This is a Scope of Work attachment for contract opportunity 20-0147, detailing renovation requirements for what appears to be an educational facility managed by DPSCD (Denver Public Schools or similar school district). The project encompasses comprehensive interior and exterior upgrades including replacement of all exterior doors, VCT and wood flooring restoration, interior painting throughout the facility, LED lighting upgrades, acoustical ceiling tile and grid installation in corridors, installation of whiteboards in classrooms, bathroom renovations with new toilet partitions and metering faucets, and repairs to broken cabinetry, molding, and display cabinets. Specific areas require targeted work, including a kitchen renovation with ceramic tile flooring installation, an auditorium restoration featuring a new stage floor, new stage lighting, approximately 300 new seats (with existing seating to be salvaged and returned to DPSCD), and new window shades measuring approximately 8 feet wide by 15 feet high. Additionally, a computer room requires conversion back to a gymnasium with approximately 30 floor repair locations and refinishing of the existing gym floor. The scope includes final cleaning upon project completion.

The file provides specific area measurements in square feet for various spaces (ranging from 4 sf to 24 sf) but does not include pricing information, budget amounts, contract term details, payment schedules, bonding requirements, or submission deadlines. No information regarding set-asides, incumbent contractors, funding sources, or other financial terms is included in this attachment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nicole.Blocker Callout *Replace existing flooring w/ VCT *Replace Exterior Door

Nicole.Blocker Text Box Overall Notes:

*Upgrade all lighting to LED lighting *Interior paint at all locations except for Boiler Rooms and Fan Rooms *Replace Broken Glass in existing interior doors

Nicole.Blocker Text Box Repair Flooring

Nicole.Blocker Callout Renovate existing bathrooms for early childhood

Nicole.Blocker Arrow

Nicole.Blocker Callout Replace broken window

Nicole.Blocker

Restore flooring, replace sink

Text Box General Notes *Replace all exterior doors *Replace broken glass in existing interior wood doors *Install 2'x4' acoustical ceiling tile and grid at corridors that are not *Interior paint at all rooms, including classrooms, lunch room, music room, auditorium, science rooms, bathrooms, etc.

*Furnish and install white boards at all classrooms *Repair broken display cabinets in corridor *Repair broken cabinetry in classrooms *Repair existing broken molding *Include final cleaning *Upgrade existing lighting to LED throughout building *Sand and refinish existing wood floors

Replace existing millwork in main office

Nicole.Blocker Callout Replace flooring, ceiling tile, broken sinks

Nicole.Blocker Callout All Toilet Rooms: Replace Toilet partitions and existing faucets with metering faucets

Nicole.Blocker Callout Auditorium:

*Restore existing stage floor *New Stage Lighting *Furnish and install approximately 300 new seats *Remove and salvage the existing auditorium seating and hand over to DPSCD *Furnish and install new window shades - 6 ea approximately 8' wide x 15' high

Nicole.Blocker Text Box

Nicole.Blocker

Replace VCT in this area only.

Text Box General Notes *Replace all exterior doors *Replace broken glass in existing interior wood doors *Install 2'x4' acoustical ceiling tile and grid at corridors that and work around existing lighting *Interior paint at all rooms, including classrooms, lunch room, music room, auditorium, science rooms, bathrooms, etc.

*Furnish and install white boards at all classrooms *Repair broken display cabinets in corridor *Repair broken cabinetry in classrooms *Repair existing broken molding *Include final cleaning *Upgrade existing lighting to LED throughout building *Sand and refinish existing wood floors

Area Measurement 24 sf

Nicole.Blocker Area Measurement 16 sf

Nicole.Blocker Area Measurement 10 sf

Nicole.Blocker Area Measurement 12 sf

Nicole.Blocker Area Measurement 4 sf

Nicole.Blocker Callout Replace all corridor flooring and install new acoustical ceiling tile and grid in these locations

Nicole.Blocker Callout Kitchen:

Replace existing floor tile w/ ceramic tile similar to 1st floor kitchen

Nicole.Blocker

This room is currently a computer room but needs to be restored back to a gym. Repair approximately 30 locations in floor where computer tables were bolted to floor and refinish existing gym floor