data Requirements List (CDRL) -Ordering Period 1. Exhibit A1- Contract Data Requirements List-Quality Assurance Plan. Exhibit A2 -Contract Data Requirements List-Safety Plan. Submission of data in accordance with the CDRL is a requirement for the contract, but shall not be separately priced.

5001 4,413,773.16 Job $1.00 $4,413,773.16 JOC District B - Ordering Period Five

FFP

Job Order Contract for Maintenance, Repair and Minor Construction Projects for the 99th Readiness Division (RD) for various facilities in Connecticut, New Jersey, Pennsylvania, and New York in accordance with the incorporated Statement of Work. The co-efficients relative to this instant contract are as stated in **ATTACHMENT 1, Pricing Workbook **

5002 136,508.44 Job $1.00 $136,508.44 Bonding- Ordering Period Five

Bonding Ordering Period Five. Bonding will not be priced at the Indefinite

5003 1 Each NSP Contract Data Requirements List (CDRL)

FFP

Contract Data Requirements List (CDRL) -Ordering Period 1. Exhibit A1- Contract Data Requirements List-Quality Assurance Plan. Exhibit A2 -Contract Data Requirements List-Safety Plan. Submission of data in accordance with the CDRL is a requirement for the contract, but shall not be separately priced.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

1001 POP 29-SEP-2020 TO

28-SEP-2021

N/A N/A

1002 POP 29-SEP-2020 TO

28-SEP-2021

1003 POP 29-SEP-2020 TO

28-SEP-2021

2001 POP 29-SEP-2021 TO

28-SEP-2022

2002 POP 29-SEP-2021 TO

2003 POP 29-SEP-2021 TO

3001 POP 29-SEP-2022 TO

28-SEP-2023

3002 POP 29-SEP-2022 TO

3003 POP 29-SEP-2022 TO

4001 POP 29-SEP-2023 TO

28-SEP-2024

4002 POP 29-SEP-2023 TO

4003 POP 29-SEP-2023 TO

5001 POP 29-SEP-2024 TO

28-SEP-2025

5002 POP 29-SEP-2024 TO

5003 POP 29-SEP-2024 TO

Section 00 22 16 - Supplementary Instructions to Proposers

TASK/DELIVERY ORDER OMBUDSMAN

TASK AND DELIVERY ORDER OMBUDSMAN

The ACC-New Jersey Task and Delivery Order Ombudsman shall review contractor complaints under either a multiple award task order or multiple award delivery order contract to ensure that all contractors awarded such contracts are provided a fair opportunity to be considered for each order, consistent with the procedures in the contract. Complaints to the ACC-New Jersey Task and Delivery Order Ombudsman must be forwarded to:

ACC-New Jersey Task and Delivery Order Ombudsman Phipps Road, Bldg. 1610 Picatinny Arsenal, NJ 07806-5000 Phone Number: 973-724-9028/609-562-4869 Facsimile: 973-724-2914 Email: usarmy.picatinny.acc.mbx.accnjombudsman@mail.mil

Submissions to the ACC-New Jersey Task and Delivery Order Ombudsman must be in writing and should include the relevant solicitation, contract, task order, or delivery order number(s), relevant information supporting the complaint and the name of the cognizant Contracting Officer, if known.

All information submitted to the Government under this text must identify any restrictions on use, release, or disclosure. Only unclassified information should be submitted in accordance with the above procedures.

Submittals under this text do not constitute submittals under the requirements of FAR 52.233-1, “Disputes and Alternates”, 52.233-2, “Service of Protest and Alternates”, and 52.233-4000, “ HQ AMC-Level Protest Program”.

UNIT PRICE DISCLOSURE

DISCLOSURE OF UNIT PRICE INFORMATION OCT/2010

This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.

Section 00 45 00 - Representations and Certifications

CLAUSES INCORPORATED BY REFERENCE

52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013

Section 00 70 00 - Conditions of the Contract

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$20,000.00 $22,751,408.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

1001 Destination Government Destination Government 1002 N/A N/A N/A Government 1003 N/A N/A N/A Government 2001 Destination Government Destination Government 2002 N/A N/A N/A Government 2003 N/A N/A N/A Government 3001 Destination Government Destination Government 3002 N/A N/A N/A Government 3003 N/A N/A N/A Government 4001 Destination Government Destination Government 4002 N/A N/A N/A Government 4003 N/A N/A N/A Government 5001 Destination Government Destination Government 5002 N/A N/A N/A Government 5003 N/A N/A N/A Government

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

OCT 2018

52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016

52.204-19 Incorporation by Reference of Representations and Certifications.

DEC 2014

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

JUL 2018

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2020

52.208-9 Contractor Use of Mandatory Sources of Supply or Services MAY 2014 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-18 Variation in Estimated Quantity APR 1984 52.215-2 Audit and Records--Negotiation OCT 2010 52.219-14 (Dev) Limitations on Subcontracting (DEVIATION 2019-O0003). DEC 2018 52.219-18 Notification Of Competition Limited To Eligible 8(a)

Participants

JAN 2017

52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation

MAY 2018

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-50 Combating Trafficking in Persons JAN 2019 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-9 Estimate of Percentage of Recovered Material Content for

EPA-Designated Items

MAY 2008

52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets AUG 2018 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Items JAN 2019 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015 52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.219-7011 Notification to Delay Performance JUN 1998 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within as identified in the individual task orders when issued calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than . * The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of Will be addressed at task order level if applicable for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.216-18 ORDERING. (AUG 2020)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 29 September 2020 through 28 September 2025.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) A delivery order or task order is considered "issued" when--

(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;

(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or

(3) If sent electronically, the Government either--

(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or

(ii) Distributes the delivery order or task order via email to the Contractor's email address.

(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.

52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor -

(1) Any order for a single item in excess of $2,000,000.00;

(2) Any order for a combination of items in excess of $4,000,000.00; or

(3) A series of orders from the same ordering office within 7 days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

52.216-22 INDEFINITE QUANTITY. (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 1 year after end of contract performance period.

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)

(a) Definitions. As used in this contract--

HUBZone small business concern means a small business concern, certified by the Small Business Administration, that appears on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration.

Service-disabled veteran-owned small business concern--

(1) Means a small business concern--

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and

(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.

(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

Small business concern means a small business as defined pursuant to Section 3 of the Small Business Act and relevant regulations promulgated pursuant thereto.

Small disadvantaged business concern, consistent with 13 CFR 124.1002, means a small business concern under the size standard applicable to the acquisition, that--

(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by--

(i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States; and

(ii) Each individual claiming economic disadvantage has a net worth not exceeding $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and

(2) The management and daily business operations of which are controlled (as defined at 13.CFR 124.106) by individuals, who meet the criteria in paragraphs (1)(i) and (ii) of this definition.

Veteran-owned small business concern means a small business concern--

(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and

(2) The management and daily business operations of which are controlled by one or more veterans.

Women-owned small business concern means a small business concern--

(1) That is at least 51 percent owned by one or more women, or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and

(2) Whose management and daily business operations are controlled by one or more women.

(b) It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is further the policy of the United States that its prime contractors establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts with small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns.

(c) The Contractor hereby agrees to carry out this policy in the awarding of subcontracts to the fullest extent consistent with efficient contract performance. The Contractor further agrees to cooperate in any studies or surveys as may be conducted by the United States Small Business Administration or the awarding agency of the United States as may be necessary to determine the extent of the Contractor's compliance with this clause.

(d)(1) The Contractor may accept a subcontractor's written representations of its size and socioeconomic status as a small business, small disadvantaged business, veteran-owned small business, service-disabled veteran-owned small business, or a women-owned small business if the subcontractor represents that the size and socioeconomic status representations with its offer are current, accurate, and complete as of the date of the offer for the subcontract.

(2) The Contractor may accept a subcontractor's representations of its size and socioeconomic status as a small business, small disadvantaged business, veteran-owned small business, service-disabled veteran-owned small business, or a women-owned small business in the System for Award Management (SAM) if--

(i) The subcontractor is registered in SAM; and

(ii) The subcontractor represents that the size and socioeconomic status representations made in SAM are current, accurate and complete as of the date of the offer for the subcontract.

(3) The Contractor may not require the use of SAM for the purposes of representing size or socioeconomic status in connection with a subcontract.

(4) In accordance with 13 CFR 121.411, 124.1015, 125.29, 126.900, and 127.700, a contractor acting in good faith is not liable for misrepresentations made by its subcontractors regarding the subcontractor's size or socioeconomic status.

(5) The Contractor shall confirm that a subcontractor representing itself as a HUBZone small business concern is certified by SBA as a HUBZone small business concern by accessing the System for Award Management or by contacting the SBA. Options for contacting the SBA include--

(i) HUBZone small business database search application Web page at http://dsbs.sba.gov/dsbs/search/dsp_searchhubzone.cfm; or http://www.sba.gov/hubzone;

(ii) In writing to the Director/HUB, U.S. Small Business Administration, 409 3rd Street, SW., Washington DC 20416; or

(iii) The SBA HUBZone Help Desk at hubzone@sba.gov.

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause--

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) \1\ Item 1 Foreign construction material.... ........... ___ ........ ....... ………. ___ ................ ........ ___ Domestic construction material... ........ ___ ............... .............. ___ .................. ...... ___ Item 2 Foreign construction material.... ......... ___ ............. ........ ……. ___ ............... ......... ___ Domestic construction material... ....... ___ .................. ............. ___ ................. ....... ___ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000)

(a) The Contractor shall submit one of the following payment protections:

At Task Order level.

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by…

This is the start of the file's text. The full file is on GovTribe.